DATE 2015/07/27
ACTIVITY: CLEAR AND GRUB
FIG 01 BUSH CLEARING
FIG 02 TREE FELLING
ACTIVITY: TOPSOIL STRIPPING
PROGRESS PHO...
FIG 03 TOP SOIL STRIPPING USING A DOZER
FIG 04 TOP SOIL STRIPPED
PREPARATION OF FOUNDATION BASE
FIG 05 EMBANKMENT FOUNDATI...
SOIL EXCAVATION IN RESERVOIR AREA
FIG 06 EXCAVATION OF SOIL FROM THE RESERVOIR AREA TO FILL EMBANKMENT
ACTIVITY : EMBANKME...
ACTIVITY : WATERING AND COMPACTION OF FILL TO THE EMBANKMENT
FIG 08 : COMPATING OF FILLING TO EMBANKMENT WITH A ROLLER
ACT...
LAYING OF 630MM DIAMETER PIPES ON IN TRENCH
FIG 12 REINFORCEMENT FOR CONCRETE FOR WRAPPING PIPES
FIG 13 SHUTTERING FOR CON...
FIG 13 CONCRETE FOR WRAPPING PIPES
Nächste SlideShare
Wird geladen in …5
×

PROGRESS PHOTOGRAPHS

80 Aufrufe

Veröffentlicht am

0 Kommentare
0 Gefällt mir
Statistik
Notizen
  • Als Erste(r) kommentieren

  • Gehören Sie zu den Ersten, denen das gefällt!

Keine Downloads
Aufrufe
Aufrufe insgesamt
80
Auf SlideShare
0
Aus Einbettungen
0
Anzahl an Einbettungen
0
Aktionen
Geteilt
0
Downloads
0
Kommentare
0
Gefällt mir
0
Einbettungen 0
Keine Einbettungen

Keine Notizen für die Folie

PROGRESS PHOTOGRAPHS

  1. 1. DATE 2015/07/27 ACTIVITY: CLEAR AND GRUB FIG 01 BUSH CLEARING FIG 02 TREE FELLING ACTIVITY: TOPSOIL STRIPPING PROGRESS PHOTO GRAPHS
  2. 2. FIG 03 TOP SOIL STRIPPING USING A DOZER FIG 04 TOP SOIL STRIPPED PREPARATION OF FOUNDATION BASE FIG 05 EMBANKMENT FOUNDATION BASE PREPARED AND READY FOR FILLING
  3. 3. SOIL EXCAVATION IN RESERVOIR AREA FIG 06 EXCAVATION OF SOIL FROM THE RESERVOIR AREA TO FILL EMBANKMENT ACTIVITY : EMBANKMENT FILL FIG 07 SPREADING OF FILL TO EMBANKMENT
  4. 4. ACTIVITY : WATERING AND COMPACTION OF FILL TO THE EMBANKMENT FIG 08 : COMPATING OF FILLING TO EMBANKMENT WITH A ROLLER ACTIVITY : EXCAVATION FOR INLET /OUTLET PIPE TRENCH FIG 10 : TRENCH EXCAVATION
  5. 5. LAYING OF 630MM DIAMETER PIPES ON IN TRENCH FIG 12 REINFORCEMENT FOR CONCRETE FOR WRAPPING PIPES FIG 13 SHUTTERING FOR CONCRETE FOR WRAPPING PIPES
  6. 6. FIG 13 CONCRETE FOR WRAPPING PIPES

×