What Is It?
 A “Strategy”?
 A “Super Summary” of the Expenditure
Forecast?
 An “Asset Strategy” as per ISO5500?
 OR a combination of all three?
What Is It?
 The missing building block in section 101A
s101A (2)(a)
the local authority’s proposals for funding and
expenditure
s101A (3)(a)
the expected changes in population and the
use of land in the district or region, and the
capital and operating costs of providing for
those changes....
What Is It?
A synthesis of the issues, response and spend
ahead
DEMAND ACTIONSRESPONSE
What Is Required?
 At least 30 year horizon
 Significant infrastructure issues
 Principal option and implications of those
options
 Infrastructural Asset* Management
* 3 Waters
* Roads and Footpaths
* Flood Protection
What Is Required?
 Renewals
 Response to growth/decline
 Level of Service Change (Identify which
driver)
 Public Health and Environmental outcomes
 Resilience to natural hazards
 Most likely management scenario
 Capital and operating expenditure for
Infrastructural Assets
 10 years + 5 + 5 + 5 + 5 Forecasts
What Is Required?
 Significant decisions required
 What, When, Options
 Scale and cost
 Assumptions
 Lifecycle of Infrastructural Assets*
 Demand
 Levels of Service
 Levels of uncertainty and their effects
What Might It Look Like?
Who is the Audience?
How is it Populated?
 From existing strategic documents, studies
and reports (direction)
 LTP assumptions
 From AMPs ( issues, proposed responses,
actions and estimated expenditure)
 The Infrastructure Strategy is also seen as an
asset strategy considering component
condition, network performance and the
maintenance and renewal approach
employed. This links with the funding
strategy.
Is that Information Reliable Enough?
 How long have we been
doing this for?
(Remember New
Zealanders are good
at AM!)
 Uncertainty =>
assumptions
 Do we state as fact or
‘couched’?
Source: Jigsaw IV
What Should I Do Now?
 Make some decisions and set
process in place
 Identify the strategic inputs
 ‘Lock down’ assumptions
 Keep AMPs on target
 Consider Cost Effectiveness
(s10 and s17)
 Challenge linear thinking
- various scenarios
Contacts
Grant Holland
Waugh Infrastructure
Management Ltd
0800 4 WAUGH
www.waughinfrastructure.com

More Related Content

Similar to Infrastructure Strategies by Grant Holland - Waugh Infrastructure Management

Long Range Planning Methodology
Long Range Planning MethodologyLong Range Planning Methodology
Long Range Planning Methodologyhilltopalive
 
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...Dr Wei Liu
 
IT4IT: Realize a Digital Strategy with ServiceNow
IT4IT: Realize a Digital Strategy with ServiceNowIT4IT: Realize a Digital Strategy with ServiceNow
IT4IT: Realize a Digital Strategy with ServiceNowZenoss
 
Agile Presentation Standing Committee on Gov't Operations Oct 17
Agile Presentation Standing Committee on Gov't Operations Oct 17Agile Presentation Standing Committee on Gov't Operations Oct 17
Agile Presentation Standing Committee on Gov't Operations Oct 17Dan Murphy, PMP, CSPO, CSM
 
APBI Briefing Slides 9 May 2022
APBI Briefing Slides 9 May 2022APBI Briefing Slides 9 May 2022
APBI Briefing Slides 9 May 2022PEODigital
 
CIL vs S106 vs S108
CIL vs S106 vs S108CIL vs S106 vs S108
CIL vs S106 vs S108PAS_Team
 
Atlas Presentation: Birmingham
Atlas Presentation: BirminghamAtlas Presentation: Birmingham
Atlas Presentation: BirminghamPAS_Team
 
Australian IT Industry Snapshot 2014
Australian IT Industry Snapshot  2014Australian IT Industry Snapshot  2014
Australian IT Industry Snapshot 2014Vishal Sharma
 
Case study in Company Project Controls Transformation By Rod Whiting - Region...
Case study in Company Project Controls Transformation By Rod Whiting - Region...Case study in Company Project Controls Transformation By Rod Whiting - Region...
Case study in Company Project Controls Transformation By Rod Whiting - Region...Project Controls Expo
 
The Challenges Facing Local CIOs | Geoff Connell | March 2016
The Challenges Facing Local CIOs | Geoff Connell | March 2016The Challenges Facing Local CIOs | Geoff Connell | March 2016
The Challenges Facing Local CIOs | Geoff Connell | March 2016Anna Fenston
 
Pas hdt support april 19 as delivered
Pas hdt support april 19 as deliveredPas hdt support april 19 as delivered
Pas hdt support april 19 as deliveredPAS_Team
 
Alistair K Smith CV
Alistair K Smith CVAlistair K Smith CV
Alistair K Smith CVAl Smith
 
How to implement ITSM as a program in the real world
How to implement ITSM as a program in the real worldHow to implement ITSM as a program in the real world
How to implement ITSM as a program in the real worldPink Elephant EMEA
 
What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...
What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...
What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...IPPAI
 
SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...
SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...
SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...SMART Infrastructure Facility
 

Similar to Infrastructure Strategies by Grant Holland - Waugh Infrastructure Management (20)

Long Range Planning Methodology
Long Range Planning MethodologyLong Range Planning Methodology
Long Range Planning Methodology
 
RBoursiquot Resume 4-24-2016
RBoursiquot Resume 4-24-2016RBoursiquot Resume 4-24-2016
RBoursiquot Resume 4-24-2016
 
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
 
IT4IT: Realize a Digital Strategy with ServiceNow
IT4IT: Realize a Digital Strategy with ServiceNowIT4IT: Realize a Digital Strategy with ServiceNow
IT4IT: Realize a Digital Strategy with ServiceNow
 
Agile Presentation Standing Committee on Gov't Operations Oct 17
Agile Presentation Standing Committee on Gov't Operations Oct 17Agile Presentation Standing Committee on Gov't Operations Oct 17
Agile Presentation Standing Committee on Gov't Operations Oct 17
 
APBI Briefing Slides 9 May 2022
APBI Briefing Slides 9 May 2022APBI Briefing Slides 9 May 2022
APBI Briefing Slides 9 May 2022
 
CIL vs S106 vs S108
CIL vs S106 vs S108CIL vs S106 vs S108
CIL vs S106 vs S108
 
Atlas Presentation: Birmingham
Atlas Presentation: BirminghamAtlas Presentation: Birmingham
Atlas Presentation: Birmingham
 
OBASHI
OBASHIOBASHI
OBASHI
 
Australian IT Industry Snapshot 2014
Australian IT Industry Snapshot  2014Australian IT Industry Snapshot  2014
Australian IT Industry Snapshot 2014
 
Case study in Company Project Controls Transformation By Rod Whiting - Region...
Case study in Company Project Controls Transformation By Rod Whiting - Region...Case study in Company Project Controls Transformation By Rod Whiting - Region...
Case study in Company Project Controls Transformation By Rod Whiting - Region...
 
The Challenges Facing Local CIOs | Geoff Connell | March 2016
The Challenges Facing Local CIOs | Geoff Connell | March 2016The Challenges Facing Local CIOs | Geoff Connell | March 2016
The Challenges Facing Local CIOs | Geoff Connell | March 2016
 
Pas hdt support april 19 as delivered
Pas hdt support april 19 as deliveredPas hdt support april 19 as delivered
Pas hdt support april 19 as delivered
 
Alistair K Smith CV
Alistair K Smith CVAlistair K Smith CV
Alistair K Smith CV
 
CV_184636_Srilakshmi_Bhagavathula
CV_184636_Srilakshmi_BhagavathulaCV_184636_Srilakshmi_Bhagavathula
CV_184636_Srilakshmi_Bhagavathula
 
How to implement ITSM as a program in the real world
How to implement ITSM as a program in the real worldHow to implement ITSM as a program in the real world
How to implement ITSM as a program in the real world
 
Helass project overview and lessons v1.0
Helass project overview and lessons v1.0Helass project overview and lessons v1.0
Helass project overview and lessons v1.0
 
Jason Hones
Jason HonesJason Hones
Jason Hones
 
What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...
What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...
What Constitutes a ’Sucessful’ Mega Transport Project? - Prof. Harry T. Dimit...
 
SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...
SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...
SMART Infrastructure Business and Policy Dialogue Event: Smart planning for s...
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Recently uploaded (20)

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Infrastructure Strategies by Grant Holland - Waugh Infrastructure Management

  • 1. Infrastructure Strategies Canterbury Strategy & Policy Forum 18 August 2014 Presenter: Grant Holland, Waugh Infrastructure Management Ltd
  • 2. Preface  Views Presented at IPWEA NZ Infrastructure Strategy Workshop (1 August 2014)  SOLGM’s Jigsaw IV  Discussions with Office of the Auditor- General  Waugh Infrastructure Management Ltd’s opinions
  • 3. What Is It?  A “Strategy”?  A “Super Summary” of the Expenditure Forecast?  An “Asset Strategy” as per ISO5500?  OR a combination of all three?
  • 4. What Is It?  The missing building block in section 101A s101A (2)(a) the local authority’s proposals for funding and expenditure s101A (3)(a) the expected changes in population and the use of land in the district or region, and the capital and operating costs of providing for those changes....
  • 5. What Is It? A synthesis of the issues, response and spend ahead DEMAND ACTIONSRESPONSE
  • 6. What Is Required?  At least 30 year horizon  Significant infrastructure issues  Principal option and implications of those options  Infrastructural Asset* Management * 3 Waters * Roads and Footpaths * Flood Protection
  • 7. What Is Required?  Renewals  Response to growth/decline  Level of Service Change (Identify which driver)  Public Health and Environmental outcomes  Resilience to natural hazards  Most likely management scenario  Capital and operating expenditure for Infrastructural Assets  10 years + 5 + 5 + 5 + 5 Forecasts
  • 8. What Is Required?  Significant decisions required  What, When, Options  Scale and cost  Assumptions  Lifecycle of Infrastructural Assets*  Demand  Levels of Service  Levels of uncertainty and their effects
  • 9. What Might It Look Like? Who is the Audience?
  • 10. How is it Populated?  From existing strategic documents, studies and reports (direction)  LTP assumptions  From AMPs ( issues, proposed responses, actions and estimated expenditure)  The Infrastructure Strategy is also seen as an asset strategy considering component condition, network performance and the maintenance and renewal approach employed. This links with the funding strategy.
  • 11. Is that Information Reliable Enough?  How long have we been doing this for? (Remember New Zealanders are good at AM!)  Uncertainty => assumptions  Do we state as fact or ‘couched’? Source: Jigsaw IV
  • 12. What Should I Do Now?  Make some decisions and set process in place  Identify the strategic inputs  ‘Lock down’ assumptions  Keep AMPs on target  Consider Cost Effectiveness (s10 and s17)  Challenge linear thinking - various scenarios
  • 13. Contacts Grant Holland Waugh Infrastructure Management Ltd 0800 4 WAUGH www.waughinfrastructure.com