DREDGING PROCESS AND ITS EFFECT
PRESENTED BY INDRANIL BANERJEE
ROLL NUMBER- 001930301008
DEPARTMENT OF WATER RESOURCES ENGINEERING
JADAVPUR UNIVERSITY
2ND SEMESTER, SPRING 2020
CONTENTS
• INTRODUCTION
• NECESSITY
• TYPE OF DREDGER
• MECHANICAL DREDGERS
• BUCKET LADDER DREDGER
• GRAB DREDGER
• BACKHOE DREDGER
• HYDRALIC DREDGERS
• SUCTION HOPER DREDGER
• CUTTER SUCTION DREDGER
• TRAILING SUCTION HOPPER DREDGER
• SITE INVESTIGATION
• VERIOUS SURVEYING
• CASSIFICATION OF SOILS
• DREDGER SELECTION
• DUMPING GROUNDS
• FIELD SURVEY
• EFFECTIVENESS
• IMPACT
• OPERATION AND MAINTENANCE STATUS
• ENVIRONMENTAL EFFECT OF DREDGING
• CONCLUSION
• REFERENCES
INTRODUCTION
• it is the subaqueous or
underwater excavation of soils
and rock. The process consists of
four phases:
 Excavation
 Vertical transport
 Horizontal transport
 Placement or use of the material
dredged.
 A dredgers is a piece of
equipment which can dig,
transport and dump a certain
amount of under water laying soil
in a certain time. The quantity of
soil moved per unit of time is
called Production.
NECESSITY
• to create a new harbor, berth or
waterway, dredging is to be done
mandatory
• Sea bed mining is also an
important part where dredging is
being done
• affected by chemical spills
• underwater foundation works for
bridge piers requires dredging to
be carried out.
• To maintain navigable waterways,
• Construction and Reclamation
• Beach nourishment
• Environmental remediation
• Flood control
• Mining
TYPES OF DREDGER
• Depending upon the
method used to
transport loosened
material from the sea-
bed to the surface
they may be classified
as:
a) Mechanical dredgers
b) Hydraulic dredgers
c) Other types
Mechanical dredgers
Hydraulic dredgers
MECHANICAL DREDGERS.
• a) Bucket ladder dredger
• b) Grab dredger
• c) Backhoe/dipper dredger
BUCKET LADDER DREDGER
WORKING METHOD
BUCKET LADDER DREDGER
PARAMETER
GRAB DREDGER
VARIOUS TYPE OF GRAB
BACKHOE DREDGER
HYDRAULIC DREDGERS
•a) Profile or plain suction dredger
1.Barge Loading suction dredger
2.Standard plain suction dredger
3.Deep suction dredger
•b) Cutter suction dredger
•c) Trailing suction hopper dredger
SUCTION HOPER DREDGER
CUTTER SUCTION DREDGER
TRAILING SUCTION HOPPER DREDGER
SITE INVESTIGATION
1. Characterization of the material to be dredged
2. Determination of the total volume to be dredged
3. Topographic Survey for shore controls land areas
reclamation
4. The hydrographic of the dredging and disposal
locations
5. Bathymetric surveys to determine bed levels
6. Geotechnical investigations to assess the nature of the
material
7. Geo-physical investigations
8. Environmental surveys_Geo-physical investigations
Meteorological Oceanographic
• Topographic Survey
Bathymetric surveysTopographic Survey
Multi Beam Echo Sounder survey
single Beam Echo Sounder survey
Magnetometer Surveys
VERIOUS SURVEY IMAGE
CASSIFICATION OF SOILS
• In order to form an opinion as to the most suitable equipment
for dredging under water, and to estimate performance of
dredging equipment, it is vital to know the nature, location,
transportation and disposal quantities of materials to be
dredged. The soil classifications as per Indian Standards .
DREDGER SELECTION
ideal dredge varies between dredging projects.
Dredge selection depends on availability and cost,
and various physical characteristics
DUMPING GROUNDS
• The effects of the disposal of such wastes include the
physical blanketing of the bottom. In addition, these
spoils may be contaminated with heavy metals, oil,
or oreganos chlorine compounds, causing adverse
effects on fish populations and marine biology.
TUTICORIN PORT DREDGING PROJECT
Field Survey: August 2003
Objectives
The project’s objectives were to alleviate draught*3 restrictions by dredging port water and approach channels at Tuticorin
Port in southern Tamil Nadu, and to improve the efficiency of port operations by increasing per vessel payload, and thereby
contribute to economic growth in the state.
Outputs
The outputs of this project were as follows:
1) Dredging of approach channel
· Dredged sand volume: 580K m3
· Channel length: 2.7km (currently 1.4km)
· Channel width: 183m (virtually identical to current width)
· Design water depth: 12.5m (currently 10.2-11.4m)
2) Dredging of harbor basin
· Dredged sand volume: 1.22m m3
· Diameter of basin: 688m
Dredging to increase water depth of zones fronting individual berths (Berth VII, etc.)
· Design water depth: 11.9m (current depth of basin: 10.6m; current depth of other frontal water zones: 9.5m-11.3m)
3) Vessel types targeted
· Bulk (dry) cargo vessels: length 230m × width 32.5m × draught 10.7m
· Bulk (liquid) cargo vessels: length 235m × width 32.5m × draught 10.7m
· Container vessels: length 220m × width 30.0m × draught 10.7m
4) Civil engineering works
· Dredger model: Cutter suction dredger
· Dredge sand disposal: to be dumped in two dumping grounds within port precincts
Shore protection of areas peripheral to the dumping grounds
· Other works: greening/planting port areas
EFFECTIVENESS
• Changes in Cargo Handling Volumes, etc.
• Indices relating to the operational efficiency of the port prior to
and after the implementation of the project (shaded sections
represent the actual implementation period) are as shown
below
Impact
• Initially Projected Impacts- port carriers have
become more active.
• Environmental Impacts - A report was obtained
via the fishery company also contains no adverse
impacts on the fishery industry.
• Other Socioeconomic Impacts (effects on local
residents) Other Impacts
• the volume of trade – increased rapidly from 59
thousand tons in fiscal 1999 to 326 thousand tons
in fiscal 2001 (i.e. an increase of approximately
5.5 times), since larger vessels can be used now
because of the dredging work.
Operation and Maintenance Status
• 1.Tuticorin Port receives physiographic protection from Sri
Lanka, and because of its structure, accumulation of sand
due to tides and winds is difficult, and (2) the bedrock on
the ocean floor is very hard and this is not a river port.
Therefore dredging is not generating any maintenance
costs.
• To summarize the above, the project succeeded in securing
the planned water depths in the approach channel and
harbor basin, and the port is functioning as expected.
• Moreover, no maintenance costs are being generated since
no special work is necessary to maintain the water depth
thanks to the port’s geographical advantages. The
executing agency is not facing any particular problems
either organizationally or financially, and the overall
sustainability of the project is deemed to be high.
ENVIRONMENTAL EFFECT OF DREDGING
 Development projects have some common problems
related to the environment. The primary categories
can be summarized as being__
Water-Related Effects(sattlement,blasting ,altered
bathymetry, changing shoreline
Land-Related Effects(dust and other airborne
emissions)
Air-Related Effects(especially hydrogen sulphides)
Placement of Dredged Material(Material
contamination)
Socio-cultural Effects(work practices, site selection)
CONCLUSION
• it can be stated that every type of dredger has its own
applied working area in which its production is
optimal in a technical way as well as in an
economical way. It will be clear that the boundaries
of these applied working areas are not strictly
determined, but are also determined by other working
conditions, which can differ from lob to job. In order
to accomplish dredging process ,different survey,
dredger selection, and environmental impact need to
be calculated, through the proper dredger selection.
REFERENCES
• 1.>http://sagarmala.gov.in/sites/default/files/dredgeguidelinesAugust2016-30146365.pdf
•
• 2.>https://www.jandenul.com/sites/default/files/activity-category/brochures/Dredging_and_Marine_Works.pdf
•
• 3.>https://www.damen.com/-/media/Products/Images/Clusters-
groups/Dredging/Documents/Brochure_Damen_Dredging.pdf
•
• 4.>https://www.researchgate.net/publication/271443986_Dredging_Processes_The_Loading_Process_of_a_Traili
ng_Suction_Hopper_Dredge_Lecture_Notes
•
• 5.>https://www.engr.colostate.edu/~pierre/ce_old/classes/ce717/2_OverviewofDredgingandDMD_Welp.pdf
•
• 6.>https://www.epa.vic.gov.au/~/media/Publications/691.pdf
•
• 7.> http://bit.ly/2XTuGoq
•
• 8.> http://www.fao.org/docrep/013/i1883e/i1883e06.pdf
•
• 9.> https://nptel.ac.in/courses/114106035/
•
• 10.> http://www.imcbrokers.com/blog/overview/detail/types-of-dredgers
•
• 11.> https://dredging.org/documents/ceda/downloads/vlasblom1-introduction-to-dredging-equipment.pdf
THANK YOU

More Related Content

What's hot

Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
Latif Hyder Wadho
 
Dredging equipment
Dredging equipmentDredging equipment
Dredging equipment
Swarna Rajan
 
Control Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTSControl Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTS
comsats
 

What's hot (20)

4. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
4. HARBOUR INFRASTRUCTURES (PHE) GTU 31706234. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
4. HARBOUR INFRASTRUCTURES (PHE) GTU 3170623
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
 
Jack hammer drill
Jack hammer drillJack hammer drill
Jack hammer drill
 
Harbour
HarbourHarbour
Harbour
 
NAVIGATIONAL AIDS.pptx
NAVIGATIONAL AIDS.pptxNAVIGATIONAL AIDS.pptx
NAVIGATIONAL AIDS.pptx
 
Dredging
DredgingDredging
Dredging
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENT
 
Working of dragline
Working of draglineWorking of dragline
Working of dragline
 
Navigational aids
Navigational aidsNavigational aids
Navigational aids
 
Dredging equipment
Dredging equipmentDredging equipment
Dredging equipment
 
Docks and Harbors.pptx
Docks and Harbors.pptxDocks and Harbors.pptx
Docks and Harbors.pptx
 
Drilling methods
Drilling methodsDrilling methods
Drilling methods
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
 
H & d ppt 05 wet docks
H & d ppt 05 wet docksH & d ppt 05 wet docks
H & d ppt 05 wet docks
 
Harbours Engineering
 Harbours Engineering  Harbours Engineering
Harbours Engineering
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
 
Control Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTSControl Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTS
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
 
Cutter Suction Dredger
Cutter Suction DredgerCutter Suction Dredger
Cutter Suction Dredger
 

Similar to DREDGING PROCESS AND ITS EFFECT

OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTION
Nardipta Pratama
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
Demzy George
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
olaboughannam1
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
olaboughannam1
 
13surface mining
13surface mining13surface mining
13surface mining
Arun Kumar
 

Similar to DREDGING PROCESS AND ITS EFFECT (20)

OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTION
 
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptx
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptxDesign-of-diversion-dam-in-tarbela-dam-pakistan.pptx
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptx
 
Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistan
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptx
 
Ground water resource evaluation
Ground water resource evaluationGround water resource evaluation
Ground water resource evaluation
 
Construction considerations of Earthen Dams
Construction considerations of Earthen DamsConstruction considerations of Earthen Dams
Construction considerations of Earthen Dams
 
Breakwater construction
Breakwater constructionBreakwater construction
Breakwater construction
 
LECT 2 - EARTHWORK.pdf
LECT 2 - EARTHWORK.pdfLECT 2 - EARTHWORK.pdf
LECT 2 - EARTHWORK.pdf
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore Renewables
 
Basics of peroleum engineering
Basics of peroleum engineeringBasics of peroleum engineering
Basics of peroleum engineering
 
OK
OKOK
OK
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundation
 
Break waters
Break watersBreak waters
Break waters
 
13surface mining
13surface mining13surface mining
13surface mining
 
Construction and survey accuracies for the execution of rockworks
Construction and survey accuracies for the execution of rockworksConstruction and survey accuracies for the execution of rockworks
Construction and survey accuracies for the execution of rockworks
 
4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptx4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptx
 
Gw quality management
Gw quality managementGw quality management
Gw quality management
 

More from INDRANIL BANERJEE

More from INDRANIL BANERJEE (20)

INDOOR AIR POLUTION.pdf
INDOOR AIR POLUTION.pdfINDOOR AIR POLUTION.pdf
INDOOR AIR POLUTION.pdf
 
waterinfluencesdifferentbehavioursofsoil.pptx
waterinfluencesdifferentbehavioursofsoil.pptxwaterinfluencesdifferentbehavioursofsoil.pptx
waterinfluencesdifferentbehavioursofsoil.pptx
 
Human changes soil structure.pptx
Human changes soil structure.pptxHuman changes soil structure.pptx
Human changes soil structure.pptx
 
HELTH DEVELPOMENT AND NATION BUILDING THROUGH YOGA
HELTH DEVELPOMENT AND NATION BUILDING THROUGH YOGAHELTH DEVELPOMENT AND NATION BUILDING THROUGH YOGA
HELTH DEVELPOMENT AND NATION BUILDING THROUGH YOGA
 
HOW TO MAKE PPT?
HOW TO MAKE PPT?HOW TO MAKE PPT?
HOW TO MAKE PPT?
 
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxHYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
 
A PPT SAMPLE FOR STUDENTS
A PPT SAMPLE FOR STUDENTSA PPT SAMPLE FOR STUDENTS
A PPT SAMPLE FOR STUDENTS
 
water distribution system
water distribution systemwater distribution system
water distribution system
 
healthcare associated infections in developing countries
healthcare associated infections in developing countrieshealthcare associated infections in developing countries
healthcare associated infections in developing countries
 
ground improvement
ground improvementground improvement
ground improvement
 
ground improvement with admixtures
ground improvement with admixturesground improvement with admixtures
ground improvement with admixtures
 
ground freezing
ground freezingground freezing
ground freezing
 
Standard penetration test
Standard penetration testStandard penetration test
Standard penetration test
 
Engineering geology
Engineering geologyEngineering geology
Engineering geology
 
Summer training report
Summer training reportSummer training report
Summer training report
 
quality engineering(ME522) part 1
quality engineering(ME522) part 1quality engineering(ME522) part 1
quality engineering(ME522) part 1
 
quality engineering(ME522) part 2
quality engineering(ME522) part 2quality engineering(ME522) part 2
quality engineering(ME522) part 2
 
Water influences different behaviours of soil
Water influences different behaviours of soilWater influences different behaviours of soil
Water influences different behaviours of soil
 
env 2
env 2env 2
env 2
 
air pollution
air pollutionair pollution
air pollution
 

Recently uploaded

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 

DREDGING PROCESS AND ITS EFFECT

  • 1. DREDGING PROCESS AND ITS EFFECT PRESENTED BY INDRANIL BANERJEE ROLL NUMBER- 001930301008 DEPARTMENT OF WATER RESOURCES ENGINEERING JADAVPUR UNIVERSITY 2ND SEMESTER, SPRING 2020
  • 2. CONTENTS • INTRODUCTION • NECESSITY • TYPE OF DREDGER • MECHANICAL DREDGERS • BUCKET LADDER DREDGER • GRAB DREDGER • BACKHOE DREDGER • HYDRALIC DREDGERS • SUCTION HOPER DREDGER • CUTTER SUCTION DREDGER • TRAILING SUCTION HOPPER DREDGER • SITE INVESTIGATION • VERIOUS SURVEYING • CASSIFICATION OF SOILS • DREDGER SELECTION • DUMPING GROUNDS • FIELD SURVEY • EFFECTIVENESS • IMPACT • OPERATION AND MAINTENANCE STATUS • ENVIRONMENTAL EFFECT OF DREDGING • CONCLUSION • REFERENCES
  • 3. INTRODUCTION • it is the subaqueous or underwater excavation of soils and rock. The process consists of four phases:  Excavation  Vertical transport  Horizontal transport  Placement or use of the material dredged.  A dredgers is a piece of equipment which can dig, transport and dump a certain amount of under water laying soil in a certain time. The quantity of soil moved per unit of time is called Production.
  • 4. NECESSITY • to create a new harbor, berth or waterway, dredging is to be done mandatory • Sea bed mining is also an important part where dredging is being done • affected by chemical spills • underwater foundation works for bridge piers requires dredging to be carried out. • To maintain navigable waterways, • Construction and Reclamation • Beach nourishment • Environmental remediation • Flood control • Mining
  • 5. TYPES OF DREDGER • Depending upon the method used to transport loosened material from the sea- bed to the surface they may be classified as: a) Mechanical dredgers b) Hydraulic dredgers c) Other types Mechanical dredgers Hydraulic dredgers
  • 6. MECHANICAL DREDGERS. • a) Bucket ladder dredger • b) Grab dredger • c) Backhoe/dipper dredger
  • 13. HYDRAULIC DREDGERS •a) Profile or plain suction dredger 1.Barge Loading suction dredger 2.Standard plain suction dredger 3.Deep suction dredger •b) Cutter suction dredger •c) Trailing suction hopper dredger
  • 16.
  • 18. SITE INVESTIGATION 1. Characterization of the material to be dredged 2. Determination of the total volume to be dredged 3. Topographic Survey for shore controls land areas reclamation 4. The hydrographic of the dredging and disposal locations 5. Bathymetric surveys to determine bed levels 6. Geotechnical investigations to assess the nature of the material 7. Geo-physical investigations 8. Environmental surveys_Geo-physical investigations Meteorological Oceanographic
  • 19. • Topographic Survey Bathymetric surveysTopographic Survey Multi Beam Echo Sounder survey single Beam Echo Sounder survey Magnetometer Surveys VERIOUS SURVEY IMAGE
  • 20. CASSIFICATION OF SOILS • In order to form an opinion as to the most suitable equipment for dredging under water, and to estimate performance of dredging equipment, it is vital to know the nature, location, transportation and disposal quantities of materials to be dredged. The soil classifications as per Indian Standards .
  • 21. DREDGER SELECTION ideal dredge varies between dredging projects. Dredge selection depends on availability and cost, and various physical characteristics
  • 22. DUMPING GROUNDS • The effects of the disposal of such wastes include the physical blanketing of the bottom. In addition, these spoils may be contaminated with heavy metals, oil, or oreganos chlorine compounds, causing adverse effects on fish populations and marine biology.
  • 23. TUTICORIN PORT DREDGING PROJECT Field Survey: August 2003 Objectives The project’s objectives were to alleviate draught*3 restrictions by dredging port water and approach channels at Tuticorin Port in southern Tamil Nadu, and to improve the efficiency of port operations by increasing per vessel payload, and thereby contribute to economic growth in the state. Outputs The outputs of this project were as follows: 1) Dredging of approach channel · Dredged sand volume: 580K m3 · Channel length: 2.7km (currently 1.4km) · Channel width: 183m (virtually identical to current width) · Design water depth: 12.5m (currently 10.2-11.4m) 2) Dredging of harbor basin · Dredged sand volume: 1.22m m3 · Diameter of basin: 688m Dredging to increase water depth of zones fronting individual berths (Berth VII, etc.) · Design water depth: 11.9m (current depth of basin: 10.6m; current depth of other frontal water zones: 9.5m-11.3m) 3) Vessel types targeted · Bulk (dry) cargo vessels: length 230m × width 32.5m × draught 10.7m · Bulk (liquid) cargo vessels: length 235m × width 32.5m × draught 10.7m · Container vessels: length 220m × width 30.0m × draught 10.7m 4) Civil engineering works · Dredger model: Cutter suction dredger · Dredge sand disposal: to be dumped in two dumping grounds within port precincts Shore protection of areas peripheral to the dumping grounds · Other works: greening/planting port areas
  • 24.
  • 25. EFFECTIVENESS • Changes in Cargo Handling Volumes, etc. • Indices relating to the operational efficiency of the port prior to and after the implementation of the project (shaded sections represent the actual implementation period) are as shown below
  • 26.
  • 27. Impact • Initially Projected Impacts- port carriers have become more active. • Environmental Impacts - A report was obtained via the fishery company also contains no adverse impacts on the fishery industry. • Other Socioeconomic Impacts (effects on local residents) Other Impacts • the volume of trade – increased rapidly from 59 thousand tons in fiscal 1999 to 326 thousand tons in fiscal 2001 (i.e. an increase of approximately 5.5 times), since larger vessels can be used now because of the dredging work.
  • 28. Operation and Maintenance Status • 1.Tuticorin Port receives physiographic protection from Sri Lanka, and because of its structure, accumulation of sand due to tides and winds is difficult, and (2) the bedrock on the ocean floor is very hard and this is not a river port. Therefore dredging is not generating any maintenance costs. • To summarize the above, the project succeeded in securing the planned water depths in the approach channel and harbor basin, and the port is functioning as expected. • Moreover, no maintenance costs are being generated since no special work is necessary to maintain the water depth thanks to the port’s geographical advantages. The executing agency is not facing any particular problems either organizationally or financially, and the overall sustainability of the project is deemed to be high.
  • 29. ENVIRONMENTAL EFFECT OF DREDGING  Development projects have some common problems related to the environment. The primary categories can be summarized as being__ Water-Related Effects(sattlement,blasting ,altered bathymetry, changing shoreline Land-Related Effects(dust and other airborne emissions) Air-Related Effects(especially hydrogen sulphides) Placement of Dredged Material(Material contamination) Socio-cultural Effects(work practices, site selection)
  • 30. CONCLUSION • it can be stated that every type of dredger has its own applied working area in which its production is optimal in a technical way as well as in an economical way. It will be clear that the boundaries of these applied working areas are not strictly determined, but are also determined by other working conditions, which can differ from lob to job. In order to accomplish dredging process ,different survey, dredger selection, and environmental impact need to be calculated, through the proper dredger selection.
  • 31. REFERENCES • 1.>http://sagarmala.gov.in/sites/default/files/dredgeguidelinesAugust2016-30146365.pdf • • 2.>https://www.jandenul.com/sites/default/files/activity-category/brochures/Dredging_and_Marine_Works.pdf • • 3.>https://www.damen.com/-/media/Products/Images/Clusters- groups/Dredging/Documents/Brochure_Damen_Dredging.pdf • • 4.>https://www.researchgate.net/publication/271443986_Dredging_Processes_The_Loading_Process_of_a_Traili ng_Suction_Hopper_Dredge_Lecture_Notes • • 5.>https://www.engr.colostate.edu/~pierre/ce_old/classes/ce717/2_OverviewofDredgingandDMD_Welp.pdf • • 6.>https://www.epa.vic.gov.au/~/media/Publications/691.pdf • • 7.> http://bit.ly/2XTuGoq • • 8.> http://www.fao.org/docrep/013/i1883e/i1883e06.pdf • • 9.> https://nptel.ac.in/courses/114106035/ • • 10.> http://www.imcbrokers.com/blog/overview/detail/types-of-dredgers • • 11.> https://dredging.org/documents/ceda/downloads/vlasblom1-introduction-to-dredging-equipment.pdf