SBIA Stage 2: ‘Without Project’ analysis & Projection Step 1: Building the Problem Flow Diagram Tuyeni H Mwampamba
Recap on where we are: SBIA Stage 1: Step 1: Discussed and defined the Project Scope (the area of influence of the Project) Step 2: Discussed the importance of developing a Project Vision:  Relatively broad (captures a wide range of potential project activities) Inspirational (outlines desired changes in the current state of project objective) Short (<30 words) & easy to remember Obj: Setting up the framework for stakeholder involvement, project ownership, and an unified agreement of what the project is about
Recap: continued Step 3: Identification and Prioritisation of social Focal Issues Created a “shopping list” of social issues that are of concern for project success Fused & merged those that are similar Arranged them in order of priority Selected the Priority Focal Issues that the Project must address Process should be transparent, participatory and easily understood Obj: To ensure that the project is first addressing those issues that pose the largest threat to project success, or which would have extensive repercussion if they were NOT addressed
Next Step: Problem Flow Diagram Step 4: Problem flow diagram for each priority focal issue Obj 1: To develop a thorough and unified understanding of the focal issues Identify direct and indirect factors contributing to existence of the focal issue (as a problem) Obj 2: To identify strategic points of entry for the project to have the most impact on changing the focal issue to desired status
Criteria for a good PFD: Visually illustrates a workable understanding of the focal issue in the project area Shows assumed relationships between factors Shows major direct threats and indirect threats (and opportunities) Presents only relevant factors Based on sound data or good understanding of the project area Results from a team effort
It’s a Diagram: Direct causal Factors Indirect causal Factors Priority focal issue 1 Priority focal issue 2
Criteria 2 & 3:  2. Shows assumed relationships and linkages between factors 3. Shows major direct and indirect threats (problems) and underlying factors
4. Presents only relevant factors
5. Is based on sound data & info Experts should be included Includes traditional ecological knowledge Includes the community experience of a focal issue (cultural understanding)
6. Results from Team effort Conducted in a stakeholder workshop setting Ensures that each SH understands the process and contributes
CCB Standards addressed: An accurate description of the condition at the start of the project; Set you up for identifying stakeholder groups (Criterion G1.5); Sets you up for documenting a “defensible and well-documented” ‘without project’ reference scenario (Criterion G2.)

More Related Content

What's hot

unit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepalunit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepal
Roshan Pant
 
Goal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinayGoal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinay
Vinay Kumar
 
Social and Biodiversity Impact Assessment - the 7 stages
Social and Biodiversity Impact Assessment  - the 7 stagesSocial and Biodiversity Impact Assessment  - the 7 stages
Social and Biodiversity Impact Assessment - the 7 stages
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE SHOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
Abraham Ncunge
 
Objective Oriented Project Planning
Objective Oriented Project PlanningObjective Oriented Project Planning
Objective Oriented Project Planning
SEED-Anantapur
 
SDF04_ ToR for District Officer MEL & GA
SDF04_ ToR for District Officer MEL & GASDF04_ ToR for District Officer MEL & GA
SDF04_ ToR for District Officer MEL & GAMahinA Arefin
 
Theory of change vs. logic model
Theory of change vs. logic modelTheory of change vs. logic model
Theory of change vs. logic model
Fadhel Alsheikh
 
Project management
Project managementProject management
Project management
Manish Runthala
 
Monitoring and Evaluation.ppt
Monitoring and Evaluation.pptMonitoring and Evaluation.ppt
Monitoring and Evaluation.ppt
AFEWORK ALARO
 
Project Monitoring and Evaluation
Project Monitoring and Evaluation Project Monitoring and Evaluation
Project Monitoring and Evaluation
Central University of Karnataka Kalaburagi
 
How to-develop-a-monitoring-and-evaluation-plan
How to-develop-a-monitoring-and-evaluation-planHow to-develop-a-monitoring-and-evaluation-plan
How to-develop-a-monitoring-and-evaluation-plan
Hussain Bux Korejo
 
Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015
Martin Comeau
 
Post Project Evaluation
Post Project EvaluationPost Project Evaluation
Post Project Evaluation
Demand Metric
 
Historical Method of Research
Historical Method of Research Historical Method of Research
Historical Method of Research
Jo Balucanag - Bitonio
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluationrajkpandey2000
 
Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notes
Tony
 

What's hot (20)

unit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepalunit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepal
 
Goal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinayGoal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinay
 
Day 1
Day 1Day 1
Day 1
 
Organizing and Managing Program Evaluation
Organizing and Managing Program EvaluationOrganizing and Managing Program Evaluation
Organizing and Managing Program Evaluation
 
Social and Biodiversity Impact Assessment - the 7 stages
Social and Biodiversity Impact Assessment  - the 7 stagesSocial and Biodiversity Impact Assessment  - the 7 stages
Social and Biodiversity Impact Assessment - the 7 stages
 
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE SHOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
 
Objective Oriented Project Planning
Objective Oriented Project PlanningObjective Oriented Project Planning
Objective Oriented Project Planning
 
SDF04_ ToR for District Officer MEL & GA
SDF04_ ToR for District Officer MEL & GASDF04_ ToR for District Officer MEL & GA
SDF04_ ToR for District Officer MEL & GA
 
Theory of change vs. logic model
Theory of change vs. logic modelTheory of change vs. logic model
Theory of change vs. logic model
 
Project management
Project managementProject management
Project management
 
Creating Wbs
Creating WbsCreating Wbs
Creating Wbs
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Monitoring and Evaluation.ppt
Monitoring and Evaluation.pptMonitoring and Evaluation.ppt
Monitoring and Evaluation.ppt
 
Project Monitoring and Evaluation
Project Monitoring and Evaluation Project Monitoring and Evaluation
Project Monitoring and Evaluation
 
How to-develop-a-monitoring-and-evaluation-plan
How to-develop-a-monitoring-and-evaluation-planHow to-develop-a-monitoring-and-evaluation-plan
How to-develop-a-monitoring-and-evaluation-plan
 
Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015
 
Post Project Evaluation
Post Project EvaluationPost Project Evaluation
Post Project Evaluation
 
Historical Method of Research
Historical Method of Research Historical Method of Research
Historical Method of Research
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluation
 
Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notes
 

Viewers also liked

206410 sales forecasting at arrow electronics
206410 sales forecasting at arrow electronics206410 sales forecasting at arrow electronics
206410 sales forecasting at arrow electronics
p6academy
 
ForecastIT 2. Linear Regression & Model Statistics
ForecastIT 2. Linear Regression & Model StatisticsForecastIT 2. Linear Regression & Model Statistics
ForecastIT 2. Linear Regression & Model Statistics
DeepThought, Inc.
 
Brad Simon - Finance Lecture - Project Valuation
Brad Simon - Finance Lecture - Project ValuationBrad Simon - Finance Lecture - Project Valuation
Brad Simon - Finance Lecture - Project Valuation
bradhapa
 
Regression analysis in hr forcasting
Regression analysis in hr forcastingRegression analysis in hr forcasting
Regression analysis in hr forcasting
Sohel Rana
 
PM Unit III - Project Cash Flows
PM   Unit III - Project Cash FlowsPM   Unit III - Project Cash Flows
PM Unit III - Project Cash Flows
Ghaith Al Darmaki
 
Simple (and Simplistic) Introduction to Econometrics and Linear Regression
Simple (and Simplistic) Introduction to Econometrics and Linear RegressionSimple (and Simplistic) Introduction to Econometrics and Linear Regression
Simple (and Simplistic) Introduction to Econometrics and Linear Regression
Philip Tiongson
 
Bba 3274 qm week 6 part 1 regression models
Bba 3274 qm week 6 part 1 regression modelsBba 3274 qm week 6 part 1 regression models
Bba 3274 qm week 6 part 1 regression models
Stephen Ong
 
ppt on data collection , processing , analysis of data & report writing
ppt on data collection , processing , analysis of data & report writingppt on data collection , processing , analysis of data & report writing
ppt on data collection , processing , analysis of data & report writing
IVRI
 
Demand Forecasting
Demand ForecastingDemand Forecasting
Demand Forecastingyashpal01
 
Planning, Sales Forecasting, and Budgeting
Planning, Sales Forecasting, and BudgetingPlanning, Sales Forecasting, and Budgeting
Planning, Sales Forecasting, and Budgeting
Sameer Chandrakar
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniques
guest865c0e0c
 

Viewers also liked (13)

206410 sales forecasting at arrow electronics
206410 sales forecasting at arrow electronics206410 sales forecasting at arrow electronics
206410 sales forecasting at arrow electronics
 
05.2comp ror
05.2comp ror05.2comp ror
05.2comp ror
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
ForecastIT 2. Linear Regression & Model Statistics
ForecastIT 2. Linear Regression & Model StatisticsForecastIT 2. Linear Regression & Model Statistics
ForecastIT 2. Linear Regression & Model Statistics
 
Brad Simon - Finance Lecture - Project Valuation
Brad Simon - Finance Lecture - Project ValuationBrad Simon - Finance Lecture - Project Valuation
Brad Simon - Finance Lecture - Project Valuation
 
Regression analysis in hr forcasting
Regression analysis in hr forcastingRegression analysis in hr forcasting
Regression analysis in hr forcasting
 
PM Unit III - Project Cash Flows
PM   Unit III - Project Cash FlowsPM   Unit III - Project Cash Flows
PM Unit III - Project Cash Flows
 
Simple (and Simplistic) Introduction to Econometrics and Linear Regression
Simple (and Simplistic) Introduction to Econometrics and Linear RegressionSimple (and Simplistic) Introduction to Econometrics and Linear Regression
Simple (and Simplistic) Introduction to Econometrics and Linear Regression
 
Bba 3274 qm week 6 part 1 regression models
Bba 3274 qm week 6 part 1 regression modelsBba 3274 qm week 6 part 1 regression models
Bba 3274 qm week 6 part 1 regression models
 
ppt on data collection , processing , analysis of data & report writing
ppt on data collection , processing , analysis of data & report writingppt on data collection , processing , analysis of data & report writing
ppt on data collection , processing , analysis of data & report writing
 
Demand Forecasting
Demand ForecastingDemand Forecasting
Demand Forecasting
 
Planning, Sales Forecasting, and Budgeting
Planning, Sales Forecasting, and BudgetingPlanning, Sales Forecasting, and Budgeting
Planning, Sales Forecasting, and Budgeting
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniques
 

Similar to Social and Biodiversity Impact Assessment (SBIA) Stage 2: ‘Without Project’ analysis & Projection

Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management
mohamed osama hussein
 
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
Tony
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notesTony
 
University of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textUniversity of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample text
Triantafyllos Katsarelis
 
Logical framework
Logical frameworkLogical framework
Logical framework
Md. Ayatullah Khan
 
Problem and situation analysis
Problem and situation analysisProblem and situation analysis
Problem and situation analysisMoamen Abu Nada
 
Objective Oriented Project Planning
Objective Oriented Project PlanningObjective Oriented Project Planning
Objective Oriented Project Planning
Shriyananda Rathnayake Jayasinghe, PMP
 
lecture about project management: Logical Framework.ppt
lecture about project management: Logical Framework.pptlecture about project management: Logical Framework.ppt
lecture about project management: Logical Framework.ppt
NguyenDanhTai
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
Tony
 
Logical framework
Logical frameworkLogical framework
Logical framework
Md. Ayatullah Khan
 
Rptr4202 ppm unit 1 org pdf
Rptr4202 ppm unit 1 org pdfRptr4202 ppm unit 1 org pdf
Rptr4202 ppm unit 1 org pdf
geraldmnyone
 
Participatory project planning
Participatory project planning Participatory project planning
Participatory project planning
foreman
 
Assignment 2 LASA 1Prepare a full Communications Plan with an a.docx
Assignment 2 LASA 1Prepare a full Communications Plan with an a.docxAssignment 2 LASA 1Prepare a full Communications Plan with an a.docx
Assignment 2 LASA 1Prepare a full Communications Plan with an a.docx
josephinepaterson7611
 
chapter_2_First thing first and anithyng about.pptx
chapter_2_First thing first and anithyng about.pptxchapter_2_First thing first and anithyng about.pptx
chapter_2_First thing first and anithyng about.pptx
FillahStories
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)
PhDSofiaUniversity
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
Shafiyazahoor327
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
selam49
 

Similar to Social and Biodiversity Impact Assessment (SBIA) Stage 2: ‘Without Project’ analysis & Projection (20)

Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management
 
Ms4 lfa
Ms4 lfaMs4 lfa
Ms4 lfa
 
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notes
 
University of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textUniversity of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample text
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Problem and situation analysis
Problem and situation analysisProblem and situation analysis
Problem and situation analysis
 
Objective Oriented Project Planning
Objective Oriented Project PlanningObjective Oriented Project Planning
Objective Oriented Project Planning
 
lecture about project management: Logical Framework.ppt
lecture about project management: Logical Framework.pptlecture about project management: Logical Framework.ppt
lecture about project management: Logical Framework.ppt
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Rptr4202 ppm unit 1 org pdf
Rptr4202 ppm unit 1 org pdfRptr4202 ppm unit 1 org pdf
Rptr4202 ppm unit 1 org pdf
 
Participatory project planning
Participatory project planning Participatory project planning
Participatory project planning
 
Assignment 2 LASA 1Prepare a full Communications Plan with an a.docx
Assignment 2 LASA 1Prepare a full Communications Plan with an a.docxAssignment 2 LASA 1Prepare a full Communications Plan with an a.docx
Assignment 2 LASA 1Prepare a full Communications Plan with an a.docx
 
chapter_2_First thing first and anithyng about.pptx
chapter_2_First thing first and anithyng about.pptxchapter_2_First thing first and anithyng about.pptx
chapter_2_First thing first and anithyng about.pptx
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 

More from Pro-poor Rewards for Environmental Services in Africa ICRAF

Report of the FORMAS - PRESA stakeholder workshop - September 2011
Report of the FORMAS - PRESA stakeholder workshop - September 2011Report of the FORMAS - PRESA stakeholder workshop - September 2011
Report of the FORMAS - PRESA stakeholder workshop - September 2011
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project designSocial and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Payments for ecosystem services: policy issues
Payments for ecosystem services: policy issuesPayments for ecosystem services: policy issues
Payments for ecosystem services: policy issues
Pro-poor Rewards for Environmental Services in Africa ICRAF
 
Key policy issues for PES and REDD+
Key policy issues for PES and REDD+Key policy issues for PES and REDD+

More from Pro-poor Rewards for Environmental Services in Africa ICRAF (20)

Report of the FORMAS - PRESA stakeholder workshop - September 2011
Report of the FORMAS - PRESA stakeholder workshop - September 2011Report of the FORMAS - PRESA stakeholder workshop - September 2011
Report of the FORMAS - PRESA stakeholder workshop - September 2011
 
Questions politiques clés pour les pse et le mécanisme redd fr
Questions politiques clés pour les pse et le mécanisme redd   frQuestions politiques clés pour les pse et le mécanisme redd   fr
Questions politiques clés pour les pse et le mécanisme redd fr
 
Pse questions politiques fr
Pse   questions politiques frPse   questions politiques fr
Pse questions politiques fr
 
Preuves des transactions volontaires fr
Preuves des transactions volontaires frPreuves des transactions volontaires fr
Preuves des transactions volontaires fr
 
Preuve que les interventions fondées sur l utilisation des terres
Preuve que les interventions fondées sur l utilisation des terresPreuve que les interventions fondées sur l utilisation des terres
Preuve que les interventions fondées sur l utilisation des terres
 
Introduction aux pse et au mécanisme redd
Introduction aux pse et au mécanisme reddIntroduction aux pse et au mécanisme redd
Introduction aux pse et au mécanisme redd
 
Guide pour la structuration d un projet pse
Guide pour la structuration d un projet pseGuide pour la structuration d un projet pse
Guide pour la structuration d un projet pse
 
Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...
Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...
Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...
 
Contrats pour les services environnementaux fr
Contrats pour les services environnementaux frContrats pour les services environnementaux fr
Contrats pour les services environnementaux fr
 
Conditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSE
Conditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSEConditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSE
Conditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSE
 
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
 
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
 
Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)
 
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project designSocial and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
 
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project designSocial and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
 
Agenda kenya uganda sia workshop 10-12 aug
Agenda kenya uganda sia workshop 10-12 augAgenda kenya uganda sia workshop 10-12 aug
Agenda kenya uganda sia workshop 10-12 aug
 
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
 
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
 
Payments for ecosystem services: policy issues
Payments for ecosystem services: policy issuesPayments for ecosystem services: policy issues
Payments for ecosystem services: policy issues
 
Key policy issues for PES and REDD+
Key policy issues for PES and REDD+Key policy issues for PES and REDD+
Key policy issues for PES and REDD+
 

Recently uploaded

State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Ransomware Mallox [EN].pdf
Ransomware         Mallox       [EN].pdfRansomware         Mallox       [EN].pdf
Ransomware Mallox [EN].pdf
Overkill Security
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 

Recently uploaded (20)

State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Ransomware Mallox [EN].pdf
Ransomware         Mallox       [EN].pdfRansomware         Mallox       [EN].pdf
Ransomware Mallox [EN].pdf
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 

Social and Biodiversity Impact Assessment (SBIA) Stage 2: ‘Without Project’ analysis & Projection

  • 1. SBIA Stage 2: ‘Without Project’ analysis & Projection Step 1: Building the Problem Flow Diagram Tuyeni H Mwampamba
  • 2. Recap on where we are: SBIA Stage 1: Step 1: Discussed and defined the Project Scope (the area of influence of the Project) Step 2: Discussed the importance of developing a Project Vision: Relatively broad (captures a wide range of potential project activities) Inspirational (outlines desired changes in the current state of project objective) Short (<30 words) & easy to remember Obj: Setting up the framework for stakeholder involvement, project ownership, and an unified agreement of what the project is about
  • 3. Recap: continued Step 3: Identification and Prioritisation of social Focal Issues Created a “shopping list” of social issues that are of concern for project success Fused & merged those that are similar Arranged them in order of priority Selected the Priority Focal Issues that the Project must address Process should be transparent, participatory and easily understood Obj: To ensure that the project is first addressing those issues that pose the largest threat to project success, or which would have extensive repercussion if they were NOT addressed
  • 4. Next Step: Problem Flow Diagram Step 4: Problem flow diagram for each priority focal issue Obj 1: To develop a thorough and unified understanding of the focal issues Identify direct and indirect factors contributing to existence of the focal issue (as a problem) Obj 2: To identify strategic points of entry for the project to have the most impact on changing the focal issue to desired status
  • 5. Criteria for a good PFD: Visually illustrates a workable understanding of the focal issue in the project area Shows assumed relationships between factors Shows major direct threats and indirect threats (and opportunities) Presents only relevant factors Based on sound data or good understanding of the project area Results from a team effort
  • 6. It’s a Diagram: Direct causal Factors Indirect causal Factors Priority focal issue 1 Priority focal issue 2
  • 7.
  • 8. Criteria 2 & 3: 2. Shows assumed relationships and linkages between factors 3. Shows major direct and indirect threats (problems) and underlying factors
  • 9. 4. Presents only relevant factors
  • 10. 5. Is based on sound data & info Experts should be included Includes traditional ecological knowledge Includes the community experience of a focal issue (cultural understanding)
  • 11. 6. Results from Team effort Conducted in a stakeholder workshop setting Ensures that each SH understands the process and contributes
  • 12. CCB Standards addressed: An accurate description of the condition at the start of the project; Set you up for identifying stakeholder groups (Criterion G1.5); Sets you up for documenting a “defensible and well-documented” ‘without project’ reference scenario (Criterion G2.)