FULL ENJOY Call girls in Paharganj Delhi | 8377087607
Â
IC-IC development
1. Enhancing interconnectivity of short and long
distance transport networks through passenger
focused interlinked information-connectivity
Project 266250.
Coordinator: Star Engineering GmbH
IC-IC development
IIID
30 July 2013
IC-IC development M18
1
2. IC-IC
IC-IC addresses work programmes of the call
•
•
IIID
TPT.2010-4. Optimisation and integration of R&D
efforts for transport of passengers by enhanced intermodality
TPT.2010-5. Demand/supply management and logistics for
transport of passengers through increased co-modality and
understanding of social behaviour
30 July 2013
IC-IC development M18
2
3. IC-IC Consortium
Project partners
IC-IC Contributors:
•
•
•
11 partners from 5 European countries
6 Scientific Advisors from America, Asia and Europe
Mobility providers from 4 European airport regions
A presentation on the expected outcome of IC-IC, the
InfoConnectivity System (ICS), along with further information, can be
found on www.ic-ic.eu
IIID
30 July 2013
IC-IC development M18
3
6. IC-IC Key Stakeholders
IC-IC Key
Stakeholders
Airport Regions:
Amsterdam NL
Frankfurt E
DE
Paris FR
Vienna AT
IIID
30 July 2013
IC-IC sets out to develop an
Infoconnectivity System
(ICS)
For Key Stakeholders
(mobility providers) of
European airport regions in
Austria, France, Germany
and The Netherlands
IC-IC development M18
6
7. Survey on traveller needs
Project progress and results
Covering Month 1 to 18 (of 36)
IIID
30 July 2013
IC-IC development M18
7
8. WP1: Information acquisition
A survey on traveller needs was carried out in Spain, Poland and
4541
Russia, addressing
persons, establishing information
requirements of air-travellers wishing to use public transport to
travel to and from the airport.
WP1
Survey on
traveller needs
IIID
30 July 2013
IC-IC development M18
8
10. WP1: Information acquisition
Investigations on global scale, to collect related studies and
standards
WP1
+
IIID
30 July 2013
Literature &
standards survey
Work Package 1 completed
IC-IC development M18
10
11. WP1: Information acquisition
WP1
Survey on
Literature &
+
traveller needs
standards survey
IIID
30 July 2013
Work Package 1 completed
IC-IC development M18
11
12. WP2: Conceiving Personas, Journeys, Scenarios
WP1
NL
FR
DE
AT
In WP2, based on
previous
findings, exemplary
virtual travellers
(“Personas”)representin
g focus groups were
created and explored in
relation to their
journeys and the
encountered travel
scenarios.
WP2
Personas
IIID
+
Journeys
30 July 2013
+
Scenarios
IC-IC development M18
Work Package 2
completed
12
13. ! "# Persona example +/*- 0/12*3+- ( 4/167( - 0+8
$% ( ) *+,% %(
'
*- .
%
%
*/%
WP2:
Q ) 50,( R
M
%
. ( +/*- 0G% %
% K0+3,*%
_S`
'Persona #15:% - ( 7: - @ 3C?7% /) *+,%
( F38 > ( - ,GE*+(
)
Haruto % 8 ,+0Requirement: Connecting public transport
Questions solved
AT THE AIRPORT
•!
Where is the station located ?
•!
When do the modes leave
Appropriate questions from our diary study:
•!
Where is the right baggage conveyor belt?
•!
What shoud I do if my baggage is lost?
IN THE PUBLIC TRANSPORTS
•!
which station to get off to take me closest to!
•!
what is the chosen connecting public transport´s
line direction/station name?
•!
which station to get off!
•!
How much is the fare?
•!
When do the modes leave? (Real Time)
Appropriate questions from our diary study:
•!
Where can I find a tourist information?
•!
Where can I change money?
Personas
Journeys
•!
Where can I find public transport (e.g. at night)?
•!
How much does it cost?
•! which time does the next connection leave?
At
8 9: %
IIID
! "#! $%2013* +' ,%
'
30 July& ( )'
Helpful Persona descriptions:
•!
Interested in consumer electronics
•!
Owns a tablet computer although some problems using it.
•!
Tends to forget things from time to time.
•!
Can dispense the glasses, if the display is big enough
•! enjoy life and have a good time
To
•!
Kumiko:
is handicapped by her weak eyesight and low mobility
(needs clear direction hints)
WP2
Scenarios
' *
IC-IC 1' 23 4 % ' ' 567%
development M18
- ,. //' 0
/%
HF%
13
14. WP3: Field investigations
WP1
WP2
WP3 started with the creation
of the traveller information
requirements table,
a compendium of 160
information requirements to
be fulfilled by the future
Infoconnectivity System (ICS)
WP3
Traveller
requirements
table
IIID
30 July 2013
IC-IC development M18
14
16. WP3: Field investigations
Studies at
Airport Regions:
Fact finding
Benchmarking
…
NL
FR
DE
AT
Studies on Key
Stakeholder premises
(Field investigations)
were carried out to
establish current status of
traveller information
provision, and evaluate
the performance of selfservice devices (selfcheck-in, ticket machines)
WP3
Traveller
Field
InfoConectivity
requirements
investigations
shortfalls
+
=
table
IIID
30 July 2013
IC-IC development M18
Work Package 3
completed
16
17. WP3: Field investigations
Fact Finding
Benchmarking of
Vienna Airport
Self-Service Facilities
Amsterdam airport region
IIID
30 July 2013
IC-IC development M18
17
18. WP3: Field investigations
Eurostar Terminal, Paris
page< 1 of 1
Frankfurt Airport
Vienna Airport
Amsterdam airport region
1
IIID
30 July 2013
IC-IC development M18
18
19. WP4: Creating an ICT enhanced ICS
WP3
WP4 provides the
technologic platform
for the ICS
UK
DE
AT
WP4
NFC, QR,
+
or other?
IIID
ICT
Impact
InfoConnectivity
+
=
=
realisation
assessment
System (ICS)
requirements
30 July 2013
IC-IC development M18
Work
Package 4
ongoing
19
20. WP5: ICS model applications
WP5 establishes required output information and data sources for
Traveller
Collection of
SYSTRAN automatic
the InfoConnectivity System (ICS), exemplifies translation software
information
+
requirements
predefined
provision of the ICS, and assesses for improvements in relation to
table
information
+
the current situation of traveller information provision. time data
Real
Amsterdam NL
+
An ICS Handbook, policy recommendations and a business model
Frankfurt E
DE
WP4
will be prepared.
Paris FR
Vienna AT
Work Package 5 – ongoing
WP5
ICS model
applications
IIID
30 July 2013
IC-IC development M18
20
21. WP5: ICS model applications
Traveller
requirements
table
Collection of
predefined
information
+
Amsterdam NL
Frankfurt E
DE
Paris FR
Vienna AT
SYSTRAN automatic
translation software
+
Real time data
+
WP4
WP5
ICS model
applications
IIID
30 July 2013
IC-IC development M18
21
22. WP5: ICS model applications
ICS model
applications
Assessment AT
WP5
ICS model
applications
IIID
Applications
assessment
30 July 2013
IC-IC development M18
22
23. WP5: ICS model applications
Scientific
Advisors
from
IC-IC Key
Stakeholders
Airport Regions:
Amsterdam NL
Frankfurt E
DE
NL
DE
Paris FR
Vienna AT
USA
AT
JP
TW
WP5
ICS model
applications
IIID
Applications
assessment
30 July 2013
Handbook
Policy recommendations
IC-IC development M18
Business
model
23
24. WP6: Networking, dissemination & participation
WP6 is geared to address to Stakeholders (mobility providers) with
affinity to a possible implementation of the ICS. This is done via
Newsletters, a Stakeholders Forum and a Stakeholders Conference
WP6
Newsletters
IIID
Stakeholders
forum
30 July 2013
Stakeholders
conference
IC-IC development M18
Work Package 6
ongoing
24
25. WP6: Networking, dissemination & participation
IC-IC Key Stakeholders only
Airport Regions:
Amsterdam NL
Frankfurt E
DE
Paris FR
Vienna AT
Date:
February 2014
WP6
Newsletters
IIID
Stakeholders
forum
30 July 2013
Stakeholders
conference
IC-IC development M18
Work Package 6
ongoing
25
26. WP6: Networking, dissemination & participation
IC-IC Stakeholders
Mobility providers:
global invitation
Date:
May 2014
WP6
Newsletters
IIID
Stakeholders
forum
30 July 2013
Stakeholders
conference
IC-IC development M18
Work Package 6
ongoing
26
27. IC-IC Final report
IC-IC will conclude in October 2014.
A presentation on the expected outcome of IC-IC, the
InfoConnectivity System (ICS), along with further
information, can be found on www.ic-ic.eu
WP7
Final
report
IIID
30 July 2013
IC-IC development M18
27
28. The research leading to these results has received
funding from the European Community's Seventh
Framework Programme (FP7/2007-2013) under grant
agreement n° 266250.
IIID
30 July 2013
IC-IC development M18
28