LINE BALANCING
An overview of
By: Hiwa Ghaffari
A SIMPLE LINE FOR PRODUCTION OR ASSEMBLY
Workstatio
n 1
Workstatio
n 2
Workstatio
n 3
Workstatio
n 4
Input Out
put
ACTIVITY CLASSIFICATION
Value Adding:
Any process that changes the
nature, shape or characteristics
of the product, in line with
customer requirements e.g.
machining, assembly
Non-Value Adding, but
unavoidable with current technology or
methods:
Any work carried out that does not increase
product value e.g. inspection, part movement,
tool changing, maintenance
Waste:
All other meaningless, non-essential
activities that do not add value to the
product you can eliminate immediately
e.g. looking for tools, waiting time
WASTES
Wastes are caused from:
 Transportation
 Inventory
 Motion
 Waiting
 Overproduction
 Over-processing
 Defects
(The 7 Wastes: T.I.M.W.O.O.D)
UNBALANCED LINE : SIMPLE EXAMPLE
1 2 3 4
25 mins5 mins 15 mins 10 mins
Constraint
Overburden
This operator
must WAIT for
operator 2
Overproduction which
causes the other 6 wastes
Waiting
Over-processing
Inventory
defects
Transportation Motion
This operator
must WAIT for
operator 3
5
10
15
20
25
1 2 3 4
mins
LINE BALANCING: DEFINITION
Line Balancing is the process of assigning tasks to
workstations in such a way that the workstations have
approximately equal time requirements.
LINE BALANCING: OBJECTIVES
Main Objectives:
to equalize the work load among the operators
to identify the bottleneck operation
to establish the speed of the production line
to determine the number of workstations
to determine the labor cost of production and pack out
to establish the percentage workload of each operator
to assist in plant layout
to reduce production cost
LINE BALANCING: METHODS
•There are many ways or methods for balancing the lines.
•The common thing for all this methods is:
using both the operator and the machine in the most
efficient way, at the same time providing flexibility in
production.
BALANCED LINE: SIMPLE EXAMPLE
5
10
15
20
25
Redistribute the work
1 2 3 4
15 mins15 mins 15 mins 10 mins
Promotes one-
piece FLOW
Avoids
overburden
Minimises the 7
wastes
Reduces
Variation
CONCEPTS
Bottleneck: The work station taking the longest time.
Required Cycle Time: Takt Time
Current Cycle Time: The same as Bottleneck Time.
Flow Time (Total Work Content): Time to complete all
stations.
1 2 3
2min 5min 3min
Flow time= 2+5+3=10min
Current cycle time = 5min
Bottleneck
CONCEPTS
Precedence diagram: Network showing order of tasks
and restrictions on their performance.
A
B
H
D
E
F
G
Total work content: Sum of the task times for all the
production tasks for the product.
Minimum number of work stations=
The quotient should be rounded to the next highest
integer.
9-12
LINE BALANCING: PREREQUISITES
 Determine minimum rational work elements.
(Smallest feasible division of work)
 Determine cycle time.
 Calculate the theoretical minimum number of
work stations.
 Draw Precedence Diagram
LINE BALANCING: A SIMPLE ALGORITHM
1. Identify tasks whose predecessors have been assigned to a
workstation (available tasks).
2. Determine from available tasks, those that fit, i.e., those whose
tasks times time remaining to be filled at this work station.
3. Choose a task that fits by some decision rule
 task with largest time
 task with most successors
 task with greatest sum of task times of its predecessors.
4. Continue steps 1 to 3 until no task fits, then go on to next
workstation.
5. Continue steps 1 to 4 until all tasks are assigned
LINE BALANCING: EXAMPLE
Task Task Time (sec) predecessors
A 70 -
B 80 A
C 40 A
D 20 A
E 40 A
F 30 B,C
G 50 C
H 50 D,E,F,G
Total: 380
A B C,D E,F G H
70 min 80 min 70 min 50 min60 min
50 min
Wanted Total Product is 320 Units Per Day
LINE BALANCING: EXAMPLE
Current Conditions:
 Current Cycle Time= Bottleneck Time = 80 sec
 Current No. of Workstations: 6
 Total Product Per Day = (total time available per day)/(cycle time)
= (8×3600)/(80) = 360 units
LINE BALANCING: EXAMPLE
According To The Problem:
 Cycle Time = (8×3600)/320 = 90 sec
 Total Work Content = 380 sec
 No. of Workstations = 380/90 = 4.22 5
LINE BALANCING: EXAMPLE
 Precedence Diagram:
A
B
C
D
E
F
G
H
70 sec 50 sec
50 sec
30 sec
40 sec
20 sec
40 sec
80 sec
LINE BALANCING: EXAMPLE
Task Task
Time
Task time +
follower
task times
A 70 380
C 80 170
B 40 160
G 20 100
E 40 90
F 30 80
D 50 70
H 50 50
A
B
C
D
E
F
G
H
70 sec
50 sec
50 sec
30 sec
40 sec
20 sec
40 sec
80 sec
Workstation
1
Workstation
2
Workstation
3
Workstation
5
Workstation
4
A C B E H
D
90 sec 90 sec 80 sec 70 sec 50 sec
G F
LINE BALANCING: EXAMPLE
Comparing Line Efficiency:
Line Efficiency =(Total Work Content)/(No. of Workstations ×Cycle Time)
Case 1: Line Efficiency = (380)/(6×80) = 79%
Case 1: Line Efficiency = (380)/(5×90) = 84%84%
1 min.2 min.1 min.1 min.
30/hr. 30/hr. 30/hr. 30/hr.
1 min.
1 min.
1 min.1 min.
60/hr.
30/hr. 30/hr.
60/hr.
1 min.
30/hr.
30/hr.
Bottleneck
Parallel Workstations
PARALLEL WORKSTATIONS
ELIMINATE WASTE : EXAMPLE
30
25
20
15
10
1 2 3
5
Cycle Time (25 hrs)
15
30
17
total work content = 15 + 30 + 17 = 62 hrs
Line Efficiency = = 69%
(3 x 30)
62 hrs
ELIMINATE WASTE : EXAMPLE
1 2 3
25 25
12
Cycle time(25 hrs)
30
25
20
15
10
5
Line Efficiency = = 83%
(3 x 25 hrs)
62 hrs
No. of workstations = Total Work Content
cycle time
25 hrs
62 hrs
= 2.48
→ 3 workstations
30
25
20
15
10
1 2 3
5
Takt (25 hrs)
15
30
17
Value
Added
Waste
Traditional Focus
• Work Longer-Harder-Faster
• Add People or Equipment
Lean Manufacturing
• Improve the Value
Stream to Eliminate
Waste
LEAD TIME
ELIMINATE WASTE : EXAMPLE
1 2 3
5
30
25
20
15
10
Non value added activity
Value added activity
Cycle time (25 hrs)
The operators cycle is broken down into elements.
These elements are put into three main categories, these being :
1. Working (man or machine)
2. Walking
3. Waiting
ELIMINATE WASTE : EXAMPLE
1 2 3
5
30
25
20
15
10
Operator other
freed up for
process or
improvement
team
REFRENCES
‫ی‬‫ضو‬‫ر‬‫قدس‬‫آستان‬ ‫ات‬‫ر‬‫انتشا‬‫؛‬‫تولید‬‫مدیریت‬ ‫؛‬‫شفیعی‬ ‫میر‬ ‫نصرهللا‬،‫الوانی‬‫مهدی‬‫سید‬
‫ایران‬‫صنعت‬‫و‬ ‫علم‬ ‫دانشگاه‬ ‫ات‬‫ر‬‫انتشا‬‫مان؛‬‫ز‬‫و‬‫کار‬ ‫یابی‬‫ز‬‫ار‬ ‫احمدی؛‬‫علی‬ ‫علیرضا‬

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
Work measurement
Work measurementWork measurement
Work measurement
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
Work study
Work studyWork study
Work study
 
Time study
Time studyTime study
Time study
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide share
 
UNIT 2 - WORK STUDY
UNIT 2 -  WORK STUDYUNIT 2 -  WORK STUDY
UNIT 2 - WORK STUDY
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Different types of Production Layout
 
Man and machine chart
Man and machine chartMan and machine chart
Man and machine chart
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Method Study
Method StudyMethod Study
Method Study
 
Work Study
Work StudyWork Study
Work Study
 
Line balancing
Line balancingLine balancing
Line balancing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 

Andere mochten auch

Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and servicePgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and serviceAquamarine Emerald
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyMd Abu Bakar Siddique
 
Production management system, plant location
Production management system, plant locationProduction management system, plant location
Production management system, plant locationRahul Boddul
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -ExampleJoseph Konnully
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout StrategiesJoanmaines
 
Product Design
Product DesignProduct Design
Product Designajithsrc
 
Product Design & Development - 1
Product Design & Development - 1Product Design & Development - 1
Product Design & Development - 1QRCE
 
Production and operations_management
Production and operations_managementProduction and operations_management
Production and operations_managementQamar Farooq
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementshart sood
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planningsenthil.G
 

Andere mochten auch (17)

Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Plant location
Plant locationPlant location
Plant location
 
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and servicePgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
Pgbm03 MBA OPERATION MANAGEMENT session 05 design of product and service
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case Study
 
Production management system, plant location
Production management system, plant locationProduction management system, plant location
Production management system, plant location
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout Strategies
 
Process design
Process designProcess design
Process design
 
Product Design
Product DesignProduct Design
Product Design
 
Product Design & Development - 1
Product Design & Development - 1Product Design & Development - 1
Product Design & Development - 1
 
Production and operations_management
Production and operations_managementProduction and operations_management
Production and operations_management
 
Product design concept
Product design conceptProduct design concept
Product design concept
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 

Ähnlich wie Line balancing

Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
Line balancing
Line balancingLine balancing
Line balancinggeetha_64
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...Joseph Uken
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production managementJoshua Miranda
 
Operations scheduling
Operations schedulingOperations scheduling
Operations schedulingRajThakuri
 
CIM report - final
CIM report - finalCIM report - final
CIM report - finalPraveen S R
 
Chapter 4 product layout - 1st (3)
Chapter 4  product layout - 1st (3)Chapter 4  product layout - 1st (3)
Chapter 4 product layout - 1st (3)Shadina Shah
 
Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysisvideoaakash15
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysisvideoaakash15
 
Case Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisCase Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisSarang Bhutada
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo Jorge Fuentes
 

Ähnlich wie Line balancing (20)

Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Layout10
Layout10Layout10
Layout10
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
Work measurement
Work measurementWork measurement
Work measurement
 
Line balancing
Line balancingLine balancing
Line balancing
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production management
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
A line in apparel
A line in apparelA line in apparel
A line in apparel
 
Line Balancing (2).pptx
Line Balancing (2).pptxLine Balancing (2).pptx
Line Balancing (2).pptx
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
Chapter 4 product layout - 1st (3)
Chapter 4  product layout - 1st (3)Chapter 4  product layout - 1st (3)
Chapter 4 product layout - 1st (3)
 
Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysis
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 
Case Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisCase Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysis
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
 

Kürzlich hochgeladen

Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectGayathriM270621
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...gerogepatton
 
Indian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfIndian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfalokitpathak01
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...arifengg7
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliNimot Muili
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studydhruvamdhruvil123
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 

Kürzlich hochgeladen (20)

Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subject
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
 
Indian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfIndian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdf
 
Versatile Engineering Construction Firms
Versatile Engineering Construction FirmsVersatile Engineering Construction Firms
Versatile Engineering Construction Firms
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain study
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 

Line balancing

  • 1. LINE BALANCING An overview of By: Hiwa Ghaffari
  • 2. A SIMPLE LINE FOR PRODUCTION OR ASSEMBLY Workstatio n 1 Workstatio n 2 Workstatio n 3 Workstatio n 4 Input Out put
  • 3. ACTIVITY CLASSIFICATION Value Adding: Any process that changes the nature, shape or characteristics of the product, in line with customer requirements e.g. machining, assembly Non-Value Adding, but unavoidable with current technology or methods: Any work carried out that does not increase product value e.g. inspection, part movement, tool changing, maintenance Waste: All other meaningless, non-essential activities that do not add value to the product you can eliminate immediately e.g. looking for tools, waiting time
  • 4. WASTES Wastes are caused from:  Transportation  Inventory  Motion  Waiting  Overproduction  Over-processing  Defects (The 7 Wastes: T.I.M.W.O.O.D)
  • 5. UNBALANCED LINE : SIMPLE EXAMPLE 1 2 3 4 25 mins5 mins 15 mins 10 mins Constraint Overburden This operator must WAIT for operator 2 Overproduction which causes the other 6 wastes Waiting Over-processing Inventory defects Transportation Motion This operator must WAIT for operator 3 5 10 15 20 25 1 2 3 4 mins
  • 6. LINE BALANCING: DEFINITION Line Balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements.
  • 7. LINE BALANCING: OBJECTIVES Main Objectives: to equalize the work load among the operators to identify the bottleneck operation to establish the speed of the production line to determine the number of workstations to determine the labor cost of production and pack out to establish the percentage workload of each operator to assist in plant layout to reduce production cost
  • 8. LINE BALANCING: METHODS •There are many ways or methods for balancing the lines. •The common thing for all this methods is: using both the operator and the machine in the most efficient way, at the same time providing flexibility in production.
  • 9. BALANCED LINE: SIMPLE EXAMPLE 5 10 15 20 25 Redistribute the work 1 2 3 4 15 mins15 mins 15 mins 10 mins Promotes one- piece FLOW Avoids overburden Minimises the 7 wastes Reduces Variation
  • 10. CONCEPTS Bottleneck: The work station taking the longest time. Required Cycle Time: Takt Time Current Cycle Time: The same as Bottleneck Time. Flow Time (Total Work Content): Time to complete all stations. 1 2 3 2min 5min 3min Flow time= 2+5+3=10min Current cycle time = 5min Bottleneck
  • 11. CONCEPTS Precedence diagram: Network showing order of tasks and restrictions on their performance. A B H D E F G Total work content: Sum of the task times for all the production tasks for the product. Minimum number of work stations= The quotient should be rounded to the next highest integer.
  • 12. 9-12 LINE BALANCING: PREREQUISITES  Determine minimum rational work elements. (Smallest feasible division of work)  Determine cycle time.  Calculate the theoretical minimum number of work stations.  Draw Precedence Diagram
  • 13. LINE BALANCING: A SIMPLE ALGORITHM 1. Identify tasks whose predecessors have been assigned to a workstation (available tasks). 2. Determine from available tasks, those that fit, i.e., those whose tasks times time remaining to be filled at this work station. 3. Choose a task that fits by some decision rule  task with largest time  task with most successors  task with greatest sum of task times of its predecessors. 4. Continue steps 1 to 3 until no task fits, then go on to next workstation. 5. Continue steps 1 to 4 until all tasks are assigned
  • 14. LINE BALANCING: EXAMPLE Task Task Time (sec) predecessors A 70 - B 80 A C 40 A D 20 A E 40 A F 30 B,C G 50 C H 50 D,E,F,G Total: 380 A B C,D E,F G H 70 min 80 min 70 min 50 min60 min 50 min Wanted Total Product is 320 Units Per Day
  • 15. LINE BALANCING: EXAMPLE Current Conditions:  Current Cycle Time= Bottleneck Time = 80 sec  Current No. of Workstations: 6  Total Product Per Day = (total time available per day)/(cycle time) = (8×3600)/(80) = 360 units
  • 16. LINE BALANCING: EXAMPLE According To The Problem:  Cycle Time = (8×3600)/320 = 90 sec  Total Work Content = 380 sec  No. of Workstations = 380/90 = 4.22 5
  • 17. LINE BALANCING: EXAMPLE  Precedence Diagram: A B C D E F G H 70 sec 50 sec 50 sec 30 sec 40 sec 20 sec 40 sec 80 sec
  • 18. LINE BALANCING: EXAMPLE Task Task Time Task time + follower task times A 70 380 C 80 170 B 40 160 G 20 100 E 40 90 F 30 80 D 50 70 H 50 50 A B C D E F G H 70 sec 50 sec 50 sec 30 sec 40 sec 20 sec 40 sec 80 sec Workstation 1 Workstation 2 Workstation 3 Workstation 5 Workstation 4 A C B E H D 90 sec 90 sec 80 sec 70 sec 50 sec G F
  • 19. LINE BALANCING: EXAMPLE Comparing Line Efficiency: Line Efficiency =(Total Work Content)/(No. of Workstations ×Cycle Time) Case 1: Line Efficiency = (380)/(6×80) = 79% Case 1: Line Efficiency = (380)/(5×90) = 84%84%
  • 20. 1 min.2 min.1 min.1 min. 30/hr. 30/hr. 30/hr. 30/hr. 1 min. 1 min. 1 min.1 min. 60/hr. 30/hr. 30/hr. 60/hr. 1 min. 30/hr. 30/hr. Bottleneck Parallel Workstations PARALLEL WORKSTATIONS
  • 21. ELIMINATE WASTE : EXAMPLE 30 25 20 15 10 1 2 3 5 Cycle Time (25 hrs) 15 30 17 total work content = 15 + 30 + 17 = 62 hrs Line Efficiency = = 69% (3 x 30) 62 hrs
  • 22. ELIMINATE WASTE : EXAMPLE 1 2 3 25 25 12 Cycle time(25 hrs) 30 25 20 15 10 5 Line Efficiency = = 83% (3 x 25 hrs) 62 hrs No. of workstations = Total Work Content cycle time 25 hrs 62 hrs = 2.48 → 3 workstations 30 25 20 15 10 1 2 3 5 Takt (25 hrs) 15 30 17
  • 23. Value Added Waste Traditional Focus • Work Longer-Harder-Faster • Add People or Equipment Lean Manufacturing • Improve the Value Stream to Eliminate Waste LEAD TIME
  • 24. ELIMINATE WASTE : EXAMPLE 1 2 3 5 30 25 20 15 10 Non value added activity Value added activity Cycle time (25 hrs) The operators cycle is broken down into elements. These elements are put into three main categories, these being : 1. Working (man or machine) 2. Walking 3. Waiting
  • 25. ELIMINATE WASTE : EXAMPLE 1 2 3 5 30 25 20 15 10 Operator other freed up for process or improvement team
  • 26.
  • 27. REFRENCES ‫ی‬‫ضو‬‫ر‬‫قدس‬‫آستان‬ ‫ات‬‫ر‬‫انتشا‬‫؛‬‫تولید‬‫مدیریت‬ ‫؛‬‫شفیعی‬ ‫میر‬ ‫نصرهللا‬،‫الوانی‬‫مهدی‬‫سید‬ ‫ایران‬‫صنعت‬‫و‬ ‫علم‬ ‫دانشگاه‬ ‫ات‬‫ر‬‫انتشا‬‫مان؛‬‫ز‬‫و‬‫کار‬ ‫یابی‬‫ز‬‫ار‬ ‫احمدی؛‬‫علی‬ ‫علیرضا‬