Russell Bee Lead Product Architect
STSM, Maximo Design and Architecture
Maximo Oil and Gas 7.6.1
Maximo HSE Manager 7.6.1
Overview and new product features
Maximo Oil and Gas/HSE Manager 7.6.1 business
processes
Operations
Management
Asset & Work
Management
Control of
Work
HSE Management Management
of Change
Quality
Management
Drilling and Well
Management
Manage operator
logs
Shift handover
Production loss
reporting
Define operating
policies and
procedures
Bypass
Management
Asset
management
Defect
Management
Risk
Management
Permit to Work
Incident
Management
Investigation
Management
Continuous
Improvement
Management
of
Change
Regulatory
Compliance
Competency
Management
Drilling
and Completion
Manage
Run Logs
Managing
non-conformance
Major Business Processes
DetailedBusinessProcesses
Safety
Quality
Compliance
Isolation
Management
Audit
Management
Work
Management
Turnaround
management
Hazard
Management
Managing
Operational
Actions
Failure
management
Managing
Corrective Action
Knowledge
Management
Capturing
Knowledge
Identifying
Solutions
Maximo Oil
and Gas only
Managing
regulatory permits
and environmental
Consents
Managing Supply
Chain Quality
Construction and
Commissioning
Management
Mobile Incident
Reporting
New processes
Maximo Oil and Gas/HSE Manager 7.6.1 Module
and Application Structure
Assets InventoryChange (Oil) Operations PlanningPlanning Purchasing
New apps
Location Profile
Cloned apps
Assets
Locations
Cloned apps
Item Master
New apps
Operator Log
Log Book
Operator
Tasks
Operating
Policies
Operating
Procedures
Bypass
Management
Operational
Actions
New apps
MOC Request
MOC
Improvements
New apps
Action
Tracking
Cloned apps
Hazards
Precautions
Lock Out/
Tag Out Plan
New apps
Permit and
Cert Types
Permit
to Work
Risk
Assessment
Risk Matrix
Isolation
Management
Cloned apps
Job Plans
Routes
Cloned apps
Incidents
Service
Requests
Solutions
Ticket
Templates
Create
Incident
Review
Incidents
Cloned apps
Work Order
Tracking
New apps
Asset List
Condition
for Work
Regulatory
Compliance
Prioritization
Matrix
Benefits and
Losses
Standard
Actions
Standard
Action
Groups
Cloned apps
Preventive
Maintenance
Preventive
Maintenance
Cloned apps
Purchase
Requests
Purchase
Orders
Key
New apps
Certifications
Audits
Defects
Investigations
Safety and
Quality
Management
Work Orders
Safety
sub module
New apps
Oil and Gas
Run Log
New apps
Oil and Gas
Drilling and
Completion
Module
New application
Cloned application
Oil and Gas only
Mobile
(Anywhere)
Incident
Reporter
New applications
Original apps
Releases
Original apps
Configuration
Items
Maximo Oil and Gas/HSE Manager 7.6.1 Module
and Application Structure – Administration Module
Administration
Cloned apps
Organizations
People
Qualifications
Key
Module
New application
Cloned application
Oil and Gas only
New applications
Original apps
Configuration
Items
Maximo for Oil and Gas/HSE Manager – Capability
Summary
5
Release 7.1.0 Release 7.1.1
All future release dates are estimates and specific content is subject to change.
Maximo 7.1 Maximo 7.1
Release 7.1.2
Maximo 7.1
GA: Sep 28, 2008 GA: Dec 2009 GA: Nov. 2010
• Location and Work Details
• Prioritization Matrix
• Condition for Work
• Regulations
• Incidents
• Defects
• Investigations
• Solutions
• Improvements
• Benefits and Losses
• Management of Change
• Action Tracking
• Standard Actions
• ISO14224 Failure Codes & Specs*
• Control of Work
• Permit and Certificate Types
• Risk Analysis
• Risk Matrices
• Operator’s Log
• Standard Action Groups
• Maximo Spatial Integration
• Support for MIMOSA
• Miscellaneous enhancements
•Hazards
•MOC Risks and Projects
•Target Availability
•Legacy Tag
•Bad Actor Dialog
•Service Request (Oil)
• Operating Policies
• Operating Procedures
• Operator Tasks
• Cause Analysis/FMECA
• Material Inspection
• Operator Log Enhancements
• Scheduler integration
• MOC enhancements
• Run Log*
• Drilling and Completion*
• Miscellaneous enhancements
•Extra failure fields
•Incident impact
•Regulations extra where used
* Maximo Oil and Gas only
Maximo for Oil and Gas/HSE Manager – Capability
Summary
6
Release 7.5.0 Release 7.5.1
Maximo 7.5 Maximo 7.5
Release 7.6
Maximo 7.6
GA: August 30 2011 GA: March 15 2013 GA Dec 4th 2015:
• Non-conformances
• ISO I4224 Failure Mechanism
• ISO14224 Sub unit/maint item
• Multiple persons on Incident
• Classification of risk assessments
• Item Master on MOC
• Add Regulation to Incidents
• Qualifications link to certificates
• Qualification verification on Labour
• Editable fields on People
• Incidents & Investigations enh.
• Bypass Management
• Chemical Mgt.
• Operational Risk Assessment
• Permit to Work enh.
• Asset & Location registers
• Certification Templates
• Audit Enhancements
• Quality & Defect enh.
• Repeatable Standard Actions
• MOC PSSR
Permit to Work
Audit and Survey
Certifications
Location profiles
Preparation Activities
Daily Operations Report
Miscellaneous enhancements
 Incidents
 Test results
 Regulations
 Risk Assessment
 Failure Reporting
 MOC
 Operator Log
Maximo for Oil and Gas/HSE Manager – Capability
Summary
7
Release 7.6.1
Maximo 7.6
GA: October 2016
• Shift handover
• Log Book
• Related Operator Logs
• Operational Actions
• Action Tracking change to Class
• Safety Bulletins
• Safety Meetings
• Incident Reporter
• Support for OSHA style reporting
• Environmental management
• Permit to Work process enh.
• Risk Assessment Hazard Review
• Certifications enhancements
• Location and Asset FMECA
• Human Factor Analysis
Key New Features
Maximo Oil and Gas 7.6.1, Maximo Health, Safety, & Environment Manager 7.6.1
8
Feature Area Features
Action Tracking • Action Tracking now a Work Order Class
• New Safety Bulletin tab
• New Safety Meeting tab
• New crossover domain for Create Action on originating applications allows ability to edit description.
Audit and Survey • Likert scale fields added to audit
• Create Certification action
• Findings category
• Group Email function for Audit Team
• Create Audit on Service Request
Bypass Management • Template capability
Certifications • Multiple Locations
• Related Certifications
• Certification extensions
• Regulatory Permit tab
• Review Actions
• Additional date and reference fields
• Create audit action
Environmental Management • Environmentally Critical Elements
• Aspects and Impacts support in Risk Assessment, Hazards, Precautions and Risk Matrix
• Environmental consents
• Emission reports
Failure Analysis • FMECA capability added to Assets and Locations
• Review Actions added to Assets and Locations to support criticality analysis and failure analysis actions
Key New Features
Maximo Oil and Gas 7.6.1, Maximo Health, Safety, & Environment Manager 7.6.1
9
Feature Area Features
Incidents • New Ticket Template clone
• New Incident Reporter Anywhere app
• OSHA style reports and supporting data structures
• Self Service Create Incident and Review Incidents
Investigations • Review Actions
• Human factors analysis
Location Profile • New Hours Worked tab
Locations and Assets • Leaking state fields
• Calculations tab to support a general calculation capability
• View Operator Log Details
MOC • Closure Actions
• MOC Template
• WO deferral
• MOC KPIs and saved queries
• Improved filtering and comments capability on Pre Start and Post Start Actions
Operator Log • Shift handover and carry over
• New Log Book application
• Related Operator Logs
• Log entry level actions
• Regulatory Log entries
• View Operator Log details on Assets and Locations
Operational Actions • A new application to manage standard actions from multiple different applications from a single place
• Supports Start Center action management
Key New Features
Maximo Oil and Gas 7.6.1, Maximo Health, Safety, & Environment Manager 7.6.1
10
Feature Area Features
Risk Assessment • Hazard Review
• Populate WO from Location Risk Assessment
• Support for risk assessment of an asset
• Group Email function for Risk Assessment Team
Permit to Work • New Isolation Management application
• Multiple site checks
• Countersignatures
• Hazard Review
• New statuses for isolation
• Suspend action
• Multiple area authorization on Permit/Person
• New options for automated status changed
• New option for automated common isolation check
• Permit to Work related KPIs
Work Management • Review Actions
• Job Plan production impact
• Regulations on PM
• Job Plan and WO supplementary risk assessments
• Operating Policy on WO
• Regulations on Item Master
• PM Certification field
Maximo Oil and Gas/HSE Manager Business Process Map
in Blueworks Live
Examples of some of the possible interactions in
Maximo Oil and Gas and Maximo HSE Manager 7.6.1
Work Order
Tracking
Operating
Procedures
Operator
Log
Operational
Actions
Failure
Reporting
Benefits
& Losses
Operating
Policy
Defects
Risk
Assessment
Risk
Matrix
Incident
Management
Investigations
Improvements
Management
of
Change
Regulatory
Compliance
Action
Tracking
People
Solutions
Certifications
Permit
To Work
Audit and
Survey
Note: Blue boxes show
Applications
Bypass
Management
Log Book
What is Maximo Oil and Gas/HSE Manager?
Capability Benefit
Incidents Addresses the continuous need for customers to improve operational performance by
creating, reviewing, and analyzing incidents. Includes Self Service Create and Review
Incidents. A mobile Incident Reporter application is also included
Investigations Allows customers to identify the root cause of problems arising from incidents on their plants
that may be safety, environmental, or production related.
Management
of Change
Allows customers to support change requirements in a more robust way with multiple levels
of reviews/approvals, authorization of change, pre and post start actions
Defects,
Non-Conformance
Provides non-conformance management capabilities designed to automate, manage, and
streamline for identifying, evaluating, reviewing, and handling on non-conforming
engineering specifications, materials, components, parts and processes.
Regulatory
Compliance
Identifies regulatory compliance against assets and locations and associates job plans and
work orders to these regulations to ensure compliance – significantly reducing the costs
associated with compliance
What is Maximo Oil and Gas/HSE Manager?
Capability Benefit
Operating
Procedures
Capabilities for documented, step-by-step operating procedures
Operating
Policy
Governance application for structuring your operating policy
Risk
Assessment
Iterative document that links all associated Health, Safety and Environment activities and
organizational data. Allows customers to analyze the risks associated with work carried out
through the Maximo products, identifying hazards and defining the impact ranking
Risk
Matrix
An application that models both probability and consequences of events supporting risk
management processes
Improvements Manages continuous improvement programs like Six Sigma or similar methodologies
What is Maximo Oil and Gas/HSE Manager?
Capability Benefit
People
(Competency
Extensions)
Improves competency assurance through capabilities for adding, modifying, and updating
competencies of the workforce
Operators
Log
Electronic log used by shift operators for recording and qualifying events which occur
during an individuals shift watch
People
(Certification)
Tracking
Complete history of all personnel job roles, certifications, training and current qualifications
Action
Tracking
Allows customers to track statutory implications to ensure certain types of work and
actions are completed by the agreed dates
Benefits &
Losses
Captures benefits/losses associated with improvements or costs associated with incidents,
failures, survey/audit findings
What is Maximo Oil and Gas/HSE Manager?
Capability Benefit
Failure
Reporting
Reporting mechanism for capturing metrics to support consistent Failure Reporting and
Corrective Action process (FRACAS)
Solutions Searchable learning repository associated with lessons learned, or with proven solutions
having a safety, operational, maintenance or engineering context
Defects Integrated approach to manage or eliminate defects
Bypass
Management
Use to manage bypass operations, also known as inhibits, or overrides, for safety related systems
such as Emergency Shutdown, Fire and Gas Systems, Alarm Panels and soft alarms on DCS
systems.
It can also be used to manage bypasses of mechanical systems such as sprinklers.
A further use case is management of security system bypasses.
Capability Benefit
Certifications A certification record contains the details that are used to verify that standards for assets or
locations are met. They can also be used to make sure that personnel are qualified for specialized
tasks.
Location
Profile
Location profiles contain information on production data. You can use location profiles to reduce
the production losses that can result from planned or unplanned maintenance shutdowns.
Preparation
Activities
An application to manage the preparation activities that are associated with different phases of
scheduled work packages. Preparation activities are tasks that are usually carried out either
before assets are put into operation or in preparation for a plant turnaround.
Lock Out/
Tag Out Plan
Lock out and tag out operations specify a plan of isolation for assets or locations to ensure the
safety of the plant. The plans describe how to remove work assets from service and place them
back into service
Permit to Work A permit to work provides for the effective management of hazards in the work place. The permit
to work is frequently used with one or more work orders. You can also generate a permit to work
based on an existing work order or task.
Audit and Survey Audits are used to evaluate compliance with industry-related regulations or with internal
regulations. You can use either audits or surveys to evaluate locations and assets for regulatory
compliance.
What is Maximo Oil and Gas/HSE Manager?
BE
PREPARED!
Capability Benefit
Operational
Actions
Consolidates standard actions across multiple different applications. Supports the sign-off of
completion of actions in a single place. Allows standard actions to be added to a Start Center
Log Book Provides a way to bring together individual operator logs into a Log Book. Supports the shift
handover process.
Isolation
Management
Supports the scenario where customers want to manage isolation separately from a permit. Fully
integrated with permit to work if required.
Incident Reporter A Maximo Anywhere based mobile application to report an incident, hazard or safety observation.
Supports disconnected operation. Also provides the ability to view your reported incidents from
the mobile device
Certifications
(Environmental
Consents)
Extension of Certification application to support the management of environmental consents and
regulatory permits.
Assets & Locations
(FMECA
Criticality)
Extensions to Assets and Locations to provide failure mode analysis and criticality analysis.
What is Maximo Oil and Gas/HSE Manager?

Weitere ähnliche Inhalte

Was ist angesagt?

Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
 Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
Maximo Oil and Gas 7.6.1 HSE: Defects & Service RequestsHelen Fisher
 
Using IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansUsing IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansDuane Aritonang
 
jshaw-projetech--understanding-maximo-inventory.pptx
jshaw-projetech--understanding-maximo-inventory.pptxjshaw-projetech--understanding-maximo-inventory.pptx
jshaw-projetech--understanding-maximo-inventory.pptxmirws1
 
Classifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementClassifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementRobert Zientara
 
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewMaximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewHelen Fisher
 
Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Bruno Portaluri
 
Maximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith PresentationMaximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith PresentationHelen Fisher
 
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementAttachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementRobert Zientara
 
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming EnhancementsPlanning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming EnhancementsIBM Danmark
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for UtilitiesVincent Kwon
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCEPANKAJ TIKEKAR
 
Maximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesMaximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesHelen Fisher
 
Maximo Training - Introduction
Maximo Training - IntroductionMaximo Training - Introduction
Maximo Training - IntroductionBruno Portaluri
 
Maximo Training - Asset Management
Maximo Training - Asset ManagementMaximo Training - Asset Management
Maximo Training - Asset ManagementBruno Portaluri
 
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapMaximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapHelen Fisher
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementRobert Zientara
 

Was ist angesagt? (20)

Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
 Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
 
Using IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansUsing IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety Plans
 
jshaw-projetech--understanding-maximo-inventory.pptx
jshaw-projetech--understanding-maximo-inventory.pptxjshaw-projetech--understanding-maximo-inventory.pptx
jshaw-projetech--understanding-maximo-inventory.pptx
 
Classifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementClassifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset Management
 
ibm_maximo
ibm_maximoibm_maximo
ibm_maximo
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewMaximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
 
Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Maximo Roadmap - September 2019
Maximo Roadmap - September 2019
 
Maximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith PresentationMaximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith Presentation
 
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementAttachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset Management
 
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming EnhancementsPlanning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for Utilities
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
Maximo 7.6 Features
Maximo 7.6 Features Maximo 7.6 Features
Maximo 7.6 Features
 
Maximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesMaximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best Practices
 
Maximo Training - Introduction
Maximo Training - IntroductionMaximo Training - Introduction
Maximo Training - Introduction
 
Maximo Training - Asset Management
Maximo Training - Asset ManagementMaximo Training - Asset Management
Maximo Training - Asset Management
 
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapMaximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmap
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset Management
 

Ähnlich wie Maximo Oil and Gas 7.6.1 HSE: Overview

GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...LN Mishra CBAP
 
Operational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss PreventionOperational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss PreventionMichael Marshall, PE
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015Worksoft
 
Software Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing TrendsSoftware Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing TrendsKMS Technology
 
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...ennVee TechnoGroup Inc
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationWorksoft
 
Sap Application Assurance Service Offerings
Sap Application Assurance Service OfferingsSap Application Assurance Service Offerings
Sap Application Assurance Service OfferingsUma Narayan
 
A New Model for Building Business Process Quality
A New Model for Building Business Process QualityA New Model for Building Business Process Quality
A New Model for Building Business Process QualityWorksoft
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3DQS Inc.
 
ROI in automated testing
ROI in automated testingROI in automated testing
ROI in automated testingsamar15
 
6 Ways to Measure the ROI of Automated Testing
6 Ways to Measure the ROI of Automated Testing6 Ways to Measure the ROI of Automated Testing
6 Ways to Measure the ROI of Automated TestingSmartBear
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviewsssusereb347d
 
13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspectionsssusereb347d
 
Measuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity ModelMeasuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity ModelNathaniel Palmer
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]JULIO GONZALEZ SANZ
 
Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"Globe Testing
 
Software Testing Process & Trend
Software Testing Process & TrendSoftware Testing Process & Trend
Software Testing Process & TrendKMS Technology
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Imaginet
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaEnergySec
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.pptssuserf2880f
 

Ähnlich wie Maximo Oil and Gas 7.6.1 HSE: Overview (20)

GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
GRCPerfect - Enterprise Project Governance, Risk and Compliance Management Sy...
 
Operational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss PreventionOperational Excellence in Oil and Gas Loss Prevention
Operational Excellence in Oil and Gas Loss Prevention
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
 
Software Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing TrendsSoftware Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing Trends
 
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
GLOC 2018: Automation or How We Eliminated Manual EBS R12.2 Upgrades and Beca...
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with Automation
 
Sap Application Assurance Service Offerings
Sap Application Assurance Service OfferingsSap Application Assurance Service Offerings
Sap Application Assurance Service Offerings
 
A New Model for Building Business Process Quality
A New Model for Building Business Process QualityA New Model for Building Business Process Quality
A New Model for Building Business Process Quality
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3
 
ROI in automated testing
ROI in automated testingROI in automated testing
ROI in automated testing
 
6 Ways to Measure the ROI of Automated Testing
6 Ways to Measure the ROI of Automated Testing6 Ways to Measure the ROI of Automated Testing
6 Ways to Measure the ROI of Automated Testing
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews
 
13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections
 
Measuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity ModelMeasuring Process Maturity: The Business Process Maturity Model
Measuring Process Maturity: The Business Process Maturity Model
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]
 
Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"
 
Software Testing Process & Trend
Software Testing Process & TrendSoftware Testing Process & Trend
Software Testing Process & Trend
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six Sigma
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
 

Mehr von Helen Fisher

MaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionMaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionHelen Fisher
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018Helen Fisher
 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Helen Fisher
 
Watson IoT at Think 2018
Watson IoT at Think 2018Watson IoT at Think 2018
Watson IoT at Think 2018Helen Fisher
 
IBM Maximo and ISO 55000
IBM Maximo and ISO 55000IBM Maximo and ISO 55000
IBM Maximo and ISO 55000Helen Fisher
 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017Helen Fisher
 
IBM Maximo for utilities T&D
IBM Maximo for utilities T&DIBM Maximo for utilities T&D
IBM Maximo for utilities T&DHelen Fisher
 
Maximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryMaximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewMaximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE ReportsMaximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE ReportsHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsMaximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module OverviewMaximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overviewMaximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewMaximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 Maximo Oil and Gas 7.6.1 HSE: Solutions Overview Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Maximo Oil and Gas 7.6.1 HSE: Solutions OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesMaximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewMaximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overviewMaximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overviewHelen Fisher
 

Mehr von Helen Fisher (20)

MaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionMaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit Solution
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018
 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201
 
Watson IoT at Think 2018
Watson IoT at Think 2018Watson IoT at Think 2018
Watson IoT at Think 2018
 
IBM Maximo and ISO 55000
IBM Maximo and ISO 55000IBM Maximo and ISO 55000
IBM Maximo and ISO 55000
 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017
 
IBM Maximo for utilities T&D
IBM Maximo for utilities T&DIBM Maximo for utilities T&D
IBM Maximo for utilities T&D
 
Maximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryMaximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industry
 
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewMaximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
 
Maximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE ReportsMaximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE Reports
 
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsMaximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module options
 
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module OverviewMaximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
 
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overviewMaximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
 
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewMaximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
 
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 Maximo Oil and Gas 7.6.1 HSE: Solutions Overview Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesMaximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
 
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewMaximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
 
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overviewMaximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
 

Kürzlich hochgeladen

Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Velvetech LLC
 
20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...
20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...
20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...Akihiro Suda
 
Simplifying Microservices & Apps - The art of effortless development - Meetup...
Simplifying Microservices & Apps - The art of effortless development - Meetup...Simplifying Microservices & Apps - The art of effortless development - Meetup...
Simplifying Microservices & Apps - The art of effortless development - Meetup...Rob Geurden
 
SensoDat: Simulation-based Sensor Dataset of Self-driving Cars
SensoDat: Simulation-based Sensor Dataset of Self-driving CarsSensoDat: Simulation-based Sensor Dataset of Self-driving Cars
SensoDat: Simulation-based Sensor Dataset of Self-driving CarsChristian Birchler
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based projectAnoyGreter
 
Cyber security and its impact on E commerce
Cyber security and its impact on E commerceCyber security and its impact on E commerce
Cyber security and its impact on E commercemanigoyal112
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Andreas Granig
 
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Matt Ray
 
Precise and Complete Requirements? An Elusive Goal
Precise and Complete Requirements? An Elusive GoalPrecise and Complete Requirements? An Elusive Goal
Precise and Complete Requirements? An Elusive GoalLionel Briand
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...Technogeeks
 
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Cizo Technology Services
 
Powering Real-Time Decisions with Continuous Data Streams
Powering Real-Time Decisions with Continuous Data StreamsPowering Real-Time Decisions with Continuous Data Streams
Powering Real-Time Decisions with Continuous Data StreamsSafe Software
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanyChristoph Pohl
 
Xen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfXen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfStefano Stabellini
 
VK Business Profile - provides IT solutions and Web Development
VK Business Profile - provides IT solutions and Web DevelopmentVK Business Profile - provides IT solutions and Web Development
VK Business Profile - provides IT solutions and Web Developmentvyaparkranti
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odishasmiwainfosol
 
Odoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 EnterpriseOdoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 Enterprisepreethippts
 

Kürzlich hochgeladen (20)

Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...
 
20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...
20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...
20240415 [Container Plumbing Days] Usernetes Gen2 - Kubernetes in Rootless Do...
 
Simplifying Microservices & Apps - The art of effortless development - Meetup...
Simplifying Microservices & Apps - The art of effortless development - Meetup...Simplifying Microservices & Apps - The art of effortless development - Meetup...
Simplifying Microservices & Apps - The art of effortless development - Meetup...
 
SensoDat: Simulation-based Sensor Dataset of Self-driving Cars
SensoDat: Simulation-based Sensor Dataset of Self-driving CarsSensoDat: Simulation-based Sensor Dataset of Self-driving Cars
SensoDat: Simulation-based Sensor Dataset of Self-driving Cars
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based project
 
Cyber security and its impact on E commerce
Cyber security and its impact on E commerceCyber security and its impact on E commerce
Cyber security and its impact on E commerce
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024
 
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
 
Precise and Complete Requirements? An Elusive Goal
Precise and Complete Requirements? An Elusive GoalPrecise and Complete Requirements? An Elusive Goal
Precise and Complete Requirements? An Elusive Goal
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...
 
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
 
Powering Real-Time Decisions with Continuous Data Streams
Powering Real-Time Decisions with Continuous Data StreamsPowering Real-Time Decisions with Continuous Data Streams
Powering Real-Time Decisions with Continuous Data Streams
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
 
Xen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfXen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdf
 
VK Business Profile - provides IT solutions and Web Development
VK Business Profile - provides IT solutions and Web DevelopmentVK Business Profile - provides IT solutions and Web Development
VK Business Profile - provides IT solutions and Web Development
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
 
Odoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 EnterpriseOdoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 Enterprise
 
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
 

Maximo Oil and Gas 7.6.1 HSE: Overview

  • 1. © 2016 IBM Corporation Russell Bee Lead Product Architect STSM, Maximo Design and Architecture Maximo Oil and Gas 7.6.1 Maximo HSE Manager 7.6.1 Overview and new product features
  • 2. Maximo Oil and Gas/HSE Manager 7.6.1 business processes Operations Management Asset & Work Management Control of Work HSE Management Management of Change Quality Management Drilling and Well Management Manage operator logs Shift handover Production loss reporting Define operating policies and procedures Bypass Management Asset management Defect Management Risk Management Permit to Work Incident Management Investigation Management Continuous Improvement Management of Change Regulatory Compliance Competency Management Drilling and Completion Manage Run Logs Managing non-conformance Major Business Processes DetailedBusinessProcesses Safety Quality Compliance Isolation Management Audit Management Work Management Turnaround management Hazard Management Managing Operational Actions Failure management Managing Corrective Action Knowledge Management Capturing Knowledge Identifying Solutions Maximo Oil and Gas only Managing regulatory permits and environmental Consents Managing Supply Chain Quality Construction and Commissioning Management Mobile Incident Reporting New processes
  • 3. Maximo Oil and Gas/HSE Manager 7.6.1 Module and Application Structure Assets InventoryChange (Oil) Operations PlanningPlanning Purchasing New apps Location Profile Cloned apps Assets Locations Cloned apps Item Master New apps Operator Log Log Book Operator Tasks Operating Policies Operating Procedures Bypass Management Operational Actions New apps MOC Request MOC Improvements New apps Action Tracking Cloned apps Hazards Precautions Lock Out/ Tag Out Plan New apps Permit and Cert Types Permit to Work Risk Assessment Risk Matrix Isolation Management Cloned apps Job Plans Routes Cloned apps Incidents Service Requests Solutions Ticket Templates Create Incident Review Incidents Cloned apps Work Order Tracking New apps Asset List Condition for Work Regulatory Compliance Prioritization Matrix Benefits and Losses Standard Actions Standard Action Groups Cloned apps Preventive Maintenance Preventive Maintenance Cloned apps Purchase Requests Purchase Orders Key New apps Certifications Audits Defects Investigations Safety and Quality Management Work Orders Safety sub module New apps Oil and Gas Run Log New apps Oil and Gas Drilling and Completion Module New application Cloned application Oil and Gas only Mobile (Anywhere) Incident Reporter New applications Original apps Releases Original apps Configuration Items
  • 4. Maximo Oil and Gas/HSE Manager 7.6.1 Module and Application Structure – Administration Module Administration Cloned apps Organizations People Qualifications Key Module New application Cloned application Oil and Gas only New applications Original apps Configuration Items
  • 5. Maximo for Oil and Gas/HSE Manager – Capability Summary 5 Release 7.1.0 Release 7.1.1 All future release dates are estimates and specific content is subject to change. Maximo 7.1 Maximo 7.1 Release 7.1.2 Maximo 7.1 GA: Sep 28, 2008 GA: Dec 2009 GA: Nov. 2010 • Location and Work Details • Prioritization Matrix • Condition for Work • Regulations • Incidents • Defects • Investigations • Solutions • Improvements • Benefits and Losses • Management of Change • Action Tracking • Standard Actions • ISO14224 Failure Codes & Specs* • Control of Work • Permit and Certificate Types • Risk Analysis • Risk Matrices • Operator’s Log • Standard Action Groups • Maximo Spatial Integration • Support for MIMOSA • Miscellaneous enhancements •Hazards •MOC Risks and Projects •Target Availability •Legacy Tag •Bad Actor Dialog •Service Request (Oil) • Operating Policies • Operating Procedures • Operator Tasks • Cause Analysis/FMECA • Material Inspection • Operator Log Enhancements • Scheduler integration • MOC enhancements • Run Log* • Drilling and Completion* • Miscellaneous enhancements •Extra failure fields •Incident impact •Regulations extra where used * Maximo Oil and Gas only
  • 6. Maximo for Oil and Gas/HSE Manager – Capability Summary 6 Release 7.5.0 Release 7.5.1 Maximo 7.5 Maximo 7.5 Release 7.6 Maximo 7.6 GA: August 30 2011 GA: March 15 2013 GA Dec 4th 2015: • Non-conformances • ISO I4224 Failure Mechanism • ISO14224 Sub unit/maint item • Multiple persons on Incident • Classification of risk assessments • Item Master on MOC • Add Regulation to Incidents • Qualifications link to certificates • Qualification verification on Labour • Editable fields on People • Incidents & Investigations enh. • Bypass Management • Chemical Mgt. • Operational Risk Assessment • Permit to Work enh. • Asset & Location registers • Certification Templates • Audit Enhancements • Quality & Defect enh. • Repeatable Standard Actions • MOC PSSR Permit to Work Audit and Survey Certifications Location profiles Preparation Activities Daily Operations Report Miscellaneous enhancements  Incidents  Test results  Regulations  Risk Assessment  Failure Reporting  MOC  Operator Log
  • 7. Maximo for Oil and Gas/HSE Manager – Capability Summary 7 Release 7.6.1 Maximo 7.6 GA: October 2016 • Shift handover • Log Book • Related Operator Logs • Operational Actions • Action Tracking change to Class • Safety Bulletins • Safety Meetings • Incident Reporter • Support for OSHA style reporting • Environmental management • Permit to Work process enh. • Risk Assessment Hazard Review • Certifications enhancements • Location and Asset FMECA • Human Factor Analysis
  • 8. Key New Features Maximo Oil and Gas 7.6.1, Maximo Health, Safety, & Environment Manager 7.6.1 8 Feature Area Features Action Tracking • Action Tracking now a Work Order Class • New Safety Bulletin tab • New Safety Meeting tab • New crossover domain for Create Action on originating applications allows ability to edit description. Audit and Survey • Likert scale fields added to audit • Create Certification action • Findings category • Group Email function for Audit Team • Create Audit on Service Request Bypass Management • Template capability Certifications • Multiple Locations • Related Certifications • Certification extensions • Regulatory Permit tab • Review Actions • Additional date and reference fields • Create audit action Environmental Management • Environmentally Critical Elements • Aspects and Impacts support in Risk Assessment, Hazards, Precautions and Risk Matrix • Environmental consents • Emission reports Failure Analysis • FMECA capability added to Assets and Locations • Review Actions added to Assets and Locations to support criticality analysis and failure analysis actions
  • 9. Key New Features Maximo Oil and Gas 7.6.1, Maximo Health, Safety, & Environment Manager 7.6.1 9 Feature Area Features Incidents • New Ticket Template clone • New Incident Reporter Anywhere app • OSHA style reports and supporting data structures • Self Service Create Incident and Review Incidents Investigations • Review Actions • Human factors analysis Location Profile • New Hours Worked tab Locations and Assets • Leaking state fields • Calculations tab to support a general calculation capability • View Operator Log Details MOC • Closure Actions • MOC Template • WO deferral • MOC KPIs and saved queries • Improved filtering and comments capability on Pre Start and Post Start Actions Operator Log • Shift handover and carry over • New Log Book application • Related Operator Logs • Log entry level actions • Regulatory Log entries • View Operator Log details on Assets and Locations Operational Actions • A new application to manage standard actions from multiple different applications from a single place • Supports Start Center action management
  • 10. Key New Features Maximo Oil and Gas 7.6.1, Maximo Health, Safety, & Environment Manager 7.6.1 10 Feature Area Features Risk Assessment • Hazard Review • Populate WO from Location Risk Assessment • Support for risk assessment of an asset • Group Email function for Risk Assessment Team Permit to Work • New Isolation Management application • Multiple site checks • Countersignatures • Hazard Review • New statuses for isolation • Suspend action • Multiple area authorization on Permit/Person • New options for automated status changed • New option for automated common isolation check • Permit to Work related KPIs Work Management • Review Actions • Job Plan production impact • Regulations on PM • Job Plan and WO supplementary risk assessments • Operating Policy on WO • Regulations on Item Master • PM Certification field
  • 11. Maximo Oil and Gas/HSE Manager Business Process Map in Blueworks Live
  • 12. Examples of some of the possible interactions in Maximo Oil and Gas and Maximo HSE Manager 7.6.1 Work Order Tracking Operating Procedures Operator Log Operational Actions Failure Reporting Benefits & Losses Operating Policy Defects Risk Assessment Risk Matrix Incident Management Investigations Improvements Management of Change Regulatory Compliance Action Tracking People Solutions Certifications Permit To Work Audit and Survey Note: Blue boxes show Applications Bypass Management Log Book
  • 13. What is Maximo Oil and Gas/HSE Manager? Capability Benefit Incidents Addresses the continuous need for customers to improve operational performance by creating, reviewing, and analyzing incidents. Includes Self Service Create and Review Incidents. A mobile Incident Reporter application is also included Investigations Allows customers to identify the root cause of problems arising from incidents on their plants that may be safety, environmental, or production related. Management of Change Allows customers to support change requirements in a more robust way with multiple levels of reviews/approvals, authorization of change, pre and post start actions Defects, Non-Conformance Provides non-conformance management capabilities designed to automate, manage, and streamline for identifying, evaluating, reviewing, and handling on non-conforming engineering specifications, materials, components, parts and processes. Regulatory Compliance Identifies regulatory compliance against assets and locations and associates job plans and work orders to these regulations to ensure compliance – significantly reducing the costs associated with compliance
  • 14. What is Maximo Oil and Gas/HSE Manager? Capability Benefit Operating Procedures Capabilities for documented, step-by-step operating procedures Operating Policy Governance application for structuring your operating policy Risk Assessment Iterative document that links all associated Health, Safety and Environment activities and organizational data. Allows customers to analyze the risks associated with work carried out through the Maximo products, identifying hazards and defining the impact ranking Risk Matrix An application that models both probability and consequences of events supporting risk management processes Improvements Manages continuous improvement programs like Six Sigma or similar methodologies
  • 15. What is Maximo Oil and Gas/HSE Manager? Capability Benefit People (Competency Extensions) Improves competency assurance through capabilities for adding, modifying, and updating competencies of the workforce Operators Log Electronic log used by shift operators for recording and qualifying events which occur during an individuals shift watch People (Certification) Tracking Complete history of all personnel job roles, certifications, training and current qualifications Action Tracking Allows customers to track statutory implications to ensure certain types of work and actions are completed by the agreed dates Benefits & Losses Captures benefits/losses associated with improvements or costs associated with incidents, failures, survey/audit findings
  • 16. What is Maximo Oil and Gas/HSE Manager? Capability Benefit Failure Reporting Reporting mechanism for capturing metrics to support consistent Failure Reporting and Corrective Action process (FRACAS) Solutions Searchable learning repository associated with lessons learned, or with proven solutions having a safety, operational, maintenance or engineering context Defects Integrated approach to manage or eliminate defects Bypass Management Use to manage bypass operations, also known as inhibits, or overrides, for safety related systems such as Emergency Shutdown, Fire and Gas Systems, Alarm Panels and soft alarms on DCS systems. It can also be used to manage bypasses of mechanical systems such as sprinklers. A further use case is management of security system bypasses.
  • 17. Capability Benefit Certifications A certification record contains the details that are used to verify that standards for assets or locations are met. They can also be used to make sure that personnel are qualified for specialized tasks. Location Profile Location profiles contain information on production data. You can use location profiles to reduce the production losses that can result from planned or unplanned maintenance shutdowns. Preparation Activities An application to manage the preparation activities that are associated with different phases of scheduled work packages. Preparation activities are tasks that are usually carried out either before assets are put into operation or in preparation for a plant turnaround. Lock Out/ Tag Out Plan Lock out and tag out operations specify a plan of isolation for assets or locations to ensure the safety of the plant. The plans describe how to remove work assets from service and place them back into service Permit to Work A permit to work provides for the effective management of hazards in the work place. The permit to work is frequently used with one or more work orders. You can also generate a permit to work based on an existing work order or task. Audit and Survey Audits are used to evaluate compliance with industry-related regulations or with internal regulations. You can use either audits or surveys to evaluate locations and assets for regulatory compliance. What is Maximo Oil and Gas/HSE Manager? BE PREPARED!
  • 18. Capability Benefit Operational Actions Consolidates standard actions across multiple different applications. Supports the sign-off of completion of actions in a single place. Allows standard actions to be added to a Start Center Log Book Provides a way to bring together individual operator logs into a Log Book. Supports the shift handover process. Isolation Management Supports the scenario where customers want to manage isolation separately from a permit. Fully integrated with permit to work if required. Incident Reporter A Maximo Anywhere based mobile application to report an incident, hazard or safety observation. Supports disconnected operation. Also provides the ability to view your reported incidents from the mobile device Certifications (Environmental Consents) Extension of Certification application to support the management of environmental consents and regulatory permits. Assets & Locations (FMECA Criticality) Extensions to Assets and Locations to provide failure mode analysis and criticality analysis. What is Maximo Oil and Gas/HSE Manager?