SlideShare a Scribd company logo
1 of 14
Building Social Protection Systems
Ethiopia PSNP/HABP
Mechanism for Harmonization
Wout Soer
AFTSP-Ethiopia
5th
February 2013
Structure
Background PSNP/HABP
PSNP/HABP Coordination Mechanisms
Gains
Challenges
Lessons learnt - elements of success
Background
Emergency system with annual appeals
for 20 years
Number of people in need ranged between
5 - 14million
Relief Costs: upward
of $1 billion in worst
year and around $700m
on average in the decade
before the start of the
program
Background 2
Impact emergency system
Saved lives - not livelihoods
Arrive late, not enough, inappropriate
Asset depletion
Increasing chronic caseload
Bulk of needs were chronic & predictable
Relief response not appropriate for this kind of
need
Background 3
Desire to:
Break the cycle of annual relief
Make resource transfers more predictable
Make resource transfers more productive
Government-led coalition for food security called for
Predictable cash & food resources for predictable
problems
One large safety net program to address chronic
needs resulted in PSNP/HABP
"Ny
athi,
Nich
olas
"
<nn
yath
i@s
nvw
orld.
org>
Coordination mechanisms
Key Elements
Pooled Funding
Joint Tracking of Progress
Joint Programme Oversight
Common Reporting, Monitoring and Evaluation
Framework
Shared Implementation Principles: e.g. cash first
principle
Coordination mechanisms 2
Institutional arrangements:
GOE /MoARD– overall responsible for the
implementation of the programme
DRMFSS - overall responsibility for coordination, early
warning and logistics
MoFED – Financial Management
NRMD: coordination of Public Works
AED & FCA: overall responsible for HABP
Regions and Woredas - Programme implementation
Development partners: DWG, DCT
Coordination mechanisms 3
Important elements:
Common information platform -Key Documents
Archive ( PIM, Aide Memoires, Key studies, RRT reports,
Guidelines, Manuals etc.)
Annual Work Plan and Budget
Six monthly Joint Review & Implementation support
Missions (Aide Memoires and Action plans)
Joint Strategic Oversight Committee – Donors and
Government (and joint technical committees)
Gains coordinated approach
One large program with one set of harmonized
procedures supported by 10 Development Partners
Large coverage: 7.6 mln clients in 319 Districts
Large number of PWs with significant developmental
impacts (40-45000 projects per annum)
Systematic strengthening of Government systems
(FM, Procurement, implementation modalities etc.)
Better structured dialogue between DPs and
Government
Challenges
Harmonisation between stakeholders not easy
(specific individual institutional requirements may
take over)
Hands-on or hands off: some level of uncertainty
Institutions have the need to generate additional
information at times
Political change necessitates action (HQ)
Transaction costs of coordination/harmonization
are significant
Pace of change
Lessons
Need to be context specific –what works in Ethiopia
may not work in other countries
Map out different DPs requirements (e.g. studies,
assessments, reviews etc.)
Invest in a DPs coordination team
Underline need for flexibility to ensure adherence
to agreed MOU, principles, structure etc.
Prepare to compromise
Lessons
Work through GoE systems as much as possible ..
but make upfront, detailed assessment of
government capacity to ensure it can deliver what
is expected.
Pool resources where possible: there are efficiency
gains but lots of work as well – need to take that
into consideration during the planning process
Learning by doing
Agree on an incremental change management
approach
Better coordination
better support
Thank you!

More Related Content

What's hot

Presentation: Routes to sustainable immunization financing
Presentation: Routes to sustainable immunization financingPresentation: Routes to sustainable immunization financing
Presentation: Routes to sustainable immunization financing
SabinVaccine
 

What's hot (20)

International trends in performance budgeting - Naida Carsimamovic, World Ban...
International trends in performance budgeting - Naida Carsimamovic, World Ban...International trends in performance budgeting - Naida Carsimamovic, World Ban...
International trends in performance budgeting - Naida Carsimamovic, World Ban...
 
State network-medicaid-expansion-tool-nga-webinar-final
State network-medicaid-expansion-tool-nga-webinar-finalState network-medicaid-expansion-tool-nga-webinar-final
State network-medicaid-expansion-tool-nga-webinar-final
 
D2-PM - Session 7 - Brenda PEQUENO, Mexico
D2-PM - Session 7 - Brenda PEQUENO, MexicoD2-PM - Session 7 - Brenda PEQUENO, Mexico
D2-PM - Session 7 - Brenda PEQUENO, Mexico
 
2015 ReSAKSS Conference – Day 1 - Stephen Mink
2015 ReSAKSS Conference – Day 1 - Stephen Mink2015 ReSAKSS Conference – Day 1 - Stephen Mink
2015 ReSAKSS Conference – Day 1 - Stephen Mink
 
Best Practices in Performance Budgeting - Ivor Beazley, OECD
Best Practices in Performance Budgeting -  Ivor Beazley, OECDBest Practices in Performance Budgeting -  Ivor Beazley, OECD
Best Practices in Performance Budgeting - Ivor Beazley, OECD
 
2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa
 
Pell Grant Program
Pell Grant ProgramPell Grant Program
Pell Grant Program
 
Vertical Integration: Why, What, How?
Vertical Integration: Why, What, How?Vertical Integration: Why, What, How?
Vertical Integration: Why, What, How?
 
Using performance information for management - Edwin Lau, OECD
Using performance information for management - Edwin Lau, OECDUsing performance information for management - Edwin Lau, OECD
Using performance information for management - Edwin Lau, OECD
 
2015 ReSAKSS Conference – Day 1 - Sam Benin
2015 ReSAKSS Conference – Day 1 - Sam Benin2015 ReSAKSS Conference – Day 1 - Sam Benin
2015 ReSAKSS Conference – Day 1 - Sam Benin
 
D1 am - session 1 - Scherie Nicol and Pinar Guven, OECD
D1 am - session 1 - Scherie Nicol and Pinar Guven, OECDD1 am - session 1 - Scherie Nicol and Pinar Guven, OECD
D1 am - session 1 - Scherie Nicol and Pinar Guven, OECD
 
Performance budgeting practices - Ivor Beazley, World Bank
Performance budgeting practices - Ivor Beazley, World BankPerformance budgeting practices - Ivor Beazley, World Bank
Performance budgeting practices - Ivor Beazley, World Bank
 
Fiscal sustainability - David Vaudt, David Bean, GASB & Ian Carruthers, CIPFA
Fiscal sustainability - David Vaudt, David Bean, GASB & Ian Carruthers, CIPFAFiscal sustainability - David Vaudt, David Bean, GASB & Ian Carruthers, CIPFA
Fiscal sustainability - David Vaudt, David Bean, GASB & Ian Carruthers, CIPFA
 
Performance Budgeting in the USA by Scott Pattison
Performance Budgeting in the USA by Scott Pattison Performance Budgeting in the USA by Scott Pattison
Performance Budgeting in the USA by Scott Pattison
 
Sustainability and transition - Nicolas Cantau, The Global Fund
Sustainability and transition - Nicolas Cantau, The Global FundSustainability and transition - Nicolas Cantau, The Global Fund
Sustainability and transition - Nicolas Cantau, The Global Fund
 
Budget execution - Chris James, OECD
Budget execution - Chris James, OECDBudget execution - Chris James, OECD
Budget execution - Chris James, OECD
 
Data and information management for M&E of national adaptation
Data and information management for M&E of national adaptationData and information management for M&E of national adaptation
Data and information management for M&E of national adaptation
 
2015 ReSAKSS Conference – Day 1 - Assefa Admaassie
2015 ReSAKSS Conference – Day 1 - Assefa Admaassie2015 ReSAKSS Conference – Day 1 - Assefa Admaassie
2015 ReSAKSS Conference – Day 1 - Assefa Admaassie
 
Webinar | Approaches to Progress Reporting on National Adaptation Plan (NAP) ...
Webinar | Approaches to Progress Reporting on National Adaptation Plan (NAP) ...Webinar | Approaches to Progress Reporting on National Adaptation Plan (NAP) ...
Webinar | Approaches to Progress Reporting on National Adaptation Plan (NAP) ...
 
Presentation: Routes to sustainable immunization financing
Presentation: Routes to sustainable immunization financingPresentation: Routes to sustainable immunization financing
Presentation: Routes to sustainable immunization financing
 

Similar to Building Social Protection Systems: Mechanism for Harmonization (Ethiopia)

Budget Tracking IsodecLearningSessionICCO15okt
Budget Tracking IsodecLearningSessionICCO15oktBudget Tracking IsodecLearningSessionICCO15okt
Budget Tracking IsodecLearningSessionICCO15okt
ICCO Cooperation
 
Ihp Review 2008 Final Presentation
Ihp Review 2008 Final PresentationIhp Review 2008 Final Presentation
Ihp Review 2008 Final Presentation
ihp
 
Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...
Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...
Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...
International Journal of Economics and Financial Research
 
Government budgeting & expenditures issues & problems
Government budgeting & expenditures issues & problemsGovernment budgeting & expenditures issues & problems
Government budgeting & expenditures issues & problems
Louie Medinaceli
 

Similar to Building Social Protection Systems: Mechanism for Harmonization (Ethiopia) (20)

Budget Tracking IsodecLearningSessionICCO15okt
Budget Tracking IsodecLearningSessionICCO15oktBudget Tracking IsodecLearningSessionICCO15okt
Budget Tracking IsodecLearningSessionICCO15okt
 
Ihp Review 2008 Final Presentation
Ihp Review 2008 Final PresentationIhp Review 2008 Final Presentation
Ihp Review 2008 Final Presentation
 
ISPMS Background, Purpose and Approach
ISPMS Background, Purpose and ApproachISPMS Background, Purpose and Approach
ISPMS Background, Purpose and Approach
 
Public Governance Review of Estonia & Finland - Preliminary Findings on Whole...
Public Governance Review of Estonia & Finland - Preliminary Findings on Whole...Public Governance Review of Estonia & Finland - Preliminary Findings on Whole...
Public Governance Review of Estonia & Finland - Preliminary Findings on Whole...
 
Moon practical approaches to aid effectiveness
Moon practical approaches to aid effectivenessMoon practical approaches to aid effectiveness
Moon practical approaches to aid effectiveness
 
Lessons from pfm in the health sector final
Lessons from pfm in the health sector finalLessons from pfm in the health sector final
Lessons from pfm in the health sector final
 
Comments on Presentation by the Government of Indonesia
Comments on Presentation by the Government of IndonesiaComments on Presentation by the Government of Indonesia
Comments on Presentation by the Government of Indonesia
 
Key findings, lessons learned and next steps for TrackFin
Key findings, lessons learned and next steps for TrackFinKey findings, lessons learned and next steps for TrackFin
Key findings, lessons learned and next steps for TrackFin
 
Treasury reform in_nepal_a_case_for_government_credibility-baburam_subedi_en
Treasury reform in_nepal_a_case_for_government_credibility-baburam_subedi_enTreasury reform in_nepal_a_case_for_government_credibility-baburam_subedi_en
Treasury reform in_nepal_a_case_for_government_credibility-baburam_subedi_en
 
Pradeep Kurukulasuriya, UNDP-GEF: Mainstreaming climate change into planning
Pradeep Kurukulasuriya, UNDP-GEF: Mainstreaming climate change into planningPradeep Kurukulasuriya, UNDP-GEF: Mainstreaming climate change into planning
Pradeep Kurukulasuriya, UNDP-GEF: Mainstreaming climate change into planning
 
Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...
Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...
Zero-based Budgeting System: Is Budgeting System the Determinant of Budget Im...
 
Taking RBF From Scheme to System
Taking RBF From Scheme to System Taking RBF From Scheme to System
Taking RBF From Scheme to System
 
Timor leste collaborative behaviour
Timor leste collaborative behaviourTimor leste collaborative behaviour
Timor leste collaborative behaviour
 
Budeting & costing
Budeting & costingBudeting & costing
Budeting & costing
 
Government budgeting & expenditures issues & problems
Government budgeting & expenditures issues & problemsGovernment budgeting & expenditures issues & problems
Government budgeting & expenditures issues & problems
 
3.30 4.45pm Improving Sector Performance (Jerome Dendura) English
3.30 4.45pm Improving Sector Performance (Jerome Dendura) English3.30 4.45pm Improving Sector Performance (Jerome Dendura) English
3.30 4.45pm Improving Sector Performance (Jerome Dendura) English
 
Sabin SIF Third Colloquium intro
Sabin SIF Third Colloquium introSabin SIF Third Colloquium intro
Sabin SIF Third Colloquium intro
 
Tap Taller Ops
Tap Taller OpsTap Taller Ops
Tap Taller Ops
 
Health and budget analysis for civil society
Health and budget analysis for civil societyHealth and budget analysis for civil society
Health and budget analysis for civil society
 
National progress report on the implementation of the hyogo framework for action
National progress report on the implementation of the hyogo framework for actionNational progress report on the implementation of the hyogo framework for action
National progress report on the implementation of the hyogo framework for action
 

More from Health, Education, Social Protection and Labor World Bank

More from Health, Education, Social Protection and Labor World Bank (20)

World Bank Education Strategy 2020: Phase 2 of External Consultations
World Bank Education Strategy 2020: Phase 2 of External ConsultationsWorld Bank Education Strategy 2020: Phase 2 of External Consultations
World Bank Education Strategy 2020: Phase 2 of External Consultations
 
[Brochure] World Bank Education Strategy 2020: Learning for All -- Investing ...
[Brochure] World Bank Education Strategy 2020: Learning for All -- Investing ...[Brochure] World Bank Education Strategy 2020: Learning for All -- Investing ...
[Brochure] World Bank Education Strategy 2020: Learning for All -- Investing ...
 
Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...
Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...
Pantawid Pamiliyang Pilipino Program - Conditional Cash Transfer (The Philipp...
 
Chile Solidario: Building Family-focused Networks
Chile Solidario: Building Family-focused NetworksChile Solidario: Building Family-focused Networks
Chile Solidario: Building Family-focused Networks
 
Reaching the Poorest in Pakistan Through an Integrated Social Protection Systems
Reaching the Poorest in Pakistan Through an Integrated Social Protection SystemsReaching the Poorest in Pakistan Through an Integrated Social Protection Systems
Reaching the Poorest in Pakistan Through an Integrated Social Protection Systems
 
Pension Core Course 2013: Symposium on Social Pensions vs. Social Assistance
Pension Core Course 2013: Symposium on Social Pensions vs. Social AssistancePension Core Course 2013: Symposium on Social Pensions vs. Social Assistance
Pension Core Course 2013: Symposium on Social Pensions vs. Social Assistance
 
Pension Core Course 2013: Agenda
Pension Core Course 2013: AgendaPension Core Course 2013: Agenda
Pension Core Course 2013: Agenda
 
Investing in Nutrition
Investing in NutritionInvesting in Nutrition
Investing in Nutrition
 
10 Things to Know About Girls Education
10 Things to Know About Girls Education10 Things to Know About Girls Education
10 Things to Know About Girls Education
 
RBF in Afghanistan: Motivation, Design and Preliminary Results
RBF in Afghanistan: Motivation, Design and Preliminary ResultsRBF in Afghanistan: Motivation, Design and Preliminary Results
RBF in Afghanistan: Motivation, Design and Preliminary Results
 
Achieving Maternal and Child Health with RBF: The Results 2013
Achieving Maternal and Child Health with RBF: The Results 2013 Achieving Maternal and Child Health with RBF: The Results 2013
Achieving Maternal and Child Health with RBF: The Results 2013
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Yo...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Yo...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Yo...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Yo...
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Wo...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Wo...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Wo...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Wo...
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sr...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sr...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sr...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sr...
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sk...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sk...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sk...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: Sk...
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: El...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: El...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: El...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: El...
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: IL...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: IL...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: IL...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: IL...
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: In...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: In...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: In...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: In...
 
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: La...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: La...Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: La...
Multi-Donor Trust Fund on Labor Markets, Job Creation and Economic Growth: La...
 
Multi-Donor Trust Fund: Activities and Results
Multi-Donor Trust Fund: Activities and ResultsMulti-Donor Trust Fund: Activities and Results
Multi-Donor Trust Fund: Activities and Results
 

Recently uploaded

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 

Building Social Protection Systems: Mechanism for Harmonization (Ethiopia)

  • 1. Building Social Protection Systems Ethiopia PSNP/HABP Mechanism for Harmonization Wout Soer AFTSP-Ethiopia 5th February 2013
  • 2. Structure Background PSNP/HABP PSNP/HABP Coordination Mechanisms Gains Challenges Lessons learnt - elements of success
  • 3. Background Emergency system with annual appeals for 20 years Number of people in need ranged between 5 - 14million Relief Costs: upward of $1 billion in worst year and around $700m on average in the decade before the start of the program
  • 4. Background 2 Impact emergency system Saved lives - not livelihoods Arrive late, not enough, inappropriate Asset depletion Increasing chronic caseload Bulk of needs were chronic & predictable Relief response not appropriate for this kind of need
  • 5. Background 3 Desire to: Break the cycle of annual relief Make resource transfers more predictable Make resource transfers more productive Government-led coalition for food security called for Predictable cash & food resources for predictable problems One large safety net program to address chronic needs resulted in PSNP/HABP "Ny athi, Nich olas " <nn yath i@s nvw orld. org>
  • 6. Coordination mechanisms Key Elements Pooled Funding Joint Tracking of Progress Joint Programme Oversight Common Reporting, Monitoring and Evaluation Framework Shared Implementation Principles: e.g. cash first principle
  • 7. Coordination mechanisms 2 Institutional arrangements: GOE /MoARD– overall responsible for the implementation of the programme DRMFSS - overall responsibility for coordination, early warning and logistics MoFED – Financial Management NRMD: coordination of Public Works AED & FCA: overall responsible for HABP Regions and Woredas - Programme implementation Development partners: DWG, DCT
  • 8. Coordination mechanisms 3 Important elements: Common information platform -Key Documents Archive ( PIM, Aide Memoires, Key studies, RRT reports, Guidelines, Manuals etc.) Annual Work Plan and Budget Six monthly Joint Review & Implementation support Missions (Aide Memoires and Action plans) Joint Strategic Oversight Committee – Donors and Government (and joint technical committees)
  • 9. Gains coordinated approach One large program with one set of harmonized procedures supported by 10 Development Partners Large coverage: 7.6 mln clients in 319 Districts Large number of PWs with significant developmental impacts (40-45000 projects per annum) Systematic strengthening of Government systems (FM, Procurement, implementation modalities etc.) Better structured dialogue between DPs and Government
  • 10. Challenges Harmonisation between stakeholders not easy (specific individual institutional requirements may take over) Hands-on or hands off: some level of uncertainty Institutions have the need to generate additional information at times Political change necessitates action (HQ) Transaction costs of coordination/harmonization are significant Pace of change
  • 11. Lessons Need to be context specific –what works in Ethiopia may not work in other countries Map out different DPs requirements (e.g. studies, assessments, reviews etc.) Invest in a DPs coordination team Underline need for flexibility to ensure adherence to agreed MOU, principles, structure etc. Prepare to compromise
  • 12. Lessons Work through GoE systems as much as possible .. but make upfront, detailed assessment of government capacity to ensure it can deliver what is expected. Pool resources where possible: there are efficiency gains but lots of work as well – need to take that into consideration during the planning process Learning by doing Agree on an incremental change management approach

Editor's Notes

  1. Harmonization between key government Departments not easy as well as harmonization between Development Partners.