SlideShare a Scribd company logo
1 of 18
Introduction to Lean
   Manufacturing




© 2009, Levinson Productivity Systems, P.C.   1
           www.ct-yankee.com
One Page Overview

• The purpose of lean is to
  remove all forms of waste
  from the value stream.
  • Waste includes cycle time,
    labor, materials, and energy.
• The chief obstacle is the
  fact that waste often hides
  in plain sight, or is built into
  activities.


   © 2009, Levinson Productivity Systems, P.C.   2
              www.ct-yankee.com
Contents
• Benefits of Lean Manufacturing
• The Origins of Lean
  Manufacturing
• What Is Lean Manufacturing?
• Waste, Friction, or Muda
• Lean Manufacturing and Green
  Manufacturing/ ISO 14001
• Some Lean Manufacturing
  Techniques
• Conclusion


   © 2009, Levinson Productivity Systems, P.C.   3
              www.ct-yankee.com
Benefits of Lean
      Manufacturing

•     Lean manufacturing
      delivers an insurmountable
      competitive advantage
      over competitors who don't
      use it effectively.




    © 2009, Levinson Productivity Systems, P.C.   4
               www.ct-yankee.com
Benefits of Lean
            Manufacturing
•       Lower production cost 
        higher profits and wages
    •      Cost avoidance flows directly to
           the bottom line.
(2) Supports ISO 14001 and
    "green" manufacturing
    •      Reduction of material waste
           and associated disposal costs
            higher profits
(3) Shorter cycle times: make-to-
    order vs. make-to-stock

        © 2009, Levinson Productivity Systems, P.C.   5
                   www.ct-yankee.com
Bottom Line and the
  Language of Money
• The first comprehensive
  implementation of lean
  manufacturing yielded:
  • Stock appreciation of 63 percent
    per year, for 16 years (not
    counting dividends)
  • 7.2 percent annual wage growth
• The next section will discuss
  lean manufacturing's origins.



   © 2009, Levinson Productivity Systems, P.C.   6
              www.ct-yankee.com
The Origin of Lean
  Manufacturing

  Discussion question:
 Who created the Toyota
  Production System?



© 2009, Levinson Productivity Systems, P.C.   7
           www.ct-yankee.com
Origin of the Toyota
  Production System
• Taiichi Ohno said openly that
  he got the idea from Henry
  Ford's books and the American
  supermarket.
  • Ford's My Life and Work (1922)
    describes just-in-time (JIT) and
    other lean concepts explicitly.
  • Depletion of supermarket shelf
    stock triggers replenishment; it is
    a "pull" system like kanban or
    Drum-Buffer-Rope.


   © 2009, Levinson Productivity Systems, P.C.   8
              www.ct-yankee.com
Bottom Line Results of
       the TPS
• The Ford Motor Company's
  original stock grew 63% per
  year (not counting dividends)
  and 7.2% annual wage growth.
• Toyota recently superseded
  General Motors as the world's
  largest automobile company.
• The next section will show how
  the TPS delivers these results.



   © 2009, Levinson Productivity Systems, P.C.   9
              www.ct-yankee.com
What is Lean
    Manufacturing?
A systematic approach to
the identification and
elimination all forms of
waste from the value
stream.


© 2009, Levinson Productivity Systems, P.C.   10
           www.ct-yankee.com
Concept of Friction,
 Waste, or Muda
Understanding of friction,
waste, or muda is the
foundation of the lean
Manufacturing.



© 2009, Levinson Productivity Systems, P.C.   11
           www.ct-yankee.com
The First Step is to
 Recognize the Waste
• This principle has been
  stressed by:
  • Henry Ford
  • Taiichi Ohno (Toyota
    production system)
  • Tom Peters (Thriving On
    Chaos)
  • Shigeo Shingo
  • J. F. Halpin (Zero Defects)


   © 2009, Levinson Productivity Systems, P.C.   12
              www.ct-yankee.com
Waste Often Hides in
     Plain View
• We cannot eliminate the waste
  of material, labor, or other
  resources until we recognize it
  as waste.
  • A job can consist of 75 percent
    waste (or even more).
• Classic example: brick laying
  in the late 19th century




   © 2009, Levinson Productivity Systems, P.C.   13
              www.ct-yankee.com
Waste is Often Built
    Into Jobs




    Pre-Gilbreth Bricklaying
© 2009, Levinson Productivity Systems, P.C.   14
           www.ct-yankee.com
Post-Gilbreth Brick
     Laying




  The solution is obvious (in
  retrospect), but first we have to
  know that we have a problem!
© 2009, Levinson Productivity Systems, P.C.   15
           www.ct-yankee.com
Lessons so far
• Waste often hides in plain
  view.
  • People become used to "living
    with it" or "working around it."
  • Definition for employees at all
    levels: If it's frustrating, a
    chronic annoyance, or a
    chronic inefficiency, it's
    friction. (Levinson and
    Tumbelty, 1997, SPC Essentials
    and Productivity Improvement,
    ASQ Quality Press)


   © 2009, Levinson Productivity Systems, P.C.   16
              www.ct-yankee.com
TPS Definitions of
         Waste
1. Overproduction
2. Waiting, including time in queue
3. Transportation (between
   workstations, or between supplier
   and customer)
4. Non-value-adding activities
5. Inventory
6. Waste motion
7. Cost of poor quality: scrap,
   rework, and inspection



   © 2009, Levinson Productivity Systems, P.C.   17
              www.ct-yankee.com
Waiting as a Form of
         Waste
• Of the total cycle time or
  lead time, how much
  involves value-adding
  work?
  • How much consists of
    waiting?




   © 2009, Levinson Productivity Systems, P.C.   18
              www.ct-yankee.com

More Related Content

What's hot

JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
Toyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean OperationToyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean OperationShahbaz Jaffri
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &ganessh04
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
Ch 1-intro-to-lean (1)
Ch 1-intro-to-lean (1)Ch 1-intro-to-lean (1)
Ch 1-intro-to-lean (1)Hårsh Pätél
 
Seminar report on lean
Seminar report on leanSeminar report on lean
Seminar report on leanMahendra Bhuva
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Reportshri1984
 
Jit principles
Jit principlesJit principles
Jit principlesamarshelke
 
Lean manufacturing and the toyota production system
Lean manufacturing and the toyota production systemLean manufacturing and the toyota production system
Lean manufacturing and the toyota production systemGrace Falcis
 
Just In Time production system
Just In Time production systemJust In Time production system
Just In Time production systemMohamed EL-Sayed
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 

What's hot (20)

Just in time concept
Just in time conceptJust in time concept
Just in time concept
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Toyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean OperationToyota production system-JIT-Lean Operation
Toyota production system-JIT-Lean Operation
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
3.1.1 . lean manufature
3.1.1 . lean manufature3.1.1 . lean manufature
3.1.1 . lean manufature
 
Ch 1-intro-to-lean (1)
Ch 1-intro-to-lean (1)Ch 1-intro-to-lean (1)
Ch 1-intro-to-lean (1)
 
Just in time
Just in timeJust in time
Just in time
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
JIT for manufacturing ppt
JIT for manufacturing pptJIT for manufacturing ppt
JIT for manufacturing ppt
 
Seminar report on lean
Seminar report on leanSeminar report on lean
Seminar report on lean
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
 
Jit principles
Jit principlesJit principles
Jit principles
 
Lean manufacturing and the toyota production system
Lean manufacturing and the toyota production systemLean manufacturing and the toyota production system
Lean manufacturing and the toyota production system
 
Just In Time production system
Just In Time production systemJust In Time production system
Just In Time production system
 
Lean system
Lean systemLean system
Lean system
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 

Similar to Lean manufacturing

Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean ManufacturingHammaduddin
 
Lesson 1 pe - lps introduction
Lesson 1   pe - lps introductionLesson 1   pe - lps introduction
Lesson 1 pe - lps introductionPaudzi Abdullah
 
The Staggering Cost of Poor Quality & How to Fix It
The Staggering Cost of Poor Quality & How to Fix ItThe Staggering Cost of Poor Quality & How to Fix It
The Staggering Cost of Poor Quality & How to Fix ItSafetyChain Software
 
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docxhyacinthshackley2629
 
6 levelsoflean
6 levelsoflean6 levelsoflean
6 levelsofleanRob Healy
 
Continuous Improvement in Lean
Continuous Improvement in LeanContinuous Improvement in Lean
Continuous Improvement in LeanRob Healy
 
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION 046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION Dr Fereidoun Dejahang
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
Toyota production system
Toyota  production systemToyota  production system
Toyota production systemEnamul Khan
 
Lean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersLean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersEquable
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsritukaushikmba25
 
ch-1-Intro-to-Lean (1).ppt
ch-1-Intro-to-Lean (1).pptch-1-Intro-to-Lean (1).ppt
ch-1-Intro-to-Lean (1).pptMilindKhandave3
 
The_Toyota_Way_and_Supply_Chain_Manageme.pdf
The_Toyota_Way_and_Supply_Chain_Manageme.pdfThe_Toyota_Way_and_Supply_Chain_Manageme.pdf
The_Toyota_Way_and_Supply_Chain_Manageme.pdfssuser45b570
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfssuser8d9a25
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfmohamedibrahim219956
 

Similar to Lean manufacturing (20)

Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lesson 1 pe - lps introduction
Lesson 1   pe - lps introductionLesson 1   pe - lps introduction
Lesson 1 pe - lps introduction
 
The Staggering Cost of Poor Quality & How to Fix It
The Staggering Cost of Poor Quality & How to Fix ItThe Staggering Cost of Poor Quality & How to Fix It
The Staggering Cost of Poor Quality & How to Fix It
 
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
 
6 levelsoflean
6 levelsoflean6 levelsoflean
6 levelsoflean
 
Continuous Improvement in Lean
Continuous Improvement in LeanContinuous Improvement in Lean
Continuous Improvement in Lean
 
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION 046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Toyota production system
Toyota  production systemToyota  production system
Toyota production system
 
Lean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersLean Management explained to CEOs & Others
Lean Management explained to CEOs & Others
 
Presentacion eglc 2013 valencia_spain
Presentacion eglc 2013 valencia_spainPresentacion eglc 2013 valencia_spain
Presentacion eglc 2013 valencia_spain
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraints
 
ch-1-Intro-to-Lean (1).ppt
ch-1-Intro-to-Lean (1).pptch-1-Intro-to-Lean (1).ppt
ch-1-Intro-to-Lean (1).ppt
 
The_Toyota_Way_and_Supply_Chain_Manageme.pdf
The_Toyota_Way_and_Supply_Chain_Manageme.pdfThe_Toyota_Way_and_Supply_Chain_Manageme.pdf
The_Toyota_Way_and_Supply_Chain_Manageme.pdf
 
Focus on Growth - 7 Wastes
Focus on Growth - 7 WastesFocus on Growth - 7 Wastes
Focus on Growth - 7 Wastes
 
Agile Bill.Lean Primer.0906a
Agile Bill.Lean Primer.0906aAgile Bill.Lean Primer.0906a
Agile Bill.Lean Primer.0906a
 
CMA 2102: Reshoring Initiative
CMA 2102: Reshoring InitiativeCMA 2102: Reshoring Initiative
CMA 2102: Reshoring Initiative
 
CPI Training overview
CPI Training overviewCPI Training overview
CPI Training overview
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
 

More from Hammaduddin

Self Confidence by Shamsuddin
Self Confidence by ShamsuddinSelf Confidence by Shamsuddin
Self Confidence by ShamsuddinHammaduddin
 
Downfall of Nokia by Wajahat
Downfall of Nokia by WajahatDownfall of Nokia by Wajahat
Downfall of Nokia by WajahatHammaduddin
 
7 P's Marketing Mix
7 P's Marketing Mix7 P's Marketing Mix
7 P's Marketing MixHammaduddin
 
Pros and Cons of using Facebook and Whatsapp
Pros and Cons of using Facebook and WhatsappPros and Cons of using Facebook and Whatsapp
Pros and Cons of using Facebook and WhatsappHammaduddin
 
1st semester rankwise results
1st semester rankwise results1st semester rankwise results
1st semester rankwise resultsHammaduddin
 
Rankholders of HPC
Rankholders of HPCRankholders of HPC
Rankholders of HPCHammaduddin
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its typesHammaduddin
 
Aggregrate planning
Aggregrate planningAggregrate planning
Aggregrate planningHammaduddin
 
Etiquettes for teachers
Etiquettes for teachersEtiquettes for teachers
Etiquettes for teachersHammaduddin
 
Comparison of process structures and characteristics
Comparison of process structures and characteristicsComparison of process structures and characteristics
Comparison of process structures and characteristicsHammaduddin
 
Intermodal (combined) transport
 Intermodal (combined) transport Intermodal (combined) transport
Intermodal (combined) transportHammaduddin
 
Vendor managed inventory
Vendor managed inventoryVendor managed inventory
Vendor managed inventoryHammaduddin
 
Multi modal transport
Multi modal transportMulti modal transport
Multi modal transportHammaduddin
 
Modes of transportation
Modes of transportationModes of transportation
Modes of transportationHammaduddin
 
International logistics
International logisticsInternational logistics
International logisticsHammaduddin
 
Fleet management
Fleet managementFleet management
Fleet managementHammaduddin
 

More from Hammaduddin (20)

Self Confidence by Shamsuddin
Self Confidence by ShamsuddinSelf Confidence by Shamsuddin
Self Confidence by Shamsuddin
 
Downfall of Nokia by Wajahat
Downfall of Nokia by WajahatDownfall of Nokia by Wajahat
Downfall of Nokia by Wajahat
 
7 P's Marketing Mix
7 P's Marketing Mix7 P's Marketing Mix
7 P's Marketing Mix
 
Pros and Cons of using Facebook and Whatsapp
Pros and Cons of using Facebook and WhatsappPros and Cons of using Facebook and Whatsapp
Pros and Cons of using Facebook and Whatsapp
 
Mba Alamanac
Mba AlamanacMba Alamanac
Mba Alamanac
 
Tqm vs bpr
Tqm vs bprTqm vs bpr
Tqm vs bpr
 
1st semester rankwise results
1st semester rankwise results1st semester rankwise results
1st semester rankwise results
 
Rankholders of HPC
Rankholders of HPCRankholders of HPC
Rankholders of HPC
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
 
Aggregrate planning
Aggregrate planningAggregrate planning
Aggregrate planning
 
Etiquettes for teachers
Etiquettes for teachersEtiquettes for teachers
Etiquettes for teachers
 
Comparison of process structures and characteristics
Comparison of process structures and characteristicsComparison of process structures and characteristics
Comparison of process structures and characteristics
 
Intermodal (combined) transport
 Intermodal (combined) transport Intermodal (combined) transport
Intermodal (combined) transport
 
Outsourcing
OutsourcingOutsourcing
Outsourcing
 
Vendor managed inventory
Vendor managed inventoryVendor managed inventory
Vendor managed inventory
 
Multi modal transport
Multi modal transportMulti modal transport
Multi modal transport
 
Modes of transportation
Modes of transportationModes of transportation
Modes of transportation
 
Just in time
Just in timeJust in time
Just in time
 
International logistics
International logisticsInternational logistics
International logistics
 
Fleet management
Fleet managementFleet management
Fleet management
 

Recently uploaded

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 

Recently uploaded (20)

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 

Lean manufacturing

  • 1. Introduction to Lean Manufacturing © 2009, Levinson Productivity Systems, P.C. 1 www.ct-yankee.com
  • 2. One Page Overview • The purpose of lean is to remove all forms of waste from the value stream. • Waste includes cycle time, labor, materials, and energy. • The chief obstacle is the fact that waste often hides in plain sight, or is built into activities. © 2009, Levinson Productivity Systems, P.C. 2 www.ct-yankee.com
  • 3. Contents • Benefits of Lean Manufacturing • The Origins of Lean Manufacturing • What Is Lean Manufacturing? • Waste, Friction, or Muda • Lean Manufacturing and Green Manufacturing/ ISO 14001 • Some Lean Manufacturing Techniques • Conclusion © 2009, Levinson Productivity Systems, P.C. 3 www.ct-yankee.com
  • 4. Benefits of Lean Manufacturing • Lean manufacturing delivers an insurmountable competitive advantage over competitors who don't use it effectively. © 2009, Levinson Productivity Systems, P.C. 4 www.ct-yankee.com
  • 5. Benefits of Lean Manufacturing • Lower production cost  higher profits and wages • Cost avoidance flows directly to the bottom line. (2) Supports ISO 14001 and "green" manufacturing • Reduction of material waste and associated disposal costs  higher profits (3) Shorter cycle times: make-to- order vs. make-to-stock © 2009, Levinson Productivity Systems, P.C. 5 www.ct-yankee.com
  • 6. Bottom Line and the Language of Money • The first comprehensive implementation of lean manufacturing yielded: • Stock appreciation of 63 percent per year, for 16 years (not counting dividends) • 7.2 percent annual wage growth • The next section will discuss lean manufacturing's origins. © 2009, Levinson Productivity Systems, P.C. 6 www.ct-yankee.com
  • 7. The Origin of Lean Manufacturing Discussion question: Who created the Toyota Production System? © 2009, Levinson Productivity Systems, P.C. 7 www.ct-yankee.com
  • 8. Origin of the Toyota Production System • Taiichi Ohno said openly that he got the idea from Henry Ford's books and the American supermarket. • Ford's My Life and Work (1922) describes just-in-time (JIT) and other lean concepts explicitly. • Depletion of supermarket shelf stock triggers replenishment; it is a "pull" system like kanban or Drum-Buffer-Rope. © 2009, Levinson Productivity Systems, P.C. 8 www.ct-yankee.com
  • 9. Bottom Line Results of the TPS • The Ford Motor Company's original stock grew 63% per year (not counting dividends) and 7.2% annual wage growth. • Toyota recently superseded General Motors as the world's largest automobile company. • The next section will show how the TPS delivers these results. © 2009, Levinson Productivity Systems, P.C. 9 www.ct-yankee.com
  • 10. What is Lean Manufacturing? A systematic approach to the identification and elimination all forms of waste from the value stream. © 2009, Levinson Productivity Systems, P.C. 10 www.ct-yankee.com
  • 11. Concept of Friction, Waste, or Muda Understanding of friction, waste, or muda is the foundation of the lean Manufacturing. © 2009, Levinson Productivity Systems, P.C. 11 www.ct-yankee.com
  • 12. The First Step is to Recognize the Waste • This principle has been stressed by: • Henry Ford • Taiichi Ohno (Toyota production system) • Tom Peters (Thriving On Chaos) • Shigeo Shingo • J. F. Halpin (Zero Defects) © 2009, Levinson Productivity Systems, P.C. 12 www.ct-yankee.com
  • 13. Waste Often Hides in Plain View • We cannot eliminate the waste of material, labor, or other resources until we recognize it as waste. • A job can consist of 75 percent waste (or even more). • Classic example: brick laying in the late 19th century © 2009, Levinson Productivity Systems, P.C. 13 www.ct-yankee.com
  • 14. Waste is Often Built Into Jobs Pre-Gilbreth Bricklaying © 2009, Levinson Productivity Systems, P.C. 14 www.ct-yankee.com
  • 15. Post-Gilbreth Brick Laying The solution is obvious (in retrospect), but first we have to know that we have a problem! © 2009, Levinson Productivity Systems, P.C. 15 www.ct-yankee.com
  • 16. Lessons so far • Waste often hides in plain view. • People become used to "living with it" or "working around it." • Definition for employees at all levels: If it's frustrating, a chronic annoyance, or a chronic inefficiency, it's friction. (Levinson and Tumbelty, 1997, SPC Essentials and Productivity Improvement, ASQ Quality Press) © 2009, Levinson Productivity Systems, P.C. 16 www.ct-yankee.com
  • 17. TPS Definitions of Waste 1. Overproduction 2. Waiting, including time in queue 3. Transportation (between workstations, or between supplier and customer) 4. Non-value-adding activities 5. Inventory 6. Waste motion 7. Cost of poor quality: scrap, rework, and inspection © 2009, Levinson Productivity Systems, P.C. 17 www.ct-yankee.com
  • 18. Waiting as a Form of Waste • Of the total cycle time or lead time, how much involves value-adding work? • How much consists of waiting? © 2009, Levinson Productivity Systems, P.C. 18 www.ct-yankee.com

Editor's Notes

  1. As we proceed through the presentation, we will see many specific advantages of lean Manufacturing. Lower production costs and shorter cycle times encompass the key competitive advantages. "Insurmountable" is not an exaggeration . The only thing that can compete with a lean Manufacturing system is another lean Manufacturing system. Make-to-order (facilitated by shorter cycle times and JIT) crushes make-to-forecast through lower cost and better customer satisfaction. Comprehensive lean Manufacturing crushes cheap foreign labor. It was, in fact, developed with this issue in mind. Lean Manufacturing can thus preserve American manufacturing capability, upon which our nation's security and standard of living depend. (3) Comprehensive lean Manufacturing beats Six Sigma any day of the week. (Lean Manufacturing actually includes many elements of Six Sigma, such as standardization and best practice deployment.) The Ford Motor Company continued to expand its sales during the post-World War I depression by using lean Manufacturing. A lean company is secure even during "bad times." "What has Six Sigma done for Motorola lately (2000-2002)?" (4) Lean Manufacturing includes total quality management (TQM).
  2. My Life and Work (1922) described all the basic principles of JIT: We have found in buying materials that it is not worth while to buy for other than immediate needs. We buy only enough to fit into the plan of production, taking into consideration the state of transportation at the time. If transportation were perfect and an even flow of materials could be assured, it would not be necessary to carry any stock whatsoever. The carloads of raw materials would arrive on schedule and in the planned order and amounts, and go from the railway cars into production. That would save a great deal of money, for it would give a very rapid turnover and thus decrease the amount of money tied up in materials. With bad transportation one has to carry larger stocks. Materials arrive exactly, and only, when the production line needs them. Materials go, not from dock to stock, but from dock to factory floor. JIT requires reliable transportation and a supporting logistics system. Bad transportation (e.g. lack of a good freight management system) requires the plant to keep more inventory. Inventory reduction frees capital. Cycle time reduction frees capital.
  3. A dollar's worth of Ford stock purchased in 1903 returned $2500 when Ford bought his stockholders out in 1919.
  4. Lean Manufacturing was directly responsible for making the United States the wealthiest and most powerful nation on earth during the early twentieth century. Enormous growth in U.S. productivity caused the United States to surpass the British Empire in wealth and military power. Lean Manufacturing is the only way to protect American manufacturing capability and preserve the nation's affluence and military security.
  5. The brick weighs about five pounds (2.3 kg). How much does the worker actually raise and lower every time he bends over for another brick? This animation illustrates the virtue of videotaping workplace activities. The people who are doing the job may have become accustomed to the waste that is built into the job but, when they watch themselves in the videotape, the waste may become obvious.
  6. "I believe that the average farmer puts to a really useful purpose only about 5 per cent. of the energy he expends. … Not only is everything done by hand, but seldom is a thought given to a logical arrangement. [Time for a kaizen blitz?] A farmer doing his chores will walk up and down a rickety ladder a dozen times. He will carry water for years instead of putting in a few lengths of pipe . His whole idea, when there is extra work to do, is to hire extra men. He thinks of putting money into improvements as an expense . … It is waste motion— waste effort— that makes farm prices high and profits low" (Henry Ford, 1922, My Life and Work ).
  7. (1) Overproduction "Just-in-case" production driven by long-term market forecasts, instead of just-in-time Dysfunctional performance measurements that demand that personnel and equipment keep busy. (2) Waiting: time in queue Aggravated by batch-and-queue operations. (Heat-treatment seems notorious for this.) Alleviated by single-unit processing (3) Transportation Hand trucks and forklifts for moving parts from one part of the factory to another: no value added, opportunity for handling damage. Transportation introduces cycle time and lead time, e.g. container ships from China add six or seven weeks . Mortal enemy of make-to-order, assemble-to-order, and JIT Defects are not discovered promptly
  8. Imai, Masaaki. 1997. Gemba Kaizen . New York: McGraw-Hill