1. BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (IncludingPossible
Contingency Plans If ProblemsAnticipated)
Mon W/B 05/01/15
(Detailed Weekly Summary)
I have started filling out my Project Schedule, and colour
coded it. This is to help in the future to keep my work on
track to the time scale. Each week I will be able to look
at the project schedule and know what I have to be
doing and what I need to get done before the next week.
Continue to finish the project schedule and
begin to research previous trailers for
inspiration. This will be the start of my initial
secondary research.
Mon W/B 12/01/15
(Detailed Weekly Summary)
This week I completed the project schedule, which is
now ready to be updated when needed in the future. I
have also started task 1, which I aim to complete by the
end of next week.
I need to continue to finish Task 1 and continue
researching previous trailers for inspiration.
Mon W/B 19/01/15
(Detailed Weekly Summary)
Still continuing to finish Task 1, this task will help me
understand the variety of briefs within the media
industry.
I will continue task 1 by next week and
continue with the other tasks I need to
complete. Making a survey and sending it out is
the next task I have to complete
Mon W/B 26/01/15
(Detailed Weekly Summary)
I am still trying to complete task 1 by coming towards
the end of it. This task is helping me understand the
variety of briefs there is.
I will definitely complete and finish task 1 by
next week and will be continuing with the other
tasks such as creating a survey and sending it
out to collect and analyse feedback.
Mon W/B 02/02/15
(Detailed Weekly Summary)
I have now completed task 1 and I am now currently
working my way through my ideas generation and mood
boards to help me find inspiration.
I will have completed my idea generation and
mood board; I will then create and send out the
survey.
2. BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
Mon W/B 09/02/15
(Detailed Weekly Summary)
I have now created my survey and sent it out to get
responses and feedback. I am now working to create my
mood board and ideas generation.
My aim is to have completed both my idea
generation and mood board, and working on
analysing the feedback from my survey.
Mon W/B 16/02/15
(Detailed Weekly Summary)
Throughout this week I have completed my project
proposal.
I will complete both my ideas generation and
mood board and hopefully have begun to
analyse my survey feedback from the survey I
had previously sent out.
Mon W/B 23/02/15
(Detailed Weekly Summary)
I am now currently working on my ideas generation and
mood board that will expand my ideas when producing
my film trailer.
I will have finished my ideas generation and
mood board and continue to collect and look at
the feedback from my survey.
Mon W/B 02/03/15
(Detailed Weekly Summary)
I am currentlyworkingoncompletingthe analysisforoursurvey
we conducted.We alsoproduceda pitchfor our final majorproject
idea.Ithinkwe producedthe pitchquite well inourpresentation
as we followedthe structure the waywe were asked topresent
our idea.We alsoincludedeachsubjecttopicwithinourfinal
majorproject,such as the narrative,characters,targetaudience,
pre-productionandproduction.The onlypartswe missedoutwere
the explanationof ourscriptandstoryboardsin the pre-production
section.Overall Ibelievewe pitchedourideaverywell,included
importantdetails,andpresentedourideawithconfidence within
depthanswers.We were givenagrade of distinctionforourpitch
presentation,soIamverypleasedwiththisgrade thatwas given.
By the endof nextweekwe plantomake a start on the
storyboardsbutalsohave completedthe majorityof the
pre-productionsuchaslocationandequipmentsheets.
Mon W/B 09/03/15
(Detailed Weekly Summary)
Thisweekwe completedthe call sheets,startedourscriptand
storyboards.HoweverIstill needtocompletemyideasgeneration
and moodboard.
I will have hopefullycompletedthe scriptand
storyboardsandcontinue tocomplete myideas
generationandmoodboard.
3. BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
Mon W/B 16/03/15
(Detailed Weekly Summary)
Mon W/B 23/03/15
(Detailed Weekly Summary)
I have completedthe majorityof pre-production;howeverIam
still workingonthe script.Withinthe nextweekortwoIwill be
completingthe equipmentsheetsandlocationreviewssowe are
readyto filmthe clipsforour final majorproject.
I will have completedthe script,equipmentsheetsand
locationsheetswithinthe nextweek.Iplantobeginto
filmwithinthe Easterholidays.
Mon W/B 30/03/15
(Detailed Weekly Summary)
We completedall the of pre-production,whichmeanswe are
readyto beginfilmingourfinal majorproject.Whichwe plantodo
overthe Easter holidays,sowe have the clipsreadyforwhenwe
come back to college.
For whenwe come back to college afterthe Easter
Holidays,we plantohopefullyhave filmedall the clips
neededforourtrailerandbeginthe postproduction
process.
Mon W/B 06/04/15
(Detailed Weekly Summary)
Thisweekwe were onEasterHolidaysandtherefore were off,
howeverwe completedthe filmingshootsforourfinal major
project.
We have completedthe filmingshootsforourtrailer,so
overthe nextfewweekswe needtostartthe post
productionprocessandeditoutfinal majorproject.
Mon W/B 13/04/15
(Detailed Weekly Summary)
Thisweekwe were onEasterHolidaysandtherefore were off,
howeverwe completedthe filmingshootsforourfinal major
project.
We have completedthe filmingshootsforour trailer,so
overthe nextfewweekswe needtostartthe post
productionprocessandeditoutfinal majorproject.
Mon W/B 20/04/15
(Detailed Weekly Summary)
We have importedboththe audioandfilmclipsfromthe shoot,I
have createda newprojecton Adobe PremierProandwill
continue toeditthe sequence togetheroverthe nextfewweeks.
NextweekIplanto have completedputtingthe
sequence inorder,andplanto start editingthe clips
individually(correctingcolour,addingsoundeffects
etc…)
Mon W/B 27/04/15
(Detailed Weekly Summary)
ThisweekIhave startedto crop my clipsand positiontheminto
sequence onpremierpro.Ialsomade title cardson aftereffects.
AlsoI have beensearchingforcopyrightfree musicandsoundFX.
By nextweekIwantto have put all myclipsinto
sequence.
Mon W/B 04/05/15
(Detailed Weekly Summary)
ThisweekIplacedall the lipsintopositionandcuttingtheminto
place.
I have beenlookingforsoundFXandbackgroundmusic
for mysequence.Iwantto continue to dothis next
week.
Mon W/B 11/05/15
(Detailed Weekly Summary)
I have nowcompletedputtingall myclipsintosequence andthey
are all cut and editedintotime.Ialsoaddedthe title cardsIhad
previouslycreatedonaftereffects.NowIamstill lookingforSound
FX that fitintomysequence correctly.
I will continue lookingforsoundFXand background
musicwhile completingthe othertasksneededtobe
finished.
4. BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
Mon W/B 18/05/15
(Detailed Weekly Summary)
ThisweekIhave addeda fewsoundFX that I have foundontomy
projectand I’malsotryingdifferenttypesof backgroundmusicto
decide whichone suitsmytrailerthe best.
I wantto have hopefullyhave myprojectbythe middle
of nextweektoensure Ihave enoughtime todomy
evaluation.
Mon W/B 25/05/15
(Detailed Weekly Summary)
I have completedmyfinal majorprojectandnowuploadingall my
workonto myblog,alsoI’m checkingIhave everythingthatis
needed.
I will startmy evaluationnextweekanduploadtomy
blog.
Mon W/B 01/06/15
(Detailed Weekly Summary)
I am continuingmyevaluationandhave collectedresultsfrommy
survey,everythingwill be uploadedandfinishedbynextweek.
I will have hopefullycompletedall myworkandhave it
uploadedtomyblogand have finishedeverythingI
needtoo.
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (IncludingPossible
ContingencyPlans)