1One roof – all solutions. Gunnar Godawa – 18/03/2014
Introduction to 4D and 5D Modeling
Gunnar Godawa – Senior Project Manager IPMA-D
2One roof – all solutions. Gunnar Godawa – 18/03/2014
Introduction to 4D and 5D Modeling
Agenda
1. Introduction to BIM
2. Fundamentals and Benefits of 4D and 5D
3. Selection of Project experiences
3One roof – all solutions. Gunnar Godawa – 18/03/2014
Selection of our Middle East Projects
• Lusail City Project, Doha, Qatar
• Nile Corniche Project, Cairo, Egypt
• Barwa Commercial Avenue, Doha, Qatar
• National Museum of Qatar, Doha, Qatar
• Al Wakra Stadium, Doha Qatar
• Metro – Green Line, Doha, Qatar
• Metro – Red Line, Doha, Qatar
• Doha Expressways Group 5, Qatar
4One roof – all solutions. Gunnar Godawa – 18/03/2014
HOCHTIEF ViCon
An international Team
• Three offices in different markets
• Services offered world-wide
• Strong cultural competence in
focused markets
• Supported more than 350 projects
• Network of experienced suppliers
5One roof – all solutions. Gunnar Godawa – 18/03/2014
Data security and user management
Certified hardware and software
Data formats and structure
Data versioning
Internet
Collaboration and communication
Knowledge and experience
Roles and responsibilities
Trust and commitment
Culture
Building standards
Risks and insurance
Ownership of deliverables
Project guidelines and contracts
Quantity take-off
Cost estimation
Change management
Operation and maintenance
Design creation and coordination
Scheduling and progress monitoring
1. Introduction to BIM
The Five Components
© HOCHTIEF ViCon
6One roof – all solutions. Gunnar Godawa – 18/03/2014
Creating 3D models,
adding information to them,
and using for many purposes.
1. Introduction to BIM
What is BIM?
7One roof – all solutions. Gunnar Godawa – 18/03/2014
1. Introduction to BIM
Extension of 3D Models
Other information
Specifications
Costs
Time
Space utilization
+
3D CAD
8One roof – all solutions. Gunnar Godawa – 18/03/2014
1. Introduction to BIM
Added Information to a 3D Model
information associated with building element
+ = BIM
9One roof – all solutions. Gunnar Godawa – 18/03/2014
Life-Cycle Development of 3D models
PhaseModelType
Concept Conceptual Design
Tender & Construction
Documents
Construction Operation
3D Marketing
Model
3D Design
Model
3D Construction
Model
3D Asset
Model
3D Schematic
Model
3D Quantity
Model
© HOCHTIEF ViCon
10One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
Information provided by a 4D and 5D model
A 4D/ 5D Model gives comprehensive answers to the above questions
Where? What?When? How much?
How many?
11One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
Importance of common model and data breakdown
Slab A
Slab B
Columns
Slab Concrete 10 m³
Columns C 40 5 m³
Columns C 50 5 m³
Material??
Joint??
12One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
System architecture of 4D and 5D data development (Creation Process)
ProjectBIMExpert
Linking Process
On-site Usage (3D Model + Numerical Data)
Construction
Program
Model-based
BOQ Quantities
4D Database
3D Model
© HOCHTIEF ViCon
13One roof – all solutions. Gunnar Godawa – 18/03/2014
Scheduler
Draftsman
Qto specialist
Client/Management
Estimator
global
projectdata
base
Objectives
Ensure quality and save time
and costs through:
• Improved data
interoperability
• Traceable change process
• Geometry combined with
other data
O&M
Procurement
Project
database
Contractor
2. Fundamentals and Benefits of 4D and 5D
Single source access 4D and 5D data
© HOCHTIEF ViCon
14One roof – all solutions. Gunnar Godawa – 18/03/2014
Slab
Columns
2. Fundamentals and Benefits of 4D and 5D
Linking 3D model with time schedule activities
50%
100%
50%
100%
15One roof – all solutions. Gunnar Godawa – 18/03/2014
Quantities available
• Direct from 3D model to
BoQ, e.g. plaster,
concrete, pipes
• Indirect from 3D model
to BoQ, e.g. rebar from
concrete volume
• Indirect with manual
input using 3D model,
e.g. FF&E in rooms
2. Fundamentals and Benefits of 4D and 5D
How can Quantities be derived from 3D
16One roof – all solutions. Gunnar Godawa – 18/03/2014
2D Concept Design
3D Model Model-based Quantities
Construction Schedule
4D / 5D Model
Design
Schedule
Quantities
2. Fundamentals and Benefits of 4D and 5D
Process to create 4D / 5D Models
© HOCHTIEF ViCon
17One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
5D Software features and requirements
• Common exchange format with 3D authoring SW
• How is the model imported to the SW (export from
3D, API connection, plugin)
• Where are basic quantities derived from (native
model, external calculation)
• What Standards / Rules of Measurement have to
be supported
• How much information (attributes) is required from
the 3D model
• How is the update process
18One roof – all solutions. Gunnar Godawa – 18/03/2014
• Integration of Design, Planning and Scope definition
• Holistic overview and consistent break down of
entire project information
• Better re-usage of information through project life-
cycle
• Integrated quantities, schedule and cost information
add value to project reporting
• Impact from changes can be better evaluated
• Quantities can identified in the 3D model (traceable)
• Visual representation supports understanding of
sequencing
2. Fundamentals and Benefits of 4D and 5D
Benefits for 4D and 5D
19One roof – all solutions. Gunnar Godawa – 18/03/2014
3. Selection of Project Experiences
20One roof – all solutions. Gunnar Godawa – 18/03/2014
Presenter
Gunnar Godawa
Senior Project Manager
www.hochtief-vicon.de
One step ahead.
Build digitally first.
Building Information Modeling (BIM)

More Related Content

What's hot

What's hot (20)

The Role of CIC on BIM Development
The Role of CIC on BIM DevelopmentThe Role of CIC on BIM Development
The Role of CIC on BIM Development
 
LEGO Architecture meets BIM
LEGO Architecture meets BIMLEGO Architecture meets BIM
LEGO Architecture meets BIM
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
BIM
BIM BIM
BIM
 
BIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and ProcedureBIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and Procedure
 
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi
 
BIM Execution plan
BIM  Execution  planBIM  Execution  plan
BIM Execution plan
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use cases
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
BIM
BIMBIM
BIM
 
Importance and Functions of Bills of Quantities in the Construction Industry:...
Importance and Functions of Bills of Quantities in the Construction Industry:...Importance and Functions of Bills of Quantities in the Construction Industry:...
Importance and Functions of Bills of Quantities in the Construction Industry:...
 
Information Management and Model Checking
Information Management and Model CheckingInformation Management and Model Checking
Information Management and Model Checking
 
BIM: An Introduction
BIM: An IntroductionBIM: An Introduction
BIM: An Introduction
 
Semantic 3D City Models with CityGML
Semantic 3D City Models with CityGMLSemantic 3D City Models with CityGML
Semantic 3D City Models with CityGML
 
Ppt on fidic claims
Ppt on fidic claimsPpt on fidic claims
Ppt on fidic claims
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 

Viewers also liked

Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
Sara Teymoor
 
Intergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next StepIntergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next Step
Jill Clelland
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in Navisworks
Le Zhang
 

Viewers also liked (20)

Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
 
5D Must Be Better Than 4D
5D Must Be Better Than 4D5D Must Be Better Than 4D
5D Must Be Better Than 4D
 
Building Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to CompletionBuilding Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to Completion
 
싱크로 4D BIM 서비스
싱크로 4D BIM 서비스싱크로 4D BIM 서비스
싱크로 4D BIM 서비스
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM 4D Services
BIM 4D ServicesBIM 4D Services
BIM 4D Services
 
3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction
 
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modelingAdvantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
 
BIM specification and the supply chain
BIM specification and the supply chainBIM specification and the supply chain
BIM specification and the supply chain
 
Elecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB GuildfordElecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB Guildford
 
PPM5D - The BIM Integrated Project Delivery Specialists
PPM5D -  The  BIM Integrated Project Delivery SpecialistsPPM5D -  The  BIM Integrated Project Delivery Specialists
PPM5D - The BIM Integrated Project Delivery Specialists
 
Arrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeArrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominative
 
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
 
Intergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next StepIntergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next Step
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in Navisworks
 
4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 

Similar to CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014

A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
lindlar
 
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
Behzad Katirachi
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
le canh
 

Similar to CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014 (20)

A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
 
Lifecycle MEP design for buildings
Lifecycle MEP design for buildingsLifecycle MEP design for buildings
Lifecycle MEP design for buildings
 
D-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUpD-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUp
 
Introduction to the 3DPDF Consortium
Introduction to the 3DPDF ConsortiumIntroduction to the 3DPDF Consortium
Introduction to the 3DPDF Consortium
 
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
 
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
 
Bim pres 120319
Bim pres  120319Bim pres  120319
Bim pres 120319
 
Transforming the Central Office: Implementing CORD
Transforming the Central Office:  Implementing CORDTransforming the Central Office:  Implementing CORD
Transforming the Central Office: Implementing CORD
 
CNCF Technology Radar - Continuous Delivery, June 2020
CNCF Technology Radar - Continuous Delivery, June 2020CNCF Technology Radar - Continuous Delivery, June 2020
CNCF Technology Radar - Continuous Delivery, June 2020
 
Practical bim collaboration in a ppp
Practical bim collaboration in a pppPractical bim collaboration in a ppp
Practical bim collaboration in a ppp
 
Early-Stage Design Simulation for Architects
Early-Stage Design Simulation for ArchitectsEarly-Stage Design Simulation for Architects
Early-Stage Design Simulation for Architects
 
BEP
BEPBEP
BEP
 
AF2018 Day 1 Ibbs
AF2018 Day 1 IbbsAF2018 Day 1 Ibbs
AF2018 Day 1 Ibbs
 
CD Sept 2015 (Tarmac) - Tarmac Showcase
CD Sept 2015 (Tarmac) - Tarmac ShowcaseCD Sept 2015 (Tarmac) - Tarmac Showcase
CD Sept 2015 (Tarmac) - Tarmac Showcase
 
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David PhilpETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David Philp
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Recently uploaded (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014

  • 1. 1One roof – all solutions. Gunnar Godawa – 18/03/2014 Introduction to 4D and 5D Modeling Gunnar Godawa – Senior Project Manager IPMA-D
  • 2. 2One roof – all solutions. Gunnar Godawa – 18/03/2014 Introduction to 4D and 5D Modeling Agenda 1. Introduction to BIM 2. Fundamentals and Benefits of 4D and 5D 3. Selection of Project experiences
  • 3. 3One roof – all solutions. Gunnar Godawa – 18/03/2014 Selection of our Middle East Projects • Lusail City Project, Doha, Qatar • Nile Corniche Project, Cairo, Egypt • Barwa Commercial Avenue, Doha, Qatar • National Museum of Qatar, Doha, Qatar • Al Wakra Stadium, Doha Qatar • Metro – Green Line, Doha, Qatar • Metro – Red Line, Doha, Qatar • Doha Expressways Group 5, Qatar
  • 4. 4One roof – all solutions. Gunnar Godawa – 18/03/2014 HOCHTIEF ViCon An international Team • Three offices in different markets • Services offered world-wide • Strong cultural competence in focused markets • Supported more than 350 projects • Network of experienced suppliers
  • 5. 5One roof – all solutions. Gunnar Godawa – 18/03/2014 Data security and user management Certified hardware and software Data formats and structure Data versioning Internet Collaboration and communication Knowledge and experience Roles and responsibilities Trust and commitment Culture Building standards Risks and insurance Ownership of deliverables Project guidelines and contracts Quantity take-off Cost estimation Change management Operation and maintenance Design creation and coordination Scheduling and progress monitoring 1. Introduction to BIM The Five Components © HOCHTIEF ViCon
  • 6. 6One roof – all solutions. Gunnar Godawa – 18/03/2014 Creating 3D models, adding information to them, and using for many purposes. 1. Introduction to BIM What is BIM?
  • 7. 7One roof – all solutions. Gunnar Godawa – 18/03/2014 1. Introduction to BIM Extension of 3D Models Other information Specifications Costs Time Space utilization + 3D CAD
  • 8. 8One roof – all solutions. Gunnar Godawa – 18/03/2014 1. Introduction to BIM Added Information to a 3D Model information associated with building element + = BIM
  • 9. 9One roof – all solutions. Gunnar Godawa – 18/03/2014 Life-Cycle Development of 3D models PhaseModelType Concept Conceptual Design Tender & Construction Documents Construction Operation 3D Marketing Model 3D Design Model 3D Construction Model 3D Asset Model 3D Schematic Model 3D Quantity Model © HOCHTIEF ViCon
  • 10. 10One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D Information provided by a 4D and 5D model A 4D/ 5D Model gives comprehensive answers to the above questions Where? What?When? How much? How many?
  • 11. 11One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D Importance of common model and data breakdown Slab A Slab B Columns Slab Concrete 10 m³ Columns C 40 5 m³ Columns C 50 5 m³ Material?? Joint??
  • 12. 12One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D System architecture of 4D and 5D data development (Creation Process) ProjectBIMExpert Linking Process On-site Usage (3D Model + Numerical Data) Construction Program Model-based BOQ Quantities 4D Database 3D Model © HOCHTIEF ViCon
  • 13. 13One roof – all solutions. Gunnar Godawa – 18/03/2014 Scheduler Draftsman Qto specialist Client/Management Estimator global projectdata base Objectives Ensure quality and save time and costs through: • Improved data interoperability • Traceable change process • Geometry combined with other data O&M Procurement Project database Contractor 2. Fundamentals and Benefits of 4D and 5D Single source access 4D and 5D data © HOCHTIEF ViCon
  • 14. 14One roof – all solutions. Gunnar Godawa – 18/03/2014 Slab Columns 2. Fundamentals and Benefits of 4D and 5D Linking 3D model with time schedule activities 50% 100% 50% 100%
  • 15. 15One roof – all solutions. Gunnar Godawa – 18/03/2014 Quantities available • Direct from 3D model to BoQ, e.g. plaster, concrete, pipes • Indirect from 3D model to BoQ, e.g. rebar from concrete volume • Indirect with manual input using 3D model, e.g. FF&E in rooms 2. Fundamentals and Benefits of 4D and 5D How can Quantities be derived from 3D
  • 16. 16One roof – all solutions. Gunnar Godawa – 18/03/2014 2D Concept Design 3D Model Model-based Quantities Construction Schedule 4D / 5D Model Design Schedule Quantities 2. Fundamentals and Benefits of 4D and 5D Process to create 4D / 5D Models © HOCHTIEF ViCon
  • 17. 17One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D 5D Software features and requirements • Common exchange format with 3D authoring SW • How is the model imported to the SW (export from 3D, API connection, plugin) • Where are basic quantities derived from (native model, external calculation) • What Standards / Rules of Measurement have to be supported • How much information (attributes) is required from the 3D model • How is the update process
  • 18. 18One roof – all solutions. Gunnar Godawa – 18/03/2014 • Integration of Design, Planning and Scope definition • Holistic overview and consistent break down of entire project information • Better re-usage of information through project life- cycle • Integrated quantities, schedule and cost information add value to project reporting • Impact from changes can be better evaluated • Quantities can identified in the 3D model (traceable) • Visual representation supports understanding of sequencing 2. Fundamentals and Benefits of 4D and 5D Benefits for 4D and 5D
  • 19. 19One roof – all solutions. Gunnar Godawa – 18/03/2014 3. Selection of Project Experiences
  • 20. 20One roof – all solutions. Gunnar Godawa – 18/03/2014 Presenter Gunnar Godawa Senior Project Manager www.hochtief-vicon.de One step ahead. Build digitally first. Building Information Modeling (BIM)