SlideShare a Scribd company logo
1 of 2
Download to read offline
Annexure A1 – Project Profile
• Name of Project: Qatar Petrochemical Company ltd. April 2011 – July 2013
• Type and description of project
QAPCO’s plants are located on the seacoast, equipped with jetty facilities and well connected to the road transport
network.
QAPCO’s LDPE capacity increased to 700 ktpa in the middle of 2012, after the successful start-up of the third LDPE
plant, which added an extra capacity of 300 ktpa, thereby making QAPCO one of the world’s leading LDPE producers.
QAPCO’s facilities also include C3/C4 and pygasoline hydrogenation units, which are integrated with Q-Chem’s stream.
The C3/C4 is supplied to QP for conversion into high-value liquefied petroleum gas (LPG), and the pygasoline is
supplied to SEEF Limited for the manufacture of linear alkyl benzene
First phase contract with Taiwan-based CTCI.
The contract was established to upgrade its main
ethylene production plant's machinery to meet
international safety and environment standards,
reduce harmful wastes and enhance productivity.
Under the terms of the project, the new furnaces
and ethylene storage tank will utilise modern
technology in combustion, waste control and on-
line monitoring.
The technology is expected to reduce nitrogen
oxides (NOx) emissions and reuse of coke inside
the furnaces that will prevent soil and air
contamination as well as improve fuel
consumption and yield.
• Geographic Location Of project
QAPCO’s plants are located on the seacoast, equipped with jetty facilities and well
connected to the road transport network. Mesaieed, Qatar
• Name of client and position and contact details of client representative
- QAPCO
• List of participating organizations
- CTCI (MAIN CONTRACTOR), QATAR CONSTRUCTION, CAPE
• Year started and year completed (or planned completed date)
- 2011 – 2013
• Original Completion date
- 2016
• Actual completion date
- Project Current
• Percentage of Practical Completion
- 1ST
PHASE COMPLETED
• Total Value of project
- $165 Million USD.
• Percentage Participation of your Organization in the project
- 60%
• Your Specific role in the project
- Site Safety Officer
• Was the project successfully completed
- Still in operation!

More Related Content

What's hot

CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikAhmed Kaleem Shaik
 
CV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam ShabbeerCV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam ShabbeerGhulam Shabbeer
 
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-muhammad shoaib sadiq
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015Saiful Amin
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerARNEL GUPIT
 
Nebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrixNebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrixCiske Berrington
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&ahijaziosama
 
CV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE EngineerCV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE EngineerAhmed Saeed
 
171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)pmbeng
 
Walid Soliman, Safety Officer, CV
Walid Soliman, Safety Officer, CVWalid Soliman, Safety Officer, CV
Walid Soliman, Safety Officer, CVWalid Soliman
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Cairn India Limited
 
Pipeline Construction In Pursuit Of The Zero Accident Project
Pipeline Construction   In Pursuit Of The Zero Accident ProjectPipeline Construction   In Pursuit Of The Zero Accident Project
Pipeline Construction In Pursuit Of The Zero Accident ProjectPeter Kinsey
 

What's hot (20)

CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
 
Nebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ansNebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ans
 
DEMOBILIZATION PLAN.docx
DEMOBILIZATION PLAN.docxDEMOBILIZATION PLAN.docx
DEMOBILIZATION PLAN.docx
 
CV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam ShabbeerCV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam Shabbeer
 
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
HSE ENGINEER CV OF MUHAMMAD SHOAIB SADIQ -2-
 
HSE Manager (C.V)
HSE Manager (C.V)HSE Manager (C.V)
HSE Manager (C.V)
 
FAHID HSE CV
FAHID HSE CVFAHID HSE CV
FAHID HSE CV
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
 
Jsa heat-treatment
Jsa  heat-treatmentJsa  heat-treatment
Jsa heat-treatment
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE Manager
 
Nebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrixNebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrix
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&a
 
CV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE EngineerCV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE Engineer
 
171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)171713161 953dfggggg36579-nebosh-igc1-revision (4)
171713161 953dfggggg36579-nebosh-igc1-revision (4)
 
Walid Soliman, Safety Officer, CV
Walid Soliman, Safety Officer, CVWalid Soliman, Safety Officer, CV
Walid Soliman, Safety Officer, CV
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
 
shamim ahmad HSE manager CV
shamim ahmad HSE manager CVshamim ahmad HSE manager CV
shamim ahmad HSE manager CV
 
Pipeline Construction In Pursuit Of The Zero Accident Project
Pipeline Construction   In Pursuit Of The Zero Accident ProjectPipeline Construction   In Pursuit Of The Zero Accident Project
Pipeline Construction In Pursuit Of The Zero Accident Project
 
HSE Officer CV
HSE Officer CVHSE Officer CV
HSE Officer CV
 

Viewers also liked

Viewers also liked (8)

Confirmation letter from SACPCMP
Confirmation letter from SACPCMPConfirmation letter from SACPCMP
Confirmation letter from SACPCMP
 
Annexures
AnnexuresAnnexures
Annexures
 
Annexure A
Annexure AAnnexure A
Annexure A
 
SACPCMP Registration Confirmation Letter J van Graan
SACPCMP Registration Confirmation Letter J van GraanSACPCMP Registration Confirmation Letter J van Graan
SACPCMP Registration Confirmation Letter J van Graan
 
Sacpcmp certificate
Sacpcmp certificateSacpcmp certificate
Sacpcmp certificate
 
Annexure c under_taking
Annexure c under_takingAnnexure c under_taking
Annexure c under_taking
 
Annexure format
Annexure formatAnnexure format
Annexure format
 
Project report on Health & Safety
Project report on Health & Safety Project report on Health & Safety
Project report on Health & Safety
 

Similar to PROJECT PROFILE ANNEXURE A2 QAPCO

Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4Mihai Dragne
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiBhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiBhupat Kanani
 
DNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_costDNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_costJan Weitzenböck
 
curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015KOSHY VARGHESE KOSHY
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking projectJohn Kingsley
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 

Similar to PROJECT PROFILE ANNEXURE A2 QAPCO (20)

Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4Karachaganak overview WKIF Aktau  25.09.12 Eng Rev-4
Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
10 years of Research in CATO CCS programs - plenary presentation given by Jan...
10 years of Research in CATO CCS programs - plenary presentation given by Jan...10 years of Research in CATO CCS programs - plenary presentation given by Jan...
10 years of Research in CATO CCS programs - plenary presentation given by Jan...
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
DNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_costDNV_GL_launches_initiatives_to_reduce_cost
DNV_GL_launches_initiatives_to_reduce_cost
 
curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Cpcl
CpclCpcl
Cpcl
 
Cpcl
CpclCpcl
Cpcl
 
CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking project
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Khursaniyah Project Brochure
Khursaniyah Project BrochureKhursaniyah Project Brochure
Khursaniyah Project Brochure
 

More from HITESH RATHOD

More from HITESH RATHOD (8)

img587
img587img587
img587
 
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshPROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
 
img589
img589img589
img589
 
SHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR ConstructionSHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR Construction
 
img581
img581img581
img581
 
img578
img578img578
img578
 
img577
img577img577
img577
 
img576
img576img576
img576
 

PROJECT PROFILE ANNEXURE A2 QAPCO

  • 1. Annexure A1 – Project Profile • Name of Project: Qatar Petrochemical Company ltd. April 2011 – July 2013 • Type and description of project QAPCO’s plants are located on the seacoast, equipped with jetty facilities and well connected to the road transport network. QAPCO’s LDPE capacity increased to 700 ktpa in the middle of 2012, after the successful start-up of the third LDPE plant, which added an extra capacity of 300 ktpa, thereby making QAPCO one of the world’s leading LDPE producers. QAPCO’s facilities also include C3/C4 and pygasoline hydrogenation units, which are integrated with Q-Chem’s stream. The C3/C4 is supplied to QP for conversion into high-value liquefied petroleum gas (LPG), and the pygasoline is supplied to SEEF Limited for the manufacture of linear alkyl benzene First phase contract with Taiwan-based CTCI. The contract was established to upgrade its main ethylene production plant's machinery to meet international safety and environment standards, reduce harmful wastes and enhance productivity. Under the terms of the project, the new furnaces and ethylene storage tank will utilise modern technology in combustion, waste control and on- line monitoring. The technology is expected to reduce nitrogen oxides (NOx) emissions and reuse of coke inside the furnaces that will prevent soil and air contamination as well as improve fuel consumption and yield. • Geographic Location Of project QAPCO’s plants are located on the seacoast, equipped with jetty facilities and well connected to the road transport network. Mesaieed, Qatar • Name of client and position and contact details of client representative - QAPCO • List of participating organizations - CTCI (MAIN CONTRACTOR), QATAR CONSTRUCTION, CAPE • Year started and year completed (or planned completed date) - 2011 – 2013 • Original Completion date - 2016 • Actual completion date - Project Current
  • 2. • Percentage of Practical Completion - 1ST PHASE COMPLETED • Total Value of project - $165 Million USD. • Percentage Participation of your Organization in the project - 60% • Your Specific role in the project - Site Safety Officer • Was the project successfully completed - Still in operation!