1. Annexure A1 – Project Profile
• Name of Project: Qatar Petrochemical Company ltd. April 2011 – July 2013
• Type and description of project
QAPCO’s plants are located on the seacoast, equipped with jetty facilities and well connected to the road transport
network.
QAPCO’s LDPE capacity increased to 700 ktpa in the middle of 2012, after the successful start-up of the third LDPE
plant, which added an extra capacity of 300 ktpa, thereby making QAPCO one of the world’s leading LDPE producers.
QAPCO’s facilities also include C3/C4 and pygasoline hydrogenation units, which are integrated with Q-Chem’s stream.
The C3/C4 is supplied to QP for conversion into high-value liquefied petroleum gas (LPG), and the pygasoline is
supplied to SEEF Limited for the manufacture of linear alkyl benzene
First phase contract with Taiwan-based CTCI.
The contract was established to upgrade its main
ethylene production plant's machinery to meet
international safety and environment standards,
reduce harmful wastes and enhance productivity.
Under the terms of the project, the new furnaces
and ethylene storage tank will utilise modern
technology in combustion, waste control and on-
line monitoring.
The technology is expected to reduce nitrogen
oxides (NOx) emissions and reuse of coke inside
the furnaces that will prevent soil and air
contamination as well as improve fuel
consumption and yield.
• Geographic Location Of project
QAPCO’s plants are located on the seacoast, equipped with jetty facilities and well
connected to the road transport network. Mesaieed, Qatar
• Name of client and position and contact details of client representative
- QAPCO
• List of participating organizations
- CTCI (MAIN CONTRACTOR), QATAR CONSTRUCTION, CAPE
• Year started and year completed (or planned completed date)
- 2011 – 2013
• Original Completion date
- 2016
• Actual completion date
- Project Current
2. • Percentage of Practical Completion
- 1ST
PHASE COMPLETED
• Total Value of project
- $165 Million USD.
• Percentage Participation of your Organization in the project
- 60%
• Your Specific role in the project
- Site Safety Officer
• Was the project successfully completed
- Still in operation!