Document Finished

G
DESIGN
The Tide,
The Tide: Page 1
Contents
Introduction: Chapter One
Executive Summary							
Project Brief								
Design Objectives							
Analysis of the Site: Chapter Two
2.1 Overview
2.2 Site History
2.3 Site Area
2.4 SWOT Analysis
2.5 Movement
Land Uses: Chapter Three				
3.1 Leisure
3.2 Lighthouse
3.3 Food & Drink
3.4 Centre for Watersports
3.5 Residential
3.6 Creative Hub
The Masterplan: Land Uses: Chapter Four
4.1 Overview
4.2 The Tide
4.3 The Docks A & B
4.4 Lighthouse
4.5 The Light
4.6 Community Gardens and Green Space
The Masterplan: Elevations: Chapter Five
The Masterplan: Climate: Chapter Six
6.1 Overview
6.2 Natural Light
6.3 Sun Path
The Masterplan: Detail: Chapter Seven
7.1 Overview
7.2 Roofing and Cladding
7.3 Windows
7.4 Balcony
7.5 Doors
Transport: Chapter Eight
8.1 Overview
8.2 Movement of Vehicles
8.3 Movement of Pedestrians and Cyclists
8.4 Car Parking
8.5 Street Design
Delivery Strategy: Chapter Nine
9.1 Funding
9.2 Delivery Strategy
2
2
2
2
3
3
3
3
3
3
4
4
4
4
4
4
4
5
5
5
5
5
5
5
7
9
9
9
9
10
10
10
10
10
10
11
11
11
11
12
12
13
13
13-14
Planning Constraints: Chapter Ten
10.1 Overview
10.2 Infrastructure
10.3 Building Heights
10.4 Building Form, Layout and Density
10.5 Environmental Factors
10.6 Social Factors
10.7 Economic Factors
The Masterplan: Impact: Chapter Eleven
11.1 Overview
11.2 Economic, Social and Environmental Impact
11.3 Linking Edinburgh’s Boardwalk
Conclusive Themes: Chapter Twelve
References: Chapter Thirteen
15
15
15
15
15
15
15
15
16
16
16
16
17
18
The Tide: Page 2
Executive Summary Project Brief Design Objectives
1.1 Current Site Issues
The current Seafield site offers little in the way of pull factors to pro-
spective inventors and generally people seeking to move to the Water-
front area. This is supported by the high concentration of industrial and
tertiary retail units that occupy the site and surrounding area. These
short comings were addressed and influenced the decisions taken to
create a development with high quality mixed use development that
utilises all aspects of good design to create an Urban Village which the
development naturally resembles.
1.2 Improvements to Site
By addressing some of the main issues surrounding the site the
Seafield area can be transformed into ‘The Tide’, which provides:
1. An attractive Focal Point that can contribute to the local, city wide
and regional economy and provide value to prospective residents.
To create a viable and financially stable development it is important
to promote the primary focal point of the site, the Lighthouse, which
can act towards ‘harnessing the instrinsic activity of the place’ (Slater,
2014, pg. 19).
2. Increased Permeability was a key improvement to the site with the
‘Dock’ style housing and commercial units constructed on site with
emphasis on ease of movement and making best use of the views out
to sea.
3. Increased Viability with a multitude of uses stemming Residential,
Commercial and Leisure. Mixing uses on site helps to create both a
inclusive and vibrant atmosphere one which makes ‘The Tide’ and
attractive place to both live and work.
1.3 Impact of Development
The development will have a significant effect on the surrounding area,
from providing improvements to the existing promenade. Incorporatng
leisure and commercial uses, providing jobs for the surrounding area
and more small businesses to contribute to the local and wider
economy.
The environmental impact will be seen through the prioritisation of
public transport and on foot travel. ‘The Tide’ will utilise the use of
street design and movement frameworks to ensure pedestrians and
cyclists are best catered for. The development also naturally reduces
the need for vehicular transport by incorporating a mixed use design.
The social impacts will be seen through a community focused public
realm, encompassing community garden provision, which are proven
to improve health, wellbeing and improve community relationships
(Wakefield et al, 2007; Armstrong, 2000).
Seaview Developments have been asked to produce a visionary
masterplan and design brief for the “Marine Gardens” site located on
Seafield Road, Edinburgh. This masterplan is to be based upon
established design principles and methods, incorporating a range of
economically viable land uses which are to be focused on leisure. How-
ever, complimentary uses are also welcomed in order to attract addi-
tional users. Furthermore the development must look to integrate the
existing promenade, and should aim to take advantage of the oppor-
tunity to extend it into the water located to the East of the site. Design
must take local planning policy into account, and must attract investors
in order to create an economically viable development. Finally consider-
ation must be given to the impact of the masterplan on the whole city.
There are three primary design objectives which have been outlined to
underpin Seaview Development’s vision for the project brief and
masterplan:
1. Improve the permeability of the site, prioritis-
ing street design and pedestrian movement.
2. Create a focal point within the development
which residents can
benefit from.
3. Ensure the development adds value in the
form of mixed use leisure based facilties, while
maintaining viability.
Introduction: Chapter one
Creative
Innovative
Contemporary
Urban Village
Viable & Attractive
Movement
Place Investment
Vibrant
The Tide: Page 3
Analysis of Site	
2.2 Site History
The Seafield site was predominantly industrial throughout the 19th,
20th and 21st centuries. To the East of the site lies the Portobello
settlement the area was well known for Pleasure related uses. The site
itself was relatively untouched development wise until the 19th and
20th centuries; at present Industrial units and residential development
occupy the site.
2.1 Overview
The Seafield area presents a blank canvas for development; over the
decades the waterfront area has seen a number of different uses from
funfair, dance hall and leisure to mainly industrial and tertiary business
as it is currently used. The existing frontages along the side are in
varying states of decay and contribute to a poor image for the area.
There is an element of mixed-use throughout the site, with
housing making up some, bars and cafes, as well as animal shelters
and industrial workshops. This is strange, as traditional waterfronts do
not contain such industrial influences. The variety of uses within the
area does however bring various different users to the site.
2.3 Site Area
With such a large area at the disposal of developers the development
potential is large. It is important to understand the site dimensions in to
help with layout, phasing and the overall planning of the development.
As such the majority of planned development falls within the largest
section of the site shown below. However is also important to realize
the development potential of the more peripheral sections of the site to
maximize the full development potential.
Site Selection Area
Site Area: East Approximately 52,000 m²
Site Area: West Approximately 126,000 m²
Road Approximately 22,000 m²
2.4 SWOT Analysis
The use of the SWOT analysis framework helps to draw together indi-
vidual elements of the site and categorise them by there strengths and
weaknesses. Analysis has shown that the site possesses strengths
related to transport links, location, size and more broad economical
and environmental factors.
Regarding the main constraints on the site the low-key stature of the
surrounding area and ‘removed’ nature from the city centre make it a
less attractive spot for potential development something that a
successful master plan and development framework could change.
Weaknesses
-Low level of proposed development in
surrounding area
-Main ‘Seafield Road’ dissects site
-Development in close proximity to sea
poses issues
-Site very open to elements causes
viability issues
-Site lies on edge of main city center
Strengths
-Close proximity to city center
-Relatively good transport links to site
and within site
-Site is very much a ‘blank canvas’ in
potential development terms
-Currently a good mix of development
type surrounding site
Opportunities
-Relatively large site allowing for mixed-
use development
-Due to location majority of views on site
are of good quality
-Lack of large-scale development in
immediate vicinity, less competition
Threats
-The Elements present problem and
should inform material choice
-Lack of agglomeration economies in
area may impact viability of project
-Already a high number of residential
developments in area may drive prices
down
-High risk of coastal flooding must be
combatted somehow
19th Century Present Day
Chapter two
2.5 Movement
The main movement throughout the current area varies greatly. This is
shown in figure 2.2.
The green indicates low use and this is predominantly on the beach
area along Seafield as this area is fairly isolated, as entry is only
available primarily through either end of the beach. This is an issue in
which the new development will look to address to allow permeability
throughout the overall area.
The orange indicates medium use, which is mainly the promenade
between the current industrial units and the beach, mainly used by
dog walkers and joggers. Again the current access to the promenade
is limited and this is an issue, which will be addressed within the new
layout.
The red shows high current use, which is along Seafield Road and
Kings Road. Currently this is not pedestrian friendly and is used for
heavy through traffic from the city centre and Leith area towards the
Edinburgh City Bypass and A1 road.
“ ”
The seafield area presents
a blank canvas for
development
Figure 2.1: Site History
Figure 2.2: Heat Map
The Tide: Page 4
Land Use
Elements of The Tide
3.1 Leisure
Seaview Developments aim to create a distinctive environment for lei-
sure, incorporating a main auditorium for concerts and events as well
as a number of restaurants and a centre for water sports. These uses
will capitalise Edinburgh’s booming tourism industry whilst also draw-
ing in residents from across the city. We believe that by creating an
attractive leisure destination on Edinburgh’s seafront, on-site residential
and employment uses will also be complimented, making the area and
attractive place to live, work and enjoy.
3.2 The Lighthouse
‘The Lighthouse’ will act as an anchor to the scheme, operating as
a state-of-the-art auditorium. A main hall within the building will hold
small concerts, as well as conferences and exhibitions which will be fa-
cilitated by smaller function suites. This will draw in leisure tourism, as
well as offering space for businesses and local communities. This ven-
ue will also bring festival events to Edinburgh’s seafront, offering wider
integration with the rest of the city. Seaview Developments believe
that the unique design and nature of this auditorium will draw in large
numbers of people, utilising Edinburgh’s reputation as a top festival
destination and enhancing the viability of adjacent uses across the site.
Edinburgh’s tourism market
generates £1.2 billion for the lo-
cal economy annually.
Edinburgh hosts thirteen
international festivals per year.
3.3 Food & Drink
Seaview Developments believe that the site offers an opportunity for
the provision of a number of unique bars and restaurants. By incor-
porating bars and restaurants into the scheme, the leisure draw of
the area will be strengthened. However due to the close proximity of
Ocean Terminal the scheme will aim to attract independent bars and
restaurants, focussing on locally sourced produce in order to ensure
that businesses are not in direct competition. Bar and restaurant own-
ers will also be incentivised by the high quality outdoor space available
to the front of the units, which will benefit from pedestrians walking to
and from the promenade. This space will also provide opportunities for
outdoor eating, with views onto the water.
3.4 Centre for Watersports
Due to the unique location of the site, it is vital that the masterplan
utilises the opportunities provided by the seafront. This scheme will
deliver a high quality sailing club with associated storage, changing
and hire facilities, with a slipway connecting the beach to the club.
This part of the development will draw people into the area during the
day, and will also provide custom for adjacent bars and restaurants, as
well as ‘The Lighthouse’. The water based activity will also make the
boardwalk more engaging, encouraging people to socialise and spend
time outdoors within the public spaces provided.
3.5 Residential
Residential units will be spread across the site, incorporating high-end,
mid-market and affordable housing in order to create a vibrant mixed
community. The spacious, high-end 2 bed apartments will be
situated above the restaurants and bars to the front of the site, ben-
efitting from spectacular sea views. The mid-market and affordable
units will be located to the back of the site, and will benefit from the
provision of high quality greenspace which will provide opportunities
for recreation. These units will also be integrated with the scheme, al-
lowing residents to easily access the leisure facilities to the front of the
site. The residential aspect of the development will also provide work-
ers from the ‘creative hub’ with the opportunity to live nearby, creating
an area for residents to work, live and play.
Luxury Residential: 29; Midmarket Residential: 25; Affordable: 30 (units)
3.6 Creative Hub
Seaview Developments have recognised an opportunity to strengthen
Edinburgh’s reputation as a centre for creative industries. By devel-
oping a creative hub, employment space will be created and will aim
to attract businesses working in industries such as digital/technology,
film/TV/radio, advertising/PR and design/architecture. This ‘hub’ will
integrate the site with Leith, due to the existence of creative industries
in this part of Edinburgh, offering businesses the opportunity to collab-
orate with nearby companies. The adjacent ‘Lighthouse’ will also offer
businesses working within the hub the chance to use the conference
and exhibition space to showcase work and hold meetings. Workers
will also be able to use the bars and restaurants on site at lunch time
and after work. The 49, 728 sq ft. of adaptable office space within the
hub will also benefit from spectacular views across the water, some-
thing that is completely unique to the development.
Building on Edinburgh’s
outstanding international
reputation as a centre for
artistic, creative and cultural
excellence.
Chapter three
Figure 3.1: Seafield Promenade
The Tide: Page 5
The Masterplan:Land Use
“the docks; lighthouse and light”
4.3 The Docks A: 55, 200 sq ft. and B: 49, 728 sq ft.
The high-end residential and creative hub areas of the site have been
created to resemble the principles of a dock. As residents and
employees live and work in the units towards the promenande, they
move towards the end of the docks to view the surroundings, socialise
and interact with the leisure units at ground floor level.
4.1 Overview
The land uses within the site have been categorised through their
relationship with the surrounding wider area’s context of docks, boats
and naturally, the sea. Areas of the development have been designed
around this, establshing the docks, the lighthouse and light.
Chapter four
Figure 4.1: Current Site.
Figure 4.2: Proposed Site.
4.2 The Tide
The tide aims to literally wash away the under-utilised original site with
a proposed, improved site encompassing a diverse, mixed use
development with a variety of green spaces. The new site naturally
follows the direction of an urban village, representing mixed tenures
with a mix of supporting amenities and leisure based facilities (Urban
Forum, 1998, as cited in Mandanipour, 2004).
4.4 The Lighthouse: 16, 410 sq ft. (minimum)
An auditorium will be a primary component of the Tide, portraying a
key opportunity of waterfront developments - a focal point. Jacobs
(1992, pg. 228) notes that focal points, of which we need more of, are
formed through contrasting its use with the surrounding area. Thus, an
auditorium within residential and commercial remains ‘special looking’.
4.5 The Light
A new facet of the public realm will be added in the form of a pier,
designed as a beneficial space for residents to utilise, while
metaphorically acting as the light of the lighthouse auditorium and
ultimately, the development. Providing a direct relationship between
the development and the water.
4.6 Community Gardens & Green Space
The inclusion of community gardens and shared green space will
provide two primary benefits to the development. Firstly, residents will
benefit from an opportunity to improve their health and wellbeing, an
established attribute of community gardens (Wakefield et al, 2007).
Secondly, community gardens have a proven benefit to community
creation (Armstrong, 2000) through creating a meeting point for resi-
dents in different tenures to come together and interact.
The Tide: Page 6
Key for Land Use Masterplan
		
	 Commercial & Leisure
		High-End Residential & Leisure
		 Affordable Housing
		Green Space
		 Public Realm
Figure 4.3: Land Use Masterplan
The Tide: Page 7
The Masterplan:Elevations
Chapter five
Figure 5.1: Elevation of Docks A & B Unit Figure 5.3: Elevation of Boathouse
Figure 5.2: Elevation of Mid-Market and Affordable Housing South
Figure 5.4: Elevation of The Lighthouse
The Tide: Page 8
Figure 5.5: Elevation of Leisure on Promenade
Figure 5.7: Elevation of The Light
Figure 5.6: Elevation of Affordable Housing West
The Tide: Page 9
The Masterplan:Climate
Chapter six
Spring
6.1 Overview
The Masterplan takes advantage of the climate, ensuring all south
facing light is utilised. Figures number to number will show the
sunlight capture both during AM - 10am - and PM - 3pm - hours,
depicting the consideration towards ensuring natural light is best
captured, improving the
Figure 6.1: Spring AM
Summer
Autumn
Winter
6.2 Natural Light
The green space and public realm will benefit greatly from the sun-
light, with the only exception being PM hours of winter, as depicted in
figure 6.8. This will aim to attract more residents to the public realm,
ultimately benefiting from the benefits outlined (Wakefield et al, 2007;
Armstrong, 2000).
In addition, the affordable housing units at the south of the site will
protection from southwest wind, enclosing the public realm and green
space - ensuring a more inclusive space is provided for communities
to interact with.
6.3 Sun Path
The sun path diagram situated over the development site shows the
movement of the sun path over the course of a day. As shown, the
sun rises to the East of the site over the Firth of Forth moving round to
the West of the site. The area will have large sun cover for most parts
of a day. Parts of the development will be quite dense but because of
the permeable layout of the site, there will be plenty sunlight, especially
in the afternoon.
Figure 6.2: Spring PM
Figure 6.3: Summer AM
Figure 6.4: Summer PM
Figure 6.5: Autumn AM
Figure 6.6: Autumn PM
Figure 6.7: Winter AM
Figure 6.8: Winter PM
Figure 6.9: Sun Path
The Tide: Page 10
The Masterplan:Materials
7.2 Roofing and Cladding
As this development is on the coastline and within a marine
environment, additional precautions are to be taken on choice of
building materials. The building fabrics will need to be made to take
on the effects of a marine environment.
The roofing will be made up of a single ply membrane, which will take
into account the protection from birds and any nuisance, which may
occur.
The cladding of the buildings will be a Terracotta Rain screen, which
has been depicted in figure 7.1
The material, which will be used on this development, will be rain-
screen terracotta cladding. It is important to have the correct material
which will cope with the potential impacts that weathering and coastal
effects can bring.
These tiles will be fixed to jointers on a galvanized steel curtain-walling
system with a breathable weather moisture barrier behind.
This system requires little or no maintenance when installed unlike
brickwork with grouting and sealant joints.
As can be seen from figure 7.2 the tile is based on the rain screen prin-
ciple. Behind the facade joints is a support system, which drains away
any excess water, which penetrates the 1st layer. Water is unable to
penetrate this point because of the air circulation pressure in which
this design brings. The air circulation between the terracotta façade
and the backing support system stops the build up of hot air, allowing
for ventilation to provide a dry cavity stopping any
condensation occurring. This system is thermally efficient to the devel-
opment as it has a higher insulation value reducing energy
consumption.
Chapter seven
7.3 Windows
The windows on the development will be powder coated aluminum
frames; these will be coating resistant to the marine environment. The
windows are very well secured and minimal maintenance is required.
The windows will be top and side hung, which allows for different lock-
ing positions. This also allows for a secured locked position allowing
for ventilation into the property. These windows also allow for easy
cleaning as the sash can be released using the hinge mechanism.
7.1 Overview
This section provides an overview of material in which will be incorpo-
rated on site to cope with the marine environment. Careful material
consideration is vital for this development because of the environment
in which is resides in and if sourced correctly this will prevent replace-
ments and maintenance of building material.
7.5 Doors
All external doors will be timber with a suitable preservative coating.
The fittings on the doors will be stainless steel and the doorframe will
be made from galvanized steel to cope with the coastal effects.
7.4 Balcony
The material base of the balcony will be similar to that of the windows,
constructured from powdered aluminium to ensure durability is
prioritised. In addition, however, the windows wil be larger, so to
benefit from the views out to the sea.
Figure 7.1: Cladding Aesthetics
Figure 7.2: Cladding Detail
Figure 7.3: Window Detail
Figure 7.4: Balcony Detail
Figure 7.5: Door Detail
The Tide: Page 11
Transport
Figure 8.1: Vehicular Movement Figure 8.2: Pedestrian & Cycle Movement
8.1 Overview
The transport links and provision of networks have been designed in
line with Scottish Government (2010) street design guidance and
recommendations by established authors (Jacobs, 1992). The
masterplan has aimed to ensure that streets and movement have
been: welcoming; adaptable; resourced efficient; distinctive; safe &
pleasant and easy to move around. In addition, links to the city centre
and car parking facilities have been
8.3 Movement of Pedestrians and Cyclists
The design of the site has aimed to ensure streets are easy for users
to move around on, providing good connectivity for a variety of
users. This is achieved through prioritising pedestrians and cyclists
over vehicular modes. Cyclists benefit from a dedicated road to the
far west of the site - which vehicles cannot use. A road solely for their
movement, as well as pedestrians avoids typical cycle lane orienta-
tion, ‘often painted onto the margin of the carrageway’, which leads
to sharing road space and subsequently, higher levels of accidents
(Smith, 1993, pg. 125).
8.2 Movement of Vehicles
The design of the site and streets for vehicular movement has been
largely focused on reducing the need and discouraging it. Through the
site adopting a mix of uses including leisure and commercial, it is likely
to have an impact on the journeys made by car (Taylor, 2003).
In addition to particular streets being strictly no-vehicle access, public
transport promotion has been a priority. As can be seen in figure 8.1,
bus stops have been allocated throughout the central street, ensuring
that all residents have access to and from the city centre.
Chapter eight
Mini Key
	 Vehicular
	Movement
	 Bus Stops	
	
Mini Key
	 Pedestrian & Cycle
	Movement
The Tide: Page 12
Figure 8.3: Car Parking Docks A &
B in Secondary Streets
8.4 Car Parking
The car parking arrangements for both the Docks A and B, will be
provided by an enclosed secondary street between the units, as
depicted in figure 8.3.This will ensure that pedestrians can walk safely
and pleasantly through the primary streets within the Docks. Ultimate-
ly, what has been achieved, is an established street user hierarchy, as
outlined by Designing Streets as a quality of a successful place (The
Scottish Government, 2010).
The prospective residents and visitors to the promenade and leisure
facilities will have superior movement to that of private vehicles.
Adaptability has also been achieved, as the visual impact of car
parking has been reduced, through the adoption of a subtle, flexible
parking system in the Docks. Car parking for the Lighthouse will be in
the preferred form of underground style parking, this is to nce again
ensure that parking is ‘accomodated by a variety of means’ which
lessens visual impact (The Scottish Government, 2010, pg. 13).
Figure 8.5: Communities and Movement in
Docks A & B on Primary Streets
Figure 8.4: Street Design
8.5 Street Design
The streets within the development have
followed a welcoming approach, enabling
the streets to be used for people - enabling
social interaction, as can be seen in figure
8.5.
Why these still of streets rather than long
strips? Jacobs (1992, pg. 120) highlights
that streets which interweave and overlap
in a fragmented fashion have the most
success, rather than a strip. She states
that the streets ‘become capable of visual
and economic variation for their users’.
This can be seen in figure 8.4, where the
streets have been staggered.
Once again considering designing streets,
the Tide has aimed to ensure that it is dis-
tintive. This can be achieved by
ensuring that landmarks and focal points
assist with navigation, as well as oppor-
tunities to obtain value from the historic
relevance of the development (The Scot-
tish Government, 2010). This is portrayed
through the proposed site’s context and
relation to the sea. The Lighthouse will
provide the focal point required to assistant
residents with navigation.
The Tide: Page 13
Delivery Strategy
Chapter nine
Key for Phasing Order
	 	 Stage One
		Stage Two
		Stage Three
This phase will prioritise site preparation, through business relo-
cation and demolition of all existing units. This will allow for Seafield
Road to be shifted to the back of the site, which in turn will ensure
that the residential units to the back of the site are not left in isolation.
Phase two prioritises uses that can be funded quickly, due to market
sentiment supporting viability. Scotland’s housing shortage has meant
that there is a strong appetite for residential development, particularly
in across the SESplan area where it is estimated that an extra 74,835
homes are required from the period of 2009-2019. Due to the mix of
residential units, ranging from high-end to affordable, Seaview Devel-
opments believe that take-up levels would be high and would quick-
ly generate capital for investment into further phases of development.
The commercial units on the ground floor of the apartments represent
a more risky aspect of the development in terms of take-up, as prior
to the completion of phase three the leisure pull of the area will not
be as strong. However we believe that the capital generated from the
residential schemes will support slow take-up within the commercial
units, which will accelerate when ‘The Lighthouse’ is constructed.
Land uses that will be delivered during phase three have been identified
as being risky in investment terms, due to the large capital outlay that
is required for construction, and the risk of slow-take ups. The creative
hub and ‘The Lighthouse’ have been places to the later stages of the
development schedule in order to mitigate risk, and ensure that there
is a supporting market already located around the developments. The
capital generated which will be generated from the residential units will
be used to part-fund these land uses. Furthermore by placing these
aspects of development in the later phases, it strengthens the de-
velopments resilience to economic downturns, which could result in
low-take ups in employment spaces provided within the creative hub.
9.1 Funding
The funding structure will take the form of a joint venture. This will be
between a residential developer and a commercial investor. This will
require a sophisticated deal structure, as the residential developer is
likely to want to sell the residential units, whilst the commercial investor
may want to gain a long term investment, via leasing the commercial
and leisure units.
9.2 Delivery Strategy
In order to ensure that the development is delivered in a manner that
ensures viability, and minimises investment risk, the phasing of the
development will be prioritised based on the following criteria:
1. Land uses which are viable at this point in time will be prioritised
2. Land uses that can be funded now will be prioritised
3. Land uses that are not able to be funded now, due to high costs or 	
risks, will not be prioritised.
4. Land uses that are highly speculative, but could become more
viable in an improving market, will not be prioritised.
	
3
3
2
Figure 9.1: Phasing Order
1
The Tide: Page 14
Business Relocation
This stage will ensure that current land occupiers are relocated appro-
priately, using financial incentives to avoid any conflict. This will ensure
that the site is completely unoccupied for demolition to begin.
Site Clearance
All structures on site will be demolished, providing a blank canvas for
development and allowing for Seafield Road East to be shifted.
Infrastructure
This development will shift the existing Seafield Road East in order to
ensure that the residential units to the back of the site are not seg-
regated from the rest of the development. New roads, services and
utilities, and drainage including stormwater management will also be
installed at this stage. Refer to figure 9.2 which depicts the change in
road layout.
Promenade
The promenade will be improved and risen slightly, incorporating stairs
down onto the beach and a pier to improve the public realm.
Figure 9.2: Revised Road Layout
Key for Revised Road Layout
		
	 	 Current Road
		Revised Road
The Docks A: High End Residential and Leisure
High end residential and leisure mixed use blocks will be constructed
on site first, along with the necessary greenspace and vehicle parking.
Due to current housing market sentiment, we believe that high end
residential blocks will quickly sell, generating capital to fund the next
phases of development.
Mid-Market and Affordable Housing - South of Site
Flats to the south east of the site will be constructed during phase two
in order to utilise housing market sentiment. Again this will generate
capital to fund further phases of development, reducing investment
risk. Public realm improvements surrounding the residential units will
also be delivered, as well as plots for the community gardens.
Boathouse
The boat house will be delivered at the same time as the residential
and leisure blocks in order to provide local recreational opportunities.
The Docks B: Creative Hub and the Lighthouse: Auditorium
The third and final stage of phasing will involve first, the creative hub,
secondly, the lighthouse auditorium and lastly, affordable housing to
the west of the site. Due to the large amount of employment space
created by the Docks B and the requirement of established leisure
amenities for the Lighthouse, these will both have to be developed
last. It is likely that it will take a considerable period of time to see sig-
nificant takeup levels within Docks B, in addition. This may mean that
both of these aspects of the development would be seen as a long
term investment. High end residential will be prioritised so to
ensure that developer returns do not discourage completion of the
site. Flexibility is also ensured, as the developer has more control over
the implementation of a potentially risky facet of development in the
current market climate.
Affordable Housing - West of Site
As income is nonexistent from affordable housing and due to the
likliehood of this being requested by the local authority through a
Section 75 agreement, affordable housing west will inevitably be
incorporated last
Addition
A temporary road will be incorporated within the site so to redirect any
construction traffic away from the newly developed Docks A. This will
become green space - west of the Lighthouse - as indicated in figure
9.2.
Figure 9.3: The Docks A
Figure 9.4: Affordable and
Mid-Market Housing
Figure 9.5: Boathouse
Figure 9.7: Affordable
Housing West
Figure 9.6
The Lighthouse and
Docks B
The Tide: Page 15
Planning Constraints
10.1 Overview
Regarding the aspects of planning policy that are relevant for the
area any planning issues that may arise must be highlighted and an
explanation given on how the development will meet these require-
ments. The area is covered by The Edinburgh City Local Development
Plan (2014) at Local level, SESplan (2014) at Regional level and the
National Planning Framework 3 (2014) at National level.
Three prospective planning constraints which could present issues are:
1. Infrastructure
2. Building Heights
3. Building Form, Density and Layout
Chapter ten
10.2 Infrastructure
It is essential that the development does not affect the main ‘artery’
Seafield Road East road that borders the site. This is particularly im-
portant as one of the main Transport ‘objectives’ for Edinburgh in the
city’s local plan is as follows:
“To ensure that development does not prejudice the implementation of
future road, public transport and cycle and footpath proposals.” (City
of Edinburgh Council, 2014, pg. 111)
Accommodating the existing transport links as well as integrating the
development into these routes is essential without jeopardising the
viability of the transport links currently in place.
10.3 Building Heights
Due to the developments close proximity to the coast and its position-
ing in terms of key views from other sections of the waterfront area
and Fife it is important for building height to be well integrated. This
point is reinforced by the content of the Edinburgh Design guidance
(2011, pg. 42):
“The Council wants new development to integrate well with existing
buildings and spaces.”
The Tide development takes on board influences from the surrounding
built form by adhering to similar materials as well as building heights.
This approach h ensures it fits seamlessly with the surrounding built
environment whilst retaining a sense of place.
10.4 Building Form, Density and Layout
Density is a key component of any development and ‘The Tide’ seeks
to deliver uses within a controlled and adaptive layout where density is
perfectly balanced, ensuring the site is not over developed. This falls
in line with guidance within the Edinburgh Design Guidance (City of
Edinburgh Council, 2011, Pg. 31) stating that:
“New Development should achieve a density that is appropriate to the
immediate site conditions and to the neighbourhood.”
The development strikes the balance between the surrounding high
density housing tenements with its own mixed use ‘blocks’ as well as
the green, open space that borders the sandy expanses of the beach.
The main stages and components of master plan creation as stated in
PAN 83 are:
Stage 1: Site appraisal
Stage 2: Analysis,
Stage 3: Developing the Design,
Stage 4: Testing the design concepts and finalizing the master plan
and finally the Proposal.
Below is an overview of the processes involved in formulation of a
good quality master-plan. In order to assess and evaluate the quality
and scope of a master plan there are some Key Considerations and
areas that must be followed, they are as follows:
It is important to have considerations and other checklists in place to
ensure that the master plan is up to the task of guiding and shaping
development in the area on several different levels. By focusing for
example on physical and environmental factors the development can
have a solid base in the built environment.
10.5 Environmental Factors
The design and layout of ‘The Tide’ incorporated low-density units
with an emphasis on interaction with the coastal environment in order
to compliment the surrounding environment.
This is mirrored by the creation of low-density units with standard
building heights of three stories and heavy use of green and open
spaces to compliment the urban realm.
10.6 Social Factors
The mixed use nature of the development allows for social interaction
at all times of the day by mixing housing, commercial and retail units in
the same vicinity.
These all lead to creating a vibrant environment within ‘The Tide’ by
encouraging positive social factors to blossom such as interaction and
maintained use of green and open spaces.
10.7 Economic Factors
‘The Tide’ will create its own buoyant economy as well as supporting
the wider Seafield and Waterfront areas. The mixed nature of the site
further helps lend to the varied uses in the area, which contribute to
the local economy. As such the success of ‘The Tide’ can create an
Agglomeration economy in the area centered around the creative hub
and nature of businesses located within the development.
Masterplan
Key Components
Social FactorsEconomic Factors
Environmental Factors
Figure 10.1: PAN 83 Recommendations
The Tide: Page 16
The Masterplan:Impact
Chapter eleven
11.1 Overview
It is hoped that the development will attract attention to not just the
Seafield area but also the Waterfront area helping to create a stronger
relationship between Seafield, Leith and Portobello as well as
integrating with the city centre.
A strongly performing waterfront should be seen as an asset,
complementing the city centre, as well as having economic, social and
environmental impacts.
11.2 Economic, Social and Environmental Impact
The creation of employment space will have a large economic im-
pact on the city, creating a large number of jobs within the creative
industry. Here the construction of a creative hub will strengthen Edin-
burgh’s reputation as an artistic and cultural centre, promoting further
industry to set up in the local area. Furthermore the creation of ‘The
Lighthouse’ will bring a strong leisure focus to Edinburgh’s waterfront,
and will provide an opportunity for Seafield to become integrated with
the city, with ‘The Lighthouse’ bringing a number of festival events to
the waterfront across the year. The creation of a significant number of
residential units will also stimulate local economic growth by creating
construction jobs and through local resident spending, and will con-
tribute towards solving Scotland’s housing need.
The development will also contribute to social improvements, both
directly and indirectly. Directly, the residents and community will ben-
efit from the green space provision and incorporation of community
gardens from health and wellbeing benefits. Indirectly, as new com-
munities are formed, wider communities will integrate, creating a wider
relationship between Seafield and the surrounding areas of Leith and
Portobello.
The Development will also have a positive impact on the environment
as a lot of greenspace will be created and incorporated throughout the
site. This is a vast improvement to the lack of green space currently on
site and the amount of industrial use, which is in place presently. The
green space will provide habitat for small animals to reside in and more
attention will be given to the boardwalk and beach area as it is cur-
rently neglected. The decrease in industrial use and increase in green
spaces and sustainable development will also have a positive impact
on the air quality. Tree buffers will also be positioned to minimise any
noise impact on residential buildings.
11.3 Linking Edinburgh’s Boardwalk
The development will have significant positive impact in the connec-
tivity of Edinburgh’s Boardwalk. This will connect up the route in an
attractive way along a 10-mile stretch from Cramond through to Porto-
bello (Edinburgh Council, 2006). The Edinburgh Boardwalk is a part of
the Edinburgh Councils plan for the emergence of development along
the coastline to make the overall waterfront area more accessible and
attractive. Making full use of the Boardwalk in Edinburgh would be
a valuable tool for the city as a whole and for the surrounding com-
munities who reside within the local areas (Edinburgh Council, 2006).
Edinburgh Council (2006) also explain that making the coastline more
attractive and popular will bring more investment into the area. This
development looks to address an area of the Boardwalk, which cur-
rently is in desperate need of attention, providing high quality facilities
for new prospective residents and the public who would be interested
in the different leisure options available within the new development.
Figure 11.1: Linking the Boardwalk
The Tide: Page 17
Conclusive Themes
Chapter twelve
Focal Point Permeability Viability
A number of conclusive themes can be drawn, based on what has
been designed from the initial objectives outlined in chapter one,
provision of a focal point, creating permeability and ensuring viability.
The development should ensure a focal point is present, in this case,
through the incorporation of the Lighthouse. As Slater (2014, pg. 19)
notes:
“one of the best opportunities offered by
a waterfront facility is the creation of a
focal point”
The development must prioritise permeability, as the current site
currently is not good as it is hard to reach the beach or the boardwalk
from Seafield Road apart from at either end of the boundaries of the
site. The new layout of the site takes into account the importance of
permeability and this has been implemented throughout. Therefore,
the development is very user friendly for pedestrians and car users.
Hayward & McGlynn (1993, pg. 86) state:
This is something which the development has aimed to remedy with
the current site. The development takes this into account and utilises
this as residential blocks are permeable and it is clear to see what is
public and what is private.
“
”
The development has to be viable, first and foremost. Slater (2014)
writes that a key challenge is often the lack of understanding that ‘the
equation of ‘cost+value added=viability’ is paramount’. We have aimed
to add value by design, while ensuring through our phasing and
delivery strategy that investment risk is minimised, and thus,
prospectively, cost.
Through providing a focal point, benefits such as navigational
awareness of residents is improved to a center point for a
development to become established in the surrounding area. The
Lighthouse satisfies both of these.
Figure 12.1: Focal Point
Figure 12.2: Current Permeability
Figure 12.3: Proposed Permeability
Figure 12.4: Current Leisure
Figure 12.5: Proposed Leisure
The Tide: Page 18
References
Chapter thirteen
Armstrong, D. (2000) ‘A survey of community gardens in upstate New
York: Implications for health promotion and community development’,
Health & Place, 6(4), 1 December, 319-327
Douglas, H. (2009) ‘NBK Terracotta Façade Panels: The Rainscreen
System’ [online] Available at: http://www.archdaily.com/32778/nbk-ter-
racotta-facade-panels-hunter-douglas-contract/ [Accessed 27 April
2015]
Edinburgh City Council (2011) Waterfront and Leith: Area Development
Framework, Edinburgh, Edinburgh City Council
Edinburgh City Council (2013) Edinburgh Design Guidance, Edinburgh,
Edinburgh City Council
Edinburgh City Council (2014) City of Edinburgh Local Development
Plan: Action Pan, Edinburgh: Edinburgh City Council
Edinburgh City Council (2014) Edinburgh City Local Development Plan:
Second Proposed Plan, Edinburgh: Edinburgh City Council
Edinburgh City Council (2015) Edinburgh City Councils Transport 2030
Vision, Edinburgh: Edinburgh City Council
IDSystems. (2015) ‘Aluminium Windows’ [online] Available at: http://
www.i-d-systems.co.uk/windows/aluminium-windows [Accessed 29
April 2015]
Jacobs, J. (1992) Death and Life of Great American Cities, New York:
Vintage Books
Kloeber (2015) ‘Entrance Doors, Timber Funkyfront Contemporary
Entrance Doors’ [online] Available from: http://www.kloeber.co.uk/
product/entrance-doors/timber/funkyfront-contemporary-en-
trance-doors [Accessed 29 April 2015].
Mandanipour, A. (2005) Public and Private Spaces of the City, New
York: Routledge
Murain, P. (1993) ‘Urban Expansion: Look Back and Learn’, in
Hayward, R & McGlynn, S., ed. Making Better Places Urban Design
Now. Oxford: Butterworth Architecture, 83-94
Slater, J. (2014) ‘Waterfronts: Opportunities and Constraints’, Urban
Design Group Journal, 131(1750), London: Urban Design Group
Taylor, D. (2003) ‘Connectivity and Movement’, in Neal, P., ed. Urban
Villages and the Making of Communities, New York: Spon Press, 103-
117
The Scottish Government (2008) Planning Advice Note 83: Master
Planning, Edinburgh: The Scottish Government
The Scottish Government (2010) Designing Streets, Edinburgh: The
Scottish Government
The Scottish Government (2014) National Planning Framework 3,
Edinburgh: The Scottish Government
Trinity Steel (n.d.) ‘Solarlux’ [online] Available at: http://www.trinitysteel.
co.uk/solarlux-bi-fold-door-and-balcony-systems/ [Accessed 25 April
2015]
Urban Realm. (2013) ‘Notre Dame Primary welcomes first pupils’ [In-
ternet]. Urban Realm, Glasgow. Available at: http://www.urbanrealm.
com/news/4361/Notre_Dame_Primary_welcomes_first_pupils.html
[Accessed 27 April 2015]
Wakefield, S., Yeudall, F., Taron, C., Reynolds, J. and Skinner, A.
(2007) ‘Growing urban health: Community gardening in South-East To-
ronto’, Health Promotion International [online], 22(2), 26 February, 92-
101, Available at: http://heapro.oxfordjournals.org/content/22/2/92.full.
pdf+html [Accessed 25 April 2015]
The Tide: Page 19
Appendices
Chapter fourteen
1 von 20

Recomendados

Northriverside Research web von
Northriverside Research webNorthriverside Research web
Northriverside Research webJaime Castro Solorzano
275 views30 Folien
How to create_livable_resilient_neighborhood-final von
How to create_livable_resilient_neighborhood-finalHow to create_livable_resilient_neighborhood-final
How to create_livable_resilient_neighborhood-finalSouthern New England American Planning Association
655 views18 Folien
Delivering the Rehabilitation of the F.G. Gardiner Expressway von
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
9.9K views12 Folien
Fort lincoln park community mtg presentation 2019 09 24 final von
Fort lincoln park  community mtg presentation 2019 09 24 finalFort lincoln park  community mtg presentation 2019 09 24 final
Fort lincoln park community mtg presentation 2019 09 24 finalRamaChilamkurthy
3K views12 Folien
Development Sustainability in Administrative Design and Facility Management A... von
Development Sustainability in Administrative Design and Facility Management A...Development Sustainability in Administrative Design and Facility Management A...
Development Sustainability in Administrative Design and Facility Management A...Istabraq Al Janabi
1.6K views47 Folien
RFP von
RFPRFP
RFPMike Upston, AICP
139 views10 Folien

Más contenido relacionado

Was ist angesagt?

19th lamont meeting presentation 2019.03.28 von
19th  lamont meeting presentation 2019.03.2819th  lamont meeting presentation 2019.03.28
19th lamont meeting presentation 2019.03.28RamaChilamkurthy
3K views15 Folien
Presentation on Redevelopment von
Presentation on RedevelopmentPresentation on Redevelopment
Presentation on RedevelopmentNuzrul Islam Nahid
5.1K views40 Folien
buttress masterplanning lr von
buttress masterplanning lrbuttress masterplanning lr
buttress masterplanning lrGavin Sorby
745 views23 Folien
Eastgate Neighborhood Plan Amendment - Developer Presentation von
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationCity of College Station
1.8K views39 Folien
Hearst community meeting 10.02.18 pn_3-30pm von
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pmRamaChilamkurthy
8.4K views29 Folien
High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -... von
High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -...High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -...
High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -...Virtual ULI
1.4K views23 Folien

Was ist angesagt?(20)

19th lamont meeting presentation 2019.03.28 von RamaChilamkurthy
19th  lamont meeting presentation 2019.03.2819th  lamont meeting presentation 2019.03.28
19th lamont meeting presentation 2019.03.28
RamaChilamkurthy3K views
buttress masterplanning lr von Gavin Sorby
buttress masterplanning lrbuttress masterplanning lr
buttress masterplanning lr
Gavin Sorby745 views
Hearst community meeting 10.02.18 pn_3-30pm von RamaChilamkurthy
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
RamaChilamkurthy8.4K views
High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -... von Virtual ULI
High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -...High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -...
High Density and Livability: Lessons Learned in Asian Cities (Lim Eng Hwee) -...
Virtual ULI1.4K views
South Main Revitalization Plan von Max Herzog
South Main Revitalization PlanSouth Main Revitalization Plan
South Main Revitalization Plan
Max Herzog139 views
RE developement of Bhindhi baazar von Yash Agrawal
RE developement of Bhindhi baazarRE developement of Bhindhi baazar
RE developement of Bhindhi baazar
Yash Agrawal6.1K views
BO ZHANG_Portfolio von BoZhang182
BO ZHANG_PortfolioBO ZHANG_Portfolio
BO ZHANG_Portfolio
BoZhang18242 views
Nicholas Seivers AICP Portfolio von NSeivers
Nicholas Seivers AICP PortfolioNicholas Seivers AICP Portfolio
Nicholas Seivers AICP Portfolio
NSeivers244 views
2015 - Oakridge Transit Centre Policy Statement von Ben Johnson
2015 - Oakridge Transit Centre Policy Statement2015 - Oakridge Transit Centre Policy Statement
2015 - Oakridge Transit Centre Policy Statement
Ben Johnson401 views

Destacado

Business Viability von
Business ViabilityBusiness Viability
Business ViabilityRichard Veryard
14K views23 Folien
Infrastructure finance nibm von
Infrastructure finance nibmInfrastructure finance nibm
Infrastructure finance nibmAkshay Samant
8.6K views33 Folien
Biomimicry von
BiomimicryBiomimicry
BiomimicryNUS SDE
47.4K views46 Folien
Developing Brownfield Sites - Mike Taylor 220216 von
Developing Brownfield Sites - Mike Taylor 220216Developing Brownfield Sites - Mike Taylor 220216
Developing Brownfield Sites - Mike Taylor 220216Mike Taylor
161 views15 Folien
CCL Brochure 2015 von
CCL Brochure 2015CCL Brochure 2015
CCL Brochure 2015Mike Taylor
172 views31 Folien
Building future learning spaces by Dr Bader Aloliwi von
Building future learning spaces by Dr Bader AloliwiBuilding future learning spaces by Dr Bader Aloliwi
Building future learning spaces by Dr Bader Aloliwialoliwi
424 views12 Folien

Destacado(20)

Infrastructure finance nibm von Akshay Samant
Infrastructure finance nibmInfrastructure finance nibm
Infrastructure finance nibm
Akshay Samant8.6K views
Biomimicry von NUS SDE
BiomimicryBiomimicry
Biomimicry
NUS SDE47.4K views
Developing Brownfield Sites - Mike Taylor 220216 von Mike Taylor
Developing Brownfield Sites - Mike Taylor 220216Developing Brownfield Sites - Mike Taylor 220216
Developing Brownfield Sites - Mike Taylor 220216
Mike Taylor161 views
Building future learning spaces by Dr Bader Aloliwi von aloliwi
Building future learning spaces by Dr Bader AloliwiBuilding future learning spaces by Dr Bader Aloliwi
Building future learning spaces by Dr Bader Aloliwi
aloliwi424 views
PlaceEXPO Future Cities: Mike Horner, Muse Developments von Place North West
PlaceEXPO Future Cities: Mike Horner, Muse DevelopmentsPlaceEXPO Future Cities: Mike Horner, Muse Developments
PlaceEXPO Future Cities: Mike Horner, Muse Developments
Place North West828 views
Challenges of Infrastructure in India von Rohan Bharaj
Challenges of Infrastructure in IndiaChallenges of Infrastructure in India
Challenges of Infrastructure in India
Rohan Bharaj979 views
Infrastructure Finance Fundamentals (ADN Capital Ventures) von Adam Nicolopoulos
Infrastructure Finance Fundamentals (ADN Capital Ventures)Infrastructure Finance Fundamentals (ADN Capital Ventures)
Infrastructure Finance Fundamentals (ADN Capital Ventures)
Adam Nicolopoulos2.5K views
Monetary Systems in Current Markets von Sunny Sabharwal
Monetary Systems in Current MarketsMonetary Systems in Current Markets
Monetary Systems in Current Markets
Sunny Sabharwal464 views
Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in... von Nate Sandvig
Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
Nate Sandvig367 views
Investment Techniques In Current Market Scenario von Sunny Sabharwal
Investment Techniques In Current Market ScenarioInvestment Techniques In Current Market Scenario
Investment Techniques In Current Market Scenario
Sunny Sabharwal896 views
AFRICA POWER VENTURES_CAPABILITY STATEMENT von Marc Goldstein
AFRICA POWER VENTURES_CAPABILITY STATEMENTAFRICA POWER VENTURES_CAPABILITY STATEMENT
AFRICA POWER VENTURES_CAPABILITY STATEMENT
Marc Goldstein518 views

Similar a Document Finished

Strategic plan poster final von
Strategic plan poster finalStrategic plan poster final
Strategic plan poster finalVanessa Baratta
119 views1 Folie
Comments on the Draft Plan and Sewers von
Comments on the Draft Plan and SewersComments on the Draft Plan and Sewers
Comments on the Draft Plan and SewersGabrielleDondero
2.6K views41 Folien
Crescent_-_DF_-_adopted_version von
Crescent_-_DF_-_adopted_versionCrescent_-_DF_-_adopted_version
Crescent_-_DF_-_adopted_versionDavid Greenfield
532 views40 Folien
Orange Avenue Overlay Final Report von
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportBrendan O'Connor
1.2K views86 Folien
Urban Design Portfolio Tim Hays von
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysTim Hays
1 view8 Folien
MARINA BAY SINGAPORE - URBAN CASE STUDY von
MARINA BAY SINGAPORE - URBAN CASE STUDYMARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDYLAr. Siti Aishah Khairuddin
27.4K views41 Folien

Similar a Document Finished(20)

Comments on the Draft Plan and Sewers von GabrielleDondero
Comments on the Draft Plan and SewersComments on the Draft Plan and Sewers
Comments on the Draft Plan and Sewers
GabrielleDondero2.6K views
Urban Design Portfolio Tim Hays von Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
Tim Hays1 view
Property Redevelopment Proposal (Final Yr Project) von Mothusi Lekgowe
Property Redevelopment Proposal (Final Yr Project)Property Redevelopment Proposal (Final Yr Project)
Property Redevelopment Proposal (Final Yr Project)
Mothusi Lekgowe550 views
Bradley Beach Presentation - August 15 von APA-NJ
Bradley Beach Presentation - August 15Bradley Beach Presentation - August 15
Bradley Beach Presentation - August 15
APA-NJ711 views
Comprehensive development zone 21 von AndrewKates
Comprehensive development zone 21Comprehensive development zone 21
Comprehensive development zone 21
AndrewKates183 views
FINAL_LakesideWayfindingReport_041516 von Greg Oldson
FINAL_LakesideWayfindingReport_041516FINAL_LakesideWayfindingReport_041516
FINAL_LakesideWayfindingReport_041516
Greg Oldson247 views
Urban renewal von noorizzah
Urban renewalUrban renewal
Urban renewal
noorizzah265 views
Placemaking, Innovation, and Planning: Dublin 8 von kieran rose
Placemaking, Innovation, and Planning: Dublin 8Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8
kieran rose659 views

Document Finished

  • 2. The Tide: Page 1 Contents Introduction: Chapter One Executive Summary Project Brief Design Objectives Analysis of the Site: Chapter Two 2.1 Overview 2.2 Site History 2.3 Site Area 2.4 SWOT Analysis 2.5 Movement Land Uses: Chapter Three 3.1 Leisure 3.2 Lighthouse 3.3 Food & Drink 3.4 Centre for Watersports 3.5 Residential 3.6 Creative Hub The Masterplan: Land Uses: Chapter Four 4.1 Overview 4.2 The Tide 4.3 The Docks A & B 4.4 Lighthouse 4.5 The Light 4.6 Community Gardens and Green Space The Masterplan: Elevations: Chapter Five The Masterplan: Climate: Chapter Six 6.1 Overview 6.2 Natural Light 6.3 Sun Path The Masterplan: Detail: Chapter Seven 7.1 Overview 7.2 Roofing and Cladding 7.3 Windows 7.4 Balcony 7.5 Doors Transport: Chapter Eight 8.1 Overview 8.2 Movement of Vehicles 8.3 Movement of Pedestrians and Cyclists 8.4 Car Parking 8.5 Street Design Delivery Strategy: Chapter Nine 9.1 Funding 9.2 Delivery Strategy 2 2 2 2 3 3 3 3 3 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 7 9 9 9 9 10 10 10 10 10 10 11 11 11 11 12 12 13 13 13-14 Planning Constraints: Chapter Ten 10.1 Overview 10.2 Infrastructure 10.3 Building Heights 10.4 Building Form, Layout and Density 10.5 Environmental Factors 10.6 Social Factors 10.7 Economic Factors The Masterplan: Impact: Chapter Eleven 11.1 Overview 11.2 Economic, Social and Environmental Impact 11.3 Linking Edinburgh’s Boardwalk Conclusive Themes: Chapter Twelve References: Chapter Thirteen 15 15 15 15 15 15 15 15 16 16 16 16 17 18
  • 3. The Tide: Page 2 Executive Summary Project Brief Design Objectives 1.1 Current Site Issues The current Seafield site offers little in the way of pull factors to pro- spective inventors and generally people seeking to move to the Water- front area. This is supported by the high concentration of industrial and tertiary retail units that occupy the site and surrounding area. These short comings were addressed and influenced the decisions taken to create a development with high quality mixed use development that utilises all aspects of good design to create an Urban Village which the development naturally resembles. 1.2 Improvements to Site By addressing some of the main issues surrounding the site the Seafield area can be transformed into ‘The Tide’, which provides: 1. An attractive Focal Point that can contribute to the local, city wide and regional economy and provide value to prospective residents. To create a viable and financially stable development it is important to promote the primary focal point of the site, the Lighthouse, which can act towards ‘harnessing the instrinsic activity of the place’ (Slater, 2014, pg. 19). 2. Increased Permeability was a key improvement to the site with the ‘Dock’ style housing and commercial units constructed on site with emphasis on ease of movement and making best use of the views out to sea. 3. Increased Viability with a multitude of uses stemming Residential, Commercial and Leisure. Mixing uses on site helps to create both a inclusive and vibrant atmosphere one which makes ‘The Tide’ and attractive place to both live and work. 1.3 Impact of Development The development will have a significant effect on the surrounding area, from providing improvements to the existing promenade. Incorporatng leisure and commercial uses, providing jobs for the surrounding area and more small businesses to contribute to the local and wider economy. The environmental impact will be seen through the prioritisation of public transport and on foot travel. ‘The Tide’ will utilise the use of street design and movement frameworks to ensure pedestrians and cyclists are best catered for. The development also naturally reduces the need for vehicular transport by incorporating a mixed use design. The social impacts will be seen through a community focused public realm, encompassing community garden provision, which are proven to improve health, wellbeing and improve community relationships (Wakefield et al, 2007; Armstrong, 2000). Seaview Developments have been asked to produce a visionary masterplan and design brief for the “Marine Gardens” site located on Seafield Road, Edinburgh. This masterplan is to be based upon established design principles and methods, incorporating a range of economically viable land uses which are to be focused on leisure. How- ever, complimentary uses are also welcomed in order to attract addi- tional users. Furthermore the development must look to integrate the existing promenade, and should aim to take advantage of the oppor- tunity to extend it into the water located to the East of the site. Design must take local planning policy into account, and must attract investors in order to create an economically viable development. Finally consider- ation must be given to the impact of the masterplan on the whole city. There are three primary design objectives which have been outlined to underpin Seaview Development’s vision for the project brief and masterplan: 1. Improve the permeability of the site, prioritis- ing street design and pedestrian movement. 2. Create a focal point within the development which residents can benefit from. 3. Ensure the development adds value in the form of mixed use leisure based facilties, while maintaining viability. Introduction: Chapter one Creative Innovative Contemporary Urban Village Viable & Attractive Movement Place Investment Vibrant
  • 4. The Tide: Page 3 Analysis of Site 2.2 Site History The Seafield site was predominantly industrial throughout the 19th, 20th and 21st centuries. To the East of the site lies the Portobello settlement the area was well known for Pleasure related uses. The site itself was relatively untouched development wise until the 19th and 20th centuries; at present Industrial units and residential development occupy the site. 2.1 Overview The Seafield area presents a blank canvas for development; over the decades the waterfront area has seen a number of different uses from funfair, dance hall and leisure to mainly industrial and tertiary business as it is currently used. The existing frontages along the side are in varying states of decay and contribute to a poor image for the area. There is an element of mixed-use throughout the site, with housing making up some, bars and cafes, as well as animal shelters and industrial workshops. This is strange, as traditional waterfronts do not contain such industrial influences. The variety of uses within the area does however bring various different users to the site. 2.3 Site Area With such a large area at the disposal of developers the development potential is large. It is important to understand the site dimensions in to help with layout, phasing and the overall planning of the development. As such the majority of planned development falls within the largest section of the site shown below. However is also important to realize the development potential of the more peripheral sections of the site to maximize the full development potential. Site Selection Area Site Area: East Approximately 52,000 m² Site Area: West Approximately 126,000 m² Road Approximately 22,000 m² 2.4 SWOT Analysis The use of the SWOT analysis framework helps to draw together indi- vidual elements of the site and categorise them by there strengths and weaknesses. Analysis has shown that the site possesses strengths related to transport links, location, size and more broad economical and environmental factors. Regarding the main constraints on the site the low-key stature of the surrounding area and ‘removed’ nature from the city centre make it a less attractive spot for potential development something that a successful master plan and development framework could change. Weaknesses -Low level of proposed development in surrounding area -Main ‘Seafield Road’ dissects site -Development in close proximity to sea poses issues -Site very open to elements causes viability issues -Site lies on edge of main city center Strengths -Close proximity to city center -Relatively good transport links to site and within site -Site is very much a ‘blank canvas’ in potential development terms -Currently a good mix of development type surrounding site Opportunities -Relatively large site allowing for mixed- use development -Due to location majority of views on site are of good quality -Lack of large-scale development in immediate vicinity, less competition Threats -The Elements present problem and should inform material choice -Lack of agglomeration economies in area may impact viability of project -Already a high number of residential developments in area may drive prices down -High risk of coastal flooding must be combatted somehow 19th Century Present Day Chapter two 2.5 Movement The main movement throughout the current area varies greatly. This is shown in figure 2.2. The green indicates low use and this is predominantly on the beach area along Seafield as this area is fairly isolated, as entry is only available primarily through either end of the beach. This is an issue in which the new development will look to address to allow permeability throughout the overall area. The orange indicates medium use, which is mainly the promenade between the current industrial units and the beach, mainly used by dog walkers and joggers. Again the current access to the promenade is limited and this is an issue, which will be addressed within the new layout. The red shows high current use, which is along Seafield Road and Kings Road. Currently this is not pedestrian friendly and is used for heavy through traffic from the city centre and Leith area towards the Edinburgh City Bypass and A1 road. “ ” The seafield area presents a blank canvas for development Figure 2.1: Site History Figure 2.2: Heat Map
  • 5. The Tide: Page 4 Land Use Elements of The Tide 3.1 Leisure Seaview Developments aim to create a distinctive environment for lei- sure, incorporating a main auditorium for concerts and events as well as a number of restaurants and a centre for water sports. These uses will capitalise Edinburgh’s booming tourism industry whilst also draw- ing in residents from across the city. We believe that by creating an attractive leisure destination on Edinburgh’s seafront, on-site residential and employment uses will also be complimented, making the area and attractive place to live, work and enjoy. 3.2 The Lighthouse ‘The Lighthouse’ will act as an anchor to the scheme, operating as a state-of-the-art auditorium. A main hall within the building will hold small concerts, as well as conferences and exhibitions which will be fa- cilitated by smaller function suites. This will draw in leisure tourism, as well as offering space for businesses and local communities. This ven- ue will also bring festival events to Edinburgh’s seafront, offering wider integration with the rest of the city. Seaview Developments believe that the unique design and nature of this auditorium will draw in large numbers of people, utilising Edinburgh’s reputation as a top festival destination and enhancing the viability of adjacent uses across the site. Edinburgh’s tourism market generates £1.2 billion for the lo- cal economy annually. Edinburgh hosts thirteen international festivals per year. 3.3 Food & Drink Seaview Developments believe that the site offers an opportunity for the provision of a number of unique bars and restaurants. By incor- porating bars and restaurants into the scheme, the leisure draw of the area will be strengthened. However due to the close proximity of Ocean Terminal the scheme will aim to attract independent bars and restaurants, focussing on locally sourced produce in order to ensure that businesses are not in direct competition. Bar and restaurant own- ers will also be incentivised by the high quality outdoor space available to the front of the units, which will benefit from pedestrians walking to and from the promenade. This space will also provide opportunities for outdoor eating, with views onto the water. 3.4 Centre for Watersports Due to the unique location of the site, it is vital that the masterplan utilises the opportunities provided by the seafront. This scheme will deliver a high quality sailing club with associated storage, changing and hire facilities, with a slipway connecting the beach to the club. This part of the development will draw people into the area during the day, and will also provide custom for adjacent bars and restaurants, as well as ‘The Lighthouse’. The water based activity will also make the boardwalk more engaging, encouraging people to socialise and spend time outdoors within the public spaces provided. 3.5 Residential Residential units will be spread across the site, incorporating high-end, mid-market and affordable housing in order to create a vibrant mixed community. The spacious, high-end 2 bed apartments will be situated above the restaurants and bars to the front of the site, ben- efitting from spectacular sea views. The mid-market and affordable units will be located to the back of the site, and will benefit from the provision of high quality greenspace which will provide opportunities for recreation. These units will also be integrated with the scheme, al- lowing residents to easily access the leisure facilities to the front of the site. The residential aspect of the development will also provide work- ers from the ‘creative hub’ with the opportunity to live nearby, creating an area for residents to work, live and play. Luxury Residential: 29; Midmarket Residential: 25; Affordable: 30 (units) 3.6 Creative Hub Seaview Developments have recognised an opportunity to strengthen Edinburgh’s reputation as a centre for creative industries. By devel- oping a creative hub, employment space will be created and will aim to attract businesses working in industries such as digital/technology, film/TV/radio, advertising/PR and design/architecture. This ‘hub’ will integrate the site with Leith, due to the existence of creative industries in this part of Edinburgh, offering businesses the opportunity to collab- orate with nearby companies. The adjacent ‘Lighthouse’ will also offer businesses working within the hub the chance to use the conference and exhibition space to showcase work and hold meetings. Workers will also be able to use the bars and restaurants on site at lunch time and after work. The 49, 728 sq ft. of adaptable office space within the hub will also benefit from spectacular views across the water, some- thing that is completely unique to the development. Building on Edinburgh’s outstanding international reputation as a centre for artistic, creative and cultural excellence. Chapter three Figure 3.1: Seafield Promenade
  • 6. The Tide: Page 5 The Masterplan:Land Use “the docks; lighthouse and light” 4.3 The Docks A: 55, 200 sq ft. and B: 49, 728 sq ft. The high-end residential and creative hub areas of the site have been created to resemble the principles of a dock. As residents and employees live and work in the units towards the promenande, they move towards the end of the docks to view the surroundings, socialise and interact with the leisure units at ground floor level. 4.1 Overview The land uses within the site have been categorised through their relationship with the surrounding wider area’s context of docks, boats and naturally, the sea. Areas of the development have been designed around this, establshing the docks, the lighthouse and light. Chapter four Figure 4.1: Current Site. Figure 4.2: Proposed Site. 4.2 The Tide The tide aims to literally wash away the under-utilised original site with a proposed, improved site encompassing a diverse, mixed use development with a variety of green spaces. The new site naturally follows the direction of an urban village, representing mixed tenures with a mix of supporting amenities and leisure based facilities (Urban Forum, 1998, as cited in Mandanipour, 2004). 4.4 The Lighthouse: 16, 410 sq ft. (minimum) An auditorium will be a primary component of the Tide, portraying a key opportunity of waterfront developments - a focal point. Jacobs (1992, pg. 228) notes that focal points, of which we need more of, are formed through contrasting its use with the surrounding area. Thus, an auditorium within residential and commercial remains ‘special looking’. 4.5 The Light A new facet of the public realm will be added in the form of a pier, designed as a beneficial space for residents to utilise, while metaphorically acting as the light of the lighthouse auditorium and ultimately, the development. Providing a direct relationship between the development and the water. 4.6 Community Gardens & Green Space The inclusion of community gardens and shared green space will provide two primary benefits to the development. Firstly, residents will benefit from an opportunity to improve their health and wellbeing, an established attribute of community gardens (Wakefield et al, 2007). Secondly, community gardens have a proven benefit to community creation (Armstrong, 2000) through creating a meeting point for resi- dents in different tenures to come together and interact.
  • 7. The Tide: Page 6 Key for Land Use Masterplan Commercial & Leisure High-End Residential & Leisure Affordable Housing Green Space Public Realm Figure 4.3: Land Use Masterplan
  • 8. The Tide: Page 7 The Masterplan:Elevations Chapter five Figure 5.1: Elevation of Docks A & B Unit Figure 5.3: Elevation of Boathouse Figure 5.2: Elevation of Mid-Market and Affordable Housing South Figure 5.4: Elevation of The Lighthouse
  • 9. The Tide: Page 8 Figure 5.5: Elevation of Leisure on Promenade Figure 5.7: Elevation of The Light Figure 5.6: Elevation of Affordable Housing West
  • 10. The Tide: Page 9 The Masterplan:Climate Chapter six Spring 6.1 Overview The Masterplan takes advantage of the climate, ensuring all south facing light is utilised. Figures number to number will show the sunlight capture both during AM - 10am - and PM - 3pm - hours, depicting the consideration towards ensuring natural light is best captured, improving the Figure 6.1: Spring AM Summer Autumn Winter 6.2 Natural Light The green space and public realm will benefit greatly from the sun- light, with the only exception being PM hours of winter, as depicted in figure 6.8. This will aim to attract more residents to the public realm, ultimately benefiting from the benefits outlined (Wakefield et al, 2007; Armstrong, 2000). In addition, the affordable housing units at the south of the site will protection from southwest wind, enclosing the public realm and green space - ensuring a more inclusive space is provided for communities to interact with. 6.3 Sun Path The sun path diagram situated over the development site shows the movement of the sun path over the course of a day. As shown, the sun rises to the East of the site over the Firth of Forth moving round to the West of the site. The area will have large sun cover for most parts of a day. Parts of the development will be quite dense but because of the permeable layout of the site, there will be plenty sunlight, especially in the afternoon. Figure 6.2: Spring PM Figure 6.3: Summer AM Figure 6.4: Summer PM Figure 6.5: Autumn AM Figure 6.6: Autumn PM Figure 6.7: Winter AM Figure 6.8: Winter PM Figure 6.9: Sun Path
  • 11. The Tide: Page 10 The Masterplan:Materials 7.2 Roofing and Cladding As this development is on the coastline and within a marine environment, additional precautions are to be taken on choice of building materials. The building fabrics will need to be made to take on the effects of a marine environment. The roofing will be made up of a single ply membrane, which will take into account the protection from birds and any nuisance, which may occur. The cladding of the buildings will be a Terracotta Rain screen, which has been depicted in figure 7.1 The material, which will be used on this development, will be rain- screen terracotta cladding. It is important to have the correct material which will cope with the potential impacts that weathering and coastal effects can bring. These tiles will be fixed to jointers on a galvanized steel curtain-walling system with a breathable weather moisture barrier behind. This system requires little or no maintenance when installed unlike brickwork with grouting and sealant joints. As can be seen from figure 7.2 the tile is based on the rain screen prin- ciple. Behind the facade joints is a support system, which drains away any excess water, which penetrates the 1st layer. Water is unable to penetrate this point because of the air circulation pressure in which this design brings. The air circulation between the terracotta façade and the backing support system stops the build up of hot air, allowing for ventilation to provide a dry cavity stopping any condensation occurring. This system is thermally efficient to the devel- opment as it has a higher insulation value reducing energy consumption. Chapter seven 7.3 Windows The windows on the development will be powder coated aluminum frames; these will be coating resistant to the marine environment. The windows are very well secured and minimal maintenance is required. The windows will be top and side hung, which allows for different lock- ing positions. This also allows for a secured locked position allowing for ventilation into the property. These windows also allow for easy cleaning as the sash can be released using the hinge mechanism. 7.1 Overview This section provides an overview of material in which will be incorpo- rated on site to cope with the marine environment. Careful material consideration is vital for this development because of the environment in which is resides in and if sourced correctly this will prevent replace- ments and maintenance of building material. 7.5 Doors All external doors will be timber with a suitable preservative coating. The fittings on the doors will be stainless steel and the doorframe will be made from galvanized steel to cope with the coastal effects. 7.4 Balcony The material base of the balcony will be similar to that of the windows, constructured from powdered aluminium to ensure durability is prioritised. In addition, however, the windows wil be larger, so to benefit from the views out to the sea. Figure 7.1: Cladding Aesthetics Figure 7.2: Cladding Detail Figure 7.3: Window Detail Figure 7.4: Balcony Detail Figure 7.5: Door Detail
  • 12. The Tide: Page 11 Transport Figure 8.1: Vehicular Movement Figure 8.2: Pedestrian & Cycle Movement 8.1 Overview The transport links and provision of networks have been designed in line with Scottish Government (2010) street design guidance and recommendations by established authors (Jacobs, 1992). The masterplan has aimed to ensure that streets and movement have been: welcoming; adaptable; resourced efficient; distinctive; safe & pleasant and easy to move around. In addition, links to the city centre and car parking facilities have been 8.3 Movement of Pedestrians and Cyclists The design of the site has aimed to ensure streets are easy for users to move around on, providing good connectivity for a variety of users. This is achieved through prioritising pedestrians and cyclists over vehicular modes. Cyclists benefit from a dedicated road to the far west of the site - which vehicles cannot use. A road solely for their movement, as well as pedestrians avoids typical cycle lane orienta- tion, ‘often painted onto the margin of the carrageway’, which leads to sharing road space and subsequently, higher levels of accidents (Smith, 1993, pg. 125). 8.2 Movement of Vehicles The design of the site and streets for vehicular movement has been largely focused on reducing the need and discouraging it. Through the site adopting a mix of uses including leisure and commercial, it is likely to have an impact on the journeys made by car (Taylor, 2003). In addition to particular streets being strictly no-vehicle access, public transport promotion has been a priority. As can be seen in figure 8.1, bus stops have been allocated throughout the central street, ensuring that all residents have access to and from the city centre. Chapter eight Mini Key Vehicular Movement Bus Stops Mini Key Pedestrian & Cycle Movement
  • 13. The Tide: Page 12 Figure 8.3: Car Parking Docks A & B in Secondary Streets 8.4 Car Parking The car parking arrangements for both the Docks A and B, will be provided by an enclosed secondary street between the units, as depicted in figure 8.3.This will ensure that pedestrians can walk safely and pleasantly through the primary streets within the Docks. Ultimate- ly, what has been achieved, is an established street user hierarchy, as outlined by Designing Streets as a quality of a successful place (The Scottish Government, 2010). The prospective residents and visitors to the promenade and leisure facilities will have superior movement to that of private vehicles. Adaptability has also been achieved, as the visual impact of car parking has been reduced, through the adoption of a subtle, flexible parking system in the Docks. Car parking for the Lighthouse will be in the preferred form of underground style parking, this is to nce again ensure that parking is ‘accomodated by a variety of means’ which lessens visual impact (The Scottish Government, 2010, pg. 13). Figure 8.5: Communities and Movement in Docks A & B on Primary Streets Figure 8.4: Street Design 8.5 Street Design The streets within the development have followed a welcoming approach, enabling the streets to be used for people - enabling social interaction, as can be seen in figure 8.5. Why these still of streets rather than long strips? Jacobs (1992, pg. 120) highlights that streets which interweave and overlap in a fragmented fashion have the most success, rather than a strip. She states that the streets ‘become capable of visual and economic variation for their users’. This can be seen in figure 8.4, where the streets have been staggered. Once again considering designing streets, the Tide has aimed to ensure that it is dis- tintive. This can be achieved by ensuring that landmarks and focal points assist with navigation, as well as oppor- tunities to obtain value from the historic relevance of the development (The Scot- tish Government, 2010). This is portrayed through the proposed site’s context and relation to the sea. The Lighthouse will provide the focal point required to assistant residents with navigation.
  • 14. The Tide: Page 13 Delivery Strategy Chapter nine Key for Phasing Order Stage One Stage Two Stage Three This phase will prioritise site preparation, through business relo- cation and demolition of all existing units. This will allow for Seafield Road to be shifted to the back of the site, which in turn will ensure that the residential units to the back of the site are not left in isolation. Phase two prioritises uses that can be funded quickly, due to market sentiment supporting viability. Scotland’s housing shortage has meant that there is a strong appetite for residential development, particularly in across the SESplan area where it is estimated that an extra 74,835 homes are required from the period of 2009-2019. Due to the mix of residential units, ranging from high-end to affordable, Seaview Devel- opments believe that take-up levels would be high and would quick- ly generate capital for investment into further phases of development. The commercial units on the ground floor of the apartments represent a more risky aspect of the development in terms of take-up, as prior to the completion of phase three the leisure pull of the area will not be as strong. However we believe that the capital generated from the residential schemes will support slow take-up within the commercial units, which will accelerate when ‘The Lighthouse’ is constructed. Land uses that will be delivered during phase three have been identified as being risky in investment terms, due to the large capital outlay that is required for construction, and the risk of slow-take ups. The creative hub and ‘The Lighthouse’ have been places to the later stages of the development schedule in order to mitigate risk, and ensure that there is a supporting market already located around the developments. The capital generated which will be generated from the residential units will be used to part-fund these land uses. Furthermore by placing these aspects of development in the later phases, it strengthens the de- velopments resilience to economic downturns, which could result in low-take ups in employment spaces provided within the creative hub. 9.1 Funding The funding structure will take the form of a joint venture. This will be between a residential developer and a commercial investor. This will require a sophisticated deal structure, as the residential developer is likely to want to sell the residential units, whilst the commercial investor may want to gain a long term investment, via leasing the commercial and leisure units. 9.2 Delivery Strategy In order to ensure that the development is delivered in a manner that ensures viability, and minimises investment risk, the phasing of the development will be prioritised based on the following criteria: 1. Land uses which are viable at this point in time will be prioritised 2. Land uses that can be funded now will be prioritised 3. Land uses that are not able to be funded now, due to high costs or risks, will not be prioritised. 4. Land uses that are highly speculative, but could become more viable in an improving market, will not be prioritised. 3 3 2 Figure 9.1: Phasing Order 1
  • 15. The Tide: Page 14 Business Relocation This stage will ensure that current land occupiers are relocated appro- priately, using financial incentives to avoid any conflict. This will ensure that the site is completely unoccupied for demolition to begin. Site Clearance All structures on site will be demolished, providing a blank canvas for development and allowing for Seafield Road East to be shifted. Infrastructure This development will shift the existing Seafield Road East in order to ensure that the residential units to the back of the site are not seg- regated from the rest of the development. New roads, services and utilities, and drainage including stormwater management will also be installed at this stage. Refer to figure 9.2 which depicts the change in road layout. Promenade The promenade will be improved and risen slightly, incorporating stairs down onto the beach and a pier to improve the public realm. Figure 9.2: Revised Road Layout Key for Revised Road Layout Current Road Revised Road The Docks A: High End Residential and Leisure High end residential and leisure mixed use blocks will be constructed on site first, along with the necessary greenspace and vehicle parking. Due to current housing market sentiment, we believe that high end residential blocks will quickly sell, generating capital to fund the next phases of development. Mid-Market and Affordable Housing - South of Site Flats to the south east of the site will be constructed during phase two in order to utilise housing market sentiment. Again this will generate capital to fund further phases of development, reducing investment risk. Public realm improvements surrounding the residential units will also be delivered, as well as plots for the community gardens. Boathouse The boat house will be delivered at the same time as the residential and leisure blocks in order to provide local recreational opportunities. The Docks B: Creative Hub and the Lighthouse: Auditorium The third and final stage of phasing will involve first, the creative hub, secondly, the lighthouse auditorium and lastly, affordable housing to the west of the site. Due to the large amount of employment space created by the Docks B and the requirement of established leisure amenities for the Lighthouse, these will both have to be developed last. It is likely that it will take a considerable period of time to see sig- nificant takeup levels within Docks B, in addition. This may mean that both of these aspects of the development would be seen as a long term investment. High end residential will be prioritised so to ensure that developer returns do not discourage completion of the site. Flexibility is also ensured, as the developer has more control over the implementation of a potentially risky facet of development in the current market climate. Affordable Housing - West of Site As income is nonexistent from affordable housing and due to the likliehood of this being requested by the local authority through a Section 75 agreement, affordable housing west will inevitably be incorporated last Addition A temporary road will be incorporated within the site so to redirect any construction traffic away from the newly developed Docks A. This will become green space - west of the Lighthouse - as indicated in figure 9.2. Figure 9.3: The Docks A Figure 9.4: Affordable and Mid-Market Housing Figure 9.5: Boathouse Figure 9.7: Affordable Housing West Figure 9.6 The Lighthouse and Docks B
  • 16. The Tide: Page 15 Planning Constraints 10.1 Overview Regarding the aspects of planning policy that are relevant for the area any planning issues that may arise must be highlighted and an explanation given on how the development will meet these require- ments. The area is covered by The Edinburgh City Local Development Plan (2014) at Local level, SESplan (2014) at Regional level and the National Planning Framework 3 (2014) at National level. Three prospective planning constraints which could present issues are: 1. Infrastructure 2. Building Heights 3. Building Form, Density and Layout Chapter ten 10.2 Infrastructure It is essential that the development does not affect the main ‘artery’ Seafield Road East road that borders the site. This is particularly im- portant as one of the main Transport ‘objectives’ for Edinburgh in the city’s local plan is as follows: “To ensure that development does not prejudice the implementation of future road, public transport and cycle and footpath proposals.” (City of Edinburgh Council, 2014, pg. 111) Accommodating the existing transport links as well as integrating the development into these routes is essential without jeopardising the viability of the transport links currently in place. 10.3 Building Heights Due to the developments close proximity to the coast and its position- ing in terms of key views from other sections of the waterfront area and Fife it is important for building height to be well integrated. This point is reinforced by the content of the Edinburgh Design guidance (2011, pg. 42): “The Council wants new development to integrate well with existing buildings and spaces.” The Tide development takes on board influences from the surrounding built form by adhering to similar materials as well as building heights. This approach h ensures it fits seamlessly with the surrounding built environment whilst retaining a sense of place. 10.4 Building Form, Density and Layout Density is a key component of any development and ‘The Tide’ seeks to deliver uses within a controlled and adaptive layout where density is perfectly balanced, ensuring the site is not over developed. This falls in line with guidance within the Edinburgh Design Guidance (City of Edinburgh Council, 2011, Pg. 31) stating that: “New Development should achieve a density that is appropriate to the immediate site conditions and to the neighbourhood.” The development strikes the balance between the surrounding high density housing tenements with its own mixed use ‘blocks’ as well as the green, open space that borders the sandy expanses of the beach. The main stages and components of master plan creation as stated in PAN 83 are: Stage 1: Site appraisal Stage 2: Analysis, Stage 3: Developing the Design, Stage 4: Testing the design concepts and finalizing the master plan and finally the Proposal. Below is an overview of the processes involved in formulation of a good quality master-plan. In order to assess and evaluate the quality and scope of a master plan there are some Key Considerations and areas that must be followed, they are as follows: It is important to have considerations and other checklists in place to ensure that the master plan is up to the task of guiding and shaping development in the area on several different levels. By focusing for example on physical and environmental factors the development can have a solid base in the built environment. 10.5 Environmental Factors The design and layout of ‘The Tide’ incorporated low-density units with an emphasis on interaction with the coastal environment in order to compliment the surrounding environment. This is mirrored by the creation of low-density units with standard building heights of three stories and heavy use of green and open spaces to compliment the urban realm. 10.6 Social Factors The mixed use nature of the development allows for social interaction at all times of the day by mixing housing, commercial and retail units in the same vicinity. These all lead to creating a vibrant environment within ‘The Tide’ by encouraging positive social factors to blossom such as interaction and maintained use of green and open spaces. 10.7 Economic Factors ‘The Tide’ will create its own buoyant economy as well as supporting the wider Seafield and Waterfront areas. The mixed nature of the site further helps lend to the varied uses in the area, which contribute to the local economy. As such the success of ‘The Tide’ can create an Agglomeration economy in the area centered around the creative hub and nature of businesses located within the development. Masterplan Key Components Social FactorsEconomic Factors Environmental Factors Figure 10.1: PAN 83 Recommendations
  • 17. The Tide: Page 16 The Masterplan:Impact Chapter eleven 11.1 Overview It is hoped that the development will attract attention to not just the Seafield area but also the Waterfront area helping to create a stronger relationship between Seafield, Leith and Portobello as well as integrating with the city centre. A strongly performing waterfront should be seen as an asset, complementing the city centre, as well as having economic, social and environmental impacts. 11.2 Economic, Social and Environmental Impact The creation of employment space will have a large economic im- pact on the city, creating a large number of jobs within the creative industry. Here the construction of a creative hub will strengthen Edin- burgh’s reputation as an artistic and cultural centre, promoting further industry to set up in the local area. Furthermore the creation of ‘The Lighthouse’ will bring a strong leisure focus to Edinburgh’s waterfront, and will provide an opportunity for Seafield to become integrated with the city, with ‘The Lighthouse’ bringing a number of festival events to the waterfront across the year. The creation of a significant number of residential units will also stimulate local economic growth by creating construction jobs and through local resident spending, and will con- tribute towards solving Scotland’s housing need. The development will also contribute to social improvements, both directly and indirectly. Directly, the residents and community will ben- efit from the green space provision and incorporation of community gardens from health and wellbeing benefits. Indirectly, as new com- munities are formed, wider communities will integrate, creating a wider relationship between Seafield and the surrounding areas of Leith and Portobello. The Development will also have a positive impact on the environment as a lot of greenspace will be created and incorporated throughout the site. This is a vast improvement to the lack of green space currently on site and the amount of industrial use, which is in place presently. The green space will provide habitat for small animals to reside in and more attention will be given to the boardwalk and beach area as it is cur- rently neglected. The decrease in industrial use and increase in green spaces and sustainable development will also have a positive impact on the air quality. Tree buffers will also be positioned to minimise any noise impact on residential buildings. 11.3 Linking Edinburgh’s Boardwalk The development will have significant positive impact in the connec- tivity of Edinburgh’s Boardwalk. This will connect up the route in an attractive way along a 10-mile stretch from Cramond through to Porto- bello (Edinburgh Council, 2006). The Edinburgh Boardwalk is a part of the Edinburgh Councils plan for the emergence of development along the coastline to make the overall waterfront area more accessible and attractive. Making full use of the Boardwalk in Edinburgh would be a valuable tool for the city as a whole and for the surrounding com- munities who reside within the local areas (Edinburgh Council, 2006). Edinburgh Council (2006) also explain that making the coastline more attractive and popular will bring more investment into the area. This development looks to address an area of the Boardwalk, which cur- rently is in desperate need of attention, providing high quality facilities for new prospective residents and the public who would be interested in the different leisure options available within the new development. Figure 11.1: Linking the Boardwalk
  • 18. The Tide: Page 17 Conclusive Themes Chapter twelve Focal Point Permeability Viability A number of conclusive themes can be drawn, based on what has been designed from the initial objectives outlined in chapter one, provision of a focal point, creating permeability and ensuring viability. The development should ensure a focal point is present, in this case, through the incorporation of the Lighthouse. As Slater (2014, pg. 19) notes: “one of the best opportunities offered by a waterfront facility is the creation of a focal point” The development must prioritise permeability, as the current site currently is not good as it is hard to reach the beach or the boardwalk from Seafield Road apart from at either end of the boundaries of the site. The new layout of the site takes into account the importance of permeability and this has been implemented throughout. Therefore, the development is very user friendly for pedestrians and car users. Hayward & McGlynn (1993, pg. 86) state: This is something which the development has aimed to remedy with the current site. The development takes this into account and utilises this as residential blocks are permeable and it is clear to see what is public and what is private. “ ” The development has to be viable, first and foremost. Slater (2014) writes that a key challenge is often the lack of understanding that ‘the equation of ‘cost+value added=viability’ is paramount’. We have aimed to add value by design, while ensuring through our phasing and delivery strategy that investment risk is minimised, and thus, prospectively, cost. Through providing a focal point, benefits such as navigational awareness of residents is improved to a center point for a development to become established in the surrounding area. The Lighthouse satisfies both of these. Figure 12.1: Focal Point Figure 12.2: Current Permeability Figure 12.3: Proposed Permeability Figure 12.4: Current Leisure Figure 12.5: Proposed Leisure
  • 19. The Tide: Page 18 References Chapter thirteen Armstrong, D. (2000) ‘A survey of community gardens in upstate New York: Implications for health promotion and community development’, Health & Place, 6(4), 1 December, 319-327 Douglas, H. (2009) ‘NBK Terracotta Façade Panels: The Rainscreen System’ [online] Available at: http://www.archdaily.com/32778/nbk-ter- racotta-facade-panels-hunter-douglas-contract/ [Accessed 27 April 2015] Edinburgh City Council (2011) Waterfront and Leith: Area Development Framework, Edinburgh, Edinburgh City Council Edinburgh City Council (2013) Edinburgh Design Guidance, Edinburgh, Edinburgh City Council Edinburgh City Council (2014) City of Edinburgh Local Development Plan: Action Pan, Edinburgh: Edinburgh City Council Edinburgh City Council (2014) Edinburgh City Local Development Plan: Second Proposed Plan, Edinburgh: Edinburgh City Council Edinburgh City Council (2015) Edinburgh City Councils Transport 2030 Vision, Edinburgh: Edinburgh City Council IDSystems. (2015) ‘Aluminium Windows’ [online] Available at: http:// www.i-d-systems.co.uk/windows/aluminium-windows [Accessed 29 April 2015] Jacobs, J. (1992) Death and Life of Great American Cities, New York: Vintage Books Kloeber (2015) ‘Entrance Doors, Timber Funkyfront Contemporary Entrance Doors’ [online] Available from: http://www.kloeber.co.uk/ product/entrance-doors/timber/funkyfront-contemporary-en- trance-doors [Accessed 29 April 2015]. Mandanipour, A. (2005) Public and Private Spaces of the City, New York: Routledge Murain, P. (1993) ‘Urban Expansion: Look Back and Learn’, in Hayward, R & McGlynn, S., ed. Making Better Places Urban Design Now. Oxford: Butterworth Architecture, 83-94 Slater, J. (2014) ‘Waterfronts: Opportunities and Constraints’, Urban Design Group Journal, 131(1750), London: Urban Design Group Taylor, D. (2003) ‘Connectivity and Movement’, in Neal, P., ed. Urban Villages and the Making of Communities, New York: Spon Press, 103- 117 The Scottish Government (2008) Planning Advice Note 83: Master Planning, Edinburgh: The Scottish Government The Scottish Government (2010) Designing Streets, Edinburgh: The Scottish Government The Scottish Government (2014) National Planning Framework 3, Edinburgh: The Scottish Government Trinity Steel (n.d.) ‘Solarlux’ [online] Available at: http://www.trinitysteel. co.uk/solarlux-bi-fold-door-and-balcony-systems/ [Accessed 25 April 2015] Urban Realm. (2013) ‘Notre Dame Primary welcomes first pupils’ [In- ternet]. Urban Realm, Glasgow. Available at: http://www.urbanrealm. com/news/4361/Notre_Dame_Primary_welcomes_first_pupils.html [Accessed 27 April 2015] Wakefield, S., Yeudall, F., Taron, C., Reynolds, J. and Skinner, A. (2007) ‘Growing urban health: Community gardening in South-East To- ronto’, Health Promotion International [online], 22(2), 26 February, 92- 101, Available at: http://heapro.oxfordjournals.org/content/22/2/92.full. pdf+html [Accessed 25 April 2015]
  • 20. The Tide: Page 19 Appendices Chapter fourteen