Post Occupancy Survey
How? What? Why? The survey work for building
Muhammad Ghulam Mustafa Joyia
B.ARCH 11011505-119
11011505-119
Muhammad Ghulam Mustafa joyia B.Arch-011 11011505-119
Post Occupancy Evaluation Survey
The systematic investigation of a facility to determine the success or failure of one
or more design elements within the project to be performed by a third-party
evaluator after the user has occupied the facility.
How?
• Questionnaires
• Interviews
• Workshops
• Environmental Measurement
• Space management
• Cost analysis
What?
• Strategy- identify need
• Describe issues to address
• Define the why how
• Select feedback approach
• Collect feedback
• Analyze and report
• Action and learn key recommendations
Why?
• Reduces client’s future costs
• Reduces whole-life environmental impact
• Maximizes value of property portfolios
• Reduces future liability of clients
• Minimizes maintenance costs
• Increases occupant’s satisfaction
• Increases design know-how
11011505-119
Muhammad Ghulam Mustafa joyia B.Arch-011 11011505-119
POE answers the following questions?
• Satisfaction survey = are people happy in the building?
• Monitoring = did it measure up physically?
• Post completion evaluation = how did the construction process go?
• Post occupancy evaluation = are people happy and did the building
measure up?
a- measured information - energy consumption, temperatures, lighting
levels, acoustic performance, maintenance etc.,
b- survey data – designer’s intentions, occupant comfort + satisfaction,
management, etc.
Identifying ways to improve building design, performance and fitness for purpose.
Strategy should use for survey?
Effective POE is fundamentally multi-modal in its approach -portfolio of methods
available including:
• pre-visit questionnaires
• gather technical data to establish construction, systems etc.
• semi-structured interviews with key actors (client, designer, contractor,
 occupant, manager)
• field observations during walk-through visits +audit
• predicted and actual resource costs identified where possible
• physical monitoring where necessary including thermal imaging
Survey types and method?
 Via Hand-held meters and cameras
 Individual space assessments
 Interviews interacts with the building occupants
 Utility analysis energy model assessment
 Design / construction assessment
 Behavior and environment
11011505-119
Muhammad Ghulam Mustafa joyia B.Arch-011 11011505-119
 Thermal comport
 Important of context
 Influence of perspective social cultural psychological
 Observations
Innovative materials performance
Innovative low-energy measures
Overall acceptance of features over time
POE survey barriers and opportunities?
• Organizations more focused the on the next development than evaluating the one just
completed
• Uneconomic to undertake expensive and comprehensive POEs particularly if physical
monitoring is required
• Use of POEs which aim to identify only what is abnormal, rather than
monitoring normality continuously, can significantly reduce cost of POE

More Related Content

What's hot

Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
D.Pawan Kumar
 
Thesis on earth architecture
Thesis on earth architectureThesis on earth architecture
Thesis on earth architecture
Bhavi Vador
 

What's hot (20)

BREEAM Presentation
BREEAM PresentationBREEAM Presentation
BREEAM Presentation
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building Materials
 
Innovative building material
Innovative building materialInnovative building material
Innovative building material
 
Planning and building energy efficiency buildings
Planning and building energy efficiency buildingsPlanning and building energy efficiency buildings
Planning and building energy efficiency buildings
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India
 
Cbri
CbriCbri
Cbri
 
New materials used in building industry
New materials used in building industryNew materials used in building industry
New materials used in building industry
 
Thesis on earth architecture
Thesis on earth architectureThesis on earth architecture
Thesis on earth architecture
 
Bioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleBioclimatic design at the site planning scale
Bioclimatic design at the site planning scale
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
Leed
Leed Leed
Leed
 
Cost effective construction tech PPT
Cost effective construction tech PPT Cost effective construction tech PPT
Cost effective construction tech PPT
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
Sustainable building materials
Sustainable building materialsSustainable building materials
Sustainable building materials
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 
Greenbuilding with examples
Greenbuilding with examplesGreenbuilding with examples
Greenbuilding with examples
 
Green building rating system
Green building rating systemGreen building rating system
Green building rating system
 
Intelligent buildings
Intelligent buildingsIntelligent buildings
Intelligent buildings
 
GRIHA
GRIHAGRIHA
GRIHA
 

Viewers also liked

Acceptance and Commitment Therapy
Acceptance and Commitment TherapyAcceptance and Commitment Therapy
Acceptance and Commitment Therapy
saraandwar
 
Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...
Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...
Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...
Georgia Libraries Conference (formerly Ga COMO).
 
Stress Management Presentation
Stress Management PresentationStress Management Presentation
Stress Management Presentation
Pk Doctors
 
ppt on Stress management
ppt on Stress managementppt on Stress management
ppt on Stress management
Ram Jagraon
 

Viewers also liked (15)

Post-Occupancy Evaluation (POE) Methodologies for School Facilities
Post-Occupancy Evaluation (POE) Methodologies for School FacilitiesPost-Occupancy Evaluation (POE) Methodologies for School Facilities
Post-Occupancy Evaluation (POE) Methodologies for School Facilities
 
Analyzing Post Occupancy Performance: A Replicable Model for Engaging Stakeho...
Analyzing Post Occupancy Performance: A Replicable Model for Engaging Stakeho...Analyzing Post Occupancy Performance: A Replicable Model for Engaging Stakeho...
Analyzing Post Occupancy Performance: A Replicable Model for Engaging Stakeho...
 
Building Psychological Flexibility
Building Psychological FlexibilityBuilding Psychological Flexibility
Building Psychological Flexibility
 
Acceptance and Commitment Therapy
Acceptance and Commitment TherapyAcceptance and Commitment Therapy
Acceptance and Commitment Therapy
 
Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...
Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...
Post Occupancy Evaluation in an Academic Library: Using Data to Make the Case...
 
The Role of Post Occupancy Evaluation
The Role of Post Occupancy EvaluationThe Role of Post Occupancy Evaluation
The Role of Post Occupancy Evaluation
 
Acceptance and Commitment Therapy (ACT): Basics
Acceptance and Commitment Therapy (ACT): BasicsAcceptance and Commitment Therapy (ACT): Basics
Acceptance and Commitment Therapy (ACT): Basics
 
Post Occupancy Evaluation - تقييم المشروعات بعد الاستخدام
Post Occupancy Evaluation - تقييم المشروعات بعد الاستخدامPost Occupancy Evaluation - تقييم المشروعات بعد الاستخدام
Post Occupancy Evaluation - تقييم المشروعات بعد الاستخدام
 
Acceptance and Commitment Therapy (ACT) Exercises & Metaphors
Acceptance and Commitment Therapy (ACT) Exercises & MetaphorsAcceptance and Commitment Therapy (ACT) Exercises & Metaphors
Acceptance and Commitment Therapy (ACT) Exercises & Metaphors
 
Mindfulness & Acceptance Powerpoint
Mindfulness & Acceptance PowerpointMindfulness & Acceptance Powerpoint
Mindfulness & Acceptance Powerpoint
 
Mindfulness Based Stress Reduction
Mindfulness Based Stress ReductionMindfulness Based Stress Reduction
Mindfulness Based Stress Reduction
 
20 Habits Of Mindful People (Mindfulness)
20 Habits Of Mindful People (Mindfulness)20 Habits Of Mindful People (Mindfulness)
20 Habits Of Mindful People (Mindfulness)
 
Stress & stress management
Stress & stress managementStress & stress management
Stress & stress management
 
Stress Management Presentation
Stress Management PresentationStress Management Presentation
Stress Management Presentation
 
ppt on Stress management
ppt on Stress managementppt on Stress management
ppt on Stress management
 

Similar to Post occupancy Evaluation Survey

Building Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy EvaluationBuilding Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy Evaluation
Galala University
 
Fire alarm ppt_presentation_to_suppliers_november_2015
Fire alarm ppt_presentation_to_suppliers_november_2015Fire alarm ppt_presentation_to_suppliers_november_2015
Fire alarm ppt_presentation_to_suppliers_november_2015
MuhamedAshraf4
 

Similar to Post occupancy Evaluation Survey (20)

QUS5207 COST CONTROL 2 VM: CONCEPTS, TERMS, RISKS & COSTS
 QUS5207 COST CONTROL 2    VM: CONCEPTS, TERMS, RISKS & COSTS QUS5207 COST CONTROL 2    VM: CONCEPTS, TERMS, RISKS & COSTS
QUS5207 COST CONTROL 2 VM: CONCEPTS, TERMS, RISKS & COSTS
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
KENA PRE.pptx
KENA PRE.pptxKENA PRE.pptx
KENA PRE.pptx
 
Vm presentation
Vm presentationVm presentation
Vm presentation
 
Another Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounAnother Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham Zeinoun
 
HCI(Human Computer Interaction)-PPT-REPORT.pptx
HCI(Human Computer Interaction)-PPT-REPORT.pptxHCI(Human Computer Interaction)-PPT-REPORT.pptx
HCI(Human Computer Interaction)-PPT-REPORT.pptx
 
Husains CV
Husains CVHusains CV
Husains CV
 
Building Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy EvaluationBuilding Performance Evaluation - Post Occupancy Evaluation
Building Performance Evaluation - Post Occupancy Evaluation
 
product development process chapter 11
product development process chapter 11product development process chapter 11
product development process chapter 11
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
 
Construction management I lecture note (QUS 3166).pptx
Construction management I lecture note  (QUS 3166).pptxConstruction management I lecture note  (QUS 3166).pptx
Construction management I lecture note (QUS 3166).pptx
 
Requirement Engineering
Requirement EngineeringRequirement Engineering
Requirement Engineering
 
Value Management
Value Management Value Management
Value Management
 
Project Analysis and Appraisal.pdf
Project Analysis and Appraisal.pdfProject Analysis and Appraisal.pdf
Project Analysis and Appraisal.pdf
 
Slide cc2
Slide cc2Slide cc2
Slide cc2
 
chapter 2.pptx
chapter 2.pptxchapter 2.pptx
chapter 2.pptx
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Fire alarm ppt_presentation_to_suppliers_november_2015
Fire alarm ppt_presentation_to_suppliers_november_2015Fire alarm ppt_presentation_to_suppliers_november_2015
Fire alarm ppt_presentation_to_suppliers_november_2015
 
What factors are considered as the interior finish is planned-Solution.docx
What factors are considered as the interior finish is planned-Solution.docxWhat factors are considered as the interior finish is planned-Solution.docx
What factors are considered as the interior finish is planned-Solution.docx
 
What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 

Post occupancy Evaluation Survey

  • 1. Post Occupancy Survey How? What? Why? The survey work for building Muhammad Ghulam Mustafa Joyia B.ARCH 11011505-119
  • 2. 11011505-119 Muhammad Ghulam Mustafa joyia B.Arch-011 11011505-119 Post Occupancy Evaluation Survey The systematic investigation of a facility to determine the success or failure of one or more design elements within the project to be performed by a third-party evaluator after the user has occupied the facility. How? • Questionnaires • Interviews • Workshops • Environmental Measurement • Space management • Cost analysis What? • Strategy- identify need • Describe issues to address • Define the why how • Select feedback approach • Collect feedback • Analyze and report • Action and learn key recommendations Why? • Reduces client’s future costs • Reduces whole-life environmental impact • Maximizes value of property portfolios • Reduces future liability of clients • Minimizes maintenance costs • Increases occupant’s satisfaction • Increases design know-how
  • 3. 11011505-119 Muhammad Ghulam Mustafa joyia B.Arch-011 11011505-119 POE answers the following questions? • Satisfaction survey = are people happy in the building? • Monitoring = did it measure up physically? • Post completion evaluation = how did the construction process go? • Post occupancy evaluation = are people happy and did the building measure up? a- measured information - energy consumption, temperatures, lighting levels, acoustic performance, maintenance etc., b- survey data – designer’s intentions, occupant comfort + satisfaction, management, etc. Identifying ways to improve building design, performance and fitness for purpose. Strategy should use for survey? Effective POE is fundamentally multi-modal in its approach -portfolio of methods available including: • pre-visit questionnaires • gather technical data to establish construction, systems etc. • semi-structured interviews with key actors (client, designer, contractor,  occupant, manager) • field observations during walk-through visits +audit • predicted and actual resource costs identified where possible • physical monitoring where necessary including thermal imaging Survey types and method?  Via Hand-held meters and cameras  Individual space assessments  Interviews interacts with the building occupants  Utility analysis energy model assessment  Design / construction assessment  Behavior and environment
  • 4. 11011505-119 Muhammad Ghulam Mustafa joyia B.Arch-011 11011505-119  Thermal comport  Important of context  Influence of perspective social cultural psychological  Observations Innovative materials performance Innovative low-energy measures Overall acceptance of features over time POE survey barriers and opportunities? • Organizations more focused the on the next development than evaluating the one just completed • Uneconomic to undertake expensive and comprehensive POEs particularly if physical monitoring is required • Use of POEs which aim to identify only what is abnormal, rather than monitoring normality continuously, can significantly reduce cost of POE