REFERENCE
PRJ-BUL-04-2019
ISSUE DATE
07/03/2019
CONTACT
Joseph Le,
joseph.le@metrotrains.com.au
L4-SQE-FOR-141(1)
Focus Areas for In-field Inspections
Background
The Office of the National Rail Safety Regulator (ONRSR) conducted an inspection between
Richmond and South Yarra between 10th
and 11th
of January 2019. Focus was placed on the
role of the Work Group Supervisor (WGS), management of Road Rail Vehicles (RRVs) and
Fatigue Risk Management.
ONRSR Inspection Findings
During the inspection the ONRSR team spoke to WGSs at various locations to verify that
they were conducting their roles and accountabilities in accordance with “Planning Work Site
Protection in the Rail Corridor” procedure L1-SQE-PRO-054 (Version 6).
Whilst WGS roles and accountabilities are clearly defined within MTM’s procedure several
areas of non-compliance were found:
 Person(s) performing the role of WGS in respect of Railway Operations did not have
the necessary tools to check and validate rail safety worker competencies
 Person(s) performing the role of WGS in respect of Railway Operations did not have
the necessary tools to validate the network acceptance status of RRVs
 Person(s) performing the role of WGS in respect of Railway Operations were not
trained and inducted, and have an understanding of their work roles and
responsibilities in accordance with L1-SQE-PRO-054
Through inspection of the management of RRVs several areas of non-compliance were
found:
 Several operators did not complete a Road Rail Usage Report and Pre-Start Vehicle
daily check. Accordingly, there was no evidence to demonstrate that the RRV was in
proper working order and therefore safe to use
 Several RRVs did not contain Safe Work Method Statements (SWMS). Accordingly,
there was no evidence to demonstrate that the rail safety workers on site had been
inducted into the safe working in and around the RRV
 Several RRVs did not contain a log book to report defects. Accordingly, there was no
evidence to demonstrate that the RRV did not contain defects and therefore safe to
use
 Several RRV did not contain a vehicle operations manual. Accordingly, there was no
evidence to demonstrate that a person using the RRV had all the necessary
information regarding the proper use of the RRV
Through inspection of the fatigue risk management arrangements several areas of non-
compliance were found:
 A number of rail safety workers had worked excessive hours during a two week
period, resulting in breaches of fatigue risk management procedure
 There was no evidence to demonstrate that risk assessments were undertaken to
assess variances to the planned hours of work
 There was no evidence of who had approved such risk assessments on these
variances
REFERENCE
PRJ-BUL-04-2019
ISSUE DATE
07/03/2019
CONTACT
Joseph Le,
joseph.le@metrotrains.com.au
L4-SQE-FOR-141(1)
Immediate Actions
When performing your respective infield inspections, focus on the following areas:
 WGS roles and accountabilities
understanding of L1-SQE-PRO-054 (Version 6)
installation of RIW App and understand its use to check rail safety workers
competencies
installation of PlantGUARD App and understand its use to check plant
registration
Note: You cannot perform WGS duties if the above areas cannot be satisfied.
 Management of RRVs
operations manual stored on the vehicle as per L4-CHE-FOR-058
plant risk / hazard assessment on the vehicle as per L1-CHE-STD-007 and L4-
CHE-FOR-058
log book stored on the vehicle as per L4-CHE-FOR-058
SWMS for specific task(s) associated with RRV as per L1-CHE-STD-007
Daily running sheet / (track vehicle) usage report maintained and kept with RRV
as per L1-CHE-STD-007
Daily checks as per L2-CHE-PRO-005
Note: The RRV operation must cease if the above areas cannot be satisfied.
 Fatigue Risk Management
risk assessments of variances to planned hours of work
appropriate MTM endorsements for risk assessments in relation to variances to
planned hours of work
Note: non-compliance with the above will result in related person(s) performing
rail safety work to cease their duties immediately.
Report any non-conformances via INX.
Authorised by
Tim Maher
Executive Director | Safety, Environment, and Risk
REFERENCE
PRJ-BUL-04-2019
ISSUE DATE
07/03/2019
CONTACT
Joseph Le,
joseph.le@metrotrains.com.au
L4-SQE-FOR-141(1)
The Responsible Manager is to determine the following:
Which areas in MTM are to be notified of this alert?
Check Code Division/Department
MTM Entire MTM Network
CHE Engineering / Chief Engineer
HMR People & Performance
INF Infrastructure Delivery
ELN Electrical Networks
OCS Operational Control Systems
SIG Signals & OCS
STF Structures & Facilities
TRK Track Delivery
OPS Operations
TSD Train Service Delivery
SWS Safeworking / Signalling
NOS Network Operations
SER Metrol
Customer Experience
STO Stations Customer Experience
AOS Authorised Officers
PRJ Projects & Planning
ROS Rolling Stock
SQE Safety, Environment & Risk
Other (e.g. Other Divisions/Departments or people not listed):
Which contractors should be notified of this alert?
Note: This is undertaken by MetroSafe through the Avetta portal. All contractors/third parties have previously been
tagged into their relevant MTM areas.
Check Division/Department
All MTM Contractors and Third Parties
Corporate
Infrastructure
Projects
Rolling Stock
Operations
How should this alert be distributed and/or acknowledged?
Note: This section may be amended by the Division dependent on best method of distribution
Check Division/Department
Issued via email
Placed on Noticeboards
Placed in staff pigeon holes / letterboxes
Delivered during toolbox discussions
Employees to acknowledge receipt
L4-SQE-FOR-070 Alert Register
Toolbox Attendance Records
Weekly Operational Notice (WON)
Other (specify):

More Related Content

Similar to Prj bul-04-2019 focus areas for in-field inspections

joint services transcript
joint services transcriptjoint services transcript
joint services transcript
Adam Brown
 
Managing Driver Behaviour & Road Asfety Violations
Managing Driver Behaviour & Road Asfety ViolationsManaging Driver Behaviour & Road Asfety Violations
Managing Driver Behaviour & Road Asfety Violations
Henry Kagbo
 
PerformanceAppraisal 2015
PerformanceAppraisal 2015PerformanceAppraisal 2015
PerformanceAppraisal 2015
Stephen Martin
 
Electrical safety inspection
Electrical safety inspectionElectrical safety inspection
Electrical safety inspection
Martin Technical
 
Electrical safety inspection
Electrical safety inspectionElectrical safety inspection
Electrical safety inspection
Martin Technical
 

Similar to Prj bul-04-2019 focus areas for in-field inspections (20)

Pr 1709 - lifting and hoisting procedure lift planning execution
Pr 1709 - lifting and hoisting procedure lift planning executionPr 1709 - lifting and hoisting procedure lift planning execution
Pr 1709 - lifting and hoisting procedure lift planning execution
 
Hoist drop from monorail investigation
Hoist drop from monorail investigationHoist drop from monorail investigation
Hoist drop from monorail investigation
 
joint services transcript
joint services transcriptjoint services transcript
joint services transcript
 
Safety and Occupational Health Performance Program
Safety and Occupational Health Performance ProgramSafety and Occupational Health Performance Program
Safety and Occupational Health Performance Program
 
VMET VC
VMET VCVMET VC
VMET VC
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
 
Reserve force weekly 14 january 11
Reserve force weekly 14 january 11Reserve force weekly 14 january 11
Reserve force weekly 14 january 11
 
Do Rules Keep Track Workers Safe
Do Rules Keep Track Workers SafeDo Rules Keep Track Workers Safe
Do Rules Keep Track Workers Safe
 
Intellibind Top Ten Most Violated Standards Presentation 2011 01 27 (F)
Intellibind   Top Ten Most Violated Standards Presentation   2011 01 27 (F)Intellibind   Top Ten Most Violated Standards Presentation   2011 01 27 (F)
Intellibind Top Ten Most Violated Standards Presentation 2011 01 27 (F)
 
Managing Driver Behaviour & Road Asfety Violations
Managing Driver Behaviour & Road Asfety ViolationsManaging Driver Behaviour & Road Asfety Violations
Managing Driver Behaviour & Road Asfety Violations
 
Force weekly 7 january 11
Force weekly 7 january 11Force weekly 7 january 11
Force weekly 7 january 11
 
IRJET- Traffic Study on Mid-Block Section & Intersection
IRJET-  	  Traffic Study on Mid-Block Section & IntersectionIRJET-  	  Traffic Study on Mid-Block Section & Intersection
IRJET- Traffic Study on Mid-Block Section & Intersection
 
PerformanceAppraisal 2015
PerformanceAppraisal 2015PerformanceAppraisal 2015
PerformanceAppraisal 2015
 
VMET
VMETVMET
VMET
 
Electrical safety inspection
Electrical safety inspectionElectrical safety inspection
Electrical safety inspection
 
Electrical safety inspection
Electrical safety inspectionElectrical safety inspection
Electrical safety inspection
 
Institutional framework for sustainable IBMS
Institutional framework for sustainable IBMSInstitutional framework for sustainable IBMS
Institutional framework for sustainable IBMS
 
Presentation for IRC
Presentation for IRCPresentation for IRC
Presentation for IRC
 
IRJET- Application for Keen Transporation and Crisis Framework
IRJET-  	  Application for Keen Transporation and Crisis FrameworkIRJET-  	  Application for Keen Transporation and Crisis Framework
IRJET- Application for Keen Transporation and Crisis Framework
 
VMET CDECKER
VMET CDECKERVMET CDECKER
VMET CDECKER
 

More from Garry Pepper

Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
Garry Pepper
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
Garry Pepper
 

More from Garry Pepper (20)

September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
 
Safe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendmentsSafe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendments
 
Laha memo
Laha memoLaha memo
Laha memo
 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
 

Recently uploaded

Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Prj bul-04-2019 focus areas for in-field inspections

  • 1. REFERENCE PRJ-BUL-04-2019 ISSUE DATE 07/03/2019 CONTACT Joseph Le, joseph.le@metrotrains.com.au L4-SQE-FOR-141(1) Focus Areas for In-field Inspections Background The Office of the National Rail Safety Regulator (ONRSR) conducted an inspection between Richmond and South Yarra between 10th and 11th of January 2019. Focus was placed on the role of the Work Group Supervisor (WGS), management of Road Rail Vehicles (RRVs) and Fatigue Risk Management. ONRSR Inspection Findings During the inspection the ONRSR team spoke to WGSs at various locations to verify that they were conducting their roles and accountabilities in accordance with “Planning Work Site Protection in the Rail Corridor” procedure L1-SQE-PRO-054 (Version 6). Whilst WGS roles and accountabilities are clearly defined within MTM’s procedure several areas of non-compliance were found:  Person(s) performing the role of WGS in respect of Railway Operations did not have the necessary tools to check and validate rail safety worker competencies  Person(s) performing the role of WGS in respect of Railway Operations did not have the necessary tools to validate the network acceptance status of RRVs  Person(s) performing the role of WGS in respect of Railway Operations were not trained and inducted, and have an understanding of their work roles and responsibilities in accordance with L1-SQE-PRO-054 Through inspection of the management of RRVs several areas of non-compliance were found:  Several operators did not complete a Road Rail Usage Report and Pre-Start Vehicle daily check. Accordingly, there was no evidence to demonstrate that the RRV was in proper working order and therefore safe to use  Several RRVs did not contain Safe Work Method Statements (SWMS). Accordingly, there was no evidence to demonstrate that the rail safety workers on site had been inducted into the safe working in and around the RRV  Several RRVs did not contain a log book to report defects. Accordingly, there was no evidence to demonstrate that the RRV did not contain defects and therefore safe to use  Several RRV did not contain a vehicle operations manual. Accordingly, there was no evidence to demonstrate that a person using the RRV had all the necessary information regarding the proper use of the RRV Through inspection of the fatigue risk management arrangements several areas of non- compliance were found:  A number of rail safety workers had worked excessive hours during a two week period, resulting in breaches of fatigue risk management procedure  There was no evidence to demonstrate that risk assessments were undertaken to assess variances to the planned hours of work  There was no evidence of who had approved such risk assessments on these variances
  • 2. REFERENCE PRJ-BUL-04-2019 ISSUE DATE 07/03/2019 CONTACT Joseph Le, joseph.le@metrotrains.com.au L4-SQE-FOR-141(1) Immediate Actions When performing your respective infield inspections, focus on the following areas:  WGS roles and accountabilities understanding of L1-SQE-PRO-054 (Version 6) installation of RIW App and understand its use to check rail safety workers competencies installation of PlantGUARD App and understand its use to check plant registration Note: You cannot perform WGS duties if the above areas cannot be satisfied.  Management of RRVs operations manual stored on the vehicle as per L4-CHE-FOR-058 plant risk / hazard assessment on the vehicle as per L1-CHE-STD-007 and L4- CHE-FOR-058 log book stored on the vehicle as per L4-CHE-FOR-058 SWMS for specific task(s) associated with RRV as per L1-CHE-STD-007 Daily running sheet / (track vehicle) usage report maintained and kept with RRV as per L1-CHE-STD-007 Daily checks as per L2-CHE-PRO-005 Note: The RRV operation must cease if the above areas cannot be satisfied.  Fatigue Risk Management risk assessments of variances to planned hours of work appropriate MTM endorsements for risk assessments in relation to variances to planned hours of work Note: non-compliance with the above will result in related person(s) performing rail safety work to cease their duties immediately. Report any non-conformances via INX. Authorised by Tim Maher Executive Director | Safety, Environment, and Risk
  • 3. REFERENCE PRJ-BUL-04-2019 ISSUE DATE 07/03/2019 CONTACT Joseph Le, joseph.le@metrotrains.com.au L4-SQE-FOR-141(1) The Responsible Manager is to determine the following: Which areas in MTM are to be notified of this alert? Check Code Division/Department MTM Entire MTM Network CHE Engineering / Chief Engineer HMR People & Performance INF Infrastructure Delivery ELN Electrical Networks OCS Operational Control Systems SIG Signals & OCS STF Structures & Facilities TRK Track Delivery OPS Operations TSD Train Service Delivery SWS Safeworking / Signalling NOS Network Operations SER Metrol Customer Experience STO Stations Customer Experience AOS Authorised Officers PRJ Projects & Planning ROS Rolling Stock SQE Safety, Environment & Risk Other (e.g. Other Divisions/Departments or people not listed): Which contractors should be notified of this alert? Note: This is undertaken by MetroSafe through the Avetta portal. All contractors/third parties have previously been tagged into their relevant MTM areas. Check Division/Department All MTM Contractors and Third Parties Corporate Infrastructure Projects Rolling Stock Operations How should this alert be distributed and/or acknowledged? Note: This section may be amended by the Division dependent on best method of distribution Check Division/Department Issued via email Placed on Noticeboards Placed in staff pigeon holes / letterboxes Delivered during toolbox discussions Employees to acknowledge receipt L4-SQE-FOR-070 Alert Register Toolbox Attendance Records Weekly Operational Notice (WON) Other (specify):