What Is A Value Steam
A value steam is “The set of all the specific actions required to bring a specific
product through the three critical management tasks of any business:…
Problem solving,…Information management,......Physical transformation…..
____Womack & Jones
Importance
• VSM addresses material process sequences and flows as well as
information flows that impact movement.
• It encourages data acquisition in a systematic manner.
• VSM maps reflect a broad view of the process, usually from external
supplier from the external customer at a given facility.
• VSM is most important in group setting because many of the problems
it exposes reach across organizational lines of responsibility and
enterprise.
• This technique lends well to high volume, low Varity production.
Application in other situation can be problematic.
History and background:
VSM derives from the automotive industry and was popularized by womack and
jones in their book “learning to see”. It is not clear whether Toyota invented VSM
or used it in a formal way.
When to use value steam mapping
Use VSM for high production, low Varity product mixes with few components and sub
assemblies and dedicated components.
VSM conventions:
VSM symbols and conventions are fairly complex. They represent
information flows, material, storage and many specific techniques of lean
such as Kanban.
VSM symbols:
Information symbols represent scheduling, forecast and similar
information flows that after production. This are generally in the upper
middle region. Information usually moves from right to left (upstream).
Material and process symbols represent process equipment and
departments, storage areas and other features related directly to material.
Material flows from left to right (downstream).
VSM Process Icons
VSM Information Icons
VSM Miscellaneous Icons
Now we will use the example of a value sleeve machining to illustrate the steps for
both present and future step maps
Sixteen steps to the present state Map:
Step 1:Draw Customer, Supplier and Production control icons. Place these as
shown in the figure
Step 2: Enter customer requirements per month and per day. The VSM of figure
has two similar but distinct parts labeled as “-4” and “-6”.
Step 3: Calculate daily production and container requirements. Production should
correspond to customer requirements. When containers hold multiple pieces,
Step 4: Draw outbound shipping icon and truck with delivery frequency. Note full,
partial or mixed loads.
Step 5: Draw inbound shipping icon, truck and delivery frequency, Note full,
partial and mixed loads.
Step 6: Draw boxes for each process in sequence, left to right.
Step 7: add data boxes below the process boxes and timeline for value added
and non value added.
Step 8:Add communication arrows and note methods and frequencies. This may require
considerable investigation.
Step 9: Obtain process attributes and add to data boxes. It is best to observe all times
directly.
Step 10: Add operator symbols and numbers. When the value stream shares a process
with other products, use only the number of operators dedicated to the value stream
being mapped.
Step 11: Add inventory locations and levels in production units.
Step 12: Add push, pull and FIFO icons.
Step 13: Add any other information that may prove useful.
Step 14: Add working hours. Use the net available hours planned or scheduled for
factory or scheduled for the factory or department at the expected customer demand.
Step 15: Calculate lead times and place on the timeline. For processes, the Lead Time
is the process cycle time. For transports it is the time for transport. For inventory point,
the section on “Calculating Inventory Times” applies.
Step 16: Calculate total cycle time and lead time. Add the total of VA and NVA times on
What Goes In A Data Box
Future State Maps
Future State Steps
Step 1: Review the present state Map
At this time, the VSM team should review their present state map. This review
should answer three questions:
1. Is the map essentially correct?
2. Does everyone on the team understand the map in all its detail?
3. Where are the major opportunity areas?
Step 2: Calculate Takt time
Calculate the takt time based on customer demand. Compare the takt time to
process time for each process box. If any process time is longer than the takt time,
there is a capacity problem with this process.
Speed up the process
Additional equipment or process
Eliminate the process
Step 3: Identify bottleneck Process
The bottleneck is the process that with the longest cycle time. It determines
total system throughput and is the primary point for scheduling. We want to
pay much attention to the bottleneck process.
Step 4: Identify lot size and setup
opportunities
The larger the setup cost the larger the lot
size. Smaller lots are desirable because
this make scheduling easier, reduce
inventory and enable kanban. If setup cost
and time can be reduced, it allows smaller
lots and frees capacity for additional
production and for scheduling flexibility.
If the machining setup cannot be reduced,
we could maintain a high inventory
between machining and honing and then
operate with much smaller lots in Honing,
Cleaning, Inspection and packaging. This
might offer significant inventory reduction
and improvements in lead-time.
Steps 5: Identify Potential Workcells
Generally it is best to combine all processes, from start to finish, in a single
workcell dedicated to the product or product family being mapped. However,
several factors may limit the feasibility of this.
Step 6: Determine Kanban, Broadcast and FIFO Locations
Identify likely locations for Kanban and FIFO and add the appropriate icons to
the future state Map as in figure
FIFO:
FIFO processes all orders in same sequence and batch size through several
operations. If this is feasible, then we control the upstream process through
kanban or conventional scheduling and the downstream process works on
whatever comes out of the upstream process in the same sequence and the
same batches. This is extremely simple and require very small inventory.
Broadcast:
Broadcast systems are a variation of FIFO in which all processes work to the
same schedule but with a short offset in time to allow for transport.
Kanban:
Kanban systems allow differences in batch size and/or sequence. Use them
where process technology dictates different batch sizes or sequences.
Any or all of these methods can work within a workcell or between workcells or
between workcells and customers or between workcells and functional
departments or between workcells and suppliers.
Step 7: Establish Overall Scheduling Methods
With the basic processes, handling and inventory methods in place, we now
establish the overall scheduling method(s). Some of the internal methods have
been already established when we set Kanban and FIFO points.
In general, the more frequently and the more quickly scheduling information is
transferred, the better the performance and the lower the inventory.
Step 8: Calculate Lead and Cycle times:
Step 9: Add kaizen bursts
In developing the future state Map we have made many assumptions about the
changes that might be made. In several areas such as the workcell design,
kanban system design and setup opportunities, we have ignored the details of
how these will be designed and implemented. Kaizen bursts indicate areas
where future work is necessary to design and implement these features.

More Related Content

What's hot

Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The ConceptSubhrajyoti Parida
 
What is VSM (Value Stream Mapping)
What is VSM (Value Stream Mapping)What is VSM (Value Stream Mapping)
What is VSM (Value Stream Mapping)VARUN BABUNELSON
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InTKMG, Inc.
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping TechniquesStephen Deas
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
value stream mapping
value stream mappingvalue stream mapping
value stream mappingvvmech
 
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh ChandrasekaranMuri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekarantcganesh
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xlsbeskidek
 
Value Stream Mapping in Anatomic Pathology
Value Stream Mapping in Anatomic PathologyValue Stream Mapping in Anatomic Pathology
Value Stream Mapping in Anatomic Pathologyguest389e15
 
Process mapping with flowcharts
Process mapping with flowchartsProcess mapping with flowcharts
Process mapping with flowchartsSteven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 

What's hot (20)

Heijunka
HeijunkaHeijunka
Heijunka
 
Value Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) PosterValue Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) Poster
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The Concept
 
Value Stream Analysis
Value Stream AnalysisValue Stream Analysis
Value Stream Analysis
 
What is VSM (Value Stream Mapping)
What is VSM (Value Stream Mapping)What is VSM (Value Stream Mapping)
What is VSM (Value Stream Mapping)
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive In
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping Techniques
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
 
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh ChandrasekaranMuri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
 
3mu
3mu3mu
3mu
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xls
 
Value Stream Mapping in Anatomic Pathology
Value Stream Mapping in Anatomic PathologyValue Stream Mapping in Anatomic Pathology
Value Stream Mapping in Anatomic Pathology
 
Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 
Agile Practice Guide Notes
Agile Practice Guide NotesAgile Practice Guide Notes
Agile Practice Guide Notes
 
Process mapping with flowcharts
Process mapping with flowchartsProcess mapping with flowcharts
Process mapping with flowcharts
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Dmaic
DmaicDmaic
Dmaic
 

Viewers also liked (10)

Learning To See Introduction
Learning To See IntroductionLearning To See Introduction
Learning To See Introduction
 
Journey begins
Journey beginsJourney begins
Journey begins
 
Jim Womack Learning To Share Your Value Streams
Jim Womack Learning To Share Your Value StreamsJim Womack Learning To Share Your Value Streams
Jim Womack Learning To Share Your Value Streams
 
Simple Lean and VSM Training
Simple Lean and VSM TrainingSimple Lean and VSM Training
Simple Lean and VSM Training
 
Paradigm shift
Paradigm shiftParadigm shift
Paradigm shift
 
How to Run a Value Stream Mapping (VSM) Workshop
How to Run a Value Stream Mapping (VSM) WorkshopHow to Run a Value Stream Mapping (VSM) Workshop
How to Run a Value Stream Mapping (VSM) Workshop
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
GSD Manual For Students
GSD Manual For StudentsGSD Manual For Students
GSD Manual For Students
 
Paradigm Shift
Paradigm ShiftParadigm Shift
Paradigm Shift
 
How to Use VSM Correctly
How to Use VSM CorrectlyHow to Use VSM Correctly
How to Use VSM Correctly
 

Similar to VSM

Eliminating the production bottlenecks
Eliminating the production bottlenecksEliminating the production bottlenecks
Eliminating the production bottlenecksdutconsult
 
Management information system
Management information systemManagement information system
Management information systemKush Sharma
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemjohann11374
 
Mass2 Lean2 Six Sigma
Mass2 Lean2 Six SigmaMass2 Lean2 Six Sigma
Mass2 Lean2 Six Sigmaguestb2a38a
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingjohann11370
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...ramuaa124
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...yearstart1
 
Production System optimization: Case Study of a Local Textile Company
Production System optimization: Case Study of a Local Textile CompanyProduction System optimization: Case Study of a Local Textile Company
Production System optimization: Case Study of a Local Textile Companyjournal ijrtem
 
Which of the following is a focusing step
Which of the following is a focusing stepWhich of the following is a focusing step
Which of the following is a focusing stepjohann11373
 
Mass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathMass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathJohnHamman
 
A p chart to monitor process quality
A p chart to monitor process qualityA p chart to monitor process quality
A p chart to monitor process qualityjohann11369
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.commyrealit
 
A company's production process
A company's production processA company's production process
A company's production processnever1240
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...never1239
 
kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit systemSridhar Siddu
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemramuaa130
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...ramuaa124
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelramuaa129
 

Similar to VSM (20)

Eliminating the production bottlenecks
Eliminating the production bottlenecksEliminating the production bottlenecks
Eliminating the production bottlenecks
 
Management information system
Management information systemManagement information system
Management information system
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
Mass2 Lean2 Six Sigma
Mass2 Lean2 Six SigmaMass2 Lean2 Six Sigma
Mass2 Lean2 Six Sigma
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...
 
Production System optimization: Case Study of a Local Textile Company
Production System optimization: Case Study of a Local Textile CompanyProduction System optimization: Case Study of a Local Textile Company
Production System optimization: Case Study of a Local Textile Company
 
Which of the following is a focusing step
Which of the following is a focusing stepWhich of the following is a focusing step
Which of the following is a focusing step
 
Patton kanban 1
Patton kanban 1Patton kanban 1
Patton kanban 1
 
Mass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathMass to Lean to Six Sigma Path
Mass to Lean to Six Sigma Path
 
kanban.ppt
kanban.pptkanban.ppt
kanban.ppt
 
A p chart to monitor process quality
A p chart to monitor process qualityA p chart to monitor process quality
A p chart to monitor process quality
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.com
 
A company's production process
A company's production processA company's production process
A company's production process
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
 
kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit system
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp system
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory model
 

More from মোঃ ফুরকান উদ্দিন জুয়েল

More from মোঃ ফুরকান উদ্দিন জুয়েল (19)

Teamwork
TeamworkTeamwork
Teamwork
 
Attitude
AttitudeAttitude
Attitude
 
7 wastages
7 wastages7 wastages
7 wastages
 
Why why analysis
Why why analysisWhy why analysis
Why why analysis
 
Line balancing & EOQ
Line balancing & EOQLine balancing & EOQ
Line balancing & EOQ
 
Kaizen
KaizenKaizen
Kaizen
 
Bangladesh labor law'2006
Bangladesh labor law'2006Bangladesh labor law'2006
Bangladesh labor law'2006
 
New gazzettee 10
New gazzettee   10New gazzettee   10
New gazzettee 10
 
SMV & Benefits
SMV & BenefitsSMV & Benefits
SMV & Benefits
 
Basic concepts on lean manufacturing
Basic concepts on lean manufacturingBasic concepts on lean manufacturing
Basic concepts on lean manufacturing
 
GSD cords
GSD cordsGSD cords
GSD cords
 
Work measurement
Work measurementWork measurement
Work measurement
 
Time study ratings&&allowances
Time  study ratings&&allowancesTime  study ratings&&allowances
Time study ratings&&allowances
 
Motion Economy
Motion EconomyMotion Economy
Motion Economy
 
Kanban
KanbanKanban
Kanban
 
Industrial engineer
Industrial engineerIndustrial engineer
Industrial engineer
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Different types of Production Layout
 
pre- determined time standard of work measurement
pre- determined time standard of work measurement pre- determined time standard of work measurement
pre- determined time standard of work measurement
 
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 

Recently uploaded (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

VSM

  • 1. What Is A Value Steam A value steam is “The set of all the specific actions required to bring a specific product through the three critical management tasks of any business:… Problem solving,…Information management,......Physical transformation….. ____Womack & Jones
  • 2. Importance • VSM addresses material process sequences and flows as well as information flows that impact movement. • It encourages data acquisition in a systematic manner. • VSM maps reflect a broad view of the process, usually from external supplier from the external customer at a given facility. • VSM is most important in group setting because many of the problems it exposes reach across organizational lines of responsibility and enterprise. • This technique lends well to high volume, low Varity production. Application in other situation can be problematic. History and background: VSM derives from the automotive industry and was popularized by womack and jones in their book “learning to see”. It is not clear whether Toyota invented VSM or used it in a formal way.
  • 3. When to use value steam mapping Use VSM for high production, low Varity product mixes with few components and sub assemblies and dedicated components.
  • 4. VSM conventions: VSM symbols and conventions are fairly complex. They represent information flows, material, storage and many specific techniques of lean such as Kanban. VSM symbols: Information symbols represent scheduling, forecast and similar information flows that after production. This are generally in the upper middle region. Information usually moves from right to left (upstream). Material and process symbols represent process equipment and departments, storage areas and other features related directly to material. Material flows from left to right (downstream).
  • 8. Now we will use the example of a value sleeve machining to illustrate the steps for both present and future step maps Sixteen steps to the present state Map: Step 1:Draw Customer, Supplier and Production control icons. Place these as shown in the figure Step 2: Enter customer requirements per month and per day. The VSM of figure has two similar but distinct parts labeled as “-4” and “-6”. Step 3: Calculate daily production and container requirements. Production should correspond to customer requirements. When containers hold multiple pieces,
  • 9. Step 4: Draw outbound shipping icon and truck with delivery frequency. Note full, partial or mixed loads. Step 5: Draw inbound shipping icon, truck and delivery frequency, Note full, partial and mixed loads.
  • 10. Step 6: Draw boxes for each process in sequence, left to right. Step 7: add data boxes below the process boxes and timeline for value added and non value added.
  • 11. Step 8:Add communication arrows and note methods and frequencies. This may require considerable investigation. Step 9: Obtain process attributes and add to data boxes. It is best to observe all times directly. Step 10: Add operator symbols and numbers. When the value stream shares a process with other products, use only the number of operators dedicated to the value stream being mapped.
  • 12. Step 11: Add inventory locations and levels in production units. Step 12: Add push, pull and FIFO icons. Step 13: Add any other information that may prove useful.
  • 13. Step 14: Add working hours. Use the net available hours planned or scheduled for factory or scheduled for the factory or department at the expected customer demand. Step 15: Calculate lead times and place on the timeline. For processes, the Lead Time is the process cycle time. For transports it is the time for transport. For inventory point, the section on “Calculating Inventory Times” applies. Step 16: Calculate total cycle time and lead time. Add the total of VA and NVA times on
  • 14. What Goes In A Data Box
  • 16. Future State Steps Step 1: Review the present state Map At this time, the VSM team should review their present state map. This review should answer three questions: 1. Is the map essentially correct? 2. Does everyone on the team understand the map in all its detail? 3. Where are the major opportunity areas? Step 2: Calculate Takt time Calculate the takt time based on customer demand. Compare the takt time to process time for each process box. If any process time is longer than the takt time, there is a capacity problem with this process. Speed up the process Additional equipment or process Eliminate the process
  • 17. Step 3: Identify bottleneck Process The bottleneck is the process that with the longest cycle time. It determines total system throughput and is the primary point for scheduling. We want to pay much attention to the bottleneck process. Step 4: Identify lot size and setup opportunities The larger the setup cost the larger the lot size. Smaller lots are desirable because this make scheduling easier, reduce inventory and enable kanban. If setup cost and time can be reduced, it allows smaller lots and frees capacity for additional production and for scheduling flexibility. If the machining setup cannot be reduced, we could maintain a high inventory between machining and honing and then operate with much smaller lots in Honing, Cleaning, Inspection and packaging. This might offer significant inventory reduction and improvements in lead-time.
  • 18. Steps 5: Identify Potential Workcells Generally it is best to combine all processes, from start to finish, in a single workcell dedicated to the product or product family being mapped. However, several factors may limit the feasibility of this. Step 6: Determine Kanban, Broadcast and FIFO Locations Identify likely locations for Kanban and FIFO and add the appropriate icons to the future state Map as in figure
  • 19. FIFO: FIFO processes all orders in same sequence and batch size through several operations. If this is feasible, then we control the upstream process through kanban or conventional scheduling and the downstream process works on whatever comes out of the upstream process in the same sequence and the same batches. This is extremely simple and require very small inventory. Broadcast: Broadcast systems are a variation of FIFO in which all processes work to the same schedule but with a short offset in time to allow for transport. Kanban: Kanban systems allow differences in batch size and/or sequence. Use them where process technology dictates different batch sizes or sequences. Any or all of these methods can work within a workcell or between workcells or between workcells and customers or between workcells and functional departments or between workcells and suppliers.
  • 20. Step 7: Establish Overall Scheduling Methods With the basic processes, handling and inventory methods in place, we now establish the overall scheduling method(s). Some of the internal methods have been already established when we set Kanban and FIFO points. In general, the more frequently and the more quickly scheduling information is transferred, the better the performance and the lower the inventory. Step 8: Calculate Lead and Cycle times: Step 9: Add kaizen bursts In developing the future state Map we have made many assumptions about the changes that might be made. In several areas such as the workcell design, kanban system design and setup opportunities, we have ignored the details of how these will be designed and implemented. Kaizen bursts indicate areas where future work is necessary to design and implement these features.