SlideShare a Scribd company logo
1 of 7
Download to read offline
Consumption analysis method for optimizing reactive
compensation at MV
Francesc Fornieles-Castells
Market Development Manager
CIRCUTOR S.A.
www.circutor.com
Josep García-Fàbrega
Product Manager - Power Quality Division
CIRCUTOR S.A.
www.circutor.com
Abstract
Many times we find the question that how many reactive power to be compensated
must be chosen after making a measurement with a network analyzer. This situation
is crucial in determining proper reactive compensation system in MV.
The presence of harmonics in the electrical system may also influence considerably,
not only upon the operation of the capacitor bank, but the entire system power quality.
This article will explain how to define the power and steps that power factor correction
in MV should be, using a simple statistical method, and assess risks to the presence
of harmonics in the electrical system.
Electrical measurements
We must start any analysis of reactive power compensation with a measure carried
out with a network analyzer (CIR-e3, AR5L or AR6), where we record the consumption
of reactive power to compensate of the installation.
We show proceed according to the following principles so that a correct data logging
is achieved for further accurate analysis:
- Period: The period for registration must be large enough to be considered as a
representative and realistic sample of normal consumption of the installation. It is
advisable for at least a period of one week.
- Sampling frequency: It is recommendable to use a sampling rate as low as possible
to observe more closely the fluctuations of loads. If we consider a system with little
load variations one can use a higher sample rate. It is suggested to use a sampling
rate between ten seconds and fifteen minutes, also considering the memory capacity
of the recording data logger.
- Seasonality: Depending on the facility activity sector, the power consumption may
differ depending on the time of year, even between days along a week. It is, therefore,
essential to assure the recorded values are as representative as possible of the real
profile consumption of the installation.
- Existing capacitor bank: The presence of a capacitor bank will interfere with the
acquired data and distort the data collected. So, ensure that during the registration
period no kind of power factor correction equipment is connected.
Analyzing the measurements
After obtaining the data, we must analyze them. We will use a very simple but yet very
useful statistical method such as histograms.
A histogram is a graphical representation of a frequency distribution given values. The
distribution of values is divided into intervals. These intervals could be selected as one
decides, but too short or too large intervals could be impossible to analyze.
One method to determinate the optimal interval size is with the following formula [1.1]:
𝑆 =
(𝑋 𝑀𝐴𝑋 − 𝑋 𝑀𝐼𝑁)
𝑘
XMAX is the maximum value, XMIN is the minimum value, and k is the number of intervals
calculated according to the Velleman method, k = 2·N1/2, where N is the number of
values. To avoid deviations you can delete outliers that could affect the correct
approach.
Let we go through an example of analysis using reactive power histogram. We can
observe the three-phase inductive reactive power consumption at a voltage of 6,6 kV
in an industry, where they are paying penalties for low power factor, in Figure 1.
Figure 1. Three-phase Inductive reactive power consumption in kvarL
By applying formula [1.1], the proposed interval value that is got would be:
𝑆 =
(2600 − 450)
48
= 45
Anyway, since usually, M.V. automatic capacitor banks are based on 100 kvar
multiples, in this case we choose this interval of 100 kvar, which will better suit to the
compensation requirements of this installation. Thus, the result of applying this interval
is the histogram of Figure 2.
Figure 2. Results of histogram (100 kvarL interval)
Interval Frequency % accumulated
100 0 0,00%
200 0 0,00%
300 0 0,00%
400 0 0,00%
500 65 11,40%
600 29 16,49%
700 20 20,00%
800 12 22,11%
900 52 31,23%
1000 73 44,04%
1100 66 55,61%
1200 21 59,30%
1300 17 62,28%
1400 115 82,46%
1500 48 90,88%
1600 3 91,40%
1700 23 95,44%
1800 14 97,89%
1900 1 98,07%
2000 3 98,60%
2100 4 99,30%
2200 0 99,30%
2300 1 99,47%
2400 0 99,47%
2500 0 99,47%
2600 3 100,00%
Figure 3. Histogram Graph (Frequencies and %Accumulative)
As you can see from the results, most of the consumption of reactive power is 1400
kvar, followed of 1000 kvar and 500 kvar. Therefore, with a configuration of steps will
be 1x500 and 1x1000 kvar.
In this way, we can choose an optimized configuration of the capacitor bank that we
could compensate the installation more than 98% of the time.
Presence of harmonics in the installation
Obviously this method allows us to determine the steps to form the capacitor bank, but
we must not forget other factors that may influence the selection of the capacitor bank.
The presence of harmonics can affect the performance of the equipment and the power
quality of the entire installation.
When we carry out inductive reactive power compensation, the incorporation of a
parallel capacitor bank is logical to attenuate this demand in order to bring the
demanded apparent power (kVA) nearest to the active power (kW), which is really used
to carry out to the purpose it is designed for. This simple concept can be summarized
as a parallel circuit with inductance (L – Transformer and Grid) and capacity (C –
Capacitor bank).
If we observe the frequency response of the system, we see that for a frequency fR the
impedance of the system is much greater than its normal performance.
The existence of current with frequencies higher than the fundamental frequency at 50
or 60 Hz, mean that the resonance conditions could be complied with. This would
basically cause:
 Amplification of the distortion in voltage for the entire installation (this could
affect the equipment and sensitive electrical elements).
 Greater absorption of current by the capacitors, with their consequential
overheating, reduction of their capacity and useful life, and in some cases the
destruction of the capacitor.
Image 1. Blow-up MV capacitor due a resonance effect
There are two methods to check or detect the risk of resonance. First method is to
calculate the frequency of resonance with the following formula:
𝑓𝑅 = 𝑓 ∙ √
𝑆𝑆𝐶
𝑄
Where SSC is the short-circuit power of the power transformer (kVA), Q is the reactive
power of the capacitor bank (kvar) and f is the rated frequency of the system (50 or 60
Hz).
Then you can check if the frequency of resonance could be close or not to harmonic
current presence in the installation, therefore could produce a resonance between the
capacitor bank and the network.
The second method is to detect if the capacitor bank is producing or not a parallel
resonance with a measurement. We just need to take measurements with and without
the capacitor bank connected, and see the performance of THDU%.
If the THDU% increases so much when you connect the capacitor bank, it will means
that exists an important resonance and it will damage the capacitor bank, as well as,
the whole equipment connected in that installation.
The only way to avoid this risk of resonance is to install a detuned capacitor bank that
reject the parallel resonance this the most common harmonics presence in the
installation.
Final conclusion
A brief summary of this paper may conclude that the right choice of a capacitor bank
to compensate any M.V. must take into account two essential points:
- The accurate selection of the stages that compose the capacitor bank, trying to get
the most cost-effective arrangement.
- A thorough analysis of the need of using detuned reactors to avoid possible
harmonic amplification phenomena.

More Related Content

What's hot

Bosch Project
Bosch ProjectBosch Project
Bosch ProjectAkash Roy
 
Power factor correction
Power factor correctionPower factor correction
Power factor correctionAbdur rehman
 
Calculo de un Sistema de Distribución, Mario Rosales
Calculo de un Sistema de Distribución, Mario RosalesCalculo de un Sistema de Distribución, Mario Rosales
Calculo de un Sistema de Distribución, Mario Rosalesrmario98
 
Active rectifier with integrated system control for microwind power systems
Active rectifier with integrated system control for microwind power systemsActive rectifier with integrated system control for microwind power systems
Active rectifier with integrated system control for microwind power systemsI3E Technologies
 
Cost of electricity generation
Cost of electricity generationCost of electricity generation
Cost of electricity generationSerajul Haque
 
Project report soofi
Project report soofiProject report soofi
Project report soofialmsoofi
 
Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of buildingniraj2510
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load schedulingMayank Sharma
 
Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Lokesh Singh
 
Compensation of harmonic currents utilizing AHC by kingsprime
Compensation of harmonic currents utilizing AHC by kingsprimeCompensation of harmonic currents utilizing AHC by kingsprime
Compensation of harmonic currents utilizing AHC by kingsprimeKalu Kingsley Ekperebuike
 
Product: Power Factor Harmonics
Product: Power Factor HarmonicsProduct: Power Factor Harmonics
Product: Power Factor HarmonicsStaco Energy
 
Power factor introduction and its correction final
Power factor introduction and its correction final Power factor introduction and its correction final
Power factor introduction and its correction final manpreetsingh1076
 

What's hot (17)

Bosch Project
Bosch ProjectBosch Project
Bosch Project
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Calculo de un Sistema de Distribución, Mario Rosales
Calculo de un Sistema de Distribución, Mario RosalesCalculo de un Sistema de Distribución, Mario Rosales
Calculo de un Sistema de Distribución, Mario Rosales
 
diversity
diversitydiversity
diversity
 
Mohsin rana
Mohsin ranaMohsin rana
Mohsin rana
 
Active rectifier with integrated system control for microwind power systems
Active rectifier with integrated system control for microwind power systemsActive rectifier with integrated system control for microwind power systems
Active rectifier with integrated system control for microwind power systems
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
Cost of electricity generation
Cost of electricity generationCost of electricity generation
Cost of electricity generation
 
PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009
 
Project report soofi
Project report soofiProject report soofi
Project report soofi
 
Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of building
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load scheduling
 
Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7
 
Compensation of harmonic currents utilizing AHC by kingsprime
Compensation of harmonic currents utilizing AHC by kingsprimeCompensation of harmonic currents utilizing AHC by kingsprime
Compensation of harmonic currents utilizing AHC by kingsprime
 
Lecture 1
Lecture 1Lecture 1
Lecture 1
 
Product: Power Factor Harmonics
Product: Power Factor HarmonicsProduct: Power Factor Harmonics
Product: Power Factor Harmonics
 
Power factor introduction and its correction final
Power factor introduction and its correction final Power factor introduction and its correction final
Power factor introduction and its correction final
 

Viewers also liked

El por qué de un grupo de energia en la UTPL
El por qué de un grupo de energia en la UTPLEl por qué de un grupo de energia en la UTPL
El por qué de un grupo de energia en la UTPLJorge Luis Jaramillo
 
Gestión de la Energía ISO 5001 (ABB) - IV Congreso Nacional de Sistemas de G...
Gestión de la Energía ISO 5001 (ABB) - IV  Congreso Nacional de Sistemas de G...Gestión de la Energía ISO 5001 (ABB) - IV  Congreso Nacional de Sistemas de G...
Gestión de la Energía ISO 5001 (ABB) - IV Congreso Nacional de Sistemas de G...Gestión de la Calidad de UTN BA
 
Webinar energia renovable latinoamérica
Webinar energia renovable latinoaméricaWebinar energia renovable latinoamérica
Webinar energia renovable latinoaméricafernando nuño
 
Impacto de Sistemas Eólicos na Qualidade de Energia
Impacto de Sistemas Eólicos na Qualidade de EnergiaImpacto de Sistemas Eólicos na Qualidade de Energia
Impacto de Sistemas Eólicos na Qualidade de EnergiaMarcos
 
Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos"
Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos" Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos"
Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos" CAIberica
 
Energy Tech Intl Group Circutor
Energy Tech Intl Group   CircutorEnergy Tech Intl Group   Circutor
Energy Tech Intl Group CircutorLald13
 
Webinar - Simulación de Sistemas de Iluminación
Webinar - Simulación de Sistemas de IluminaciónWebinar - Simulación de Sistemas de Iluminación
Webinar - Simulación de Sistemas de Iluminaciónfernando nuño
 
Compensacion de la energia reactiva
Compensacion de la energia reactivaCompensacion de la energia reactiva
Compensacion de la energia reactivaMauricio Plaza
 
Ctai Ingeniería - Curso compensacion energía reactiva
Ctai Ingeniería - Curso compensacion energía reactivaCtai Ingeniería - Curso compensacion energía reactiva
Ctai Ingeniería - Curso compensacion energía reactivaCTAI Ingeniería, S.L.
 
Utp plan de tesis
  Utp plan de tesis  Utp plan de tesis
Utp plan de tesisjcbenitezp
 
Webinar - Dimensionamiento economico de conductores electricos
Webinar - Dimensionamiento economico de conductores electricosWebinar - Dimensionamiento economico de conductores electricos
Webinar - Dimensionamiento economico de conductores electricosfernando nuño
 
Maestría En Gerencia Y Liderazgo Educacional
Maestría En Gerencia Y Liderazgo EducacionalMaestría En Gerencia Y Liderazgo Educacional
Maestría En Gerencia Y Liderazgo EducacionalVideoconferencias UTPL
 
Utp perfil de tesis
  Utp perfil de tesis  Utp perfil de tesis
Utp perfil de tesisjcbenitezp
 

Viewers also liked (20)

El por qué de un grupo de energia en la UTPL
El por qué de un grupo de energia en la UTPLEl por qué de un grupo de energia en la UTPL
El por qué de un grupo de energia en la UTPL
 
Gestión de la Energía ISO 5001 (ABB) - IV Congreso Nacional de Sistemas de G...
Gestión de la Energía ISO 5001 (ABB) - IV  Congreso Nacional de Sistemas de G...Gestión de la Energía ISO 5001 (ABB) - IV  Congreso Nacional de Sistemas de G...
Gestión de la Energía ISO 5001 (ABB) - IV Congreso Nacional de Sistemas de G...
 
Webinar energia renovable latinoamérica
Webinar energia renovable latinoaméricaWebinar energia renovable latinoamérica
Webinar energia renovable latinoamérica
 
Impacto de Sistemas Eólicos na Qualidade de Energia
Impacto de Sistemas Eólicos na Qualidade de EnergiaImpacto de Sistemas Eólicos na Qualidade de Energia
Impacto de Sistemas Eólicos na Qualidade de Energia
 
Aplicaciones
AplicacionesAplicaciones
Aplicaciones
 
Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos"
Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos" Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos"
Barcelona, 3 de mayo de 2012: Jornada "Claves para reducir costes energéticos"
 
Webinario compensación energia reactiva 2015
Webinario compensación energia reactiva 2015Webinario compensación energia reactiva 2015
Webinario compensación energia reactiva 2015
 
Expo2222
Expo2222Expo2222
Expo2222
 
Energy Tech Intl Group Circutor
Energy Tech Intl Group   CircutorEnergy Tech Intl Group   Circutor
Energy Tech Intl Group Circutor
 
Caso de exito: CANAL 30
Caso de exito: CANAL 30Caso de exito: CANAL 30
Caso de exito: CANAL 30
 
Webinar - Simulación de Sistemas de Iluminación
Webinar - Simulación de Sistemas de IluminaciónWebinar - Simulación de Sistemas de Iluminación
Webinar - Simulación de Sistemas de Iluminación
 
Efectos del terreno arequipa - Sismo 2001 Atico
Efectos del terreno arequipa - Sismo 2001 AticoEfectos del terreno arequipa - Sismo 2001 Atico
Efectos del terreno arequipa - Sismo 2001 Atico
 
Compensacion de la energia reactiva
Compensacion de la energia reactivaCompensacion de la energia reactiva
Compensacion de la energia reactiva
 
Ctai Ingeniería - Curso compensacion energía reactiva
Ctai Ingeniería - Curso compensacion energía reactivaCtai Ingeniería - Curso compensacion energía reactiva
Ctai Ingeniería - Curso compensacion energía reactiva
 
Potencia electrica
Potencia electricaPotencia electrica
Potencia electrica
 
Utp plan de tesis
  Utp plan de tesis  Utp plan de tesis
Utp plan de tesis
 
Webinar - Dimensionamiento economico de conductores electricos
Webinar - Dimensionamiento economico de conductores electricosWebinar - Dimensionamiento economico de conductores electricos
Webinar - Dimensionamiento economico de conductores electricos
 
Maestría En Gerencia Y Liderazgo Educacional
Maestría En Gerencia Y Liderazgo EducacionalMaestría En Gerencia Y Liderazgo Educacional
Maestría En Gerencia Y Liderazgo Educacional
 
Webinario proteccion diferencial 2015
Webinario proteccion diferencial 2015Webinario proteccion diferencial 2015
Webinario proteccion diferencial 2015
 
Utp perfil de tesis
  Utp perfil de tesis  Utp perfil de tesis
Utp perfil de tesis
 

Similar to Consumption analysis method for optimizing reactive compensation at MV

Enhancement of Power System Dynamics Using a Novel Series Compensation Scheme
Enhancement of Power System Dynamics Using a Novel Series Compensation SchemeEnhancement of Power System Dynamics Using a Novel Series Compensation Scheme
Enhancement of Power System Dynamics Using a Novel Series Compensation SchemeIJMER
 
A Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact DevicesA Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact DevicesIOSR Journals
 
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...IJMER
 
Energy Storage Systems – Grid Connection Using Synchronverters
Energy Storage Systems – Grid Connection Using SynchronvertersEnergy Storage Systems – Grid Connection Using Synchronverters
Energy Storage Systems – Grid Connection Using SynchronvertersGal Barzilai
 
Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...
Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...
Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...IJERA Editor
 
Soft power factor modification using static
Soft power factor modification using staticSoft power factor modification using static
Soft power factor modification using staticchodachude
 
Improved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithmImproved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithmAlexander Decker
 
To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...
To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...
To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...ijtsrd
 

Similar to Consumption analysis method for optimizing reactive compensation at MV (20)

Enhancement of Power System Dynamics Using a Novel Series Compensation Scheme
Enhancement of Power System Dynamics Using a Novel Series Compensation SchemeEnhancement of Power System Dynamics Using a Novel Series Compensation Scheme
Enhancement of Power System Dynamics Using a Novel Series Compensation Scheme
 
G046033742
G046033742G046033742
G046033742
 
A Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact DevicesA Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact Devices
 
A1103010108
A1103010108A1103010108
A1103010108
 
G1101045767
G1101045767G1101045767
G1101045767
 
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
 
Au4101266270
Au4101266270Au4101266270
Au4101266270
 
www.ijerd.com
www.ijerd.comwww.ijerd.com
www.ijerd.com
 
Energy Storage Systems – Grid Connection Using Synchronverters
Energy Storage Systems – Grid Connection Using SynchronvertersEnergy Storage Systems – Grid Connection Using Synchronverters
Energy Storage Systems – Grid Connection Using Synchronverters
 
Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...
Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...
Implementation Of Thyristor Controlled Series Capacitor (TCSC) In Transmissio...
 
Hn3613321337
Hn3613321337Hn3613321337
Hn3613321337
 
Gto csc
Gto cscGto csc
Gto csc
 
pptsekar NEW).ppt
pptsekar  NEW).pptpptsekar  NEW).ppt
pptsekar NEW).ppt
 
Soft power factor modification using static
Soft power factor modification using staticSoft power factor modification using static
Soft power factor modification using static
 
Improved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithmImproved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithm
 
Thyristor switched capacitor
Thyristor switched capacitorThyristor switched capacitor
Thyristor switched capacitor
 
Apfc project 2016 17
Apfc project 2016 17Apfc project 2016 17
Apfc project 2016 17
 
To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...
To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...
To Study, Analysis and Implementation of Power Quality Improvement Using DSTA...
 
685 calavia
685 calavia685 calavia
685 calavia
 
www.ijerd.com
www.ijerd.comwww.ijerd.com
www.ijerd.com
 

Recently uploaded

HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 

Recently uploaded (20)

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 

Consumption analysis method for optimizing reactive compensation at MV

  • 1. Consumption analysis method for optimizing reactive compensation at MV Francesc Fornieles-Castells Market Development Manager CIRCUTOR S.A. www.circutor.com Josep García-Fàbrega Product Manager - Power Quality Division CIRCUTOR S.A. www.circutor.com Abstract Many times we find the question that how many reactive power to be compensated must be chosen after making a measurement with a network analyzer. This situation is crucial in determining proper reactive compensation system in MV. The presence of harmonics in the electrical system may also influence considerably, not only upon the operation of the capacitor bank, but the entire system power quality. This article will explain how to define the power and steps that power factor correction in MV should be, using a simple statistical method, and assess risks to the presence of harmonics in the electrical system. Electrical measurements We must start any analysis of reactive power compensation with a measure carried out with a network analyzer (CIR-e3, AR5L or AR6), where we record the consumption of reactive power to compensate of the installation. We show proceed according to the following principles so that a correct data logging is achieved for further accurate analysis: - Period: The period for registration must be large enough to be considered as a representative and realistic sample of normal consumption of the installation. It is advisable for at least a period of one week. - Sampling frequency: It is recommendable to use a sampling rate as low as possible to observe more closely the fluctuations of loads. If we consider a system with little load variations one can use a higher sample rate. It is suggested to use a sampling rate between ten seconds and fifteen minutes, also considering the memory capacity of the recording data logger. - Seasonality: Depending on the facility activity sector, the power consumption may differ depending on the time of year, even between days along a week. It is, therefore, essential to assure the recorded values are as representative as possible of the real profile consumption of the installation. - Existing capacitor bank: The presence of a capacitor bank will interfere with the acquired data and distort the data collected. So, ensure that during the registration period no kind of power factor correction equipment is connected.
  • 2. Analyzing the measurements After obtaining the data, we must analyze them. We will use a very simple but yet very useful statistical method such as histograms. A histogram is a graphical representation of a frequency distribution given values. The distribution of values is divided into intervals. These intervals could be selected as one decides, but too short or too large intervals could be impossible to analyze. One method to determinate the optimal interval size is with the following formula [1.1]: 𝑆 = (𝑋 𝑀𝐴𝑋 − 𝑋 𝑀𝐼𝑁) 𝑘 XMAX is the maximum value, XMIN is the minimum value, and k is the number of intervals calculated according to the Velleman method, k = 2·N1/2, where N is the number of values. To avoid deviations you can delete outliers that could affect the correct approach. Let we go through an example of analysis using reactive power histogram. We can observe the three-phase inductive reactive power consumption at a voltage of 6,6 kV in an industry, where they are paying penalties for low power factor, in Figure 1. Figure 1. Three-phase Inductive reactive power consumption in kvarL
  • 3. By applying formula [1.1], the proposed interval value that is got would be: 𝑆 = (2600 − 450) 48 = 45 Anyway, since usually, M.V. automatic capacitor banks are based on 100 kvar multiples, in this case we choose this interval of 100 kvar, which will better suit to the compensation requirements of this installation. Thus, the result of applying this interval is the histogram of Figure 2. Figure 2. Results of histogram (100 kvarL interval) Interval Frequency % accumulated 100 0 0,00% 200 0 0,00% 300 0 0,00% 400 0 0,00% 500 65 11,40% 600 29 16,49% 700 20 20,00% 800 12 22,11% 900 52 31,23% 1000 73 44,04% 1100 66 55,61% 1200 21 59,30% 1300 17 62,28% 1400 115 82,46% 1500 48 90,88% 1600 3 91,40% 1700 23 95,44% 1800 14 97,89% 1900 1 98,07% 2000 3 98,60% 2100 4 99,30% 2200 0 99,30% 2300 1 99,47% 2400 0 99,47% 2500 0 99,47% 2600 3 100,00%
  • 4. Figure 3. Histogram Graph (Frequencies and %Accumulative) As you can see from the results, most of the consumption of reactive power is 1400 kvar, followed of 1000 kvar and 500 kvar. Therefore, with a configuration of steps will be 1x500 and 1x1000 kvar. In this way, we can choose an optimized configuration of the capacitor bank that we could compensate the installation more than 98% of the time.
  • 5. Presence of harmonics in the installation Obviously this method allows us to determine the steps to form the capacitor bank, but we must not forget other factors that may influence the selection of the capacitor bank. The presence of harmonics can affect the performance of the equipment and the power quality of the entire installation. When we carry out inductive reactive power compensation, the incorporation of a parallel capacitor bank is logical to attenuate this demand in order to bring the demanded apparent power (kVA) nearest to the active power (kW), which is really used to carry out to the purpose it is designed for. This simple concept can be summarized as a parallel circuit with inductance (L – Transformer and Grid) and capacity (C – Capacitor bank). If we observe the frequency response of the system, we see that for a frequency fR the impedance of the system is much greater than its normal performance. The existence of current with frequencies higher than the fundamental frequency at 50 or 60 Hz, mean that the resonance conditions could be complied with. This would basically cause:  Amplification of the distortion in voltage for the entire installation (this could affect the equipment and sensitive electrical elements).  Greater absorption of current by the capacitors, with their consequential overheating, reduction of their capacity and useful life, and in some cases the destruction of the capacitor.
  • 6. Image 1. Blow-up MV capacitor due a resonance effect There are two methods to check or detect the risk of resonance. First method is to calculate the frequency of resonance with the following formula: 𝑓𝑅 = 𝑓 ∙ √ 𝑆𝑆𝐶 𝑄 Where SSC is the short-circuit power of the power transformer (kVA), Q is the reactive power of the capacitor bank (kvar) and f is the rated frequency of the system (50 or 60 Hz). Then you can check if the frequency of resonance could be close or not to harmonic current presence in the installation, therefore could produce a resonance between the capacitor bank and the network. The second method is to detect if the capacitor bank is producing or not a parallel resonance with a measurement. We just need to take measurements with and without the capacitor bank connected, and see the performance of THDU%.
  • 7. If the THDU% increases so much when you connect the capacitor bank, it will means that exists an important resonance and it will damage the capacitor bank, as well as, the whole equipment connected in that installation. The only way to avoid this risk of resonance is to install a detuned capacitor bank that reject the parallel resonance this the most common harmonics presence in the installation. Final conclusion A brief summary of this paper may conclude that the right choice of a capacitor bank to compensate any M.V. must take into account two essential points: - The accurate selection of the stages that compose the capacitor bank, trying to get the most cost-effective arrangement. - A thorough analysis of the need of using detuned reactors to avoid possible harmonic amplification phenomena.