SlideShare ist ein Scribd-Unternehmen logo
1 von 17
Downloaden Sie, um offline zu lesen
FAO/AgWA | COMESA
ROUNDTABLE
Rome, 19-20 May 2014
PROJECT TCP/INT/3404
SUPPORT TO THE PRE- AND POST-CAADP COMPACT
PROCESS FOR IMPROVED AWM
(EGYPT, MALAWI, THE SUDAN & SWAZILAND)
PROJECT TCP/INT/3404
OUTLINE
1. THE 4 COUNTRIES
2. CHALLENGES
3. PROJECT RESUME
4. PROJECT ACTIVITIES
5. IMPACT
6. RISKS & SUSTAINABILITY
7. MANAGEMENT
8. CURRENT STATUS
THE 4 COUNTRIES
EGYPT
THE SUDAN
MALAWI
SWAZILAND
CHALLENGES
• Reliance on irregular and
unreliable rainfall for
agricultural production
• Heavily dependent on
agriculture for their
livelihoods and employment
• Susceptibility of agriculture to
climatic variability and other
hazards
• Persistent high poverty
levels and low food security
CHALLENGES
PROJECT RESUME
DONOR AND COUNTERPART TOTAL COST AND DURATION TIME FRAME
FAO - AgWA & COMESA USD 488 000 (18 months) Nov. 2013 – March 2015
CAADP STATUS
Egypt: has not signed CAADP
The Sudan: CAADP compact signed recently (July 2013)
Malawi: in post CAADP compact process - NAIP already
developed
Swaziland: in post CAADP compact process - NAIP
already developed
IMPACT
Hunger and poverty is
reduced in the selected
project countries.
PROJECT TITLE: SUPPORT TO THE PRE- AND POST-CAADP COMPACT
PROCESS FOR IMPROVED AGRICULTURAL WATER MANAGEMENT
AGENCIES
FAO - AgWA & COMESA
PROJECT ACTIVITIESPROJECT RESUME
1. Investment profile for the
identification of AWM
priorities is produced and
national capacity is built in
the Sudan
OVERALL IMPACT
Improved agricultural water management in Egypt, Malawi, the Sudan,
and Swaziland
3. A broad National
Agriculture Investment Plan
(NAIP) refined for Swaziland
to specifically re-emphasize
AWM
4. Defined investment
projects in agricultural
water for Malawi are
prepared to foster the
investment flow into high-
priority areas, based on
the NAIP
2. Investment
profile/portfolio for the
identification of AWM
priorities is produced and
national capacity is built
in Egypt
5. Increased regional
integration, coordination and
partnership between AgWA and
COMESA
PROJECT ACTIVITIES
Main Output Activities
 Establishment of Task Force & Project Country
Team
Sign Agreement with development partners to
support to the CAADP Compact process
Preparation of a Work Plan & Strategy of
Support
Technical, institutional and financial Evidence-based
Analysis using the DTI tools
 Preparation of comprehensive Country Investment
Profile/Portfolio
 Training on the application of the DTI tools
National level policy-dialogue to validate the
evidence-based analysis
THE SUDAN
1. Investment profile for the
identification of AWM priorities
at national level is produced
and national capacity is built in
the Sudan in the context of the
CAADP-Compact process
PROJECT ACTIVITIES
Main Output Activities
 Establishment of Task Force & Project Country
Team
Sign Agreement with development partners to
support to the CAADP Compact process
Preparation of a Work Plan & Strategy
Update technical, institutional and financial Evidence-
based Analysis using the DTI tools
 Update the National Investment
Profile/Portfolio
 Training on the application of the DTI tools
National level policy-dialogue to validate the
evidence-based analysis
EGYPT
2. Investment profile for the
identification of AWM priorities
at national level is produced
and national capacity is built in
Egypt in the context of the
CAADP-Compact process
PROJECT ACTIVITIES
Achieving objectives By implementing activities
Inception meeting and establishment of project
country team
Institutional and financial evidence-based analysis
using the DTI tools
National workshop to detail key investment areas in
Agricultural Water Management
Refinement of NAIP
Training on the application of the DTI tools
Policy dialogue, a validation process and a donors
roundtable
SWAZILAND
PROJECT ACTIVITIES
Main Output Activities
Establishment of Project Country Technical
Team to coordinate the in-country post-compact
process related to AWM
National Inception Workshop to detail, taking the
moves from the signed CAADP Compact & key
investment areas gaps in AWM
Technical, institutional and financial Evidence-based
Analysis using the DTI tools
Training on the application of the DTI tools
Refinement of NAIP to integrate a AWM chapter
National level policy-dialogue to validate/endorse
the revised NAIP, particularly focusing on the AWM
chapter
Donors roundtable with partners to promote
external investment to pre-finance AWM projects
3. A broad National Agriculture
Investment Plan (NAIP) is
refined for Swaziland to
specifically re-emphasize AWM
PROJECT ACTIVITIES
Main Output Activities
MALAWI
4. Defined investment projects in
agricultural water for Malawi are
prepared to foster the
investment flow into high-
priority areas, based on the
National Agriculture Investment
Plan (NAIP)
Establishment of Project Country Technical
Team to coordinate the in-country post-compact
process related to AWM
National Inception Workshop based on the
priorities areas outlines in the NAIP
Define economic/financial indicators for
scheduling investments based on DTI tools (financial
tool)
Training on the application of the DTI tools
Prepare complete portfolio of investment projects
for donors to decide on the allocation of financial flows
Donors roundtable with partners to promote
external investment to pre-finance AWM projects
PROJECT ACTIVITIES
Main Output Activities
AgWA & COMESA
5. Increased regional integration,
coordination and partnership
between AgWA and COMESA
Convene an AgWA-COMESA roundtable to
ensure harmonization between AgWA’s activities and
COMESA’s strategic priorities, in particular around
issues related to policy, strategy, lines of interventions
Formulate an agreed-upon AgWA-COMESA Work
Plan detailing role and procedures to ensure alignment
and outlining a clear plan of action for future regional
support
PROJECT ACTIVITIESIMPACT
• Staff and experts from
COMESA and AgWA
• Staff at relevant ministries
• Policy and decision makers
at relevant ministries
Activities that will have an impact...
DIRECT IMPACT INDIRECT IMPACT
• Farming communities whose
livelihood depends on agriculture
and on the management of water
for agriculture
PROJECT ACTIVITIESRISKS & SUSTAINABILITY
Risks Sustainability
• Insufficient commitment
of the national institutions
• Insufficient commitment
of the private and civil
society organizations
• Proposed consultation
and papers not
completed in the estimated
time frame
• Stable social conditions in
the countries deteriorate
 Adoption of technically feasible work plans
and strategies
 Participatory process with all relevant
stakeholder, including the most vulnerable
groups, during the implementation of the project
 Great commitment of the national
governments and the support of a strong
coalition of stakeholders
 Alignment with the donors’ strategies and the
development of an agreed upon documents
 Active participation of donors in all the
platforms created by the project
PROJECT ACTIVITIESMANAGEMENT
Implementation and Management Arrangements
Project Steering Committee (PSC)
[FAO/AgWA, COMESA, national governments]
Overall responsibility and supervision of national workshops, training activities,
donors’ roundtables and project materials
Task Force | Project Country Team
[members of Ministry departments involved]
Focal Point/National Coordinator
COMESA
Counterpart
Institute
AgWA
On-ground
operation
International
/ National
Consultants
FAO-HQ NRL
Technical lead +
Operations +
Budget holder
FAO Country
Offices
Administrative and
logistical support
Project Task Force
PROJECT ACTIVITIESCURRENT STATUS
EGYPT
THE SUDAN SWAZILAND
MALAWI
 Inception mission done
 Task Force & Project Country Team
established
 Agreement with partners on their
inputs
 Process of hiring consultants for
evidence-based analysis
 Inception mission done
 Task Force & Project Country Team
established
 Agreement with partners on their
inputs
 Process of hiring consultants for
evidence-based analysis
 Inception mission done
 Task Force & Project Country Technical Team
established
 Process of hiring consultants for
evidence-based analysis
 Inception mission done
 Task Force & Project Country
Technical Team established
 Process of hiring consultants for
evidence-based analysis
PROJECT ACTIVITIESCURRENT STATUS
AgWA & COMESA
Convene an AgWA-COMESA roundtable to ensure
harmonization between AgWA’s activities and COMESA’s
strategic priorities, in particular around issues related to policy,
strategy, lines of interventions
Formulate an agreed-upon AgWA-COMESA Work Plan
THANK YOU YOUR
ATTENTION!!
PROJECT TCP/INT/3404
FAO/AgWA | COMESA ROUNDTABLE
Rome, 19 May 2014

Weitere ähnliche Inhalte

Andere mochten auch

SARIO Newsletter November 2011
SARIO Newsletter November 2011 SARIO Newsletter November 2011
SARIO Newsletter November 2011 +421 Foundation
 
Mateusz herych content search problem on android
Mateusz herych content search problem on androidMateusz herych content search problem on android
Mateusz herych content search problem on androidapps4allru
 
Talent scouting angkatan ii
Talent scouting angkatan iiTalent scouting angkatan ii
Talent scouting angkatan iiAan Kurniawan
 
Favourite album art of all time
Favourite album art of all timeFavourite album art of all time
Favourite album art of all timeNasimNasAli
 
Gender Equity and Adaptive Capacity: Essentials for scaling up CSA
Gender Equity and Adaptive Capacity:  Essentials for scaling up CSA Gender Equity and Adaptive Capacity:  Essentials for scaling up CSA
Gender Equity and Adaptive Capacity: Essentials for scaling up CSA World Agroforestry (ICRAF)
 

Andere mochten auch (6)

( Images for star mercury ) from google.com
( Images for star mercury ) from google.com( Images for star mercury ) from google.com
( Images for star mercury ) from google.com
 
SARIO Newsletter November 2011
SARIO Newsletter November 2011 SARIO Newsletter November 2011
SARIO Newsletter November 2011
 
Mateusz herych content search problem on android
Mateusz herych content search problem on androidMateusz herych content search problem on android
Mateusz herych content search problem on android
 
Talent scouting angkatan ii
Talent scouting angkatan iiTalent scouting angkatan ii
Talent scouting angkatan ii
 
Favourite album art of all time
Favourite album art of all timeFavourite album art of all time
Favourite album art of all time
 
Gender Equity and Adaptive Capacity: Essentials for scaling up CSA
Gender Equity and Adaptive Capacity:  Essentials for scaling up CSA Gender Equity and Adaptive Capacity:  Essentials for scaling up CSA
Gender Equity and Adaptive Capacity: Essentials for scaling up CSA
 

Ähnlich wie Support To The Pre- And Post-CAADP Compact Process For Improved AWM

Support to Agricultural Water Management in the Horn of Africa through the Pa...
Support to Agricultural Water Management in the Horn of Africa through the Pa...Support to Agricultural Water Management in the Horn of Africa through the Pa...
Support to Agricultural Water Management in the Horn of Africa through the Pa...FAO
 
The partenership for Agricultural Water for Africa
The partenership for Agricultural Water for AfricaThe partenership for Agricultural Water for Africa
The partenership for Agricultural Water for AfricaFAO
 
Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...FAO
 
Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...NENAwaterscarcity
 
Integrating agriculture in National Adaptation Plans
Integrating agriculture in National Adaptation Plans Integrating agriculture in National Adaptation Plans
Integrating agriculture in National Adaptation Plans FAO
 
undpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdf
undpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdfundpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdf
undpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdfHassan AGOUZOUL
 
WCP towards a shared vision alex simalabwi 27 aug
WCP towards a shared vision alex simalabwi 27 augWCP towards a shared vision alex simalabwi 27 aug
WCP towards a shared vision alex simalabwi 27 augGlobal Water Partnership
 
NAP Expo 2015 Building national capacities NAP-GSP
NAP Expo 2015 Building national capacities NAP-GSPNAP Expo 2015 Building national capacities NAP-GSP
NAP Expo 2015 Building national capacities NAP-GSPNAP Events
 
National Adaptation Plans and Water Security
National Adaptation Plans and Water SecurityNational Adaptation Plans and Water Security
National Adaptation Plans and Water SecurityGlobal Water Partnership
 
NAP Expo 2015 Session II, III Timor-Leste
NAP Expo 2015 Session II, III Timor-LesteNAP Expo 2015 Session II, III Timor-Leste
NAP Expo 2015 Session II, III Timor-LesteNAP Events
 
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 augPartnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 augGlobal Water Partnership
 
Science to Sustainable Governance - The Case of the Benguela Current Commission
Science to Sustainable Governance - The Case of the Benguela Current CommissionScience to Sustainable Governance - The Case of the Benguela Current Commission
Science to Sustainable Governance - The Case of the Benguela Current CommissionIwl Pcu
 
Water, Climate and Development Programme. By Torkil Jønch Clausen.
Water, Climate and Development Programme. By Torkil Jønch Clausen.Water, Climate and Development Programme. By Torkil Jønch Clausen.
Water, Climate and Development Programme. By Torkil Jønch Clausen.Global Water Partnership
 

Ähnlich wie Support To The Pre- And Post-CAADP Compact Process For Improved AWM (20)

Support to Agricultural Water Management in the Horn of Africa through the Pa...
Support to Agricultural Water Management in the Horn of Africa through the Pa...Support to Agricultural Water Management in the Horn of Africa through the Pa...
Support to Agricultural Water Management in the Horn of Africa through the Pa...
 
The partenership for Agricultural Water for Africa
The partenership for Agricultural Water for AfricaThe partenership for Agricultural Water for Africa
The partenership for Agricultural Water for Africa
 
Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...
 
Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...Assessing Impact of Investments in Agricultural Water Management in African C...
Assessing Impact of Investments in Agricultural Water Management in African C...
 
Integrating agriculture in National Adaptation Plans
Integrating agriculture in National Adaptation Plans Integrating agriculture in National Adaptation Plans
Integrating agriculture in National Adaptation Plans
 
undpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdf
undpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdfundpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdf
undpfaoglobalprogrammeccscfinal-151002132244-lva1-app6892.pdf
 
WACDEP Global Coordination Investment
WACDEP Global Coordination InvestmentWACDEP Global Coordination Investment
WACDEP Global Coordination Investment
 
WCP towards a shared vision alex simalabwi 27 aug
WCP towards a shared vision alex simalabwi 27 augWCP towards a shared vision alex simalabwi 27 aug
WCP towards a shared vision alex simalabwi 27 aug
 
NAP Expo 2015 Building national capacities NAP-GSP
NAP Expo 2015 Building national capacities NAP-GSPNAP Expo 2015 Building national capacities NAP-GSP
NAP Expo 2015 Building national capacities NAP-GSP
 
WACDEP Capacity Development
WACDEP Capacity DevelopmentWACDEP Capacity Development
WACDEP Capacity Development
 
National Adaptation Plans and Water Security
National Adaptation Plans and Water SecurityNational Adaptation Plans and Water Security
National Adaptation Plans and Water Security
 
NAP Expo 2015 Session II, III Timor-Leste
NAP Expo 2015 Session II, III Timor-LesteNAP Expo 2015 Session II, III Timor-Leste
NAP Expo 2015 Session II, III Timor-Leste
 
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 augPartnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
Partnership and sustainability WP8 GWPWAF_dam mogbante_28 aug
 
CAADP country process
CAADP country processCAADP country process
CAADP country process
 
Science to Sustainable Governance - The Case of the Benguela Current Commission
Science to Sustainable Governance - The Case of the Benguela Current CommissionScience to Sustainable Governance - The Case of the Benguela Current Commission
Science to Sustainable Governance - The Case of the Benguela Current Commission
 
Institutional WACDEP Africa - Goal 2
Institutional WACDEP Africa - Goal 2Institutional WACDEP Africa - Goal 2
Institutional WACDEP Africa - Goal 2
 
Stocktaking of Integrated Approach Pilots (IAPs) Preparation
Stocktaking of Integrated Approach Pilots (IAPs) PreparationStocktaking of Integrated Approach Pilots (IAPs) Preparation
Stocktaking of Integrated Approach Pilots (IAPs) Preparation
 
Strengthening Mutual Accountability through Agricultural Joint Sector Reviews
Strengthening Mutual Accountability through Agricultural Joint Sector ReviewsStrengthening Mutual Accountability through Agricultural Joint Sector Reviews
Strengthening Mutual Accountability through Agricultural Joint Sector Reviews
 
Ghana science-policy dialogue platform presentations
Ghana science-policy dialogue platform presentationsGhana science-policy dialogue platform presentations
Ghana science-policy dialogue platform presentations
 
Water, Climate and Development Programme. By Torkil Jønch Clausen.
Water, Climate and Development Programme. By Torkil Jønch Clausen.Water, Climate and Development Programme. By Torkil Jønch Clausen.
Water, Climate and Development Programme. By Torkil Jønch Clausen.
 

Mehr von FAO

Nigeria
NigeriaNigeria
NigeriaFAO
 
Niger
NigerNiger
NigerFAO
 
Namibia
NamibiaNamibia
NamibiaFAO
 
Mozambique
MozambiqueMozambique
MozambiqueFAO
 
Zimbabwe takesure
Zimbabwe takesureZimbabwe takesure
Zimbabwe takesureFAO
 
Zimbabwe
ZimbabweZimbabwe
ZimbabweFAO
 
Zambia
ZambiaZambia
ZambiaFAO
 
Togo
TogoTogo
TogoFAO
 
Tanzania
TanzaniaTanzania
TanzaniaFAO
 
Spal presentation
Spal presentationSpal presentation
Spal presentationFAO
 
Rwanda
RwandaRwanda
RwandaFAO
 
Nigeria uponi
Nigeria uponiNigeria uponi
Nigeria uponiFAO
 
The multi-faced role of soil in the NENA regions (part 2)
The multi-faced role of soil in the NENA regions (part 2)The multi-faced role of soil in the NENA regions (part 2)
The multi-faced role of soil in the NENA regions (part 2)FAO
 
The multi-faced role of soil in the NENA regions (part 1)
The multi-faced role of soil in the NENA regions (part 1)The multi-faced role of soil in the NENA regions (part 1)
The multi-faced role of soil in the NENA regions (part 1)FAO
 
Agenda of the launch of the soil policy brief at the Land&Water Days
Agenda of the launch of the soil policy brief at the Land&Water DaysAgenda of the launch of the soil policy brief at the Land&Water Days
Agenda of the launch of the soil policy brief at the Land&Water DaysFAO
 
Agenda of the 5th NENA Soil Partnership meeting
Agenda of the 5th NENA Soil Partnership meetingAgenda of the 5th NENA Soil Partnership meeting
Agenda of the 5th NENA Soil Partnership meetingFAO
 
The Voluntary Guidelines for Sustainable Soil Management
The Voluntary Guidelines for Sustainable Soil ManagementThe Voluntary Guidelines for Sustainable Soil Management
The Voluntary Guidelines for Sustainable Soil ManagementFAO
 
GLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forwardGLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forwardFAO
 
Towards a Global Soil Information System (GLOSIS)
Towards a Global Soil Information System (GLOSIS)Towards a Global Soil Information System (GLOSIS)
Towards a Global Soil Information System (GLOSIS)FAO
 
GSP developments of regional interest in 2019
GSP developments of regional interest in 2019GSP developments of regional interest in 2019
GSP developments of regional interest in 2019FAO
 

Mehr von FAO (20)

Nigeria
NigeriaNigeria
Nigeria
 
Niger
NigerNiger
Niger
 
Namibia
NamibiaNamibia
Namibia
 
Mozambique
MozambiqueMozambique
Mozambique
 
Zimbabwe takesure
Zimbabwe takesureZimbabwe takesure
Zimbabwe takesure
 
Zimbabwe
ZimbabweZimbabwe
Zimbabwe
 
Zambia
ZambiaZambia
Zambia
 
Togo
TogoTogo
Togo
 
Tanzania
TanzaniaTanzania
Tanzania
 
Spal presentation
Spal presentationSpal presentation
Spal presentation
 
Rwanda
RwandaRwanda
Rwanda
 
Nigeria uponi
Nigeria uponiNigeria uponi
Nigeria uponi
 
The multi-faced role of soil in the NENA regions (part 2)
The multi-faced role of soil in the NENA regions (part 2)The multi-faced role of soil in the NENA regions (part 2)
The multi-faced role of soil in the NENA regions (part 2)
 
The multi-faced role of soil in the NENA regions (part 1)
The multi-faced role of soil in the NENA regions (part 1)The multi-faced role of soil in the NENA regions (part 1)
The multi-faced role of soil in the NENA regions (part 1)
 
Agenda of the launch of the soil policy brief at the Land&Water Days
Agenda of the launch of the soil policy brief at the Land&Water DaysAgenda of the launch of the soil policy brief at the Land&Water Days
Agenda of the launch of the soil policy brief at the Land&Water Days
 
Agenda of the 5th NENA Soil Partnership meeting
Agenda of the 5th NENA Soil Partnership meetingAgenda of the 5th NENA Soil Partnership meeting
Agenda of the 5th NENA Soil Partnership meeting
 
The Voluntary Guidelines for Sustainable Soil Management
The Voluntary Guidelines for Sustainable Soil ManagementThe Voluntary Guidelines for Sustainable Soil Management
The Voluntary Guidelines for Sustainable Soil Management
 
GLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forwardGLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forward
 
Towards a Global Soil Information System (GLOSIS)
Towards a Global Soil Information System (GLOSIS)Towards a Global Soil Information System (GLOSIS)
Towards a Global Soil Information System (GLOSIS)
 
GSP developments of regional interest in 2019
GSP developments of regional interest in 2019GSP developments of regional interest in 2019
GSP developments of regional interest in 2019
 

Kürzlich hochgeladen

Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxJanEmmanBrigoli
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxElton John Embodo
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 

Kürzlich hochgeladen (20)

Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptx
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 

Support To The Pre- And Post-CAADP Compact Process For Improved AWM

  • 1. FAO/AgWA | COMESA ROUNDTABLE Rome, 19-20 May 2014 PROJECT TCP/INT/3404 SUPPORT TO THE PRE- AND POST-CAADP COMPACT PROCESS FOR IMPROVED AWM (EGYPT, MALAWI, THE SUDAN & SWAZILAND)
  • 2. PROJECT TCP/INT/3404 OUTLINE 1. THE 4 COUNTRIES 2. CHALLENGES 3. PROJECT RESUME 4. PROJECT ACTIVITIES 5. IMPACT 6. RISKS & SUSTAINABILITY 7. MANAGEMENT 8. CURRENT STATUS
  • 3. THE 4 COUNTRIES EGYPT THE SUDAN MALAWI SWAZILAND
  • 4. CHALLENGES • Reliance on irregular and unreliable rainfall for agricultural production • Heavily dependent on agriculture for their livelihoods and employment • Susceptibility of agriculture to climatic variability and other hazards • Persistent high poverty levels and low food security CHALLENGES
  • 5. PROJECT RESUME DONOR AND COUNTERPART TOTAL COST AND DURATION TIME FRAME FAO - AgWA & COMESA USD 488 000 (18 months) Nov. 2013 – March 2015 CAADP STATUS Egypt: has not signed CAADP The Sudan: CAADP compact signed recently (July 2013) Malawi: in post CAADP compact process - NAIP already developed Swaziland: in post CAADP compact process - NAIP already developed IMPACT Hunger and poverty is reduced in the selected project countries. PROJECT TITLE: SUPPORT TO THE PRE- AND POST-CAADP COMPACT PROCESS FOR IMPROVED AGRICULTURAL WATER MANAGEMENT AGENCIES FAO - AgWA & COMESA
  • 6. PROJECT ACTIVITIESPROJECT RESUME 1. Investment profile for the identification of AWM priorities is produced and national capacity is built in the Sudan OVERALL IMPACT Improved agricultural water management in Egypt, Malawi, the Sudan, and Swaziland 3. A broad National Agriculture Investment Plan (NAIP) refined for Swaziland to specifically re-emphasize AWM 4. Defined investment projects in agricultural water for Malawi are prepared to foster the investment flow into high- priority areas, based on the NAIP 2. Investment profile/portfolio for the identification of AWM priorities is produced and national capacity is built in Egypt 5. Increased regional integration, coordination and partnership between AgWA and COMESA
  • 7. PROJECT ACTIVITIES Main Output Activities  Establishment of Task Force & Project Country Team Sign Agreement with development partners to support to the CAADP Compact process Preparation of a Work Plan & Strategy of Support Technical, institutional and financial Evidence-based Analysis using the DTI tools  Preparation of comprehensive Country Investment Profile/Portfolio  Training on the application of the DTI tools National level policy-dialogue to validate the evidence-based analysis THE SUDAN 1. Investment profile for the identification of AWM priorities at national level is produced and national capacity is built in the Sudan in the context of the CAADP-Compact process
  • 8. PROJECT ACTIVITIES Main Output Activities  Establishment of Task Force & Project Country Team Sign Agreement with development partners to support to the CAADP Compact process Preparation of a Work Plan & Strategy Update technical, institutional and financial Evidence- based Analysis using the DTI tools  Update the National Investment Profile/Portfolio  Training on the application of the DTI tools National level policy-dialogue to validate the evidence-based analysis EGYPT 2. Investment profile for the identification of AWM priorities at national level is produced and national capacity is built in Egypt in the context of the CAADP-Compact process
  • 9. PROJECT ACTIVITIES Achieving objectives By implementing activities Inception meeting and establishment of project country team Institutional and financial evidence-based analysis using the DTI tools National workshop to detail key investment areas in Agricultural Water Management Refinement of NAIP Training on the application of the DTI tools Policy dialogue, a validation process and a donors roundtable SWAZILAND PROJECT ACTIVITIES Main Output Activities Establishment of Project Country Technical Team to coordinate the in-country post-compact process related to AWM National Inception Workshop to detail, taking the moves from the signed CAADP Compact & key investment areas gaps in AWM Technical, institutional and financial Evidence-based Analysis using the DTI tools Training on the application of the DTI tools Refinement of NAIP to integrate a AWM chapter National level policy-dialogue to validate/endorse the revised NAIP, particularly focusing on the AWM chapter Donors roundtable with partners to promote external investment to pre-finance AWM projects 3. A broad National Agriculture Investment Plan (NAIP) is refined for Swaziland to specifically re-emphasize AWM
  • 10. PROJECT ACTIVITIES Main Output Activities MALAWI 4. Defined investment projects in agricultural water for Malawi are prepared to foster the investment flow into high- priority areas, based on the National Agriculture Investment Plan (NAIP) Establishment of Project Country Technical Team to coordinate the in-country post-compact process related to AWM National Inception Workshop based on the priorities areas outlines in the NAIP Define economic/financial indicators for scheduling investments based on DTI tools (financial tool) Training on the application of the DTI tools Prepare complete portfolio of investment projects for donors to decide on the allocation of financial flows Donors roundtable with partners to promote external investment to pre-finance AWM projects
  • 11. PROJECT ACTIVITIES Main Output Activities AgWA & COMESA 5. Increased regional integration, coordination and partnership between AgWA and COMESA Convene an AgWA-COMESA roundtable to ensure harmonization between AgWA’s activities and COMESA’s strategic priorities, in particular around issues related to policy, strategy, lines of interventions Formulate an agreed-upon AgWA-COMESA Work Plan detailing role and procedures to ensure alignment and outlining a clear plan of action for future regional support
  • 12. PROJECT ACTIVITIESIMPACT • Staff and experts from COMESA and AgWA • Staff at relevant ministries • Policy and decision makers at relevant ministries Activities that will have an impact... DIRECT IMPACT INDIRECT IMPACT • Farming communities whose livelihood depends on agriculture and on the management of water for agriculture
  • 13. PROJECT ACTIVITIESRISKS & SUSTAINABILITY Risks Sustainability • Insufficient commitment of the national institutions • Insufficient commitment of the private and civil society organizations • Proposed consultation and papers not completed in the estimated time frame • Stable social conditions in the countries deteriorate  Adoption of technically feasible work plans and strategies  Participatory process with all relevant stakeholder, including the most vulnerable groups, during the implementation of the project  Great commitment of the national governments and the support of a strong coalition of stakeholders  Alignment with the donors’ strategies and the development of an agreed upon documents  Active participation of donors in all the platforms created by the project
  • 14. PROJECT ACTIVITIESMANAGEMENT Implementation and Management Arrangements Project Steering Committee (PSC) [FAO/AgWA, COMESA, national governments] Overall responsibility and supervision of national workshops, training activities, donors’ roundtables and project materials Task Force | Project Country Team [members of Ministry departments involved] Focal Point/National Coordinator COMESA Counterpart Institute AgWA On-ground operation International / National Consultants FAO-HQ NRL Technical lead + Operations + Budget holder FAO Country Offices Administrative and logistical support Project Task Force
  • 15. PROJECT ACTIVITIESCURRENT STATUS EGYPT THE SUDAN SWAZILAND MALAWI  Inception mission done  Task Force & Project Country Team established  Agreement with partners on their inputs  Process of hiring consultants for evidence-based analysis  Inception mission done  Task Force & Project Country Team established  Agreement with partners on their inputs  Process of hiring consultants for evidence-based analysis  Inception mission done  Task Force & Project Country Technical Team established  Process of hiring consultants for evidence-based analysis  Inception mission done  Task Force & Project Country Technical Team established  Process of hiring consultants for evidence-based analysis
  • 16. PROJECT ACTIVITIESCURRENT STATUS AgWA & COMESA Convene an AgWA-COMESA roundtable to ensure harmonization between AgWA’s activities and COMESA’s strategic priorities, in particular around issues related to policy, strategy, lines of interventions Formulate an agreed-upon AgWA-COMESA Work Plan
  • 17. THANK YOU YOUR ATTENTION!! PROJECT TCP/INT/3404 FAO/AgWA | COMESA ROUNDTABLE Rome, 19 May 2014