SlideShare a Scribd company logo
1 of 3
Download to read offline
Curriculum Vitae Erik Groot
Zandstraat 19a
4561SB, Hulst
Netherlands
Mobile: +31 (0)6 290 245 15 Email: ejgroot@gmail.com
HVAC DE S IG N /EN G IN E E R IN G /CO N S T R U C T IO N MA N A G E M E N T
w P r o j e c t M a n a g e m e n t – H V A C E n g i n e e r i n g – I n s t a l l a t i o n C o m m i s s i o n i n g
Over 19 years experience with HVAC design and engineering. Experienced within estimating, proposals,
design, procurement, manufacturing, fabrication, installation, hazardous zones, instrumentation, materials
and commissioning. Calm under pressure and committed to, finish all works within budget, timescales and
process limitations whilst striving to produce the highest degree of client satisfaction.
AR E A S O F EX P E R T I S E
§ Specialist in design of Marine, Industrial, Commercial, and Institutional HVAC Systems
§ Building Audits, Energy Audits, System Analysis, and Feasibility Studies
§ Project Coordination and Management, Client Relations, Proposal and Project Development
§ HVAC System Testing, Inspections and Commissioning
§ Standard computer skills including Microsoft Office (Word, Excel, PowerPoint), AutoCad, Microstation
and PDMS
§ Working knowledge in MS Project, Vabi and ‘Carrier’ HVAC Simulations
§ Extended knowledge of offshore regulations, international standards and building codes
PR O F E S S I O N A L EX P E R I E N C E A N D SI G N I F I C A N T AC H I E V E M E N T S
SENIOR HVAC ENGINEER, HEBRON LQ Nov 2012 – Mar 2015
NE-AL Partnership (w/ Apply Leirvik), St. John, Nfld, Canada
As senior team member responsible for engineering and design of the HVAC systems for the 220 person
Living Quarters (LQ) module for Exxon Mobil’s South Hebron platform off the southeast coast of
Newfoundland, Canada. Second in command reporting directly to the Engineering Manager in absence of
the Discipline Lead managing and coaching of the HVAC discipline team members in setting up D&ID’s,
calculations and sizing equipment.
Further responsibilities and tasks involving this role were; setting up and populating Technical Data Sheets
(TDS), preparing Request For Quote (RFQ) and reporting Technical Bid Clarification’s (TBC), select and
procure LQ main mechanical equipment such as AHU’s, Extract Fans, Humidifiers, Re-heaters, Control
Panel and Dampers. Other responsibilities included HAZOP as lead author of the LQ HVAC Control
Philosophy.
Later became Responsible Package Engineer (RPE) for all HVAC related equipment packages including
reviewing vendor documentation, scheduling, and procurement of supplemental HVAC equipment as
required and to ensure certification (CSA, DNV), attending factory testing of mechanical equipment (FAT)
at the manufacturing fabrication side as outlined by the Client’s specifications.
Also supporting procurement and QA-QC departments by reviewing and reporting third party inspections
reports of procured equipment and coordination with Equipment Vendors, HVAC subcontractors, client
representatives (Exxon Mobil and Worley Parson), Certifying Body (DNV) and Regulator (CNLOPB).
Providing engineering support to the HVAC fabrication team, the last 6 month’s of my contract (remaining
HVAC PRE), I became a member of the engineering team located at Bull arm construction facility,
responsible to communicate design and coordination with other disciplines at fabrication level.
SENIOR HVAC ENGINEER Jan 2012 – Oct 2012
Hertel Offshore Rotterdam
§ Working within a multi discipline team on accommodation HVAC design and procurement.
§ Preparation of supplier RFQ, and TBE.
§ Established procurement schedules and comparison costs of new construction equipment. Assessed
terms, conditions and implications during the tender phase for a new construction.
§ Package engineering duties, management of sub vendors, design and documentation review.
§ Performed vendor inspections, factory acceptance testing and inspection for key equipment.
§ HVAC Design compliant with Norsok requirements and client specific TR specifications (Statoil)
§ HVAC detailed calculations including Carrier HAP load analysis.
§ Supervision and input into PDMS 3D model for the LQ.
§ Supervision and input into design drafting department.
§ Testing and Commissioning procedures.
SENIOR HVAC ENGINEER Jul 2011 – Dec 2011
Techniplan Consultancy, Rotterdam
§ Consultancy of Building Services Projects.
§ Engineering and Design.
§ Worked in conjunction with authorities on regulations and building codes.
§ Controlling contractors and budget.
HVAC PROJECT MANAGER May 2009 – Jun 2011
BAM Holding, Commercial Building Division
§ Management of Building Services Projects
§ Supervised site installation commissioning and successful handovers to our clients
§ Responsible for budget and financial control.
§ Worked in conjunction with local council on schools modernisation scheme as main mechanical
contractor with multiple projects with tight deadlines.
§ Responsible for site safety, control of sub contractors, direct and in direct labour
§ Procurement, liason with suppliers, estimating and proposals.
§ Responsible for cultivation of new work and clients, reporting directly to the branch manager.
§ Majority of project revenue in excess of 1.3 m Eur.
SENIOR CONSULTANT ENGINEER Mar 2007 – Jun 2009
Halmos Consultancy
§ Consultancy of Building Services Projects.
§ Engineering and Design.
§ Responsible for budget control.
§ Worked in conjunction with authorities on regulations and building codes.
§ Responsible for control of contractors, financially.
SENIOR HVAC ENGINEER Sep 2005 – Mar 2007
Poppe Commercial Building Services
§ Management of Building Services Projects
§ Supervised the site installation commissioning and successful handover to our clients
§ Responsible for budget and financial control.
§ Worked in conjunction with several construction contractors as main mechanical contractor with
multiple projects with tight deadlines.
§ Responsible for site safety, control of sub contractors, direct and in direct labour
§ Procurement, liason with suppliers, estimating and proposals.
§ Responsible for cultivation of new work and clients, reporting direct to the branch manager.
HVAC DESIGNER/ENGINEER Nov 2002 – Sep 2005
Kuijpers Commercial Building Services
§ Management of Building Services Projects
§ Responsible for budget and financial control.
§ Responsible for site safety, control of sub contractors, direct and in direct labour
§ Procurement, liason with suppliers, estimating and proposals.
EA R L I E R CA R E E R SU M M A R Y (1995-02)
Project Designer Grontmij Commercial Building Services
2001-02
Project Designer (Contract) DOW Chemical
1997-01
Project Draughtsman Heinen & Hopman
1995-97
PR O F E S S I O N A L DE V E L O P M E N T
TVVL Dutch
Association for Air
Handling
Refrigeration & Air Conditioning (Bachelor Level) 2008 - 2009
M.I.T National
Diploma
Plumbing Electrical and HVAC Engineering 2002 - 2005
Training courses: Various courses commensurate with areas of expertise e.g Carrier E20
Load estimation, Microstation, PDMS, Auto cad related experience.
Mobility: Full clean driving license. Born: 1966. Status: Single
Nationality: Canadian/Dutch
EX A M P L E S O F P R O J E C T I N V O L V E M E N T
Hospital Leiden (NLD) Feed Study Plumbing and HVAC installations
Hospital Utrecht (NLD) Feed Study HVAC Plant-room and Utilities
University Eindhoven (NLD) Feed Study Plumbing and HVAC installations
DOW Chemical (NLD) Maintenance of Plant Waste Water Sewer Systems
University Leiden (NLD) Maintenance of HVAC Systems
Statoil Valemon LQ (Norway) Engineering and Design HVAC
Shell Draugen (Norway) Engineering and Design HVAC
Exxon Mobile Hebron LQ (Canada) Engineering and Design HVAC

More Related Content

What's hot (18)

Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015
 
Manoj Kumar_ Resume.DOC
Manoj Kumar_ Resume.DOCManoj Kumar_ Resume.DOC
Manoj Kumar_ Resume.DOC
 
Eng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 newEng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 new
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Peter Fru, Curriculum Vitae
Peter Fru, Curriculum VitaePeter Fru, Curriculum Vitae
Peter Fru, Curriculum Vitae
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
Project management plan
Project management planProject management plan
Project management plan
 
EPC Business Model
EPC Business ModelEPC Business Model
EPC Business Model
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 

Similar to Erik Groot CV Updated Aug 2015 rev 01

Similar to Erik Groot CV Updated Aug 2015 rev 01 (20)

T. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsT. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controls
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
M Sahar CV-Updated
M Sahar CV-UpdatedM Sahar CV-Updated
M Sahar CV-Updated
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 
CV
CVCV
CV
 
Detailed resume
Detailed resumeDetailed resume
Detailed resume
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
Resume_Mallanagouda Patil
Resume_Mallanagouda PatilResume_Mallanagouda Patil
Resume_Mallanagouda Patil
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Nayer Resume March 2016
Nayer Resume March 2016Nayer Resume March 2016
Nayer Resume March 2016
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
McLeod, Sean Resume
McLeod, Sean ResumeMcLeod, Sean Resume
McLeod, Sean Resume
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 

Erik Groot CV Updated Aug 2015 rev 01

  • 1. Curriculum Vitae Erik Groot Zandstraat 19a 4561SB, Hulst Netherlands Mobile: +31 (0)6 290 245 15 Email: ejgroot@gmail.com HVAC DE S IG N /EN G IN E E R IN G /CO N S T R U C T IO N MA N A G E M E N T w P r o j e c t M a n a g e m e n t – H V A C E n g i n e e r i n g – I n s t a l l a t i o n C o m m i s s i o n i n g Over 19 years experience with HVAC design and engineering. Experienced within estimating, proposals, design, procurement, manufacturing, fabrication, installation, hazardous zones, instrumentation, materials and commissioning. Calm under pressure and committed to, finish all works within budget, timescales and process limitations whilst striving to produce the highest degree of client satisfaction. AR E A S O F EX P E R T I S E § Specialist in design of Marine, Industrial, Commercial, and Institutional HVAC Systems § Building Audits, Energy Audits, System Analysis, and Feasibility Studies § Project Coordination and Management, Client Relations, Proposal and Project Development § HVAC System Testing, Inspections and Commissioning § Standard computer skills including Microsoft Office (Word, Excel, PowerPoint), AutoCad, Microstation and PDMS § Working knowledge in MS Project, Vabi and ‘Carrier’ HVAC Simulations § Extended knowledge of offshore regulations, international standards and building codes PR O F E S S I O N A L EX P E R I E N C E A N D SI G N I F I C A N T AC H I E V E M E N T S SENIOR HVAC ENGINEER, HEBRON LQ Nov 2012 – Mar 2015 NE-AL Partnership (w/ Apply Leirvik), St. John, Nfld, Canada As senior team member responsible for engineering and design of the HVAC systems for the 220 person Living Quarters (LQ) module for Exxon Mobil’s South Hebron platform off the southeast coast of Newfoundland, Canada. Second in command reporting directly to the Engineering Manager in absence of the Discipline Lead managing and coaching of the HVAC discipline team members in setting up D&ID’s, calculations and sizing equipment. Further responsibilities and tasks involving this role were; setting up and populating Technical Data Sheets (TDS), preparing Request For Quote (RFQ) and reporting Technical Bid Clarification’s (TBC), select and procure LQ main mechanical equipment such as AHU’s, Extract Fans, Humidifiers, Re-heaters, Control Panel and Dampers. Other responsibilities included HAZOP as lead author of the LQ HVAC Control Philosophy. Later became Responsible Package Engineer (RPE) for all HVAC related equipment packages including reviewing vendor documentation, scheduling, and procurement of supplemental HVAC equipment as required and to ensure certification (CSA, DNV), attending factory testing of mechanical equipment (FAT) at the manufacturing fabrication side as outlined by the Client’s specifications. Also supporting procurement and QA-QC departments by reviewing and reporting third party inspections reports of procured equipment and coordination with Equipment Vendors, HVAC subcontractors, client representatives (Exxon Mobil and Worley Parson), Certifying Body (DNV) and Regulator (CNLOPB). Providing engineering support to the HVAC fabrication team, the last 6 month’s of my contract (remaining HVAC PRE), I became a member of the engineering team located at Bull arm construction facility, responsible to communicate design and coordination with other disciplines at fabrication level.
  • 2. SENIOR HVAC ENGINEER Jan 2012 – Oct 2012 Hertel Offshore Rotterdam § Working within a multi discipline team on accommodation HVAC design and procurement. § Preparation of supplier RFQ, and TBE. § Established procurement schedules and comparison costs of new construction equipment. Assessed terms, conditions and implications during the tender phase for a new construction. § Package engineering duties, management of sub vendors, design and documentation review. § Performed vendor inspections, factory acceptance testing and inspection for key equipment. § HVAC Design compliant with Norsok requirements and client specific TR specifications (Statoil) § HVAC detailed calculations including Carrier HAP load analysis. § Supervision and input into PDMS 3D model for the LQ. § Supervision and input into design drafting department. § Testing and Commissioning procedures. SENIOR HVAC ENGINEER Jul 2011 – Dec 2011 Techniplan Consultancy, Rotterdam § Consultancy of Building Services Projects. § Engineering and Design. § Worked in conjunction with authorities on regulations and building codes. § Controlling contractors and budget. HVAC PROJECT MANAGER May 2009 – Jun 2011 BAM Holding, Commercial Building Division § Management of Building Services Projects § Supervised site installation commissioning and successful handovers to our clients § Responsible for budget and financial control. § Worked in conjunction with local council on schools modernisation scheme as main mechanical contractor with multiple projects with tight deadlines. § Responsible for site safety, control of sub contractors, direct and in direct labour § Procurement, liason with suppliers, estimating and proposals. § Responsible for cultivation of new work and clients, reporting directly to the branch manager. § Majority of project revenue in excess of 1.3 m Eur. SENIOR CONSULTANT ENGINEER Mar 2007 – Jun 2009 Halmos Consultancy § Consultancy of Building Services Projects. § Engineering and Design. § Responsible for budget control. § Worked in conjunction with authorities on regulations and building codes. § Responsible for control of contractors, financially. SENIOR HVAC ENGINEER Sep 2005 – Mar 2007 Poppe Commercial Building Services § Management of Building Services Projects § Supervised the site installation commissioning and successful handover to our clients § Responsible for budget and financial control. § Worked in conjunction with several construction contractors as main mechanical contractor with multiple projects with tight deadlines. § Responsible for site safety, control of sub contractors, direct and in direct labour § Procurement, liason with suppliers, estimating and proposals. § Responsible for cultivation of new work and clients, reporting direct to the branch manager.
  • 3. HVAC DESIGNER/ENGINEER Nov 2002 – Sep 2005 Kuijpers Commercial Building Services § Management of Building Services Projects § Responsible for budget and financial control. § Responsible for site safety, control of sub contractors, direct and in direct labour § Procurement, liason with suppliers, estimating and proposals. EA R L I E R CA R E E R SU M M A R Y (1995-02) Project Designer Grontmij Commercial Building Services 2001-02 Project Designer (Contract) DOW Chemical 1997-01 Project Draughtsman Heinen & Hopman 1995-97 PR O F E S S I O N A L DE V E L O P M E N T TVVL Dutch Association for Air Handling Refrigeration & Air Conditioning (Bachelor Level) 2008 - 2009 M.I.T National Diploma Plumbing Electrical and HVAC Engineering 2002 - 2005 Training courses: Various courses commensurate with areas of expertise e.g Carrier E20 Load estimation, Microstation, PDMS, Auto cad related experience. Mobility: Full clean driving license. Born: 1966. Status: Single Nationality: Canadian/Dutch EX A M P L E S O F P R O J E C T I N V O L V E M E N T Hospital Leiden (NLD) Feed Study Plumbing and HVAC installations Hospital Utrecht (NLD) Feed Study HVAC Plant-room and Utilities University Eindhoven (NLD) Feed Study Plumbing and HVAC installations DOW Chemical (NLD) Maintenance of Plant Waste Water Sewer Systems University Leiden (NLD) Maintenance of HVAC Systems Statoil Valemon LQ (Norway) Engineering and Design HVAC Shell Draugen (Norway) Engineering and Design HVAC Exxon Mobile Hebron LQ (Canada) Engineering and Design HVAC