PROJECT SCHEDULING
• PROJECT:
• An individual or collaborative enterprise that is carefully planned to achieve a
particular aim.
• Planned set of interrelated tasks to be executed over a fixed period and within
certain cost and other limitations.
• SCHEDULING:
• Scheduling consists of the assignment of starting and completion times for
the various operations to be performed.
WHY DO WE NEED A PROJECT SCHEDULE?
The project schedule represents the tasks with:
• start and finish dates of each task
• duration of each task
• dependencies between tasks (predecessors and successors)
• a hierarchy organizing the tasks (using Work Breakdown Structure)
• a graphical Gantt Chart showing the date ranges of the tasks as bars over time
• Project schedules are not just for complex projects
• Even a project with only a few tasks can benefit from the project schedule
• WBS is a decomposition of a project into smaller components or tasks
• A work breakdown structure (WBS) is a chart in which tasks, of a project are
illustrated to portray their relationships to each other and to the project as a whole.
• WBS is a key project deliverable that organizes the team work in manageable
sections
• WBS provides the necessary framework for detail cost estimating and control
• As a project has a definite start and end date,WBS defines the start and end
date of the projects
• Within the project there are phases,WBS makes portions or divides the project into
phases
• Within each phase WBS provides work Units…work units are chunk of works in a
phase..these must be completed before jumping to next phases
• WBS Divides work units into smaller tasks
• A task must be divided even it became a atomic task
• WBS divides a project in different levels
Project scope
Phases
Work Units
Tasks
• There is no right or wrong way to create a WBS.
• WBS can be drawn on a white Board, Sketch on page using a pencil or being
technical and using a software like Microsoft Project,excel,Visio or
powerpoint……………….
=>100% RULE:
• 100 % Rule states that the WBS incudes 100% of the work identified by the project
scope and all deliverables..
=>MUTUALLY EXCLUSIVE ELEMENTS:
• It is important that there is no overlap in scope definition between different elements of
awork break down structure
• This ambiguity results in duplicate work or miscommunications about responsibility,cost
accounting etc
=>LEVEL OF DETAIL:
• One must decide when to stop dividing into smaller elements
• This will help to determine the duration of activities
• It helps more accurately and specifically define and organize the scope of the project(Using
hierarchichal tree structure)
• It helps with assigning responsibilities,resource allocation,monitoring the project and
controlling the project
• This also allows for better estimation of cost,risk and time
• Finally it allows to double check the deliverables, specifics with the stake holders and make
sure that nothing missing or overlapping
• Provides full control on project
Communication
Lunch
Meetings
E-mail
Project
Manager
Informal Chats
Phone
Conferences
Web UpdatesFormal
Meetings
• Both are the part of project plan
• Usually WBS is developed first and then the project schedule is developed based
on the WBS as each task in the project schedule is task in WBS
Project scheduling and work break down structure(wbs) 12 cs18
Project scheduling and work break down structure(wbs) 12 cs18
Project scheduling and work break down structure(wbs) 12 cs18

More Related Content

What's hot

Earned value management
Earned value managementEarned value management
Earned value management
Ashif AR
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
sslovepk
 
MS Project Presentation
MS Project PresentationMS Project Presentation
MS Project Presentation
Khem Singh
 

What's hot (20)

8. (lecture 6) Project Cost Control.ppt
8. (lecture 6) Project Cost Control.ppt8. (lecture 6) Project Cost Control.ppt
8. (lecture 6) Project Cost Control.ppt
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures
 
Ignore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own PerilIgnore Project Scope & WBS At Your Own Peril
Ignore Project Scope & WBS At Your Own Peril
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Earned value management
Earned value managementEarned value management
Earned value management
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
MS Project Presentation
MS Project PresentationMS Project Presentation
MS Project Presentation
 
Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationExtension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
 
Self test engine PSP-PMI-SP
Self test engine PSP-PMI-SPSelf test engine PSP-PMI-SP
Self test engine PSP-PMI-SP
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 

Viewers also liked

Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
saurabmi2
 
Foundations Of Control
Foundations Of ControlFoundations Of Control
Foundations Of Control
Rasha Shawoosh
 
Chapter 18 Foundations Of Control
Chapter 18   Foundations Of ControlChapter 18   Foundations Of Control
Chapter 18 Foundations Of Control
management 2
 

Viewers also liked (20)

Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Work breakdown structure by muhammad talha
Work breakdown structure by muhammad talhaWork breakdown structure by muhammad talha
Work breakdown structure by muhammad talha
 
MANAGING RESISTANCE TO CHANGE
MANAGING RESISTANCE TO CHANGEMANAGING RESISTANCE TO CHANGE
MANAGING RESISTANCE TO CHANGE
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
Project scheduling and control techniques
Project scheduling and control techniquesProject scheduling and control techniques
Project scheduling and control techniques
 
Resistance and types of resistance to change
Resistance and types of resistance to changeResistance and types of resistance to change
Resistance and types of resistance to change
 
Controlling in the Management Principles
Controlling in the Management PrinciplesControlling in the Management Principles
Controlling in the Management Principles
 
Principles of Management – Chpt 17 : Controlling
Principles of Management – Chpt 17 : ControllingPrinciples of Management – Chpt 17 : Controlling
Principles of Management – Chpt 17 : Controlling
 
Change Management
Change ManagementChange Management
Change Management
 
Controlling 2 ppt
Controlling 2 pptControlling 2 ppt
Controlling 2 ppt
 
Controlling ppt
Controlling pptControlling ppt
Controlling ppt
 
Change management
Change managementChange management
Change management
 
Project Planning Scheduling
Project Planning SchedulingProject Planning Scheduling
Project Planning Scheduling
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT Slides
 
Work Break Down Structure
Work Break Down StructureWork Break Down Structure
Work Break Down Structure
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structure
 
Foundations Of Control
Foundations Of ControlFoundations Of Control
Foundations Of Control
 
Earned Value Analysis - Basic Concepts
Earned Value Analysis  - Basic ConceptsEarned Value Analysis  - Basic Concepts
Earned Value Analysis - Basic Concepts
 
Chapter 18 Foundations Of Control
Chapter 18   Foundations Of ControlChapter 18   Foundations Of Control
Chapter 18 Foundations Of Control
 
WBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project ManagementWBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project Management
 

Similar to Project scheduling and work break down structure(wbs) 12 cs18

Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdf
deepaksatrker
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure ppt
nazi2020
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project management
tanishkagupta907
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
DipakBorse6
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx
SONU61709
 

Similar to Project scheduling and work break down structure(wbs) 12 cs18 (20)

Babu 143
Babu 143Babu 143
Babu 143
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdf
 
WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptx
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure ppt
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project management
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
 
K.chaitanya pm
K.chaitanya pmK.chaitanya pm
K.chaitanya pm
 
Work breakdown structure
Work breakdown structure Work breakdown structure
Work breakdown structure
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 
Lec 05 wbs & obs 1
Lec 05 wbs & obs 1Lec 05 wbs & obs 1
Lec 05 wbs & obs 1
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
 
How do you apply earned value management successfully
How do you apply earned value management successfullyHow do you apply earned value management successfully
How do you apply earned value management successfully
 
Chapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.pptChapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.ppt
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).ppt
 
Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Project scheduling and work break down structure(wbs) 12 cs18

  • 1.
  • 2.
  • 3. PROJECT SCHEDULING • PROJECT: • An individual or collaborative enterprise that is carefully planned to achieve a particular aim. • Planned set of interrelated tasks to be executed over a fixed period and within certain cost and other limitations.
  • 4. • SCHEDULING: • Scheduling consists of the assignment of starting and completion times for the various operations to be performed.
  • 5. WHY DO WE NEED A PROJECT SCHEDULE? The project schedule represents the tasks with: • start and finish dates of each task • duration of each task • dependencies between tasks (predecessors and successors) • a hierarchy organizing the tasks (using Work Breakdown Structure) • a graphical Gantt Chart showing the date ranges of the tasks as bars over time
  • 6. • Project schedules are not just for complex projects • Even a project with only a few tasks can benefit from the project schedule
  • 7. • WBS is a decomposition of a project into smaller components or tasks • A work breakdown structure (WBS) is a chart in which tasks, of a project are illustrated to portray their relationships to each other and to the project as a whole. • WBS is a key project deliverable that organizes the team work in manageable sections • WBS provides the necessary framework for detail cost estimating and control
  • 8. • As a project has a definite start and end date,WBS defines the start and end date of the projects • Within the project there are phases,WBS makes portions or divides the project into phases • Within each phase WBS provides work Units…work units are chunk of works in a phase..these must be completed before jumping to next phases • WBS Divides work units into smaller tasks • A task must be divided even it became a atomic task • WBS divides a project in different levels
  • 10. • There is no right or wrong way to create a WBS. • WBS can be drawn on a white Board, Sketch on page using a pencil or being technical and using a software like Microsoft Project,excel,Visio or powerpoint……………….
  • 11. =>100% RULE: • 100 % Rule states that the WBS incudes 100% of the work identified by the project scope and all deliverables..
  • 12. =>MUTUALLY EXCLUSIVE ELEMENTS: • It is important that there is no overlap in scope definition between different elements of awork break down structure • This ambiguity results in duplicate work or miscommunications about responsibility,cost accounting etc
  • 13. =>LEVEL OF DETAIL: • One must decide when to stop dividing into smaller elements • This will help to determine the duration of activities
  • 14. • It helps more accurately and specifically define and organize the scope of the project(Using hierarchichal tree structure) • It helps with assigning responsibilities,resource allocation,monitoring the project and controlling the project • This also allows for better estimation of cost,risk and time • Finally it allows to double check the deliverables, specifics with the stake holders and make sure that nothing missing or overlapping • Provides full control on project
  • 16.
  • 17.
  • 18. • Both are the part of project plan • Usually WBS is developed first and then the project schedule is developed based on the WBS as each task in the project schedule is task in WBS