Conservation and
Demand Management,
Commercial & Retail
Optional Presentation Title / Footer 2
CDM Program Tiers 2011-2014
Tier 1
Province-wide
programs developed
by OPA/EDA working
groups
Tier 2
Programs developed
by groups of LDCs to
address specific
market segments
Tier 3
Programs specific to
the LDC and will serve
their unique
situations
• Province wide
• Similar to ERIP
• Prescriptive
• Regional applicability
• Engineered / Custom
Program
• Cannot duplicate
“Tier 1” Programs
• Local applicability
• Engineered / Custom
Program
• Cannot duplicate
“Tier 1” Programs
Optional Presentation Title / Footer 3
OPA Province-Wide CDM Programs
Commercial Institutional Multi-Family Agricultural
Industrial
Low Income
Consumer
Commercial
Institutional
Optional Presentation Title / Footer 4
Commercial & Institutional Program
Building Types
Commercia
l
• Offices
• Retail Stores, Grocery Stores
• Restaurants
• Hotels/Motels
• Warehouses
Institutional
• Health Care
• Universities, Colleges, and Schools
Optional Presentation Title / Footer 5
Incentive Summary – Small Business
• Direct Install Lighting
• Direct Install Space Cooling
• Energy Efficient Equipment
Replacement
• Small Commercial Demand
Response
Small Business (Existing)
(GS < 50 kW)
• Similar to Power Savings Blitz
• $1,000 Limit
• Extra prescriptive incentives beyond $1000 limit
• Still eligible for other incentives
• Similar to Power Savings Blitz
• $750 Limit
• Systems less than 25 tonnes
• Without an existing service agreement, and one
year without service
• Prescriptive list of equipment and benefits
• Participants receive load control devices (at no
charge) with access to real time consumption and
price information
•On-premises or online access
Optional Presentation Title / Footer 6
Incentive Summary – Larger Business
• Pre-Project Assessment
• Energy Efficient Equipment
Replacement
• Building Commissioning
• Demand Response 1 or 3
• Capability Building
Medium & Large Business (Existing)
• $0.05/ft2, <50,000 ft2 , up to 50% or $25,000
• $0.10/ft2 , >50,000 ft2 , up to 50% or $35,000
• Prescriptive list of equipment and benefits
• Custom or Engineered approach:
• $400/kW or $0.05/kWh (lighting)
• $800/kW or $0.10/kWh (non-lighting)
• Scoping Study $2,500
•Investigation - Max $50,000
•Implementation- $800/kW; 2-year payback threshold
•Commissioning - Max $2,500
•DR1 is a voluntary program
•DR3 is a contractual commitment
•Funding for availability and utilization
•Education, Training & Certification
Optional Presentation Title / Footer 7
Incentive Summary – New Construction
• Building Modeling
• Prescriptive Incentives
• Custom Incentives
Business (New)
• Maximum $10,000
• Additional incentives for design team
• Prescriptive list of equipment and benefits based
on $250/kW rate
• Custom approach will depend on level of savings
to a maximum of 50% of project cost, and minimum
incentive of $5,000:
•$250/kW – 25% above code
•$300/kW – 26-50% above code
•$400/kW – 50%+ above code
Optional Presentation Title / Footer 8
How to Participate in the Programs
• Apply directly to OPA (iCon) via website (paper based applications also available)
• Applications will be forwarded to the appropriate LDC based on postal code
• iCon serves as central information hub for applications, information, approvals,
updates, invoices, incentive claims, etc for both customers and LDC’s
• iCon will provide information to both LDC and customer on real time basis
• Customers can assign a representative (i.e. energy auditor)
• Direct install - LDCs will work with qualified contractors to deliver the initiative
within their service territories. These contractors may operate door to door or
through targeted marketing efforts. Customers also have the option of self
selection.
Optional Presentation Title / Footer 9
Channel Alignment/Partnership
Toronto
Hydro
City of
Toronto
BOMA
Demand
Response
Enbridge
ESCO’s
3rd
Parties
LDCs Are
Responsible For
CDM Delivery
Optional Presentation Title / Footer 10
Potential Tier 2 & 3 CDM Programs
• Multi Residential & Small Commercial peaksaver – DR1
• Monitoring and Targeting for C&I Facilities
• Thermal Storage – Heating, Cooling / DHW, HVAC
• Ground Source Heat Pumps
• Rooftop Ecosaver
• Data Centre Incentive Program
• Compressed Air
• Others under review
Optional Presentation Title / Footer 11
Key Changes to CDM
INITIATIVE ENHANCEMENTS FOR 2011 - 2014
Existing Building Retrofits & New
Construction
 Pre-Project assessments
 Engineered approach for equipment replacement
 Commissioning activities for existing buildings > 50,000 ft2
 Capability building initiatives
 No retroactivity
Direct Installed Lighting  Carry-forward of Power Saving Blitz, but with additional prescriptive
incentives beyond the $1000 limit
Direct Installed Cooling  New
Demand Response  New offerings for small Commercial customers starting July 2011
 DR1 for Medium & Large Customers
Thank you.

More Related Content

Viewers also liked

Lessons to learn from fast food employees
Lessons to learn from fast food employeesLessons to learn from fast food employees
Lessons to learn from fast food employeesAAyuja, Inc.
 
Ervaringe van n padlokomotief
Ervaringe van n padlokomotiefErvaringe van n padlokomotief
Ervaringe van n padlokomotiefchungarisk
 
Fire Resisting Glass and its Use in Architectural Design: David Cooper, IFC G...
Fire Resisting Glass and itsUse in Architectural Design: David Cooper, IFC G...Fire Resisting Glass and itsUse in Architectural Design: David Cooper, IFC G...
Fire Resisting Glass and its Use in Architectural Design: David Cooper, IFC G...Su Butcher
 
PostgreSQL HA
PostgreSQL   HAPostgreSQL   HA
PostgreSQL HAharoonm
 
Interplay of Big Data and IoT - StampedeCon 2016
Interplay of Big Data and IoT - StampedeCon 2016Interplay of Big Data and IoT - StampedeCon 2016
Interplay of Big Data and IoT - StampedeCon 2016StampedeCon
 

Viewers also liked (7)

CLD Gas Presentation
CLD Gas PresentationCLD Gas Presentation
CLD Gas Presentation
 
Lessons to learn from fast food employees
Lessons to learn from fast food employeesLessons to learn from fast food employees
Lessons to learn from fast food employees
 
Ervaringe van n padlokomotief
Ervaringe van n padlokomotiefErvaringe van n padlokomotief
Ervaringe van n padlokomotief
 
Fire Resisting Glass and its Use in Architectural Design: David Cooper, IFC G...
Fire Resisting Glass and itsUse in Architectural Design: David Cooper, IFC G...Fire Resisting Glass and itsUse in Architectural Design: David Cooper, IFC G...
Fire Resisting Glass and its Use in Architectural Design: David Cooper, IFC G...
 
PostgreSQL HA
PostgreSQL   HAPostgreSQL   HA
PostgreSQL HA
 
Interplay of Big Data and IoT - StampedeCon 2016
Interplay of Big Data and IoT - StampedeCon 2016Interplay of Big Data and IoT - StampedeCon 2016
Interplay of Big Data and IoT - StampedeCon 2016
 
Glass
GlassGlass
Glass
 

Similar to Commercial & Institutional CDM Program Overview

13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE FundingTim Rushenberg
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.LongBun1
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityDiana Nash
 
Funding Energy Efficiency With Rebates &amp; Incentives Kim
Funding Energy Efficiency With Rebates &amp; Incentives KimFunding Energy Efficiency With Rebates &amp; Incentives Kim
Funding Energy Efficiency With Rebates &amp; Incentives Kimkimcollins01
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentCenter for Energy and Environment
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designSustainableEnergyAut
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptxSayeedHvac
 
Existing Buildings: Energy Efficiency
Existing Buildings: Energy EfficiencyExisting Buildings: Energy Efficiency
Existing Buildings: Energy Efficiencyjwalleisa
 
Energy Into Action – Industrial
Energy Into Action – IndustrialEnergy Into Action – Industrial
Energy Into Action – IndustrialEnergyIntoAction
 
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...lacclimatebusinessforum
 
Top 10 Utility Incentive Programs
Top 10 Utility Incentive ProgramsTop 10 Utility Incentive Programs
Top 10 Utility Incentive Programsenernoc_marketing
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay ScalingWRONG PERSON
 
C&I Direct Program Presenation
C&I Direct Program PresenationC&I Direct Program Presenation
C&I Direct Program Presenationconed
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processShanti Pless
 

Similar to Commercial & Institutional CDM Program Overview (20)

13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding
 
Panel 2: Utility Presentation
Panel 2: Utility PresentationPanel 2: Utility Presentation
Panel 2: Utility Presentation
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico City
 
Funding Energy Efficiency With Rebates &amp; Incentives Kim
Funding Energy Efficiency With Rebates &amp; Incentives KimFunding Energy Efficiency With Rebates &amp; Incentives Kim
Funding Energy Efficiency With Rebates &amp; Incentives Kim
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 
Big Savings for Clean Generation Part III
Big Savings for Clean Generation Part IIIBig Savings for Clean Generation Part III
Big Savings for Clean Generation Part III
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
 
Existing Buildings: Energy Efficiency
Existing Buildings: Energy EfficiencyExisting Buildings: Energy Efficiency
Existing Buildings: Energy Efficiency
 
Energy Into Action – Industrial
Energy Into Action – IndustrialEnergy Into Action – Industrial
Energy Into Action – Industrial
 
Mike Twedt on Green Energy Engineering
Mike Twedt on Green Energy EngineeringMike Twedt on Green Energy Engineering
Mike Twedt on Green Energy Engineering
 
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
Top 10 Utility Incentive Programs
Top 10 Utility Incentive ProgramsTop 10 Utility Incentive Programs
Top 10 Utility Incentive Programs
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay Scaling
 
C&I Direct Program Presenation
C&I Direct Program PresenationC&I Direct Program Presenation
C&I Direct Program Presenation
 
Micro Demand Response and Energy Saving - Task 19
Micro Demand Response and Energy Saving - Task 19 Micro Demand Response and Energy Saving - Task 19
Micro Demand Response and Energy Saving - Task 19
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
 

More from EnergyIntoAction

Cld gas presentation november 4 2010
Cld gas presentation november 4 2010Cld gas presentation november 4 2010
Cld gas presentation november 4 2010EnergyIntoAction
 
Energy Into Action Keynote: Tom Rand
Energy Into Action Keynote: Tom RandEnergy Into Action Keynote: Tom Rand
Energy Into Action Keynote: Tom RandEnergyIntoAction
 
Energy Into Action – Commercial Institutional (Enbridge Gas)
Energy Into Action  – Commercial Institutional (Enbridge Gas)Energy Into Action  – Commercial Institutional (Enbridge Gas)
Energy Into Action – Commercial Institutional (Enbridge Gas)EnergyIntoAction
 
Energy Into Action: Multi-Residential
Energy Into Action: Multi-ResidentialEnergy Into Action: Multi-Residential
Energy Into Action: Multi-ResidentialEnergyIntoAction
 
Energy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout SessionEnergy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout SessionEnergyIntoAction
 
Energy Into Action: Chris Tyrrell
Energy Into Action: Chris TyrrellEnergy Into Action: Chris Tyrrell
Energy Into Action: Chris TyrrellEnergyIntoAction
 
Energy Into Action: Bryan Leslie
Energy Into Action: Bryan LeslieEnergy Into Action: Bryan Leslie
Energy Into Action: Bryan LeslieEnergyIntoAction
 

More from EnergyIntoAction (8)

CLD Gas Presentation
CLD Gas PresentationCLD Gas Presentation
CLD Gas Presentation
 
Cld gas presentation november 4 2010
Cld gas presentation november 4 2010Cld gas presentation november 4 2010
Cld gas presentation november 4 2010
 
Energy Into Action Keynote: Tom Rand
Energy Into Action Keynote: Tom RandEnergy Into Action Keynote: Tom Rand
Energy Into Action Keynote: Tom Rand
 
Energy Into Action – Commercial Institutional (Enbridge Gas)
Energy Into Action  – Commercial Institutional (Enbridge Gas)Energy Into Action  – Commercial Institutional (Enbridge Gas)
Energy Into Action – Commercial Institutional (Enbridge Gas)
 
Energy Into Action: Multi-Residential
Energy Into Action: Multi-ResidentialEnergy Into Action: Multi-Residential
Energy Into Action: Multi-Residential
 
Energy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout SessionEnergy Into Action: Multi-Residential Breakout Session
Energy Into Action: Multi-Residential Breakout Session
 
Energy Into Action: Chris Tyrrell
Energy Into Action: Chris TyrrellEnergy Into Action: Chris Tyrrell
Energy Into Action: Chris Tyrrell
 
Energy Into Action: Bryan Leslie
Energy Into Action: Bryan LeslieEnergy Into Action: Bryan Leslie
Energy Into Action: Bryan Leslie
 

Recently uploaded

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 

Recently uploaded (20)

20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 

Commercial & Institutional CDM Program Overview

  • 1. Optional Presentation Title / Footer 1 Conservation and Demand Management, Commercial & Retail
  • 2. Optional Presentation Title / Footer 2 CDM Program Tiers 2011-2014 Tier 1 Province-wide programs developed by OPA/EDA working groups Tier 2 Programs developed by groups of LDCs to address specific market segments Tier 3 Programs specific to the LDC and will serve their unique situations • Province wide • Similar to ERIP • Prescriptive • Regional applicability • Engineered / Custom Program • Cannot duplicate “Tier 1” Programs • Local applicability • Engineered / Custom Program • Cannot duplicate “Tier 1” Programs
  • 3. Optional Presentation Title / Footer 3 OPA Province-Wide CDM Programs Commercial Institutional Multi-Family Agricultural Industrial Low Income Consumer Commercial Institutional
  • 4. Optional Presentation Title / Footer 4 Commercial & Institutional Program Building Types Commercia l • Offices • Retail Stores, Grocery Stores • Restaurants • Hotels/Motels • Warehouses Institutional • Health Care • Universities, Colleges, and Schools
  • 5. Optional Presentation Title / Footer 5 Incentive Summary – Small Business • Direct Install Lighting • Direct Install Space Cooling • Energy Efficient Equipment Replacement • Small Commercial Demand Response Small Business (Existing) (GS < 50 kW) • Similar to Power Savings Blitz • $1,000 Limit • Extra prescriptive incentives beyond $1000 limit • Still eligible for other incentives • Similar to Power Savings Blitz • $750 Limit • Systems less than 25 tonnes • Without an existing service agreement, and one year without service • Prescriptive list of equipment and benefits • Participants receive load control devices (at no charge) with access to real time consumption and price information •On-premises or online access
  • 6. Optional Presentation Title / Footer 6 Incentive Summary – Larger Business • Pre-Project Assessment • Energy Efficient Equipment Replacement • Building Commissioning • Demand Response 1 or 3 • Capability Building Medium & Large Business (Existing) • $0.05/ft2, <50,000 ft2 , up to 50% or $25,000 • $0.10/ft2 , >50,000 ft2 , up to 50% or $35,000 • Prescriptive list of equipment and benefits • Custom or Engineered approach: • $400/kW or $0.05/kWh (lighting) • $800/kW or $0.10/kWh (non-lighting) • Scoping Study $2,500 •Investigation - Max $50,000 •Implementation- $800/kW; 2-year payback threshold •Commissioning - Max $2,500 •DR1 is a voluntary program •DR3 is a contractual commitment •Funding for availability and utilization •Education, Training & Certification
  • 7. Optional Presentation Title / Footer 7 Incentive Summary – New Construction • Building Modeling • Prescriptive Incentives • Custom Incentives Business (New) • Maximum $10,000 • Additional incentives for design team • Prescriptive list of equipment and benefits based on $250/kW rate • Custom approach will depend on level of savings to a maximum of 50% of project cost, and minimum incentive of $5,000: •$250/kW – 25% above code •$300/kW – 26-50% above code •$400/kW – 50%+ above code
  • 8. Optional Presentation Title / Footer 8 How to Participate in the Programs • Apply directly to OPA (iCon) via website (paper based applications also available) • Applications will be forwarded to the appropriate LDC based on postal code • iCon serves as central information hub for applications, information, approvals, updates, invoices, incentive claims, etc for both customers and LDC’s • iCon will provide information to both LDC and customer on real time basis • Customers can assign a representative (i.e. energy auditor) • Direct install - LDCs will work with qualified contractors to deliver the initiative within their service territories. These contractors may operate door to door or through targeted marketing efforts. Customers also have the option of self selection.
  • 9. Optional Presentation Title / Footer 9 Channel Alignment/Partnership Toronto Hydro City of Toronto BOMA Demand Response Enbridge ESCO’s 3rd Parties LDCs Are Responsible For CDM Delivery
  • 10. Optional Presentation Title / Footer 10 Potential Tier 2 & 3 CDM Programs • Multi Residential & Small Commercial peaksaver – DR1 • Monitoring and Targeting for C&I Facilities • Thermal Storage – Heating, Cooling / DHW, HVAC • Ground Source Heat Pumps • Rooftop Ecosaver • Data Centre Incentive Program • Compressed Air • Others under review
  • 11. Optional Presentation Title / Footer 11 Key Changes to CDM INITIATIVE ENHANCEMENTS FOR 2011 - 2014 Existing Building Retrofits & New Construction  Pre-Project assessments  Engineered approach for equipment replacement  Commissioning activities for existing buildings > 50,000 ft2  Capability building initiatives  No retroactivity Direct Installed Lighting  Carry-forward of Power Saving Blitz, but with additional prescriptive incentives beyond the $1000 limit Direct Installed Cooling  New Demand Response  New offerings for small Commercial customers starting July 2011  DR1 for Medium & Large Customers

Editor's Notes

  1. The 2011-2014 CDM programs deployed in Ontario under the GEA mandate are classified into 3 categories or tiers to reflect scope and applicability of specific energy efficiency measures. Tier 1 programs are automatically built into the 2011 CDM programs Tier 2 and Tier 3 can be defined over time, subject to OEB approval, though it is in our interest to establish them as quickly as possibble to begin contributing towards our target.
  2. CDM targets are exclusively the responsibility of the LDCs. Where does that leave BOMA and the City? Our intent is to work with BOMA and the City of Toronto as our Channel Partners in delivering CDM programs on Toronto Hydro’s behalf within their particular sectors: City = M.A.S.H BOMA = Commercial and Large Retail We are currently working on an agreement to formalize the arrangement. This approach makes sense: recognizes and leverages the expertise and strengths of stakeholders within each of their sectors.
  3. can’t say much more because they have not been formally submitted or approved yet. In fact, if you have good ideas, let me know.
  4. Alternative Applications: Thermostatic Setback Control Web-based Thermostats Demand Control Ventilation Disabling Perimeter Heating Re-commissioning Efficient Signage Efficient Accent Lighting