MANUFACTURING FACILITY PLANNING
By: Endashaw Yohannes
Kombolcha/Ethiopia
Nov, 2019
1/29/2020 1
Course Objectives
โ€ข The objectives of the course are
โ€ข To understand the importance of facility design in general and
manufacturing unit in particular.
โ€ข To analyze the basic principles of effective plant layout and design as
these apply to the apparel industry.
โ€ข To develop understanding of building typology and indoor environment
โ€ข To draw upon specialized knowledge from a number of disciplines
including engineering, architecture, business management, and
economics, as these relate to plant engineering.
โ€ข To learn the planning of layout using simulation exercises in classroom.
โ€ข To understand principles of material system and equipments
2
CHAPTER ONE: OUTLINE
o Introduction to Facility Planning
o why facility planning is important?
o Objectives of Facility Planning
o Classification of Facility Planning
o Facility planning process steps
3
1. Introduction to facility planning
What is Facility ?
โ€ข A facility is an entity(object) that facilitates
the performance of any job.
โ€ข Example Machine, tool, work center,
manufacturing cell, warehouse, land, buildings,
equipment, furnishings and etc.
4
What is Facility Planning?
Facility Planning determines how an activityโ€™s tangible fixed assets
best support in achieving the activityโ€™s objectives.
Examples:
a. In manufacturing, the objective is to support production.
(manufacturing facility Planning)
b. In an airport, the objective is to support the passenger airplane
interface.
c. In a hospital, the objective is to provide medical care to
patients.
5
Facility plan
6
Hierarchy of Facility Planning
Facility
Planning
Structural
Design
Facility
Location
Facility
Design
Layout
Design
Handling System
Design
7
1. Facility location : is the placement of a facility
with respect to customers, suppliers,
and other facilities with which it
interfaces.
2. Structure Design: consists of the building
and services (e.g., gas, water system,
lighting system, air conditioning system,,
sewage system, safety system, etc. )
8
3. Layout Design: consists of all equipment,
machinery, and furnishings within the
structure.
4. Handling System Design: consists of the
mechanism by which all interactions
required by the layout are satisfied
(e.g., materials, personnel, information,
and equipment handling systems).
9
Plant lay out
10
Why is Facility planning important?
1) Facility planning must be a continuing activity to be
competitive and keep developments in its field.
โ€ข Economic considerations of existing systems,
personnel and equipment
โ€ข New machines and processes
โ€ข Rapid changes in production techniques in the
present and future
11
2) Facility planning can increase plant productivity and
reduce costs by reducing or eliminating all activities
that are unnecessary and wasteful.
3) By incorporating vital health and safety measures
the employer may avoid unsafe conditions and losses
in both money and manpower resulting from industrial
accidents.
12
Why is Facility planning important?
Cont..
4) Energy conservation incorporating new methods of
energy to reduce the cost of energy
5) Other factors that requires investment in new facilities
Example
โ€ข Fire protection ,Security, Disability act
โ€ข Community rules and regulations regarding noise ,air
pollution, liquid and solid waste disposal.
6) Pilferage- stealing merchandise from manufacturing
companies etcโ€ฆ
13
Why is Facility planning important?
Cont..
2. Objectives of Facility planning
o Minimize capital investment & increase productivity
o Improve customer satisfaction
o Effectively utilize people, equipment ,Space and energy
o Improved material handling, material control and good
house keeping.
o Promote flexibility & increase speed to customer
response (shorten lead time)
o Provide for employee safety and job satisfaction
o Improve productivity and reduce costs
14
3. Classification of Facility Planning
โ€ข It is important to organize and classify facility planning
into manageable sub-projects based on their Levels of
Detail.
โ€ข Each sub-project has a series of tasks that the design
team must complete.
โ€ข The tasks and their sequence differ for each level
15
Facility planning levels of details
I. Global (Site Location)
This involves factors such as freight cost, labor cost, skill
availability and site focus.
II. Supra (Site Planning)
This includes number, size, and location of buildings. It includes
infrastructure such as roads, water, gas and rail.
III. Macro (Building Layout)
Operating departments are defined and located at this level.
Frequently, this is the most important level of planning. A Macro-
Layout institutionalizes the fundamental organizational structure
in steel and apparel industry.
16
Facility planning levels of details cont..
IV. Micro (Work cell/Department
Layout)
determines the location of specific equipment and
furniture
V. Sub-Micro (Workstation Design)
focuses on individual workers. Here we design
workstations for efficiency, effectiveness and
safety. Ergonomics is key.
17
18
4. Facility planning process steps
1) Define or redefine the objective of the facility
2) Specify the primary and support activities to be performed in
accomplishing the objective
3) Determine the interrelationships among all activities
4) Determine the space requirement for all activities
5) Generate alternative facility plans
6) Evaluate alternative facility plans
7) Select a facilities plan
8) Implement the facilities plan
9) Maintain and adapt the facility plans
10) Redefine the objective of the facilities
19
1) Define or redefine the objective of the facility
โ€ข May be planning for new facility or improvement of
existing facility.
โ€ข Products to be produced or services to be provided
must be specified quantitatively
โ€ข Volumes or levels of activities are to be identified
when possible.
20
2) Specify the primary and support activities to be
performed in accomplishing the objective
โ€ข Primary and support activities to be performed and
should be specified in terms of operations ,equipment
,personnel and material flow involved.
โ€ข Support activities allow primary operations to
function properly with out interruptions.
e.g Maintenance function is a support activity for
manufacturing.
21
3) Determine the interrelationships among all activities
โ€ข Define both quantitatively and qualitatively how
activities interact and support one another with in the
boundaries of the facility.
4) Determine the space requirement for all activities
โ€ข All equipment , material, and personnel requirements
must be considered while considering space
requirements for each activity.
22
5) Generate alternative facility plans
โ€ข Alternative facility plans will include both alternative
facility locations and alternative facility designs.
โ€ข Alternative facility designs will include alternative
layout design, structural designs and material handling
system designs.
โ€ข Depending on the situation the facility location decision
and facility designs may be decoupled
23
6) Evaluate alternative facility plans
โ€ข Determine the factors, set an accepted criteria and
rank the plans.
7) Select a facility plans
โ€ข Select the most acceptable in satisfying the goals and
objectives of the organizations.
โ€ข Most often cost is not the only major considerations
when evaluating a facility plans.
โ€ข Use the information generated in step 6.
24
8) Implement the facility plans
โ€ข After selection, considerable amount of planning must
precede before the actual construction of the facility.
โ€ข Supervising installation of layout, getting ready to
start up, actual starting up, running and correction
activities are all part of implantation phase of facility
planning.
25
9) Maintain and adapt facilities plans.
โ€ข When new requirements are placed on the facility, the
facility plan must be modified accordingly.
โ€ข Changes in product design, new machines ,material
handling equipments or flow patterns require an
updated facility plan.
10) Redefine the objective of the facility
โ€ข In case of potential modifications ,expansion and so on
for existing facilities, all recognized changes must be
considered and the objective of the facility should be
redefined in quantifiable terms 26
Brainstorming
โ€ข Think about your role as a facility
planner and what kind of
improvements would you like to
suggest for garment industries.
27
1/29/2020 28

More Related Content

What's hot

Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01Victor Molina
ย 
Location Planning and Analysis
Location Planning and AnalysisLocation Planning and Analysis
Location Planning and AnalysisIza Marie
ย 
Production and operation management
Production and operation management Production and operation management
Production and operation management venkateswararao meesala
ย 
Chapter 2 Plant Location
Chapter 2 Plant LocationChapter 2 Plant Location
Chapter 2 Plant Locationmustafizulhilmie
ย 
location planning and analysis
location planning and analysislocation planning and analysis
location planning and analysisjanyne aguilar
ย 
Facility layout
Facility  layoutFacility  layout
Facility layoutNIPER hyderabad
ย 
2. scope of operations management
2.  scope of operations management2.  scope of operations management
2. scope of operations managementAkash Bakshi
ย 
Production Management
Production ManagementProduction Management
Production ManagementHiten Patel
ย 
Process Selection And Facility Layout
Process Selection And Facility LayoutProcess Selection And Facility Layout
Process Selection And Facility LayoutSachiniGunawardana
ย 
layout planning
layout planninglayout planning
layout planningRadhika Itkan
ย 
Module 1- Basics of Costing.ppt
Module 1- Basics of Costing.pptModule 1- Basics of Costing.ppt
Module 1- Basics of Costing.pptMahesh Bendigeri
ย 
Facility Location Planning
Facility Location PlanningFacility Location Planning
Facility Location PlanningNishant Agrawal
ย 
Plant layout
Plant layoutPlant layout
Plant layoutPARIN SINGLA
ย 
Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)Mohamed Effat
ย 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementHarold B. Duran, LCB
ย 
Plant Location
Plant  LocationPlant  Location
Plant LocationBob Bin
ย 
job shop production system in productions and operations system
job shop production system in productions and operations systemjob shop production system in productions and operations system
job shop production system in productions and operations systemar9530
ย 
production planning and control
production planning and controlproduction planning and control
production planning and controlParitosh Kasaudhan
ย 

What's hot (20)

Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01
ย 
Location Planning and Analysis
Location Planning and AnalysisLocation Planning and Analysis
Location Planning and Analysis
ย 
Location Planning
Location PlanningLocation Planning
Location Planning
ย 
Production and operation management
Production and operation management Production and operation management
Production and operation management
ย 
Chapter 2 Plant Location
Chapter 2 Plant LocationChapter 2 Plant Location
Chapter 2 Plant Location
ย 
location planning and analysis
location planning and analysislocation planning and analysis
location planning and analysis
ย 
Facility layout
Facility  layoutFacility  layout
Facility layout
ย 
2. scope of operations management
2.  scope of operations management2.  scope of operations management
2. scope of operations management
ย 
Production Management
Production ManagementProduction Management
Production Management
ย 
Process Selection And Facility Layout
Process Selection And Facility LayoutProcess Selection And Facility Layout
Process Selection And Facility Layout
ย 
layout planning
layout planninglayout planning
layout planning
ย 
Module 1- Basics of Costing.ppt
Module 1- Basics of Costing.pptModule 1- Basics of Costing.ppt
Module 1- Basics of Costing.ppt
ย 
Facility Location Planning
Facility Location PlanningFacility Location Planning
Facility Location Planning
ย 
Purchasing
PurchasingPurchasing
Purchasing
ย 
Plant layout
Plant layoutPlant layout
Plant layout
ย 
Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)Supply chain operations (Making and Delivering)
Supply chain operations (Making and Delivering)
ย 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
ย 
Plant Location
Plant  LocationPlant  Location
Plant Location
ย 
job shop production system in productions and operations system
job shop production system in productions and operations systemjob shop production system in productions and operations system
job shop production system in productions and operations system
ย 
production planning and control
production planning and controlproduction planning and control
production planning and control
ย 

Similar to FACILITY PLANNING

Textile plant design.pptx
Textile plant design.pptxTextile plant design.pptx
Textile plant design.pptxBewuket Teshome
ย 
Designing and Redesigning business process: Plant Location
Designing and Redesigning business process: Plant LocationDesigning and Redesigning business process: Plant Location
Designing and Redesigning business process: Plant LocationMOHD AMAAN HASAN
ย 
Chapter5 technicalanalysis
Chapter5 technicalanalysisChapter5 technicalanalysis
Chapter5 technicalanalysisAKSHAYA0000
ย 
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and OperationsAchal Gupta
ย 
Chapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxChapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxAlwanYusuf
ย 
Introduction to Industrial Engineering.pptx
Introduction to Industrial Engineering.pptxIntroduction to Industrial Engineering.pptx
Introduction to Industrial Engineering.pptxJanak Suthar
ย 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxBekithemba2
ย 
Final -jan-apr_2013
Final  -jan-apr_2013Final  -jan-apr_2013
Final -jan-apr_2013Sporsho
ย 
Techno delacruz report
Techno delacruz reportTechno delacruz report
Techno delacruz reportArvin Dela Cruz
ย 
IARE_PLMH_PPT.pdf
IARE_PLMH_PPT.pdfIARE_PLMH_PPT.pdf
IARE_PLMH_PPT.pdfJay Parmar
ย 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304kriti201
ย 
Job Layout
Job LayoutJob Layout
Job LayoutBahzad5
ย 
FP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdfFP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdfamrahmed683029
ย 
A Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningA Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningIRJET Journal
ย 
Lecture 1 and 2
Lecture 1 and 2Lecture 1 and 2
Lecture 1 and 2Serajul Haque
ย 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
ย 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
ย 

Similar to FACILITY PLANNING (20)

Textile plant design.pptx
Textile plant design.pptxTextile plant design.pptx
Textile plant design.pptx
ย 
Designing and Redesigning business process: Plant Location
Designing and Redesigning business process: Plant LocationDesigning and Redesigning business process: Plant Location
Designing and Redesigning business process: Plant Location
ย 
Plant layout
Plant layoutPlant layout
Plant layout
ย 
Chapter5 technicalanalysis
Chapter5 technicalanalysisChapter5 technicalanalysis
Chapter5 technicalanalysis
ย 
Plant location and layout in any industry
Plant location and layout in any industryPlant location and layout in any industry
Plant location and layout in any industry
ย 
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and Operations
ย 
Chapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxChapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptx
ย 
Introduction to Industrial Engineering.pptx
Introduction to Industrial Engineering.pptxIntroduction to Industrial Engineering.pptx
Introduction to Industrial Engineering.pptx
ย 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptx
ย 
Sample ppt facility location and layout
Sample ppt facility location and layoutSample ppt facility location and layout
Sample ppt facility location and layout
ย 
Final -jan-apr_2013
Final  -jan-apr_2013Final  -jan-apr_2013
Final -jan-apr_2013
ย 
Techno delacruz report
Techno delacruz reportTechno delacruz report
Techno delacruz report
ย 
IARE_PLMH_PPT.pdf
IARE_PLMH_PPT.pdfIARE_PLMH_PPT.pdf
IARE_PLMH_PPT.pdf
ย 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304
ย 
Job Layout
Job LayoutJob Layout
Job Layout
ย 
FP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdfFP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdf
ย 
A Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningA Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout Planning
ย 
Lecture 1 and 2
Lecture 1 and 2Lecture 1 and 2
Lecture 1 and 2
ย 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
ย 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
ย 

More from Endashaw Yohannes Hailu

More from Endashaw Yohannes Hailu (10)

PLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUTPLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUT
ย 
PLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODELPLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODEL
ย 
PLANT LOCATION
PLANT LOCATIONPLANT LOCATION
PLANT LOCATION
ย 
PLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTSPLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTS
ย 
LEAN SYSTEM JIDOKA
LEAN SYSTEM JIDOKALEAN SYSTEM JIDOKA
LEAN SYSTEM JIDOKA
ย 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
ย 
JUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEMJUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEM
ย 
LEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERINGLEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERING
ย 
LEAN STABILITY
LEAN STABILITYLEAN STABILITY
LEAN STABILITY
ย 
BIRTH OF LEAN SYSTEM
BIRTH OF LEAN SYSTEMBIRTH OF LEAN SYSTEM
BIRTH OF LEAN SYSTEM
ย 

Recently uploaded

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Call Girls in Nagpur High Profile
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoordharasingh5698
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsArindam Chakraborty, Ph.D., P.E. (CA, TX)
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
ย 

Recently uploaded (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 

FACILITY PLANNING

  • 1. KIOT Plant Layout and Facility Design Course code: Greg 4181 Target group: 4th year GED Chapter one MANUFACTURING FACILITY PLANNING By: Endashaw Yohannes Kombolcha/Ethiopia Nov, 2019 1/29/2020 1
  • 2. Course Objectives โ€ข The objectives of the course are โ€ข To understand the importance of facility design in general and manufacturing unit in particular. โ€ข To analyze the basic principles of effective plant layout and design as these apply to the apparel industry. โ€ข To develop understanding of building typology and indoor environment โ€ข To draw upon specialized knowledge from a number of disciplines including engineering, architecture, business management, and economics, as these relate to plant engineering. โ€ข To learn the planning of layout using simulation exercises in classroom. โ€ข To understand principles of material system and equipments 2
  • 3. CHAPTER ONE: OUTLINE o Introduction to Facility Planning o why facility planning is important? o Objectives of Facility Planning o Classification of Facility Planning o Facility planning process steps 3
  • 4. 1. Introduction to facility planning What is Facility ? โ€ข A facility is an entity(object) that facilitates the performance of any job. โ€ข Example Machine, tool, work center, manufacturing cell, warehouse, land, buildings, equipment, furnishings and etc. 4
  • 5. What is Facility Planning? Facility Planning determines how an activityโ€™s tangible fixed assets best support in achieving the activityโ€™s objectives. Examples: a. In manufacturing, the objective is to support production. (manufacturing facility Planning) b. In an airport, the objective is to support the passenger airplane interface. c. In a hospital, the objective is to provide medical care to patients. 5
  • 7. Hierarchy of Facility Planning Facility Planning Structural Design Facility Location Facility Design Layout Design Handling System Design 7
  • 8. 1. Facility location : is the placement of a facility with respect to customers, suppliers, and other facilities with which it interfaces. 2. Structure Design: consists of the building and services (e.g., gas, water system, lighting system, air conditioning system,, sewage system, safety system, etc. ) 8
  • 9. 3. Layout Design: consists of all equipment, machinery, and furnishings within the structure. 4. Handling System Design: consists of the mechanism by which all interactions required by the layout are satisfied (e.g., materials, personnel, information, and equipment handling systems). 9
  • 11. Why is Facility planning important? 1) Facility planning must be a continuing activity to be competitive and keep developments in its field. โ€ข Economic considerations of existing systems, personnel and equipment โ€ข New machines and processes โ€ข Rapid changes in production techniques in the present and future 11
  • 12. 2) Facility planning can increase plant productivity and reduce costs by reducing or eliminating all activities that are unnecessary and wasteful. 3) By incorporating vital health and safety measures the employer may avoid unsafe conditions and losses in both money and manpower resulting from industrial accidents. 12 Why is Facility planning important? Cont..
  • 13. 4) Energy conservation incorporating new methods of energy to reduce the cost of energy 5) Other factors that requires investment in new facilities Example โ€ข Fire protection ,Security, Disability act โ€ข Community rules and regulations regarding noise ,air pollution, liquid and solid waste disposal. 6) Pilferage- stealing merchandise from manufacturing companies etcโ€ฆ 13 Why is Facility planning important? Cont..
  • 14. 2. Objectives of Facility planning o Minimize capital investment & increase productivity o Improve customer satisfaction o Effectively utilize people, equipment ,Space and energy o Improved material handling, material control and good house keeping. o Promote flexibility & increase speed to customer response (shorten lead time) o Provide for employee safety and job satisfaction o Improve productivity and reduce costs 14
  • 15. 3. Classification of Facility Planning โ€ข It is important to organize and classify facility planning into manageable sub-projects based on their Levels of Detail. โ€ข Each sub-project has a series of tasks that the design team must complete. โ€ข The tasks and their sequence differ for each level 15
  • 16. Facility planning levels of details I. Global (Site Location) This involves factors such as freight cost, labor cost, skill availability and site focus. II. Supra (Site Planning) This includes number, size, and location of buildings. It includes infrastructure such as roads, water, gas and rail. III. Macro (Building Layout) Operating departments are defined and located at this level. Frequently, this is the most important level of planning. A Macro- Layout institutionalizes the fundamental organizational structure in steel and apparel industry. 16
  • 17. Facility planning levels of details cont.. IV. Micro (Work cell/Department Layout) determines the location of specific equipment and furniture V. Sub-Micro (Workstation Design) focuses on individual workers. Here we design workstations for efficiency, effectiveness and safety. Ergonomics is key. 17
  • 18. 18
  • 19. 4. Facility planning process steps 1) Define or redefine the objective of the facility 2) Specify the primary and support activities to be performed in accomplishing the objective 3) Determine the interrelationships among all activities 4) Determine the space requirement for all activities 5) Generate alternative facility plans 6) Evaluate alternative facility plans 7) Select a facilities plan 8) Implement the facilities plan 9) Maintain and adapt the facility plans 10) Redefine the objective of the facilities 19
  • 20. 1) Define or redefine the objective of the facility โ€ข May be planning for new facility or improvement of existing facility. โ€ข Products to be produced or services to be provided must be specified quantitatively โ€ข Volumes or levels of activities are to be identified when possible. 20
  • 21. 2) Specify the primary and support activities to be performed in accomplishing the objective โ€ข Primary and support activities to be performed and should be specified in terms of operations ,equipment ,personnel and material flow involved. โ€ข Support activities allow primary operations to function properly with out interruptions. e.g Maintenance function is a support activity for manufacturing. 21
  • 22. 3) Determine the interrelationships among all activities โ€ข Define both quantitatively and qualitatively how activities interact and support one another with in the boundaries of the facility. 4) Determine the space requirement for all activities โ€ข All equipment , material, and personnel requirements must be considered while considering space requirements for each activity. 22
  • 23. 5) Generate alternative facility plans โ€ข Alternative facility plans will include both alternative facility locations and alternative facility designs. โ€ข Alternative facility designs will include alternative layout design, structural designs and material handling system designs. โ€ข Depending on the situation the facility location decision and facility designs may be decoupled 23
  • 24. 6) Evaluate alternative facility plans โ€ข Determine the factors, set an accepted criteria and rank the plans. 7) Select a facility plans โ€ข Select the most acceptable in satisfying the goals and objectives of the organizations. โ€ข Most often cost is not the only major considerations when evaluating a facility plans. โ€ข Use the information generated in step 6. 24
  • 25. 8) Implement the facility plans โ€ข After selection, considerable amount of planning must precede before the actual construction of the facility. โ€ข Supervising installation of layout, getting ready to start up, actual starting up, running and correction activities are all part of implantation phase of facility planning. 25
  • 26. 9) Maintain and adapt facilities plans. โ€ข When new requirements are placed on the facility, the facility plan must be modified accordingly. โ€ข Changes in product design, new machines ,material handling equipments or flow patterns require an updated facility plan. 10) Redefine the objective of the facility โ€ข In case of potential modifications ,expansion and so on for existing facilities, all recognized changes must be considered and the objective of the facility should be redefined in quantifiable terms 26
  • 27. Brainstorming โ€ข Think about your role as a facility planner and what kind of improvements would you like to suggest for garment industries. 27