1. A PQR was qualified in SG position using a new welder. But production welding is to be
done by the same welder in 3G position. Which of the following are applicable as a
minimum?
a. Both procedure and welder shall be re-qualified in 2G position.
b. The qualified procedure can be used, only welder needs to be re-qualified in 3G
position.
c. The welder is qualified, but the procedure needs re-qualification.
d. Both procedure and welder need not be re-qualified.
2. A procedure is required with preheat temp = 2S0oF. Two WPS were made based on this
PQR. All other parameters being same WPS (A) showed preheat temp = 280°F and WPS
(B) showed preheat temp = 140°F, will you:
a. Reject (A) & (B)
b. Accept (A) only
c. Accept (B) only
d. Accept both
3. In a certain PQR for SMAW, the electrodes used for all passes were of AWS classification
(E7018). Corresponding WPS also showed filler materials as E 7018. Now the
manufacturer proposes to change the filler material in WPS to E 701S. Will you ask
manufacturer to:
a. Quality new PQR with E 7015 electrodes.
b. Revise only WPS showing the change from E 7018 to E7015 and submit WPS as a
new revision.
c. Revise only the PQR showing the change and resubmit for approval.
d. Revise both WPS and PQR showing the change and resubmit for approval.
4. A PQR in GTAW process was qualified with PWHT with A 516 grade 70 materials, ¾”
thick. The thickness for production welds is 1.0”, but without PWHT. The manufacturer
claims that same PQR will be O.K. What is your assessment?
a. It qualifies required conditions hence no new PQR is required.
b. It qualifies thickness but not It does not qualify "No PWHT" condition, hence new
PQR is required.
c. It qualifies "no PWHT" condition, but not thickness. New PQR is required.
d. It does not qualify both thickness as well as "No PWHT" - condition, hence new PQR
is required.
5. For 515 grade 60 material, the following results were obtained for two tensile test
specimen during a PQR qualification.
Specimen T1: failed in B.M. at 57,400 psi
Specimen T2: failed in weld metal, at 59,500 psi
Your assessment is:
a. PQR test is OK since both are within acceptance criteria
b. PQR test is rejected as both T1 and T2 are not within the acceptance criteria
c. PQR in rejected because T1 is OK but T2 has failed
d. PQR in rejected because T1 is failed thoughT2 is OK
6. A procedure is qualified with Base metal THK. = 20mm. Two WPS were made based on
this PQR. Other parameters being same, WPS (A) showed Base Metal Thk. = 38 mm and
WPS (B) showed Base Metal Thk. = 6mm.
Your assessment is:
a. Reject (A) & (B)
b. Accept (A) only
c. Accept (B) only
d. Accept both
7. A welder has made 25 SMAW groove welds, but the guided bend test for the welder's
qualification was never performed. In order to avoid cutting out all of the production welds
made by this welder, which of the following minimum steps would be taken to validate the
qualification?
a. Radiograph the welder's first production weld and accept the qualification based on
acceptable weld quality by radiography.
b. There is no alternative to qualifying a welder by the guided bend test.
c. Have the welder prepare a test coupon and have the bend test done on that. If bend test
is okay, accept the welds already made.
d. Radiograph all 25 welds, regardless of the governing specifications for sample
selection.
8. In a radiographic examination of butt weld (Thk= 3.5 in.) the Geometric un-sharpness
shall not exceed?
a. 0.02"
b. 0.04"
c. 0.03"
d. None of above
9. Select suitable Hole Type (Source Side) penetrameter for following weld joint:
Base Mertal Thk. = 7/8”
Backing Strip Thk. = 3/16”
Weld Re-enforcement Thk. = 1/8”
a. No. 20
b. No. 25
c. No. 30
d. None of the above
10. If type of penetrameter in above question is changed to wire type what shall be the
wire designation (wire diameter In Inch)?
a. 0.025 dia. (No.10)
b. 0.016 dia. (No. 8)
c. 0.032 dia. (No.11)
d. None of the above
11. For steel plates and welds to be checked by LPI what shall be the penetration time for
the Penetrant?
a. 10 min for weld, 5 min for plate
b. 5 min for both
c. 10 min for both
d. 5 min for weld, 10 min for plate
12. After applying the developer the examiner checked four welds for surface defects after
following period, weld A after 5 minute, weld B after 10 minutes, weld C was checked
after 30 minutes and welds D after 65 minutes. Which of the welds were checked
wrongly?
a. Weld A and B
b. Weld C and D
c. Weld D only
d. Weld A and D
13. For MT examination by Prod Technique the spacing between prods shall be between?
a. 4 inch to 12 inch
b. 4 inch to 10 inch
c. 3 inch to 10 inch
d. 3 inch to 8 inch
14. Calculate estimated inspection period for external and internal inspection for a vessel
whose remaining life is estimated as 12 years?
a. Internal = 6 years, external = 10 years
b. Internal = 6 years, external = 5 years
c. Internal = 5 years, external = 10 years
d. None of the above
15. As per WPS the material used is SAS16 Gr.70 and the electrode used is E-7018. What
are the P. No. and F No.?
a. 1 and 4
b. 4 and 1
c. 2 and 4
d. 4 and 2
API 510 PREPARATORY
PRACTICE QUESTIONS
ANSWER KEY
API 510 OPEN BOOK-1
Q. NO. ANSWER
1 D
2 B
3 B
4 B
5 C
6 D
7 A
8 B
9 B
10 D
11 D
12 D
13 D
14 B
15 A

Recomendados

Api 510-closed-2 von
Api 510-closed-2Api 510-closed-2
Api 510-closed-2Tariq Mahmood
3.9K views19 Folien
Api practice questions von
Api practice questions  Api practice questions
Api practice questions Hamza Khamkar
3.5K views138 Folien
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf von
API 510 Practice Exam #5 CLOSE BOOK Questions.pdfAPI 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdfEmmanuelMatutu
311 views18 Folien
Api 510-closed-1[1] von
Api 510-closed-1[1]Api 510-closed-1[1]
Api 510-closed-1[1]Tariq Mahmood
1.2K views6 Folien
86177188-Wps-Pqr-Guide.ppt von
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.pptpeter770054
61 views40 Folien

Más contenido relacionado

Similar a API-510-OPEN-1.pdf

Piping bv von
Piping bvPiping bv
Piping bvLorena Barros
1.7K views11 Folien
Sampleq practice-exam-d11-2002 (1) von
Sampleq practice-exam-d11-2002 (1)Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)Lennard Charles
10K views22 Folien
pdfslide.net_iec-61439pptx.pptx von
pdfslide.net_iec-61439pptx.pptxpdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptxjiguparmar
18 views34 Folien
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt von
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptmohammed194284
42 views41 Folien
sapl-presentation von
sapl-presentationsapl-presentation
sapl-presentationArjun Reddiar
399 views44 Folien
Telescopic poles nea von
Telescopic poles  neaTelescopic poles  nea
Telescopic poles neakapil pudasaini
113 views7 Folien

Similar a API-510-OPEN-1.pdf(20)

Sampleq practice-exam-d11-2002 (1) von Lennard Charles
Sampleq practice-exam-d11-2002 (1)Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)
Lennard Charles10K views
pdfslide.net_iec-61439pptx.pptx von jiguparmar
pdfslide.net_iec-61439pptx.pptxpdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptx
jiguparmar18 views
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt von mohammed194284
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
mohammed19428442 views
Weld Improvement Example in Offshore Oil & Gas von Imran Choudury
Weld Improvement Example in Offshore Oil & GasWeld Improvement Example in Offshore Oil & Gas
Weld Improvement Example in Offshore Oil & Gas
Imran Choudury481 views
Stainless Steel Threaded&Welding Joint.docx von toramansor
Stainless Steel Threaded&Welding Joint.docxStainless Steel Threaded&Welding Joint.docx
Stainless Steel Threaded&Welding Joint.docx
toramansor111 views
X Ray inspection of Plated Throughhole Devices Using X-Ray von Bob Wettermann
X Ray inspection of Plated Throughhole Devices Using X-RayX Ray inspection of Plated Throughhole Devices Using X-Ray
X Ray inspection of Plated Throughhole Devices Using X-Ray
Bob Wettermann1.2K views
Ultrasonic Testing Specific-01 von YOGESH JADHAV
Ultrasonic Testing Specific-01Ultrasonic Testing Specific-01
Ultrasonic Testing Specific-01
YOGESH JADHAV225 views
Spatter Reduction by Prateek Biswas von Prateek Biswas
Spatter Reduction by Prateek BiswasSpatter Reduction by Prateek Biswas
Spatter Reduction by Prateek Biswas
Prateek Biswas4.2K views
Ultrasonic Testing Specific-02 von YOGESH JADHAV
Ultrasonic Testing Specific-02Ultrasonic Testing Specific-02
Ultrasonic Testing Specific-02
YOGESH JADHAV180 views
Factory Tour Report 120309 von wangyangzhong
Factory Tour Report 120309Factory Tour Report 120309
Factory Tour Report 120309
wangyangzhong6.5K views
International Journal of Engineering Research and Development von IJERD Editor
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor357 views

Más de EmmanuelMatutu

1. Usman Ali CV Project Engineer Electrical.pdf von
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdfEmmanuelMatutu
24 views5 Folien
A Presentation on Field Instrumentation .pdf von
A Presentation on Field Instrumentation .pdfA Presentation on Field Instrumentation .pdf
A Presentation on Field Instrumentation .pdfEmmanuelMatutu
24 views105 Folien
API 653 Exam March 2019-1.pdf von
API 653 Exam March 2019-1.pdfAPI 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfEmmanuelMatutu
97 views18 Folien
API 510 EXAM 2021.pdf von
API 510 EXAM 2021.pdfAPI 510 EXAM 2021.pdf
API 510 EXAM 2021.pdfEmmanuelMatutu
302 views14 Folien
API 570 open book.pdf von
API 570 open book.pdfAPI 570 open book.pdf
API 570 open book.pdfEmmanuelMatutu
213 views9 Folien
4419025.pdf von
4419025.pdf4419025.pdf
4419025.pdfEmmanuelMatutu
6 views155 Folien

Más de EmmanuelMatutu(12)

Último

When Sex Gets Complicated: Porn, Affairs, & Cybersex von
When Sex Gets Complicated: Porn, Affairs, & CybersexWhen Sex Gets Complicated: Porn, Affairs, & Cybersex
When Sex Gets Complicated: Porn, Affairs, & CybersexMarlene Maheu
108 views73 Folien
Create a Structure in VBNet.pptx von
Create a Structure in VBNet.pptxCreate a Structure in VBNet.pptx
Create a Structure in VBNet.pptxBreach_P
82 views8 Folien
11.30.23A Poverty and Inequality in America.pptx von
11.30.23A Poverty and Inequality in America.pptx11.30.23A Poverty and Inequality in America.pptx
11.30.23A Poverty and Inequality in America.pptxmary850239
86 views18 Folien
A Guide to Applying for the Wells Mountain Initiative Scholarship 2023 von
A Guide to Applying for the Wells Mountain Initiative Scholarship 2023A Guide to Applying for the Wells Mountain Initiative Scholarship 2023
A Guide to Applying for the Wells Mountain Initiative Scholarship 2023Excellence Foundation for South Sudan
79 views26 Folien
Parts of Speech (1).pptx von
Parts of Speech (1).pptxParts of Speech (1).pptx
Parts of Speech (1).pptxmhkpreet001
43 views20 Folien
unidad 3.pdf von
unidad 3.pdfunidad 3.pdf
unidad 3.pdfMarcosRodriguezUcedo
129 views38 Folien

Último(20)

When Sex Gets Complicated: Porn, Affairs, & Cybersex von Marlene Maheu
When Sex Gets Complicated: Porn, Affairs, & CybersexWhen Sex Gets Complicated: Porn, Affairs, & Cybersex
When Sex Gets Complicated: Porn, Affairs, & Cybersex
Marlene Maheu108 views
Create a Structure in VBNet.pptx von Breach_P
Create a Structure in VBNet.pptxCreate a Structure in VBNet.pptx
Create a Structure in VBNet.pptx
Breach_P82 views
11.30.23A Poverty and Inequality in America.pptx von mary850239
11.30.23A Poverty and Inequality in America.pptx11.30.23A Poverty and Inequality in America.pptx
11.30.23A Poverty and Inequality in America.pptx
mary85023986 views
Parts of Speech (1).pptx von mhkpreet001
Parts of Speech (1).pptxParts of Speech (1).pptx
Parts of Speech (1).pptx
mhkpreet00143 views
JQUERY.pdf von ArthyR3
JQUERY.pdfJQUERY.pdf
JQUERY.pdf
ArthyR3103 views
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (FRIE... von Nguyen Thanh Tu Collection
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (FRIE...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (FRIE...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (FRIE...
INT-244 Topic 6b Confucianism von S Meyer
INT-244 Topic 6b ConfucianismINT-244 Topic 6b Confucianism
INT-244 Topic 6b Confucianism
S Meyer44 views
Payment Integration using Braintree Connector | MuleSoft Mysore Meetup #37 von MysoreMuleSoftMeetup
Payment Integration using Braintree Connector | MuleSoft Mysore Meetup #37Payment Integration using Braintree Connector | MuleSoft Mysore Meetup #37
Payment Integration using Braintree Connector | MuleSoft Mysore Meetup #37
SURGICAL MANAGEMENT OF CERVICAL CANCER DR. NN CHAVAN 28102023.pptx von Niranjan Chavan
SURGICAL MANAGEMENT OF CERVICAL CANCER DR. NN CHAVAN 28102023.pptxSURGICAL MANAGEMENT OF CERVICAL CANCER DR. NN CHAVAN 28102023.pptx
SURGICAL MANAGEMENT OF CERVICAL CANCER DR. NN CHAVAN 28102023.pptx
Niranjan Chavan43 views
Monthly Information Session for MV Asterix (November) von Esquimalt MFRC
Monthly Information Session for MV Asterix (November)Monthly Information Session for MV Asterix (November)
Monthly Information Session for MV Asterix (November)
Esquimalt MFRC98 views

API-510-OPEN-1.pdf

  • 1. API-510-OPEN-1 1. A PQR was qualified in SG position using a new welder. But production welding is to be done by the same welder in 3G position. Which of the following are applicable as a minimum? a. Both procedure and welder shall be re-qualified in 2G position. b. The qualified procedure can be used, only welder needs to be re-qualified in 3G position. c. The welder is qualified, but the procedure needs re-qualification. d. Both procedure and welder need not be re-qualified. 2. A procedure is required with preheat temp = 2S0oF. Two WPS were made based on this PQR. All other parameters being same WPS (A) showed preheat temp = 280°F and WPS (B) showed preheat temp = 140°F, will you: a. Reject (A) & (B) b. Accept (A) only c. Accept (B) only d. Accept both 3. In a certain PQR for SMAW, the electrodes used for all passes were of AWS classification (E7018). Corresponding WPS also showed filler materials as E 7018. Now the manufacturer proposes to change the filler material in WPS to E 701S. Will you ask manufacturer to: a. Quality new PQR with E 7015 electrodes. b. Revise only WPS showing the change from E 7018 to E7015 and submit WPS as a new revision. c. Revise only the PQR showing the change and resubmit for approval. d. Revise both WPS and PQR showing the change and resubmit for approval. 4. A PQR in GTAW process was qualified with PWHT with A 516 grade 70 materials, ¾” thick. The thickness for production welds is 1.0”, but without PWHT. The manufacturer claims that same PQR will be O.K. What is your assessment? a. It qualifies required conditions hence no new PQR is required. b. It qualifies thickness but not It does not qualify "No PWHT" condition, hence new PQR is required. c. It qualifies "no PWHT" condition, but not thickness. New PQR is required. d. It does not qualify both thickness as well as "No PWHT" - condition, hence new PQR is required. 5. For 515 grade 60 material, the following results were obtained for two tensile test specimen during a PQR qualification. Specimen T1: failed in B.M. at 57,400 psi Specimen T2: failed in weld metal, at 59,500 psi Your assessment is:
  • 2. a. PQR test is OK since both are within acceptance criteria b. PQR test is rejected as both T1 and T2 are not within the acceptance criteria c. PQR in rejected because T1 is OK but T2 has failed d. PQR in rejected because T1 is failed thoughT2 is OK 6. A procedure is qualified with Base metal THK. = 20mm. Two WPS were made based on this PQR. Other parameters being same, WPS (A) showed Base Metal Thk. = 38 mm and WPS (B) showed Base Metal Thk. = 6mm. Your assessment is: a. Reject (A) & (B) b. Accept (A) only c. Accept (B) only d. Accept both 7. A welder has made 25 SMAW groove welds, but the guided bend test for the welder's qualification was never performed. In order to avoid cutting out all of the production welds made by this welder, which of the following minimum steps would be taken to validate the qualification? a. Radiograph the welder's first production weld and accept the qualification based on acceptable weld quality by radiography. b. There is no alternative to qualifying a welder by the guided bend test. c. Have the welder prepare a test coupon and have the bend test done on that. If bend test is okay, accept the welds already made. d. Radiograph all 25 welds, regardless of the governing specifications for sample selection. 8. In a radiographic examination of butt weld (Thk= 3.5 in.) the Geometric un-sharpness shall not exceed? a. 0.02" b. 0.04" c. 0.03" d. None of above 9. Select suitable Hole Type (Source Side) penetrameter for following weld joint: Base Mertal Thk. = 7/8” Backing Strip Thk. = 3/16” Weld Re-enforcement Thk. = 1/8” a. No. 20 b. No. 25 c. No. 30
  • 3. d. None of the above 10. If type of penetrameter in above question is changed to wire type what shall be the wire designation (wire diameter In Inch)? a. 0.025 dia. (No.10) b. 0.016 dia. (No. 8) c. 0.032 dia. (No.11) d. None of the above 11. For steel plates and welds to be checked by LPI what shall be the penetration time for the Penetrant? a. 10 min for weld, 5 min for plate b. 5 min for both c. 10 min for both d. 5 min for weld, 10 min for plate 12. After applying the developer the examiner checked four welds for surface defects after following period, weld A after 5 minute, weld B after 10 minutes, weld C was checked after 30 minutes and welds D after 65 minutes. Which of the welds were checked wrongly? a. Weld A and B b. Weld C and D c. Weld D only d. Weld A and D 13. For MT examination by Prod Technique the spacing between prods shall be between? a. 4 inch to 12 inch b. 4 inch to 10 inch c. 3 inch to 10 inch d. 3 inch to 8 inch 14. Calculate estimated inspection period for external and internal inspection for a vessel whose remaining life is estimated as 12 years? a. Internal = 6 years, external = 10 years b. Internal = 6 years, external = 5 years c. Internal = 5 years, external = 10 years d. None of the above 15. As per WPS the material used is SAS16 Gr.70 and the electrode used is E-7018. What are the P. No. and F No.? a. 1 and 4 b. 4 and 1 c. 2 and 4 d. 4 and 2
  • 4. API 510 PREPARATORY PRACTICE QUESTIONS ANSWER KEY API 510 OPEN BOOK-1 Q. NO. ANSWER 1 D 2 B 3 B 4 B 5 C 6 D 7 A 8 B 9 B 10 D 11 D 12 D 13 D 14 B 15 A