SlideShare a Scribd company logo
1 of 15
Portland Public Schools Capital
 Construction Bond Program

  Presentation to Portland AIA Chapter
                   by
          James E. Owens, PE
           Executive Director
     Office of School Modernization
                    &
           Elaine Baker, CPPO
            Program Director
       Purchasing & Contracting
             February 21, 2012
Strategic Framework
Bond Development Committee
• 22 community member committee
• Considered a number of criteria and dollar
  values for 17 bond proposals including:
  – High Schools       - Facility Condition Index
  – Large Site Size - Free & Reduced Lunch %
  – Poor Seismic Condition
  – Priority Access Needs - Partnerships
  – Only infrastructure major repairs
Public Input Session:
            May 2012
• Support for November 2012 as the right
  time to move forward with a bond measure
• Seismic issues identified as concern
• Concern over cost of a bond measure
• Support for initial focus on high schools
• Interest in bond supporting an educational
  vision as well as taking care of urgent
  needs
Preferred School Construction

           Bond Proposal
• Partnership
  – Faubion PK-8 with Concordia University
• Starting at High Schools:
  – a natural extension of the high school re-
    design process
  – Greater need for specialized educational
    spaces
  – Minimizes student disruption during K-12
  – More visible & accessible to entire community
Preferred School Construction

              Bond Proposal
• Provides balance between schools
  identified for full modernization and
  focused, urgent facility needs
  – Physical facility improvements provide a
    geographic balance across the district
  – Criteria includes;
     •   High seismic risk
     •   Priority roof replacements
     •   Accessibility to educational programs
     •   Partnerships
“Modernizations/Replacements”
• Master Plan entire site
• All building systems addressed at one time;
  complete interior & exterior rehabilitation
• Cost savings through coordinated work
• More costly overall than simply repairing but
  results in improved learning spaces
• Likely requires students to relocate during
  construction
“Targeted Improvements”
• Partial improvements to one or two building
  systems at a time (roofs, seismic strength &
  ADA)
• Educational facility improvements at grade 6-
  8 Science Classrooms
• Addresses biggest problems at many schools
• Less likely to substantively improve learning
  spaces
• Most work should not require student
  relocation
High School, Seismic & Access
  $1.10 per $1000 of assessed value
       Educational Facility Improvements
       Improve grades 6-8 science classrooms with sinks and electrical outlets
       at as many as 39 schools.
  $5M
       Seismic and other building improvements
       Seismic strengthening at as many as 26 schools. Replace and
       seismically brace roofs at as many as 14 schools. Replace roofs at as
       many as 8 schools. Improve accessibility to educational programs at as
$69.5M many as 33 schools.
       Full modernizations or replacement
       These schools are identified as potential modernizations or replacement:
       • High schools with high seismic risk.
$278M • High schools with major access upgrades needed.
       • Faubion = capital partnership with Concordia University.

         3 high schools –        Grant      Franklin     Roosevelt

                                 $95M       $85M         $70M
                       Faubion
         1 K-8 –
                       $28M
High School, Seismic & Access
  $1.10 per $1,000 of assessed value
       Debt repayment
       Rosa Parks K-8.
       Boiler conversions, prior roof replacements and other financed capital
 $45M projects.
       Program costs
       Required reserves, materials and labor cost escalation, bond issuance
       costs and improvements and transportation to buildings where students
$84.5M attend school while their school is renovated. Master planning for 6 high
       schools ($1.5M)
$482M Total Bond Program
       Estimated rate: $1.10/$1,000 of assessed value over 8 years, $0.30
       over an additional 12 years.

          Program duration – Eight Years
Voter Decision
         Measure M26-144
• Strong voter response - 66% voted in
  favor based on County analysis – Passed!
• Transparency & oversight
  – Use of bond accountability committee
  – Seven member committee
  – Report to Board
  – Design oversight group for full
    modernizations/replacements
  – Extensive community involvement
Blended team
Doing business with PPS
• PPS is a large public agency - “full & open competition”
  is an important objective
• Equity in public purchasing & contracting policy
   – Aspirational MWESB, workforce & students
• Architect, Engineers, Land Surveyors & Related services
   – PM/CM, Planners, architects, building envelope,
     engineers, special inspection, etc.
• Builders/Contractors – Public Improvements
   – Traditional design-bid-build & alternative (CM/GC)
• Goods & Services
   – Furniture, Fixtures & Equipment
Next Steps
• Monitor ORPIN/DJC for solicitations
• Get on PPS’s ‘list of interested
  consultants’
• Multiple opportunities at direct
  appointment & informal level
• Project sequence – Roosevelt, Franklin,
  Group 2 designs
• Communicate with purchasing &
  contracting and OSM staff
Questions?
• Thank you for your support Portland
• Buildings do matter and contribute to
  student success!

More Related Content

Similar to Portland public schools

School Plant Management Educ. 265
School Plant Management Educ. 265School Plant Management Educ. 265
School Plant Management Educ. 265Elma Gapusan
 
Think You Can't Afford Green? Think Again
Think You Can't Afford Green? Think AgainThink You Can't Afford Green? Think Again
Think You Can't Afford Green? Think AgainCHPSOnline
 
TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)Timothy Ralston
 
Financing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyFinancing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyTNenergy
 
A Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation SuccessA Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation SuccessCalifornia STEM Learning Network
 
Critical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauCritical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauMeg Thompson
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsLHSBudget
 
renovation presentation
renovation presentationrenovation presentation
renovation presentationDavid Peck
 
SUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterSUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterHigherEdUtah
 
Green needham sustainable communities
Green needham sustainable communitiesGreen needham sustainable communities
Green needham sustainable communitiesGreen Needham
 
Paulpirainomasccc2014
Paulpirainomasccc2014Paulpirainomasccc2014
Paulpirainomasccc2014Jen Boudrie
 
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...Mieko Ozeki
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30Rick McGrath
 
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...caiscalifornia
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School EnergyCharter School Capital
 
A Year of Transition
A Year of TransitionA Year of Transition
A Year of Transitioncelinstitute
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013SchoolDude
 
Guilford High School Proposed Improvement
Guilford High School Proposed ImprovementGuilford High School Proposed Improvement
Guilford High School Proposed ImprovementTai Soo Kim Partners
 

Similar to Portland public schools (20)

School Plant Management Educ. 265
School Plant Management Educ. 265School Plant Management Educ. 265
School Plant Management Educ. 265
 
Think You Can't Afford Green? Think Again
Think You Can't Afford Green? Think AgainThink You Can't Afford Green? Think Again
Think You Can't Afford Green? Think Again
 
TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)
 
Financing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyFinancing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energy
 
A Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation SuccessA Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation Success
 
Critical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauCritical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - Thurnau
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings Recommendations
 
renovation presentation
renovation presentationrenovation presentation
renovation presentation
 
SUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterSUU Sorenson Child & Family Center
SUU Sorenson Child & Family Center
 
Green needham sustainable communities
Green needham sustainable communitiesGreen needham sustainable communities
Green needham sustainable communities
 
Cefpi power point presentation revised
Cefpi power point presentation revisedCefpi power point presentation revised
Cefpi power point presentation revised
 
Paulpirainomasccc2014
Paulpirainomasccc2014Paulpirainomasccc2014
Paulpirainomasccc2014
 
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Watkins School Modernization Community (November 17, 2015)
Watkins School Modernization Community (November 17, 2015)Watkins School Modernization Community (November 17, 2015)
Watkins School Modernization Community (November 17, 2015)
 
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School Energy
 
A Year of Transition
A Year of TransitionA Year of Transition
A Year of Transition
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Guilford High School Proposed Improvement
Guilford High School Proposed ImprovementGuilford High School Proposed Improvement
Guilford High School Proposed Improvement
 

Recently uploaded

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 

Recently uploaded (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 

Portland public schools

  • 1. Portland Public Schools Capital Construction Bond Program Presentation to Portland AIA Chapter by James E. Owens, PE Executive Director Office of School Modernization & Elaine Baker, CPPO Program Director Purchasing & Contracting February 21, 2012
  • 3. Bond Development Committee • 22 community member committee • Considered a number of criteria and dollar values for 17 bond proposals including: – High Schools - Facility Condition Index – Large Site Size - Free & Reduced Lunch % – Poor Seismic Condition – Priority Access Needs - Partnerships – Only infrastructure major repairs
  • 4. Public Input Session: May 2012 • Support for November 2012 as the right time to move forward with a bond measure • Seismic issues identified as concern • Concern over cost of a bond measure • Support for initial focus on high schools • Interest in bond supporting an educational vision as well as taking care of urgent needs
  • 5. Preferred School Construction Bond Proposal • Partnership – Faubion PK-8 with Concordia University • Starting at High Schools: – a natural extension of the high school re- design process – Greater need for specialized educational spaces – Minimizes student disruption during K-12 – More visible & accessible to entire community
  • 6. Preferred School Construction Bond Proposal • Provides balance between schools identified for full modernization and focused, urgent facility needs – Physical facility improvements provide a geographic balance across the district – Criteria includes; • High seismic risk • Priority roof replacements • Accessibility to educational programs • Partnerships
  • 7. “Modernizations/Replacements” • Master Plan entire site • All building systems addressed at one time; complete interior & exterior rehabilitation • Cost savings through coordinated work • More costly overall than simply repairing but results in improved learning spaces • Likely requires students to relocate during construction
  • 8. “Targeted Improvements” • Partial improvements to one or two building systems at a time (roofs, seismic strength & ADA) • Educational facility improvements at grade 6- 8 Science Classrooms • Addresses biggest problems at many schools • Less likely to substantively improve learning spaces • Most work should not require student relocation
  • 9. High School, Seismic & Access $1.10 per $1000 of assessed value Educational Facility Improvements Improve grades 6-8 science classrooms with sinks and electrical outlets at as many as 39 schools. $5M Seismic and other building improvements Seismic strengthening at as many as 26 schools. Replace and seismically brace roofs at as many as 14 schools. Replace roofs at as many as 8 schools. Improve accessibility to educational programs at as $69.5M many as 33 schools. Full modernizations or replacement These schools are identified as potential modernizations or replacement: • High schools with high seismic risk. $278M • High schools with major access upgrades needed. • Faubion = capital partnership with Concordia University. 3 high schools – Grant Franklin Roosevelt $95M $85M $70M Faubion 1 K-8 – $28M
  • 10. High School, Seismic & Access $1.10 per $1,000 of assessed value Debt repayment Rosa Parks K-8. Boiler conversions, prior roof replacements and other financed capital $45M projects. Program costs Required reserves, materials and labor cost escalation, bond issuance costs and improvements and transportation to buildings where students $84.5M attend school while their school is renovated. Master planning for 6 high schools ($1.5M) $482M Total Bond Program Estimated rate: $1.10/$1,000 of assessed value over 8 years, $0.30 over an additional 12 years. Program duration – Eight Years
  • 11. Voter Decision Measure M26-144 • Strong voter response - 66% voted in favor based on County analysis – Passed! • Transparency & oversight – Use of bond accountability committee – Seven member committee – Report to Board – Design oversight group for full modernizations/replacements – Extensive community involvement
  • 13. Doing business with PPS • PPS is a large public agency - “full & open competition” is an important objective • Equity in public purchasing & contracting policy – Aspirational MWESB, workforce & students • Architect, Engineers, Land Surveyors & Related services – PM/CM, Planners, architects, building envelope, engineers, special inspection, etc. • Builders/Contractors – Public Improvements – Traditional design-bid-build & alternative (CM/GC) • Goods & Services – Furniture, Fixtures & Equipment
  • 14. Next Steps • Monitor ORPIN/DJC for solicitations • Get on PPS’s ‘list of interested consultants’ • Multiple opportunities at direct appointment & informal level • Project sequence – Roosevelt, Franklin, Group 2 designs • Communicate with purchasing & contracting and OSM staff
  • 15. Questions? • Thank you for your support Portland • Buildings do matter and contribute to student success!