Customers                                1.603.529

Employees (-subcont.)                         638

Total Installed Cap. (MVA)                  3.162

Peak Load (MW)                              1.513

Transformers (-3rd party)                   9.376

Street lights                             392.165

Poles                                    1.172.774
AFTER TAKEOVER     INVESTMENTS
INFORMATION TECHNOLOGY
After takeover, all software and hardware system has been
renewed.
AFTER TAKEOVER         INVESTMENTS
COMMUNICATION INFRASTRUCTURE
Fiber optic network has been set up for 140 Points and 3G redundant
communication
AFTER TAKEOVER   INVESTMENTS
CALL CENTER
                               • Call Center (44 44
                                 186) is operating
                                 24/7 effectively both
                                 in Turkish and
                                 English.

                               • Call Center answers
                                 to the questions
                                 about subscription,
                                 failure, billing,
                                 debts, complaints,
                                 requests for
                                 information.
AFTER TAKEOVER      INVESTMENTS
AMR by using GPRS/ 3G
  Until end of this year, 23.000 meters will be reading via AMR

  Our target until the end of the 2015: 75.000 meters
AFTER TAKEOVER    INVESTMENTS
AMR by using PLC
Pilot Project for PLC in 2013 : 2000 meters via AMR by using
communicaton type of PLC.
Until the end of the 2020, all meters via AMR by using PLC
AFTER TAKEOVER     INVESTMENTS
SCADA - DMS
SCADA-DMS Project get started in 2011 and continues for 70
substation centers.
AFTER TAKEOVER      INVESTMENTS
SCADA - DMS
  In the first year of the project, 100 transformers and within five
  years, 1000 transformers will take place in this Project.
AFTER TAKEOVER     INVESTMENTS
SCADA - DMS
  For the purpose of remote monitoring of the distribution system,
  350 power analyzers and communication systems were installed to
  main injection points so that changes in distribution of both
  voltage and load profiles are monitored in real time.
AFTER TAKEOVER             INVESTMENTS
  GIS (Geographical Information Sysem) and Field Management
                             System
 GIS project was completed and update in progress.




The Photograph in the Google Earth                  Used satellite photograph by us

   With Worldview-2 and Geoeye satellites , 50 cm resolution, 6.5 m coordinat
   accuracy, %1 cloudiness rate , supplied satellite photo and it was used GIS map.
AFTER TAKEOVER          INVESTMENTS
 GIS (Geographical Information Sysem) and Field Management
                            System
• All repair & maintanence
  vehicles were equipped with
  mobile computer systems
  and integration between call
  center system and vehicle
  tracking system was
  completed so that teams can
  intervene with failures in a
  shorter time.
• By this system, the time for
  intervention to failures was
  reduced from 76 min. to 37
  min.
AFTER TAKEOVER       INVESTMENTS
 DISASTER CENTER
• To prevent Aydem service from potential disasters, disaster
  center has been established to keep the system working
  continuously.
• Sufficient infrastructure for Customer Information System was
  also provided in Aydın Province in case of a disaster in Denizli.
AFTER TAKEOVER      INVESTMENTS
MOBIL AYDEM
Planned outage announcements

Payment points directions

Declarations complaint,

Estimated billing account,

Consumption analysis,
AFTER TAKEOVER         INVESTMENTS
Electric Vehicle Conversion Studies

• asynchronous motor: 90 kW/
1500 rpm

•   Torque : 630 Nm / 1500
rpm.

• Duration of travel 2 h 45’

• Duration of Recharge: 5h 30’

• Max speed : 110 km/h

• Range : 220 km

• Empty weight: 7500 Kg
AFTER TAKEOVER      INVESTMENTS
In Next 5 Years Software Requirements

• ERP Solutions

• Asset Management System

• Work Force Management System

• Meter Data Management System
Contact Details:

Mehmet KARADENİZ
IT MANAGER

Web: www.aydem.com

E-mail Address: mehmet.karadeniz@aydem.com

More Related Content

What's hot

TRAFFIC LIGHT CONTROL USING RF TECH
TRAFFIC LIGHT CONTROL USING RF TECHTRAFFIC LIGHT CONTROL USING RF TECH
TRAFFIC LIGHT CONTROL USING RF TECH
Pranay Raj
 
Intelligent ambulance car witch controle traffic lights
Intelligent ambulance car witch controle traffic lightsIntelligent ambulance car witch controle traffic lights
Intelligent ambulance car witch controle traffic lights
Padmakar Mangrule
 
4 Way traffic controll new
4 Way traffic controll new4 Way traffic controll new
4 Way traffic controll new
Mainak Nandi
 
Ijater 03 06
Ijater 03 06Ijater 03 06
Ijater 03 06
nandhu458
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report
9951081577
 

What's hot (20)

Intelligent traffic control system using ardiuno
Intelligent traffic control system using ardiuno Intelligent traffic control system using ardiuno
Intelligent traffic control system using ardiuno
 
TRAFFIC LIGHT CONTROL USING RF TECH
TRAFFIC LIGHT CONTROL USING RF TECHTRAFFIC LIGHT CONTROL USING RF TECH
TRAFFIC LIGHT CONTROL USING RF TECH
 
Intelligent ambulance car witch controle traffic lights
Intelligent ambulance car witch controle traffic lightsIntelligent ambulance car witch controle traffic lights
Intelligent ambulance car witch controle traffic lights
 
4 Way traffic controll new
4 Way traffic controll new4 Way traffic controll new
4 Way traffic controll new
 
DENSITY BASED TRAFFIC LIGHT CONTROLLER BY SAIKIRAN PANJALA
DENSITY BASED TRAFFIC LIGHT CONTROLLER BY SAIKIRAN PANJALADENSITY BASED TRAFFIC LIGHT CONTROLLER BY SAIKIRAN PANJALA
DENSITY BASED TRAFFIC LIGHT CONTROLLER BY SAIKIRAN PANJALA
 
Smart Traffic Congestion Control System
Smart Traffic Congestion Control SystemSmart Traffic Congestion Control System
Smart Traffic Congestion Control System
 
Ijater 03 06
Ijater 03 06Ijater 03 06
Ijater 03 06
 
Resume
ResumeResume
Resume
 
Automation of load using mobile phone.
Automation of load using mobile phone.Automation of load using mobile phone.
Automation of load using mobile phone.
 
SMART TRAFFIC CONTROL
SMART TRAFFIC CONTROLSMART TRAFFIC CONTROL
SMART TRAFFIC CONTROL
 
IRJET- IoT based Smart Ambulance System
IRJET-  	  IoT based Smart Ambulance SystemIRJET-  	  IoT based Smart Ambulance System
IRJET- IoT based Smart Ambulance System
 
Micro controller based Traffic control system
Micro controller based Traffic control systemMicro controller based Traffic control system
Micro controller based Traffic control system
 
Smart Traffic Light Controller
Smart Traffic Light ControllerSmart Traffic Light Controller
Smart Traffic Light Controller
 
Density based-traffic-light-control-system project-2 (3)
Density based-traffic-light-control-system project-2 (3)Density based-traffic-light-control-system project-2 (3)
Density based-traffic-light-control-system project-2 (3)
 
Eng.Walidmanaa CV
Eng.Walidmanaa  CVEng.Walidmanaa  CV
Eng.Walidmanaa CV
 
wireless traffic density control using sensor
wireless traffic density control using sensorwireless traffic density control using sensor
wireless traffic density control using sensor
 
Density based traffic signal system
Density based traffic signal systemDensity based traffic signal system
Density based traffic signal system
 
Rohini_CV
Rohini_CVRohini_CV
Rohini_CV
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report
 
Wisp Italy ISP WiFi
Wisp Italy ISP WiFiWisp Italy ISP WiFi
Wisp Italy ISP WiFi
 

Similar to U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz

Fal telecom profile dec 2012
Fal telecom profile   dec 2012Fal telecom profile   dec 2012
Fal telecom profile dec 2012
Venkata Reddy
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
Mohallab Shbeeb
 
UNMESH 2015 modified Presentation
UNMESH 2015 modified PresentationUNMESH 2015 modified Presentation
UNMESH 2015 modified Presentation
Sayak Chakraborty
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013
Joseph Melanson
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015
Moreau Mulume
 

Similar to U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz (20)

Automatic Meter reading (amr)
Automatic Meter reading (amr)Automatic Meter reading (amr)
Automatic Meter reading (amr)
 
Ramesh CV
Ramesh CVRamesh CV
Ramesh CV
 
Telemetry over gprs vico indonesia
Telemetry over gprs vico indonesiaTelemetry over gprs vico indonesia
Telemetry over gprs vico indonesia
 
Automated Tunnel Monitoring System (ATMS)
Automated Tunnel Monitoring System (ATMS)Automated Tunnel Monitoring System (ATMS)
Automated Tunnel Monitoring System (ATMS)
 
Fal telecom profile dec 2012
Fal telecom profile   dec 2012Fal telecom profile   dec 2012
Fal telecom profile dec 2012
 
Phani_Resume
Phani_ResumePhani_Resume
Phani_Resume
 
Resume_Arvind_Srivastava
Resume_Arvind_SrivastavaResume_Arvind_Srivastava
Resume_Arvind_Srivastava
 
Vsat noc engineer
Vsat  noc engineerVsat  noc engineer
Vsat noc engineer
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
 
Accedian METRONODE 10GE
Accedian METRONODE 10GEAccedian METRONODE 10GE
Accedian METRONODE 10GE
 
111ei0254ppt8thsem
111ei0254ppt8thsem111ei0254ppt8thsem
111ei0254ppt8thsem
 
Resume_Arvind_Srivastava
Resume_Arvind_SrivastavaResume_Arvind_Srivastava
Resume_Arvind_Srivastava
 
AGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefsAGE TECHNOLOGIES_2014 project briefs
AGE TECHNOLOGIES_2014 project briefs
 
UNMESH 2015 modified Presentation
UNMESH 2015 modified PresentationUNMESH 2015 modified Presentation
UNMESH 2015 modified Presentation
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013
 
Smart City Convergence of Technologies
Smart City Convergence of TechnologiesSmart City Convergence of Technologies
Smart City Convergence of Technologies
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015
 
INOC - Art Meierdirk Presentation from UTC April 15, 2014
INOC - Art Meierdirk Presentation from UTC April 15, 2014 INOC - Art Meierdirk Presentation from UTC April 15, 2014
INOC - Art Meierdirk Presentation from UTC April 15, 2014
 
IT & telecommunication
IT & telecommunicationIT & telecommunication
IT & telecommunication
 
Wireless Mesh Technology, Ecosystem and Alliance for reliable and secure IoT
Wireless Mesh Technology, Ecosystem and Alliance for reliable and secure IoTWireless Mesh Technology, Ecosystem and Alliance for reliable and secure IoT
Wireless Mesh Technology, Ecosystem and Alliance for reliable and secure IoT
 

Recently uploaded

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 

U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz

  • 2. About Us Technical Info Customers 1.603.529 Employees (-subcont.) 638 Total Installed Cap. (MVA) 3.162 Peak Load (MW) 1.513 Transformers (-3rd party) 9.376 Street lights 392.165 Poles 1.172.774
  • 3. AFTER TAKEOVER INVESTMENTS INFORMATION TECHNOLOGY After takeover, all software and hardware system has been renewed.
  • 4. AFTER TAKEOVER INVESTMENTS COMMUNICATION INFRASTRUCTURE Fiber optic network has been set up for 140 Points and 3G redundant communication
  • 5. AFTER TAKEOVER INVESTMENTS CALL CENTER • Call Center (44 44 186) is operating 24/7 effectively both in Turkish and English. • Call Center answers to the questions about subscription, failure, billing, debts, complaints, requests for information.
  • 6. AFTER TAKEOVER INVESTMENTS AMR by using GPRS/ 3G Until end of this year, 23.000 meters will be reading via AMR Our target until the end of the 2015: 75.000 meters
  • 7. AFTER TAKEOVER INVESTMENTS AMR by using PLC Pilot Project for PLC in 2013 : 2000 meters via AMR by using communicaton type of PLC. Until the end of the 2020, all meters via AMR by using PLC
  • 8. AFTER TAKEOVER INVESTMENTS SCADA - DMS SCADA-DMS Project get started in 2011 and continues for 70 substation centers.
  • 9. AFTER TAKEOVER INVESTMENTS SCADA - DMS In the first year of the project, 100 transformers and within five years, 1000 transformers will take place in this Project.
  • 10. AFTER TAKEOVER INVESTMENTS SCADA - DMS For the purpose of remote monitoring of the distribution system, 350 power analyzers and communication systems were installed to main injection points so that changes in distribution of both voltage and load profiles are monitored in real time.
  • 11. AFTER TAKEOVER INVESTMENTS GIS (Geographical Information Sysem) and Field Management System GIS project was completed and update in progress. The Photograph in the Google Earth Used satellite photograph by us With Worldview-2 and Geoeye satellites , 50 cm resolution, 6.5 m coordinat accuracy, %1 cloudiness rate , supplied satellite photo and it was used GIS map.
  • 12. AFTER TAKEOVER INVESTMENTS GIS (Geographical Information Sysem) and Field Management System • All repair & maintanence vehicles were equipped with mobile computer systems and integration between call center system and vehicle tracking system was completed so that teams can intervene with failures in a shorter time. • By this system, the time for intervention to failures was reduced from 76 min. to 37 min.
  • 13. AFTER TAKEOVER INVESTMENTS DISASTER CENTER • To prevent Aydem service from potential disasters, disaster center has been established to keep the system working continuously. • Sufficient infrastructure for Customer Information System was also provided in Aydın Province in case of a disaster in Denizli.
  • 14. AFTER TAKEOVER INVESTMENTS MOBIL AYDEM Planned outage announcements Payment points directions Declarations complaint, Estimated billing account, Consumption analysis,
  • 15. AFTER TAKEOVER INVESTMENTS Electric Vehicle Conversion Studies • asynchronous motor: 90 kW/ 1500 rpm • Torque : 630 Nm / 1500 rpm. • Duration of travel 2 h 45’ • Duration of Recharge: 5h 30’ • Max speed : 110 km/h • Range : 220 km • Empty weight: 7500 Kg
  • 16. AFTER TAKEOVER INVESTMENTS In Next 5 Years Software Requirements • ERP Solutions • Asset Management System • Work Force Management System • Meter Data Management System