Water Woes of Mumbai City by Mr.P.K.Charankar

Ekonnect Knowledge Foundation
Ekonnect Knowledge FoundationEkonnect Knowledge Foundation
Water Woes of Mumbai
P.K. Charankar
Consulting Engineer
Retired Deputy Municipal Commissioner
(Special Engineering)
Municipal Corporation of Greater Mumbai
2
Existing Water Supply Sources
Sr.
No.
Name of the Source Year of
Completion
Qty of Water
Supply (MLD)
Total Qty of Water
Supply
(MLD)(Cumulative)
1 Vihar Lake 1860 110 110
2 Tulsi Lake 1879 18 128
3 Tansa Lake 1892 to 1925 485 613
4 Modak sagar & Upper
Vaitarna
1957 1142 1755
6 Bhatsa (3 SCHEMES
TOGETHER)
1974 to 2007 1700 3455
Middle Vaitrna 2014 455 3910
Inclusive of 120MLD En-Route Supply
3
Water Supply: 3900 Mld
Major Water Treatment Plants:
Bhandup: Rated capacity 1910 Mld, working
at 2100 Mld + 990 Newly added in 2014
Panjarapur: Rated capacity 1365 Mld, working
at 1365 Mld
Vehar + Tulsi : Rated capacity 90 Mld
Master Balancing Reservoirs : 2 (Yewai & Bhandup)
Service Reservoirs : 26
Length of water mains : 4000 Kms
No. of Distribution Zones : 109
No. of Leak-detection Zones : 615
No. of daily operated valves : 800
Mumbai Water Supply Scenario
4
Sources of Water Supply For Mumbai
MIDDLE
VAITARNA
GARGAI
UPPER
VAITARNA
LOWER
VAITARNA
PINJAL
BHATSATANSA
Bhatsa release
Pise Pumping
1315 Mld to City
2435 Mld to City
670 Mld
2315 Mld
430 Mld
1765 Mld
VaiternaTansa
2020 Mld
Overview of Water Supply to
Mumbai
En route
120 Mld
Other sources
120 Mld
Raw water
Treated water
Net Flow to City: 3750 Mld
6
Length of water mains : 4000 Kms
No. of Distribution Zones : 109
No. of Leak-detection Zones : 615
No. of daily operated valves : 800
Population : 13.3 millions
Mumbai Water Supply Scenario
Reservoirs
Distribution Mains
Service Mains
Consumer Connections
Source
Demand Supply Scenario
2001 2011 2021
12.2 m
14.4m
16.7m
Source: Dr. Chitale Committee Report
2902
3033
4392
3798
3813
4243
Demand in Mld
Supply in Mld
Present Supply 3900 Mld
Simple Arithmetic
 Total Supply = 3900 Mld
 Estimated UFW = 30%
 Net Available = 2730 Mld
 Estimated Population = 20 Millions
 Net availability/person = 136 litres/head/day
It is less than international standards but
Mumbai is not a water stressed area
Broad Conclusion
Sufficient
Water but
unequal
distribution
leads to
water
scarcity in
this City
10
Challenges of Mumbai’s Water Supply
Issues pertaining to Quantity of Water
• Growing demand and problem of inequitable distribution owing to sub-
optimal pressure regulation.
Issues pertaining to Quality of Water
• Contamination due to aging network and intermittent supply, peaking
during monsoon
Issues pertaining to hours of supply
• Intermittent supply. Average duration of supply: 2-4 hrs.
Issues pertaining to “unaccounted for water”
• Physical as well as revenue losses amounting to 20-25%
Issues pertaining to Cost of Operations and tariff
structure
• Need to cover growing operational costs and generate surplus for
investments in water supply infrastructure through efficiency
enhancement measures and timely and periodic revision of user
charges
11
Action Plan For Improvement in
Water Sector
Source Augmentation
Better Supply-side
Management
Better Demand-side
Management
12
Action Plan For Water Sector
Source Augmentation
13
Long Term Plan For Source Augmentation
In the year 1993, the Govt. of Maharashtra appointed an expert committee under the
chairmanship of Dr M A Chitale (Ex-Secretary, Irrigation Dept) for advice on the long term
planning for augmentation of water supply to Mumbai. The committee recommended
development of following sources in phases
The GoM has accepted the Dr. Chitale Committee recommendations and has
approved allotment of these sources. The MCGM has therefore taken up the Middle
Vaitarna Project as an immediate additional source of water supply. The same was
completed in 2012. It is expected that the supply will be available from October
2014.
Simultaneously feasibility of Gargai and Pinjal Projects is currently being studied
Sr. Source Basin Yield
No. [MLD]
1 Middle Vaitarna Vaitarna 455
2 Gargai Vaitarna 455
3 Pinjal Vaitarna 865
4 Kalu Ulhas 590
IV MUMBAI (MIDDLE VAITERNA) WATER
SUPPLY PROJECT
Completed in 2012
Tunnel for Conveyance completed in 2014
Water Availability 455 Mld
Challenges in Source Augmentation
 All new sources are situated in
Environmentally sensitive areas. For
Example: Gargai is located in Wildlife
Sanctuary
 Forest land will have to deforested.
 Land acquisition of revenue land is costly.
 Rehabilitation of Project Affected People is a
great challenge for executing agency
Towards Better Supply-side
Management
Challenges on Supply Side
Management
 Leakages in transmission and distribution
network
 Contamination
 Unequitable distribution
 Reduction in NRW -Physical leakage
-Thefts
- Incorrect metering
18
Supply Side initiatives: Distribution
Network
Comprehensive Water Supply Distribution Improvement Programme
1. Division of the entire city into various District Metering Areas (DMAs)
2. Hydraulic study of DMAs, each comprising about 1000 connections.
3.100% Consumer metering, Bulk metering and District Metering set-up.
4. Water balance and estimation of NRW/UFW in each DMA
• Leakage detection, Repairs / Rehabilitation / Replacement plan
• Water balance of each DMA
• Install pressure regulating devices for equitable distribution
• Digital mapping of the utility on GIS compatible base maps.
• Hydraulic modeling of the entire network.
• Introduce / upgrade ‘SCADA’, the distribution management tool.
Approach
Universal Metering Policy Matter. It has been
accepted in principle and is
being implemented
Telescopic Tariff Structure
for Water Consumption
Policy Matter. It has been
implemented for certain
categories
Water Distribution Network
Up gradation
Hiring Consultancy Services and
Implementation of
Suggestions under their
supervision:
A Result Oriented Consultancy
Agreement
Reduction in UFW/NRW
& 24 X 7 Water Supply
 Updating of water network maps with
universal reference points.
Present Status: Some part of the network has
been digitalized. Newly laid pipelines have
not been integrated in the digitalised version.
OBJECTIVE 1
OBJECTIVE 2
Estimation and Reduction of UFW for the entire city
network.
I-Phase –
 a) Providing Bulk Measuring Meters on various zones.
 b) Estimation of UFW under intermittent water
supply conditions by actual measurement of flows .
 c) Reduction in UFW upto target level of 10% under
existing conditions of intermittent water supply by
implementing the suggestions
II-Phase –
 Reduction in UFW up to target level as per minimum
night flow on 24 hour basis.
 Zone-wise hydraulic analysis of primary,
secondary and tertiary water supply
network.
 Water balance in each zone
OBJECTIVE 3
 24 x 7 Water Supply for entire city
(with available water supply which could be of
the order of 3500 Mld for a population of about
15 millions and NRW limited to 15-18%, it is
expected that the situation is conducive for 24
X 7 water supply.
The terrain, variation in population density are
the challenges in supplying water on 24 X 7)
OBJECTIVE 4
Replacement of Old Water Mains by
Underground Tunnels
Towards Better Supply-side
Management
Condition of Some of the Old
Pipelines
PRESENT STATUS
 There are 11 outlets of Malbar
Hill Reservoir varying in
diameter from 450 mm to 1200
mm, passing through
Chaupati Beach & further
along the Netaji
Subhashchandra Bose Road.
Most of these mains are
nearly 50 years old.
 The rehabilitation of these
outlets lines is very difficult
because of social and
physical cost impacts.
Therefore, 8 out of 11 outlets
are replaced by tunnel
Water Woes of Mumbai City by Mr.P.K.Charankar
TUNNEL FROM MAROSHI TO
RUPAREL COLLEGE
Water Woes of Mumbai City by Mr.P.K.Charankar
TBM CUTTER HEAD-FRONT VIEW
Water Woes of Mumbai City by Mr.P.K.Charankar
RCC LINED TUNNEL
Towards Better Demand-side
 New housing projects
with 135 lpcd
 Recycling of Grey
water
 Telescopic water tariff
to encourage the
people to conserve
water
 Equitable Water
Distribution
Technological Challenges
 Replacement &
rehabilitation of old water
mains in confined space
 Reliable and robust water
leak detection
equipments/systems
 Reliable and robust water
meters
 Management consultancy
in reduction in NRW in
such a complex situation
 Utility mapping for old
pipelines
Quality Aspects
1. Protection of Water Sources
2. Treatment Facilities and adequacy
3. Possibility of Contamination of water
supply through water distribution
network.
General Characteristics of Raw Water
 Turbidity: From lake sources-Max 20 NTU
From river source- Max. 50 NTU
 pH 6.8 to 7.5
 SS Max. 20 mg/lit
 TDS Max 75 mg/lit
No hardness
No presence of any toxic material
Protection of Water Sources: Modak
Sagar
Bhatsa Abstraction
River Abstraction at Pise
Quality Assurance at Treatment
Plants
1. The entire water supply is treated at two major water
treatment plants: Bhandup and Panjarapur
2. The treatment consists of conventional treatment
units such as pre chlorination, Settling, filtration, post
chlorination. This treatment is adequate as all the
sources are away from inhabitation and well
protected.
3. There are full scale laboratories with trained staff and
state of art laboratory equipment
4. for quality control of water
5. The quality is fully ensured (as per IS as well as WHO
Standards) while the water leaves treatment plants.
Challenges in Protection of Water
mains in some parts of City
Protection of Distribution System
Water Woes Summary
 Intermittent Water Supply: Leading to ingress of water from
outside into water mains during non supply hours.
 Sufficient water but unequal distribution leading to wrong
impression about availability.
 Complicated procedure for new water connections
 Low pressures in distribution system
 Old pipelines which are heavily corroded
 Hidden population: Census 2011 data shows declining
population of Mumbai- Creating problems for planning.
That’s all I have to share
with you friends!
1 von 44

Recomendados

Case Studies of Water Supply Infrastructures von
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresPrasad Thanthratey
964 views24 Folien
water supply Project theory von
water supply Project theorywater supply Project theory
water supply Project theoryMadhav Parajuli
12.5K views28 Folien
Drainage Master Plan von
Drainage Master PlanDrainage Master Plan
Drainage Master PlanCity of College Station
1.4K views8 Folien
Storm water rain water harvesting von
Storm water   rain water harvestingStorm water   rain water harvesting
Storm water rain water harvestingDipesh Jain
3.1K views58 Folien
Water distribution von
Water distributionWater distribution
Water distributionMuhammad Nouman
12.4K views8 Folien
Water supply von
Water supplyWater supply
Water supplyRajiva Gupta
13.3K views159 Folien

Más contenido relacionado

Was ist angesagt?

Bangalore's Water Supply situation - BWSSB von
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBSangeeta (San) Banerjee
11.3K views57 Folien
Amrut ppt von
Amrut pptAmrut ppt
Amrut pptPankaj Maurya
1.7K views22 Folien
Planning and management of water von
Planning and management of waterPlanning and management of water
Planning and management of waterSiddhi Vakharia
3K views47 Folien
Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas... von
Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas...Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas...
Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas...Vijay Meena
4.2K views19 Folien
Rural water von
Rural water Rural water
Rural water Ghassan Hadi
3.3K views11 Folien
Interlinking of rivers in india von
Interlinking of rivers in indiaInterlinking of rivers in india
Interlinking of rivers in indiaIqura Malik
829 views25 Folien

Was ist angesagt?(20)

Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas... von Vijay Meena
Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas...Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas...
Integrated Village Development Plan | Case study: Kagalabamori Village, Rajas...
Vijay Meena4.2K views
Interlinking of rivers in india von Iqura Malik
Interlinking of rivers in indiaInterlinking of rivers in india
Interlinking of rivers in india
Iqura Malik829 views
House connection from mains, laying and joints in pipes von krishnacp
House connection from mains, laying and joints in pipesHouse connection from mains, laying and joints in pipes
House connection from mains, laying and joints in pipes
krishnacp40.6K views
Iwm case studies (standard) von biometrust
Iwm case studies (standard)Iwm case studies (standard)
Iwm case studies (standard)
biometrust708 views
DRINKING WATER SUPPLY SCHEMES FOR SOLAPUR TOWN DEVELOPMENT, PROBLEMS & FUTUR... von SHRINIVAS VADAGBALKAR
DRINKING WATER SUPPLY SCHEMES  FOR SOLAPUR TOWN DEVELOPMENT, PROBLEMS & FUTUR...DRINKING WATER SUPPLY SCHEMES  FOR SOLAPUR TOWN DEVELOPMENT, PROBLEMS & FUTUR...
DRINKING WATER SUPPLY SCHEMES FOR SOLAPUR TOWN DEVELOPMENT, PROBLEMS & FUTUR...
Water distribution System In Water Supply Schemes von Vaibhav Kambale
Water distribution System In Water Supply Schemes Water distribution System In Water Supply Schemes
Water distribution System In Water Supply Schemes
Vaibhav Kambale1K views
Plumbing services in high rise building and group housing von Rohit Bhatt
Plumbing services in high rise building and group housingPlumbing services in high rise building and group housing
Plumbing services in high rise building and group housing
Rohit Bhatt15.8K views
Week 05 lecture 05 water supply von Hena Dutt
Week 05 lecture 05 water supplyWeek 05 lecture 05 water supply
Week 05 lecture 05 water supply
Hena Dutt1.4K views
Water distribution system by kalpesh solanki von kalpesh solanki
Water distribution system by kalpesh solankiWater distribution system by kalpesh solanki
Water distribution system by kalpesh solanki
kalpesh solanki6.1K views
Planning & Design of Storm water Drainage system for Valsad city von Mona Prajapati
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad city
Mona Prajapati3.9K views
City Development Plan Solapur 2041 von AdithyaA16
City Development Plan Solapur 2041City Development Plan Solapur 2041
City Development Plan Solapur 2041
AdithyaA161.7K views

Destacado

Mumbai status von
Mumbai statusMumbai status
Mumbai statusSandeep Das
988 views19 Folien
Water Community Media Ppt von
Water Community Media PptWater Community Media Ppt
Water Community Media Pptashokmalik
3K views55 Folien
Sustainable Cities: Managing Urban Water Resources von
Sustainable Cities: Managing Urban Water ResourcesSustainable Cities: Managing Urban Water Resources
Sustainable Cities: Managing Urban Water ResourcesAnuradha Mukherji
694 views42 Folien
Rising City Ghatkopar von
Rising City GhatkoparRising City Ghatkopar
Rising City GhatkoparBig Move
1.4K views20 Folien
Regency Sarvam Project by Regency Group at Titwala East von
Regency Sarvam Project by Regency Group at Titwala EastRegency Sarvam Project by Regency Group at Titwala East
Regency Sarvam Project by Regency Group at Titwala EastBig Move
27.4K views19 Folien
Project_Mumbai Infrastructure Case Study von
Project_Mumbai Infrastructure Case StudyProject_Mumbai Infrastructure Case Study
Project_Mumbai Infrastructure Case StudyStephanie Byrd
1.5K views17 Folien

Destacado(20)

Water Community Media Ppt von ashokmalik
Water Community Media PptWater Community Media Ppt
Water Community Media Ppt
ashokmalik3K views
Sustainable Cities: Managing Urban Water Resources von Anuradha Mukherji
Sustainable Cities: Managing Urban Water ResourcesSustainable Cities: Managing Urban Water Resources
Sustainable Cities: Managing Urban Water Resources
Anuradha Mukherji694 views
Rising City Ghatkopar von Big Move
Rising City GhatkoparRising City Ghatkopar
Rising City Ghatkopar
Big Move1.4K views
Regency Sarvam Project by Regency Group at Titwala East von Big Move
Regency Sarvam Project by Regency Group at Titwala EastRegency Sarvam Project by Regency Group at Titwala East
Regency Sarvam Project by Regency Group at Titwala East
Big Move27.4K views
Project_Mumbai Infrastructure Case Study von Stephanie Byrd
Project_Mumbai Infrastructure Case StudyProject_Mumbai Infrastructure Case Study
Project_Mumbai Infrastructure Case Study
Stephanie Byrd1.5K views
Small community water supply system very good one von Priodeep Chowdhury
Small community water supply system  very good oneSmall community water supply system  very good one
Small community water supply system very good one
Priodeep Chowdhury1.6K views
underground water tunnel project von Ratnesh Shinde
underground water tunnel projectunderground water tunnel project
underground water tunnel project
Ratnesh Shinde489 views
Water Quality In Mumbai : Chlorinated Compounds In Potable Water von Sourabh Kulkarni
Water Quality In Mumbai : Chlorinated Compounds In Potable WaterWater Quality In Mumbai : Chlorinated Compounds In Potable Water
Water Quality In Mumbai : Chlorinated Compounds In Potable Water
Sourabh Kulkarni2.5K views
Water Conservation Pakistan von naeemqureshi
Water Conservation PakistanWater Conservation Pakistan
Water Conservation Pakistan
naeemqureshi8.5K views
Navi mumbai development von smritigupta24
Navi mumbai developmentNavi mumbai development
Navi mumbai development
smritigupta2413.1K views
Rain Water Harvesting- its simple!!! von Francin Pinto
Rain Water Harvesting- its simple!!!Rain Water Harvesting- its simple!!!
Rain Water Harvesting- its simple!!!
Francin Pinto21.6K views
Theory of Settlement : Navi Mumbai von debakshi
Theory of Settlement : Navi MumbaiTheory of Settlement : Navi Mumbai
Theory of Settlement : Navi Mumbai
debakshi29.2K views

Similar a Water Woes of Mumbai City by Mr.P.K.Charankar

Kumar M - UEI Day 1 - Kochi Jan18 von
Kumar M - UEI Day 1 - Kochi Jan18Kumar M - UEI Day 1 - Kochi Jan18
Kumar M - UEI Day 1 - Kochi Jan18India UK Water Centre (IUKWC)
129 views31 Folien
SV Ranganath's Lecture on Water Governance in Bangalore von
SV Ranganath's Lecture on Water Governance in BangaloreSV Ranganath's Lecture on Water Governance in Bangalore
SV Ranganath's Lecture on Water Governance in BangaloreCommunications and Policy Engagement at CSTEP
259 views30 Folien
Rainwater Harvesting in an Urban Context : Training of Urban Local Bodies von
Rainwater Harvesting in an Urban Context : Training of Urban Local BodiesRainwater Harvesting in an Urban Context : Training of Urban Local Bodies
Rainwater Harvesting in an Urban Context : Training of Urban Local Bodiesbiomeshubha
681 views66 Folien
Jaipur_water supply service.pdf von
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
17 views40 Folien
IWRM Evaluation Result_Singapore von
IWRM Evaluation Result_SingaporeIWRM Evaluation Result_Singapore
IWRM Evaluation Result_SingaporeGWP SOUTHEAST ASIA
4.3K views45 Folien
Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water... von
Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water...Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water...
Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water...India Water Portal
4.5K views33 Folien

Similar a Water Woes of Mumbai City by Mr.P.K.Charankar(20)

Rainwater Harvesting in an Urban Context : Training of Urban Local Bodies von biomeshubha
Rainwater Harvesting in an Urban Context : Training of Urban Local BodiesRainwater Harvesting in an Urban Context : Training of Urban Local Bodies
Rainwater Harvesting in an Urban Context : Training of Urban Local Bodies
biomeshubha681 views
Jaipur_water supply service.pdf von AKASHICWORLD
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
AKASHICWORLD17 views
Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water... von India Water Portal
Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water...Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water...
Water conservation & management in rural Punjab_S.R. Aggarwal_Deptt. of Water...
India Water Portal4.5K views
Rainwater harvesting in a megacity presentation for BWSSB von zenrain man
Rainwater harvesting in a megacity  presentation for BWSSBRainwater harvesting in a megacity  presentation for BWSSB
Rainwater harvesting in a megacity presentation for BWSSB
zenrain man2.3K views
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan... von India-EU Water Partnership
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Innovative participatory community managed drinking water delivery approach i... von India Water Portal
Innovative participatory community managed drinking water delivery approach i...Innovative participatory community managed drinking water delivery approach i...
Innovative participatory community managed drinking water delivery approach i...
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez von IPPAI
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
IPPAI5.1K views
Rainwater harvesting efforts in Bangalore_BWSSB_2013 von India Water Portal
Rainwater harvesting efforts in Bangalore_BWSSB_2013Rainwater harvesting efforts in Bangalore_BWSSB_2013
Rainwater harvesting efforts in Bangalore_BWSSB_2013
India Water Portal2.4K views
26 nov16 irrigation_water_use_efficiency von IWRS Society
26 nov16 irrigation_water_use_efficiency26 nov16 irrigation_water_use_efficiency
26 nov16 irrigation_water_use_efficiency
IWRS Society1.8K views
Continuous water supply system against existing Intermittent Supply system von ijsrd.com
Continuous water supply system against existing Intermittent Supply systemContinuous water supply system against existing Intermittent Supply system
Continuous water supply system against existing Intermittent Supply system
ijsrd.com370 views

Más de Ekonnect Knowledge Foundation

Environmental Data Management and Analytics von
Environmental Data Management and AnalyticsEnvironmental Data Management and Analytics
Environmental Data Management and AnalyticsEkonnect Knowledge Foundation
3K views79 Folien
Waste Segregation von
Waste Segregation Waste Segregation
Waste Segregation Ekonnect Knowledge Foundation
67.4K views34 Folien
Waste Management Hierarchy von
Waste Management Hierarchy Waste Management Hierarchy
Waste Management Hierarchy Ekonnect Knowledge Foundation
5.1K views37 Folien
Waste Procesing Techniuques - Biomethanation von
Waste Procesing Techniuques - Biomethanation Waste Procesing Techniuques - Biomethanation
Waste Procesing Techniuques - Biomethanation Ekonnect Knowledge Foundation
884 views36 Folien
Trends in Solid Waste Management von
Trends in Solid Waste ManagementTrends in Solid Waste Management
Trends in Solid Waste ManagementEkonnect Knowledge Foundation
1.1K views29 Folien
Stree Mukti Sanghatana von
Stree Mukti SanghatanaStree Mukti Sanghatana
Stree Mukti SanghatanaEkonnect Knowledge Foundation
529 views55 Folien

Más de Ekonnect Knowledge Foundation(20)

Último

Panoramica sulle certificazioni di sostenibilità - Mazzaglia, Vireo von
Panoramica sulle certificazioni di sostenibilità - Mazzaglia, VireoPanoramica sulle certificazioni di sostenibilità - Mazzaglia, Vireo
Panoramica sulle certificazioni di sostenibilità - Mazzaglia, VireoEtifor srl
14 views16 Folien
Energy System Transitions in the context of sustainable development: Findings... von
Energy System Transitions in the context of sustainable development: Findings...Energy System Transitions in the context of sustainable development: Findings...
Energy System Transitions in the context of sustainable development: Findings...ipcc-media
57 views9 Folien
Sustainable Tourism von
Sustainable TourismSustainable Tourism
Sustainable TourismDr. Salem Baidas
19 views20 Folien
Opportunities for Early Career Scientists to Contribute to IPCC work & the IP... von
Opportunities for Early Career Scientists to Contribute to IPCC work & the IP...Opportunities for Early Career Scientists to Contribute to IPCC work & the IP...
Opportunities for Early Career Scientists to Contribute to IPCC work & the IP...ipcc-media
63 views10 Folien
Uforest Innovation Challenge - The Meandering Forest von
Uforest Innovation Challenge - The Meandering ForestUforest Innovation Challenge - The Meandering Forest
Uforest Innovation Challenge - The Meandering ForestEtifor srl
52 views36 Folien
Low-emission food system perspectives in Viet Nam von
Low-emission food system perspectives in Viet NamLow-emission food system perspectives in Viet Nam
Low-emission food system perspectives in Viet NamCIFOR-ICRAF
8 views6 Folien

Último(20)

Panoramica sulle certificazioni di sostenibilità - Mazzaglia, Vireo von Etifor srl
Panoramica sulle certificazioni di sostenibilità - Mazzaglia, VireoPanoramica sulle certificazioni di sostenibilità - Mazzaglia, Vireo
Panoramica sulle certificazioni di sostenibilità - Mazzaglia, Vireo
Etifor srl14 views
Energy System Transitions in the context of sustainable development: Findings... von ipcc-media
Energy System Transitions in the context of sustainable development: Findings...Energy System Transitions in the context of sustainable development: Findings...
Energy System Transitions in the context of sustainable development: Findings...
ipcc-media57 views
Opportunities for Early Career Scientists to Contribute to IPCC work & the IP... von ipcc-media
Opportunities for Early Career Scientists to Contribute to IPCC work & the IP...Opportunities for Early Career Scientists to Contribute to IPCC work & the IP...
Opportunities for Early Career Scientists to Contribute to IPCC work & the IP...
ipcc-media63 views
Uforest Innovation Challenge - The Meandering Forest von Etifor srl
Uforest Innovation Challenge - The Meandering ForestUforest Innovation Challenge - The Meandering Forest
Uforest Innovation Challenge - The Meandering Forest
Etifor srl52 views
Low-emission food system perspectives in Viet Nam von CIFOR-ICRAF
Low-emission food system perspectives in Viet NamLow-emission food system perspectives in Viet Nam
Low-emission food system perspectives in Viet Nam
CIFOR-ICRAF8 views
Challenges for WG1 von ipcc-media
Challenges for WG1Challenges for WG1
Challenges for WG1
ipcc-media45 views
Uforest Innovation Challenge - Bosc Glial von Etifor srl
Uforest Innovation Challenge - Bosc GlialUforest Innovation Challenge - Bosc Glial
Uforest Innovation Challenge - Bosc Glial
Etifor srl74 views
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7 von ipcc-media
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7 Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7
ipcc-media73 views
Activity 9 Sustainability System.pptx von AkarshSingh57
Activity 9 Sustainability System.pptxActivity 9 Sustainability System.pptx
Activity 9 Sustainability System.pptx
AkarshSingh579 views
Climate Change and Health von ipcc-media
Climate Change and HealthClimate Change and Health
Climate Change and Health
ipcc-media78 views
Carbon Dioxide Removal to reach net-zero and return from overshoot von ipcc-media
Carbon Dioxide Removal to reach net-zero and return from overshootCarbon Dioxide Removal to reach net-zero and return from overshoot
Carbon Dioxide Removal to reach net-zero and return from overshoot
ipcc-media196 views
Physical Science Challenges for AR7 von ipcc-media
Physical Science Challenges for AR7Physical Science Challenges for AR7
Physical Science Challenges for AR7
ipcc-media271 views
Uforest Innovation Challenge - UNIFOREST von Etifor srl
Uforest Innovation Challenge - UNIFORESTUforest Innovation Challenge - UNIFOREST
Uforest Innovation Challenge - UNIFOREST
Etifor srl25 views

Water Woes of Mumbai City by Mr.P.K.Charankar

  • 1. Water Woes of Mumbai P.K. Charankar Consulting Engineer Retired Deputy Municipal Commissioner (Special Engineering) Municipal Corporation of Greater Mumbai
  • 2. 2 Existing Water Supply Sources Sr. No. Name of the Source Year of Completion Qty of Water Supply (MLD) Total Qty of Water Supply (MLD)(Cumulative) 1 Vihar Lake 1860 110 110 2 Tulsi Lake 1879 18 128 3 Tansa Lake 1892 to 1925 485 613 4 Modak sagar & Upper Vaitarna 1957 1142 1755 6 Bhatsa (3 SCHEMES TOGETHER) 1974 to 2007 1700 3455 Middle Vaitrna 2014 455 3910 Inclusive of 120MLD En-Route Supply
  • 3. 3 Water Supply: 3900 Mld Major Water Treatment Plants: Bhandup: Rated capacity 1910 Mld, working at 2100 Mld + 990 Newly added in 2014 Panjarapur: Rated capacity 1365 Mld, working at 1365 Mld Vehar + Tulsi : Rated capacity 90 Mld Master Balancing Reservoirs : 2 (Yewai & Bhandup) Service Reservoirs : 26 Length of water mains : 4000 Kms No. of Distribution Zones : 109 No. of Leak-detection Zones : 615 No. of daily operated valves : 800 Mumbai Water Supply Scenario
  • 4. 4 Sources of Water Supply For Mumbai MIDDLE VAITARNA GARGAI UPPER VAITARNA LOWER VAITARNA PINJAL BHATSATANSA
  • 5. Bhatsa release Pise Pumping 1315 Mld to City 2435 Mld to City 670 Mld 2315 Mld 430 Mld 1765 Mld VaiternaTansa 2020 Mld Overview of Water Supply to Mumbai En route 120 Mld Other sources 120 Mld Raw water Treated water Net Flow to City: 3750 Mld
  • 6. 6 Length of water mains : 4000 Kms No. of Distribution Zones : 109 No. of Leak-detection Zones : 615 No. of daily operated valves : 800 Population : 13.3 millions Mumbai Water Supply Scenario Reservoirs Distribution Mains Service Mains Consumer Connections Source
  • 7. Demand Supply Scenario 2001 2011 2021 12.2 m 14.4m 16.7m Source: Dr. Chitale Committee Report 2902 3033 4392 3798 3813 4243 Demand in Mld Supply in Mld Present Supply 3900 Mld
  • 8. Simple Arithmetic  Total Supply = 3900 Mld  Estimated UFW = 30%  Net Available = 2730 Mld  Estimated Population = 20 Millions  Net availability/person = 136 litres/head/day It is less than international standards but Mumbai is not a water stressed area
  • 10. 10 Challenges of Mumbai’s Water Supply Issues pertaining to Quantity of Water • Growing demand and problem of inequitable distribution owing to sub- optimal pressure regulation. Issues pertaining to Quality of Water • Contamination due to aging network and intermittent supply, peaking during monsoon Issues pertaining to hours of supply • Intermittent supply. Average duration of supply: 2-4 hrs. Issues pertaining to “unaccounted for water” • Physical as well as revenue losses amounting to 20-25% Issues pertaining to Cost of Operations and tariff structure • Need to cover growing operational costs and generate surplus for investments in water supply infrastructure through efficiency enhancement measures and timely and periodic revision of user charges
  • 11. 11 Action Plan For Improvement in Water Sector Source Augmentation Better Supply-side Management Better Demand-side Management
  • 12. 12 Action Plan For Water Sector Source Augmentation
  • 13. 13 Long Term Plan For Source Augmentation In the year 1993, the Govt. of Maharashtra appointed an expert committee under the chairmanship of Dr M A Chitale (Ex-Secretary, Irrigation Dept) for advice on the long term planning for augmentation of water supply to Mumbai. The committee recommended development of following sources in phases The GoM has accepted the Dr. Chitale Committee recommendations and has approved allotment of these sources. The MCGM has therefore taken up the Middle Vaitarna Project as an immediate additional source of water supply. The same was completed in 2012. It is expected that the supply will be available from October 2014. Simultaneously feasibility of Gargai and Pinjal Projects is currently being studied Sr. Source Basin Yield No. [MLD] 1 Middle Vaitarna Vaitarna 455 2 Gargai Vaitarna 455 3 Pinjal Vaitarna 865 4 Kalu Ulhas 590
  • 14. IV MUMBAI (MIDDLE VAITERNA) WATER SUPPLY PROJECT Completed in 2012 Tunnel for Conveyance completed in 2014 Water Availability 455 Mld
  • 15. Challenges in Source Augmentation  All new sources are situated in Environmentally sensitive areas. For Example: Gargai is located in Wildlife Sanctuary  Forest land will have to deforested.  Land acquisition of revenue land is costly.  Rehabilitation of Project Affected People is a great challenge for executing agency
  • 17. Challenges on Supply Side Management  Leakages in transmission and distribution network  Contamination  Unequitable distribution  Reduction in NRW -Physical leakage -Thefts - Incorrect metering
  • 18. 18 Supply Side initiatives: Distribution Network Comprehensive Water Supply Distribution Improvement Programme 1. Division of the entire city into various District Metering Areas (DMAs) 2. Hydraulic study of DMAs, each comprising about 1000 connections. 3.100% Consumer metering, Bulk metering and District Metering set-up. 4. Water balance and estimation of NRW/UFW in each DMA • Leakage detection, Repairs / Rehabilitation / Replacement plan • Water balance of each DMA • Install pressure regulating devices for equitable distribution • Digital mapping of the utility on GIS compatible base maps. • Hydraulic modeling of the entire network. • Introduce / upgrade ‘SCADA’, the distribution management tool.
  • 19. Approach Universal Metering Policy Matter. It has been accepted in principle and is being implemented Telescopic Tariff Structure for Water Consumption Policy Matter. It has been implemented for certain categories Water Distribution Network Up gradation Hiring Consultancy Services and Implementation of Suggestions under their supervision: A Result Oriented Consultancy Agreement Reduction in UFW/NRW & 24 X 7 Water Supply
  • 20.  Updating of water network maps with universal reference points. Present Status: Some part of the network has been digitalized. Newly laid pipelines have not been integrated in the digitalised version. OBJECTIVE 1
  • 21. OBJECTIVE 2 Estimation and Reduction of UFW for the entire city network. I-Phase –  a) Providing Bulk Measuring Meters on various zones.  b) Estimation of UFW under intermittent water supply conditions by actual measurement of flows .  c) Reduction in UFW upto target level of 10% under existing conditions of intermittent water supply by implementing the suggestions II-Phase –  Reduction in UFW up to target level as per minimum night flow on 24 hour basis.
  • 22.  Zone-wise hydraulic analysis of primary, secondary and tertiary water supply network.  Water balance in each zone OBJECTIVE 3
  • 23.  24 x 7 Water Supply for entire city (with available water supply which could be of the order of 3500 Mld for a population of about 15 millions and NRW limited to 15-18%, it is expected that the situation is conducive for 24 X 7 water supply. The terrain, variation in population density are the challenges in supplying water on 24 X 7) OBJECTIVE 4
  • 24. Replacement of Old Water Mains by Underground Tunnels Towards Better Supply-side Management
  • 25. Condition of Some of the Old Pipelines
  • 26. PRESENT STATUS  There are 11 outlets of Malbar Hill Reservoir varying in diameter from 450 mm to 1200 mm, passing through Chaupati Beach & further along the Netaji Subhashchandra Bose Road. Most of these mains are nearly 50 years old.  The rehabilitation of these outlets lines is very difficult because of social and physical cost impacts. Therefore, 8 out of 11 outlets are replaced by tunnel
  • 28. TUNNEL FROM MAROSHI TO RUPAREL COLLEGE
  • 33. Towards Better Demand-side  New housing projects with 135 lpcd  Recycling of Grey water  Telescopic water tariff to encourage the people to conserve water  Equitable Water Distribution
  • 34. Technological Challenges  Replacement & rehabilitation of old water mains in confined space  Reliable and robust water leak detection equipments/systems  Reliable and robust water meters  Management consultancy in reduction in NRW in such a complex situation  Utility mapping for old pipelines
  • 35. Quality Aspects 1. Protection of Water Sources 2. Treatment Facilities and adequacy 3. Possibility of Contamination of water supply through water distribution network.
  • 36. General Characteristics of Raw Water  Turbidity: From lake sources-Max 20 NTU From river source- Max. 50 NTU  pH 6.8 to 7.5  SS Max. 20 mg/lit  TDS Max 75 mg/lit No hardness No presence of any toxic material
  • 37. Protection of Water Sources: Modak Sagar
  • 40. Quality Assurance at Treatment Plants 1. The entire water supply is treated at two major water treatment plants: Bhandup and Panjarapur 2. The treatment consists of conventional treatment units such as pre chlorination, Settling, filtration, post chlorination. This treatment is adequate as all the sources are away from inhabitation and well protected. 3. There are full scale laboratories with trained staff and state of art laboratory equipment 4. for quality control of water 5. The quality is fully ensured (as per IS as well as WHO Standards) while the water leaves treatment plants.
  • 41. Challenges in Protection of Water mains in some parts of City
  • 43. Water Woes Summary  Intermittent Water Supply: Leading to ingress of water from outside into water mains during non supply hours.  Sufficient water but unequal distribution leading to wrong impression about availability.  Complicated procedure for new water connections  Low pressures in distribution system  Old pipelines which are heavily corroded  Hidden population: Census 2011 data shows declining population of Mumbai- Creating problems for planning.
  • 44. That’s all I have to share with you friends!