Diese Präsentation wurde erfolgreich gemeldet.
Wir verwenden Ihre LinkedIn Profilangaben und Informationen zu Ihren Aktivitäten, um Anzeigen zu personalisieren und Ihnen relevantere Inhalte anzuzeigen. Sie können Ihre Anzeigeneinstellungen jederzeit ändern.
1
REQUIREMENTS FOR BUILDING PLAN APPROVAL AT THE
MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT
Below are the requiremen...
2
vii. Location plan must be sealed by a Registered Town Planner.
Storey Building in Ado Ekiti.
i. Four (4) sets of workin...
3
COMMERCIAL BUILDING
Bungalow/ Storey Building in Ado Ekiti.
I. Four (4) sets of working drawings with architectural seal...
4
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee
vi...
5
line
11. Minimum setback to the centre of
medium tension power line (33kv)
30m 15m
12. Minimum setback to the low
tensio...
6
iii. Four (4) sets of Mechanical drawings sealed by a Registered
Engineer.
iv. Four (4) sets of Electrical drawings seal...
7
GAS STATION.
SPATIAL REQUIREMENTS SCHEDULE
Minimum Spatial Requirements
1.
Requirement/ condition
Site Area Minimum
Majo...
8
14. Minimum setback from the
property line to the edge of any
stream where there are no
embankment wall.
15m 10m
15. Min...
9
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town Planner.
viii. Enviro...
10
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed by a Registered Town Planner.
x. Envir...
11
iv. Ratification Fee
v. Land use clearance
vi. Perimeter Fencing
vii. Location plan must be sealed by a Registered Town...
12
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed...
13
v. Assessment Fee
vi. Ratification Fee
vii. Land use clearance
viii. Perimeter Fencing
ix. Location plan must be sealed...
14
vii. Perimeter Fencing
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assess...
15
x. Environmental Impact Assessment.
PLACE OF WORSHIP
i. Four (4) sets of working drawings with architectural seal.
ii. ...
16
Commercial/Petrol Station/ Sawmill
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of s...
17
iv. Location plan must be sealed by a Registered Town Planner.
v. Environmental Impact Assessment.
PENALTY IN RESPECTOF...
18
iii. Evidence of payment of tax and Ekiti State Development levy for 3
years.
iv. Broadcasting license.
v. EIA/SAR
3. I...
Nächste SlideShare
Wird geladen in …5
×

REQUIREMENTS FOR BUILDING PLAN APPROVAL AT THE MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT

This document contains the requirements for project application and approval at the Ministry of Lands, Housing and Urban Development. However, the fees payable varies, depending on the size, use and volume of development involved.
Assessment fees are worked on porata that is, volume multiply by fees order.

  • Als Erste(r) kommentieren

  • Gehören Sie zu den Ersten, denen das gefällt!

REQUIREMENTS FOR BUILDING PLAN APPROVAL AT THE MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT

  1. 1. 1 REQUIREMENTS FOR BUILDING PLAN APPROVAL AT THE MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT Below are the requirements for project application and approval at the Ministry of Lands, Housing and Urban Development. However, the fees payable varies, depending on the size, use and volume of development involved. Assessment fees are worked on porata that is, volume multiply by fees order. RESIDENTIAL BUILDING Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Local Government Headquarters i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Towns i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing
  2. 2. 2 vii. Location plan must be sealed by a Registered Town Planner. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Local Government Headquarters. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner.
  3. 3. 3 COMMERCIAL BUILDING Bungalow/ Storey Building in Ado Ekiti. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee vii. Ratification Fee viii. Land use clearance ix. Perimeter Fencing x. Location plan must be sealed by a Registered Town Planner. Bungalow/ Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee vii. Ratification Fee viii. Land use clearance ix. Perimeter Fencing x. Location plan must be sealed by a Registered Town Planner. BANK BUILDING I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment.
  4. 4. 4 iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee vii. Ratification Fee viii. Land use clearance ix. Perimeter Fencing x. Location plan must be sealed by a Registered Town Planner. PETROL FILLING STATION SPATIAL REQUIREMENTS SCHEDULE Minimum Spatial Requirements 1. Requirement/ condition Site Area Minimum Major 1500m Domestic Retailers 900-1000m 2. Minimum Frontal Width. 30m 18m 3. Minimum distance between Filling station at the same side of the road. 500m 180m 4. On the other side of road 200m 120m 5. Minimum drive way width abuting the station. 12m 9m 6. Minimum width of each gate egress and ingress (open frontage is preferred). No block wall fence in the frontage. 6.0m 4.5m 7. The set back of the building structures and installations within the station. 6.0m 4.5m 8. …to adjoining properties of residential structures. 8.2m 6.0m 9. Minimum set back to the NNPC or Gas Pipeline 45m 45m 10. Minimum setback to 130/132kv 50m 50m
  5. 5. 5 line 11. Minimum setback to the centre of medium tension power line (33kv) 30m 15m 12. Minimum setback to the low tension power line (11kv) 20m 15m 13. Minimum setback to stream from the centre of the property where there is no embankment walls. 30m 30m 14. Minimum setback from the property line to the edge of any stream where there are no embankment wall. 15m 10m 15. Minimum setback to the centre of road intersection. 45m 20m 16. Minimum distance from property line to the centre line of secondary road i.e State & Intercity road. 30m 20m i. Four (4) sets of Electrical drawings sealed by a Registered Engineer ii. Environmental Impact Assessment. iii. Fire Service Clearance. iv. Police Traffic Clearance. v. Letter of suitability/feasibility Approval from DPR. vi. Land use clearance Approval. vii. Current 3 years tax clearance and 3 years Development levy. viii. Letter of supervision by the Structural Engineer. ix. Approved survey plan by surveyor General. x. Assessment Fee xi. Ratification Fee xii. Land use clearance xiii. Perimeter Fencing xiv. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Local Government Area. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
  6. 6. 6 iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility Approval from DPR. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee xiv. Ratification Fee xv. Land use clearance xvi. Perimeter Fencing xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. Iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer iv. Environmental Impact Assessment. v. Fire Service Clearance. vi. Police Traffic Clearance. vii. Land use clearance Approval. viii. Letter of suitability/feasibility Clearance from DPR. ix. Current 3 years tax clearance and 3 years Development Levy. x. Letter of supervision by the Structural Engineer. xi. Approved survey plan by surveyor General. xii. Assessment Fee xiii. Ratification Fee xiv. Land use clearance xv. Perimeter Fencing xvi. Location plan must be sealed by a Registered Town Planner.
  7. 7. 7 GAS STATION. SPATIAL REQUIREMENTS SCHEDULE Minimum Spatial Requirements 1. Requirement/ condition Site Area Minimum Major 1500m Domestic Retailers 900-1000m 2. Minimum Frontal Width. 30m 18m 3. Minimum distance between Filling station at the same side of the road. 500m 180m 4. On the other side of road 200m 120m 5. Minimum drive way width abuting the station. 12m 9m 6. Minimum width of each gate egress and ingress (open frontage is preferred). No block wall fence in the frontage. 6.0m 4.5m 7. The set back of the building structures and installations within the station. 6.0m 4.5m 8. …to adjoining properties of residential structures. 8.2m 6.0m 9. Minimum set back to the NNPC or Gas Pipeline 45m 45m 10. Minimum setback to 130/132kv line 50m 50m 11. Minimum setback to the centre of medium tension power line (33kv) 30m 15m 12. Minimum setback to the low tension power line (11kv) 20m 15m 13. Minimum setback to stream from the centre of the property where there is no embankment walls. 30m 30m
  8. 8. 8 14. Minimum setback from the property line to the edge of any stream where there are no embankment wall. 15m 10m 15. Minimum setback to the centre of road intersection. 45m 20m 16. Minimum distance from property line to the centre line of secondary road i.e State & Intercity road. 30m 20m i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility from DPR. x. Current 3 years tax clearance and 3 years Development Levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee xiv. Ratification Fee xv. Land use clearance xvi. Perimeter Fencing xvii. Location plan must be sealed by a Registered Town Planner. HOSTEL. Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee
  9. 9. 9 v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee
  10. 10. 10 vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. SAWMILL. Saw Mill in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Saw Mill in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. xi. HOTEL/EATERY/RESTAURANTS Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee
  11. 11. 11 iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General.
  12. 12. 12 v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. LIGHT INDUSTRY Block Making Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Concrete Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry (Mechanical) i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General.
  13. 13. 13 v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry with Asphalt i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. AGRICULTURAL DEVELOPMENT Mechanized Farming i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee iv. Ratification Fee v. Land use clearance vi. Perimeter Fencing vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. POULTRY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = (100-200) Birds iv. Assessment Fee = (201-500) Birds v. Ratification Fee vi. Land use clearance
  14. 14. 14 vii. Perimeter Fencing viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. FISHERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial) iv. Assessment Fee (Domestic) v. Ratification Fee vi. Land use clearance vii. Perimeter Fencing viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. PIGGERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial) iv. Assessment Fee (Domestic) v. Ratification Fee vi. Land use clearance vii. Perimeter Fencing viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. RELIGION CAMP GROUND i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner.
  15. 15. 15 x. Environmental Impact Assessment. PLACE OF WORSHIP i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. EDUCATION INSTITUTION Nursery/Primary school/Secondary school/Post-Secondary school i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee vi. Ratification Fee vii. Land use clearance viii. Perimeter Fencing ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. CHANGE OF SITE OF AN APPROVED PLAN Residential i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner.
  16. 16. 16 Commercial/Petrol Station/ Sawmill i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. RENEWAL OF BUILDING PLAN Residential/Commercial/Industrial i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 20% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. (Commercial/Industrial) LAYOUT PLAN i. Six (6) sets of layout plan with locational plan prepared by a Registered Town Planner. ii. Approved survey plan by surveyor General. iii. Land Use Clearance iv. Assessment Fee 0.5 Ha- 2.5Ha 2.5Ha - 5.0Ha 5.1Ha - 10Ha Above 10Ha v. Location plan must be sealed by a Registered Town Planner. vi. Environmental Impact Assessment. ROAD CONSTRUCTION YARD PROJECT SITE i. Four (4) sets of working drawings with architectural seal ii. Approved survey plan by surveyor General. iii. Assessment Fee
  17. 17. 17 iv. Location plan must be sealed by a Registered Town Planner. v. Environmental Impact Assessment. PENALTY IN RESPECTOF UNAPPROVED EXISTING BUILDING PLAN i. Assessment Fee = The present Assessment + 50% of the assessment OPERATIONAL MODE OF PLANNING PERMIT DEPARTMENT Payments are made on these categories i. Commercial ii. Corporate bodies iii. Individual/private Condition for approval of mast/base transceiver station(BTS) for all categories of mast. i. Submission of four working drawings. ii. Submission of three copies of site analysis report. (SAR)/Environmental impact Assessment (EIA) iii. Joint site visitation to the site. iv. Issuance of demand notice for effective payment. v. Submission of evidence of payment in accordance with the demand notice. vi. Issuance of approval/ permit letter. vii. Continuous oversight function over the site activities. MEDIA HOUSES 1. Submission of application for the project of intension. 2. Submission of four copies of working drawings which must include the followings. i. Perimeter survey plan of the site signed by the Surveyor General. ii. Four copies of the working drawings of the building projects which can include the: electrical, mechanical, land scape e.t.c
  18. 18. 18 iii. Evidence of payment of tax and Ekiti State Development levy for 3 years. iv. Broadcasting license. v. EIA/SAR 3. Issuance of demand notices for effective payment. 4. Joint site visitation. 5. Evidence of payment in the manners prescribed in the demand notice. 6. Issuance of approval /permit. REQUIREMENTS FOR LAYING OF OPTIC FIBRE. 1. Submission of application by the prospective service provider showing. i. The name of the routes covered by the cables. ii. Map of the road network of the routes from origin to the last point. iii. Schedule/tabulation sheet of name, distances, total and categories of the affected routes. 2. Joint site visitation to the affected routes. 3. Issuance of demand notice generated from the application submitted. 4. Evidence of payment of the prescribed fee as entrenched in the demand notice. 5. Continuous oversight function of the ministry. 6. Issuance of certificate of completion when the job is satisfactorily implemented. Note:Penalty for contravension is double of the assessment fee above and other condition determined by the ministry.

×