SlideShare a Scribd company logo
1 of 25
OrCAD Data Management & 
Collaboration 
Janine Flagg – Sr. Applications Engineer
OrCAD Data Management 
Design Data Management 
2 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Topics 
Component / Library Management 
Q&A
OrCAD Data Management 
Capture 
Schematic Entry PCB Design 
CIP 
Collaboration Symbol Creation 
3 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Distributors 
PCB Editor 
Cadence Desktop PCB Design Flow 
CIS 
Parts 
EDM 
FP Creation 
Library 
Builder 
Engineering Central Server/File Repository/Libraries 
Corporate Systems – PLM, ERP, MRP, etc.. 
Library 
Builder
Component Data Management Common Issues 
• Inaccurate manual BOM editing 
• Inefficient part request and approval 
4 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
processes 
• Endless ECO changes 
• Duplicate CAD symbols 
• Incorrect PCB footprints in Netlist 
• Obsolete and non-compliant parts on 
designs 
• Poor integration to corporate systems 
• Communication issues with internal and 
external resources 
• National/global locations including CM 
issues
Searching and Selecting Approved Parts 
• Searching & Selecting parts from a controlled centralized data source 
• Eliminates manually changing of schematic symbol properties 
• Removes need for excessive symbol management 
• Only one Resistor symbol as opposed to hundreds 
• Reuse known good part data to help eliminate duplicate effort and 
improve efficiency 
• Visibility of all parametric data, graphical (symbols/footprints), 
Component Datasheets & Mfg data 
Centralized Parts Schematic 
Sym Library 
Part data 
5 © 2014 Cadence Design Systems, Inc. Cadence confidential.
Verification of Parts 
• Ensure component data integrity by validating data against database 
• Visual indication of approved, unapproved and new temporary parts 
• Track changes of a schematics parts availability and lifecycle 
• Notification of incorrect data like a wrong footprint prior to netlisting 
• Catch part errors prior to netlisting and BOM generation 
Part Manager 
Approved 
Undefined 
Temporary 
6 © 2014 Cadence Design Systems, Inc. Cadence confidential.
Automated New Part Introduction 
• Email notifications 
• Integration to distributor data and accelerated library building tools 
• Eliminate copy and paste errors 
• Controls the number of new parts added 
• Schematic updated when new part is released or approved 
• New part synchronization with corporate system 
7 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Part 
Updated 
Part Created 
Temp 
Added 
Part 
Approved
Implementing Zero-Touch BOMs 
• Eliminates error prone manually editing of BOMs 
• Ensures all users placing controlled parts from database 
• Verification of current schematic parts 
• Consistent BOM exports via standard templates 
• Incorporation of corporate data and multi-sourced parts 
• Closed-loop BOM flow between Capture and the corporate system 
ECAD 
Database 
Schematic 
BOM 
Data 
8 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
ERP/PLM 
Corp Data
Integration of Corporate Data 
• Integrate ERP/PLM by mirroring corporate data into engineering 
environment (Including Multiple Mfg support) 
• Enhanced engineering decisions by accessing corporate part data (part 
cost, availability, lead time) in the engineering design environment 
• Cost savings through part consolidation opportunities by eliminating 
unnecessary new part introductions 
• Minimizes administrative overhead (approvals etc) by streamlining the 
part introduction process 
• Eliminates manual BOM creation (and errors) 
ECAD 
Database 
Schematic 
9 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
ERP/PLM 
Corp Data
Collaboration and Global Involvement 
• A common dashboard for all users 
• Leverage powerful database and web based technology 
• Direct visibility of approved data between all players 
• Purchasing, Librarians, Designers, Component Engineers, etc 
• Email notifications to team members 
• Multi-site capabilities 
ECAD 
Libraries/ 
Database 
Site A Users 
Site B Users 
Site C Users 
10 © 2014 Cadence Design Systems, Inc. Cadence confidential.
Obsolete and Non-compliant Part Notification 
• Promotes the use of company preferred 
components to help meet corporate 
initiatives and goals. 
• Visual indication of non-compliant and 
11 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
unapproved parts 
• Site wide filtering of parts 
Table Parametric Data 
Released 
Obsolete 
In Review
Demo 
• Searching and placing centralized-controlled parts 
• Creating a new part using distributor data and accelerated symbol 
building techniques 
• Managing parts 
• Highlight “What’s New in CIP 5.0” features and enhancements 
12 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
throughout demo 
• User interface administration
Design Data Management Issues 
• What projects are currently active across the entire design 
team and who is working on them? 
• Where are my project’s schematic files? 
• Who is working on my design? 
– Should they be? 
• What version / revision should I be working on? 
• What were the changes to the last revision? 
– Who made them? 
• How do I ensure my design is locked once I send to layout? 
How do you reliably answer these questions? 
13 © 2014 Cadence Design Systems, Inc. Cadence confidential.
Typical PCB Data Management Environment 
• Data management occurs 
outside the CAD tools 
– Email 
– Conference calls / meetings 
– Notes 
– Shared Drives 
• None of this valuable data is 
pushed back into the CAD 
environment for management 
and traceability 
• This can quickly become a 
management nightmare 
14 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
?
What is OrCAD Engineering Data Management 
(EDM)? 
• Comprehensive collaboration and management 
environment for OrCAD Capture 
– Integrated directly within the OrCAD Capture environment 
• Fully integrated project dashboard for concurrently 
managing multiple projects 
• Builds a fully traceable audit trail as an inherent part of the 
design process 
• Facilitates IP reuse through access into current and 
previous design projects 
• Enables multiple engineer, team-based design and 
management of distributed design data 
15 © 2014 Cadence Design Systems, Inc. Cadence confidential.
Engineering Collaboration and Management 
Environment 
16 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Reviewer 
Manufacturer 
Engineer 1 
Engineer 2 
Engineer X 
Design Partner 
Collaborate and manage in-process designs and data 
directly inside OrCAD Capture across multiple 
projects and design teams 
Design 
Lead 
Project 
Manager
17 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Traceability 
Project 
When 
What & Why 
Who 
Versions
Project Level Management 
• Manage and track progress 
across all projects and users 
– Dashboard with real-time updates 
– Full revision history 
– Quick project access inside Capture 
• Control data access across 
projects 
– Assign projects to users 
– Allow users to add new projects 
– Archive projects 
– Invite stakeholders and partners to 
collaborate in “view-only” mode 
OrCAD EDM Design Data 
Repository 
Project A Project B Project C 
WIP 
Data 
18 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Team 
Design 
Read 
Only 
Access 
Engineer A 
Working on 
their own 
design 
Reviewer 
Downloads 
“Read Only” 
Version of 
Project B 
Engineering 
Team 
Working 
Collaboratively 
on a single 
project
Page-level Management 
• OrCAD Capture uses a single file 
system per project 
– Great for portability…not so much for 
collaboration 
• OrCAD EDM allows: 
– Assign individual pages to users 
– Assign multiple pages 
– Allow users to add pages 
– Recompile pages into master DSN 
• Best of both worlds – portability 
and page-level management 
Power 
Supply 
19 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Master 
.DSN 
Memory 
Interface 
Power 
Supply 
Engineer A 
1 page 
checked out 
for editing 
Engineer B 
Multiple 
pages 
checked out 
for editing 
Engineer C 
Page 
locked for 
editing (by 
Engineer 1). 
View only
Library Management 
• OrCAD Capture libraries are built 
similarly to schematic projects 
– One .OLB contains multiple symbols 
• Again great for portability…not so 
much for collaborative design 
• OrCAD EDM enables editing and 
version tracking of individual 
symbols within OLB files 
Symbol 
1 
20 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Master 
.OLB 
Symbol 
2 - X 
Symbol 
1 
Engineer A 
Individual 
notes, rev. 
history 
maintained 
for any 
edits 
Engineer B 
Editing 
multiple 
symbols 
Engineer C 
Can only 
view / place 
symbol 1. 
Locked for 
editing.
Administrative Control 
• Easily assign projects and 
pages to users 
– Specific pages 
– Set of page numbers 
• Control user rights 
– What they can edit 
– What they can view 
• Access previous revisions with 
rollback as needed 
21 © 2014 Cadence Design Systems, Inc. Cadence confidential.
Change Tracking / Reporting 
• Full audit trail is maintained 
– Who made changes 
– What changes did they make 
– When were those changes made 
– Why were the changes made 
• Get a quick real-time snapshot of 
– Individual project status 
– All projects 
– User tasks/progress 
• Powerful design management cockpit 
22 © 2014 Cadence Design Systems, Inc. Cadence confidential. 
Engineers/Designers 
Collaborate & View 
the Same Data 
Management/Project Leads
Demo Section 
23 © 2014 Cadence Design Systems, Inc. Cadence confidential.
OrCAD EDM Benefits 
• Purpose built solution specifically for collaborative 
schematic design and data management 
• Seamlessly integrated with OrCAD Capture schematic 
entry environment 
• Build a fully traceable audit trail as an inherent part of 
design process 
• Provides single dashboard view of all active OrCAD 
Capture design projects for users to review and access files 
• Keep all team members, regardless of geographic location, 
updated on project status in real-time 
24 © 2014 Cadence Design Systems, Inc. Cadence confidential.
25 © 2014 Cadence Design Systems, Inc. Cadence confidential.

More Related Content

What's hot

Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBe2camp Admin
 
BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500United-BIM
 
AVEVA Diagrams 12.0
AVEVA Diagrams 12.0AVEVA Diagrams 12.0
AVEVA Diagrams 12.0Hadi Karimi
 
An Introduction to BIM.ppsx
An Introduction to BIM.ppsxAn Introduction to BIM.ppsx
An Introduction to BIM.ppsxMujahid Kadri
 
Intro revit 9
Intro revit 9Intro revit 9
Intro revit 9divislide
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling PresentationMotasem Albanna
 
Revit mep online training ppt
Revit mep online training pptRevit mep online training ppt
Revit mep online training pptjaymicrosoftva
 
Revit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADDRevit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADDGaurang Trivedi
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectNguyen Manh Tuan
 
COBIE Overview
COBIE OverviewCOBIE Overview
COBIE Overviewistarkov
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit StructureMostafa El-Ashmawy
 
Aec bim presentation
Aec bim presentationAec bim presentation
Aec bim presentationAnkur Sardana
 
Open bim and collaboration practice
Open bim and collaboration practiceOpen bim and collaboration practice
Open bim and collaboration practiceOmar Selim
 
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012HOCHTIEF ViCon
 

What's hot (20)

Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in India
 
BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500
 
Synergis University 2014-BIM for Construction
Synergis University 2014-BIM for ConstructionSynergis University 2014-BIM for Construction
Synergis University 2014-BIM for Construction
 
AVEVA Diagrams 12.0
AVEVA Diagrams 12.0AVEVA Diagrams 12.0
AVEVA Diagrams 12.0
 
An Introduction to BIM.ppsx
An Introduction to BIM.ppsxAn Introduction to BIM.ppsx
An Introduction to BIM.ppsx
 
Intro revit 9
Intro revit 9Intro revit 9
Intro revit 9
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling Presentation
 
Revit mep online training ppt
Revit mep online training pptRevit mep online training ppt
Revit mep online training ppt
 
Delivering COBie data
Delivering COBie dataDelivering COBie data
Delivering COBie data
 
100 cad exercises
100 cad exercises100 cad exercises
100 cad exercises
 
Revit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADDRevit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADD
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
COBIE Overview
COBIE OverviewCOBIE Overview
COBIE Overview
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit Structure
 
Brkarc 3454
Brkarc 3454Brkarc 3454
Brkarc 3454
 
Aec bim presentation
Aec bim presentationAec bim presentation
Aec bim presentation
 
Open bim and collaboration practice
Open bim and collaboration practiceOpen bim and collaboration practice
Open bim and collaboration practice
 
BIM awareness
BIM awarenessBIM awareness
BIM awareness
 
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
 

Similar to PCB Design and Data Management

OrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview PresentationOrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview PresentationEMA Design Automation
 
OrCAD Documentation Editor PCB Documentation Environment
OrCAD Documentation Editor PCB Documentation EnvironmentOrCAD Documentation Editor PCB Documentation Environment
OrCAD Documentation Editor PCB Documentation EnvironmentEMA Design Automation
 
Synergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeks
Synergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeksSynergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeks
Synergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeksSynergis Engineering Design Solutions
 
Dedicated Computing Implmenting Aras
Dedicated Computing Implmenting ArasDedicated Computing Implmenting Aras
Dedicated Computing Implmenting ArasAras
 
How to become a Rational Developer for IBM i Power User
How to become a Rational Developer for IBM i Power UserHow to become a Rational Developer for IBM i Power User
How to become a Rational Developer for IBM i Power UserStrongback Consulting
 
automotive_nx_design
automotive_nx_designautomotive_nx_design
automotive_nx_designAIMFirst
 
PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignEMA Design Automation
 
Oracle web-applications
Oracle web-applicationsOracle web-applications
Oracle web-applicationsurskeshav
 
Audit your existing code in Domino - Collabsphere2022_v5.pdf
Audit your existing code in Domino  - Collabsphere2022_v5.pdfAudit your existing code in Domino  - Collabsphere2022_v5.pdf
Audit your existing code in Domino - Collabsphere2022_v5.pdfDominiquePerarnaud
 
Innovations in Sencha Tooling and Framework
Innovations in Sencha Tooling and FrameworkInnovations in Sencha Tooling and Framework
Innovations in Sencha Tooling and FrameworkSandeep Adwankar
 
Modern Web-site Development Pipeline
Modern Web-site Development PipelineModern Web-site Development Pipeline
Modern Web-site Development PipelineGlobalLogic Ukraine
 
The Fastest Way to Redis on Pivotal Cloud Foundry
The Fastest Way to Redis on Pivotal Cloud FoundryThe Fastest Way to Redis on Pivotal Cloud Foundry
The Fastest Way to Redis on Pivotal Cloud FoundryVMware Tanzu
 

Similar to PCB Design and Data Management (20)

OrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview PresentationOrCAD Library Builder Overview Presentation
OrCAD Library Builder Overview Presentation
 
Synergis University 2014-Top Reasons to Step Up from Basic Vault
Synergis University 2014-Top Reasons to Step Up from Basic VaultSynergis University 2014-Top Reasons to Step Up from Basic Vault
Synergis University 2014-Top Reasons to Step Up from Basic Vault
 
OrCAD Documentation Editor PCB Documentation Environment
OrCAD Documentation Editor PCB Documentation EnvironmentOrCAD Documentation Editor PCB Documentation Environment
OrCAD Documentation Editor PCB Documentation Environment
 
Synergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeks
Synergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeksSynergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeks
Synergis University 2014- 10 Data Management Challenges You Can Solve in 3 weeks
 
Dedicated Computing Implmenting Aras
Dedicated Computing Implmenting ArasDedicated Computing Implmenting Aras
Dedicated Computing Implmenting Aras
 
How to become a Rational Developer for IBM i Power User
How to become a Rational Developer for IBM i Power UserHow to become a Rational Developer for IBM i Power User
How to become a Rational Developer for IBM i Power User
 
automotive_nx_design
automotive_nx_designautomotive_nx_design
automotive_nx_design
 
PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB Design
 
Oracle web-applications
Oracle web-applicationsOracle web-applications
Oracle web-applications
 
SharePoint Custom Development
SharePoint Custom DevelopmentSharePoint Custom Development
SharePoint Custom Development
 
PCB Data Management Webinar
PCB Data Management WebinarPCB Data Management Webinar
PCB Data Management Webinar
 
Audit your existing code in Domino - Collabsphere2022_v5.pdf
Audit your existing code in Domino  - Collabsphere2022_v5.pdfAudit your existing code in Domino  - Collabsphere2022_v5.pdf
Audit your existing code in Domino - Collabsphere2022_v5.pdf
 
Developer want change Ops want control - devops
Developer want change Ops want control - devopsDeveloper want change Ops want control - devops
Developer want change Ops want control - devops
 
Innovations in Sencha Tooling and Framework
Innovations in Sencha Tooling and FrameworkInnovations in Sencha Tooling and Framework
Innovations in Sencha Tooling and Framework
 
Location-independent SharePoint
Location-independent SharePointLocation-independent SharePoint
Location-independent SharePoint
 
Technical Without Code
Technical Without CodeTechnical Without Code
Technical Without Code
 
PTC - CREO - DesignTech Systems Ltd
PTC - CREO - DesignTech Systems LtdPTC - CREO - DesignTech Systems Ltd
PTC - CREO - DesignTech Systems Ltd
 
OrCAD Panel Editor
OrCAD Panel EditorOrCAD Panel Editor
OrCAD Panel Editor
 
Modern Web-site Development Pipeline
Modern Web-site Development PipelineModern Web-site Development Pipeline
Modern Web-site Development Pipeline
 
The Fastest Way to Redis on Pivotal Cloud Foundry
The Fastest Way to Redis on Pivotal Cloud FoundryThe Fastest Way to Redis on Pivotal Cloud Foundry
The Fastest Way to Redis on Pivotal Cloud Foundry
 

More from EMA Design Automation

Serial Link Design - Meeting the Need for Speed
Serial Link Design - Meeting the Need for SpeedSerial Link Design - Meeting the Need for Speed
Serial Link Design - Meeting the Need for SpeedEMA Design Automation
 
Your Route to Design Success - PCB Routing Tips from the Pros
Your Route to Design Success - PCB Routing Tips from the ProsYour Route to Design Success - PCB Routing Tips from the Pros
Your Route to Design Success - PCB Routing Tips from the ProsEMA Design Automation
 
Common High-Speed PCB Design Issues and How to Solve Them
Common High-Speed PCB Design Issues and How to Solve ThemCommon High-Speed PCB Design Issues and How to Solve Them
Common High-Speed PCB Design Issues and How to Solve ThemEMA Design Automation
 
Designing for RF - Tips and Tricks from the PCB Design Pros
Designing for RF - Tips and Tricks from the PCB Design ProsDesigning for RF - Tips and Tricks from the PCB Design Pros
Designing for RF - Tips and Tricks from the PCB Design ProsEMA Design Automation
 
Design for Manufacturing (DFM) and Why it Matters
Design for Manufacturing (DFM) and Why it MattersDesign for Manufacturing (DFM) and Why it Matters
Design for Manufacturing (DFM) and Why it MattersEMA Design Automation
 
Let's Get Flexible: Expert Tips for Designing Flex PCBs
Let's Get Flexible: Expert Tips for Designing Flex PCBsLet's Get Flexible: Expert Tips for Designing Flex PCBs
Let's Get Flexible: Expert Tips for Designing Flex PCBsEMA Design Automation
 
Your PCB Power Delivery Network (PDN) Gives Your Board Life
Your PCB Power Delivery Network (PDN) Gives Your Board LifeYour PCB Power Delivery Network (PDN) Gives Your Board Life
Your PCB Power Delivery Network (PDN) Gives Your Board LifeEMA Design Automation
 
Modeling an Embedded Device for PSpice Simulation
Modeling an Embedded Device for PSpice SimulationModeling an Embedded Device for PSpice Simulation
Modeling an Embedded Device for PSpice SimulationEMA Design Automation
 
Implementing a Flexible Design Reuse Methodology
Implementing a Flexible Design Reuse MethodologyImplementing a Flexible Design Reuse Methodology
Implementing a Flexible Design Reuse MethodologyEMA Design Automation
 
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCBECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCBEMA Design Automation
 
Advanced Layout & Routing Techniques
Advanced Layout & Routing TechniquesAdvanced Layout & Routing Techniques
Advanced Layout & Routing TechniquesEMA Design Automation
 
Implementing Electrical and Simulation Rule Checks to ensure Signal Quality
Implementing Electrical and Simulation Rule Checks to ensure Signal QualityImplementing Electrical and Simulation Rule Checks to ensure Signal Quality
Implementing Electrical and Simulation Rule Checks to ensure Signal QualityEMA Design Automation
 
Analog Mixed Signal Simulation With PSpice
Analog Mixed Signal Simulation With PSpiceAnalog Mixed Signal Simulation With PSpice
Analog Mixed Signal Simulation With PSpiceEMA Design Automation
 

More from EMA Design Automation (18)

Serial Link Design - Meeting the Need for Speed
Serial Link Design - Meeting the Need for SpeedSerial Link Design - Meeting the Need for Speed
Serial Link Design - Meeting the Need for Speed
 
Power Supply Webinar
Power Supply WebinarPower Supply Webinar
Power Supply Webinar
 
How does your Stack-up, stack up?
How does your Stack-up, stack up?How does your Stack-up, stack up?
How does your Stack-up, stack up?
 
Your Route to Design Success - PCB Routing Tips from the Pros
Your Route to Design Success - PCB Routing Tips from the ProsYour Route to Design Success - PCB Routing Tips from the Pros
Your Route to Design Success - PCB Routing Tips from the Pros
 
Common High-Speed PCB Design Issues and How to Solve Them
Common High-Speed PCB Design Issues and How to Solve ThemCommon High-Speed PCB Design Issues and How to Solve Them
Common High-Speed PCB Design Issues and How to Solve Them
 
Designing for RF - Tips and Tricks from the PCB Design Pros
Designing for RF - Tips and Tricks from the PCB Design ProsDesigning for RF - Tips and Tricks from the PCB Design Pros
Designing for RF - Tips and Tricks from the PCB Design Pros
 
Design for Manufacturing (DFM) and Why it Matters
Design for Manufacturing (DFM) and Why it MattersDesign for Manufacturing (DFM) and Why it Matters
Design for Manufacturing (DFM) and Why it Matters
 
Let's Get Flexible: Expert Tips for Designing Flex PCBs
Let's Get Flexible: Expert Tips for Designing Flex PCBsLet's Get Flexible: Expert Tips for Designing Flex PCBs
Let's Get Flexible: Expert Tips for Designing Flex PCBs
 
Your PCB Power Delivery Network (PDN) Gives Your Board Life
Your PCB Power Delivery Network (PDN) Gives Your Board LifeYour PCB Power Delivery Network (PDN) Gives Your Board Life
Your PCB Power Delivery Network (PDN) Gives Your Board Life
 
What's New - OrCAD 17.2 QIR 6
What's New - OrCAD 17.2 QIR 6What's New - OrCAD 17.2 QIR 6
What's New - OrCAD 17.2 QIR 6
 
PCB Virtual Prototyping with PSpice
PCB Virtual Prototyping with PSpicePCB Virtual Prototyping with PSpice
PCB Virtual Prototyping with PSpice
 
Modeling an Embedded Device for PSpice Simulation
Modeling an Embedded Device for PSpice SimulationModeling an Embedded Device for PSpice Simulation
Modeling an Embedded Device for PSpice Simulation
 
Implementing a Flexible Design Reuse Methodology
Implementing a Flexible Design Reuse MethodologyImplementing a Flexible Design Reuse Methodology
Implementing a Flexible Design Reuse Methodology
 
OrCAD Constraint Driven Design Flow
OrCAD Constraint Driven Design FlowOrCAD Constraint Driven Design Flow
OrCAD Constraint Driven Design Flow
 
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCBECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
ECAD MCAD Design Data Management with PTC Windchill and Cadence Allegro PCB
 
Advanced Layout & Routing Techniques
Advanced Layout & Routing TechniquesAdvanced Layout & Routing Techniques
Advanced Layout & Routing Techniques
 
Implementing Electrical and Simulation Rule Checks to ensure Signal Quality
Implementing Electrical and Simulation Rule Checks to ensure Signal QualityImplementing Electrical and Simulation Rule Checks to ensure Signal Quality
Implementing Electrical and Simulation Rule Checks to ensure Signal Quality
 
Analog Mixed Signal Simulation With PSpice
Analog Mixed Signal Simulation With PSpiceAnalog Mixed Signal Simulation With PSpice
Analog Mixed Signal Simulation With PSpice
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

PCB Design and Data Management

  • 1. OrCAD Data Management & Collaboration Janine Flagg – Sr. Applications Engineer
  • 2. OrCAD Data Management Design Data Management 2 © 2014 Cadence Design Systems, Inc. Cadence confidential. Topics Component / Library Management Q&A
  • 3. OrCAD Data Management Capture Schematic Entry PCB Design CIP Collaboration Symbol Creation 3 © 2014 Cadence Design Systems, Inc. Cadence confidential. Distributors PCB Editor Cadence Desktop PCB Design Flow CIS Parts EDM FP Creation Library Builder Engineering Central Server/File Repository/Libraries Corporate Systems – PLM, ERP, MRP, etc.. Library Builder
  • 4. Component Data Management Common Issues • Inaccurate manual BOM editing • Inefficient part request and approval 4 © 2014 Cadence Design Systems, Inc. Cadence confidential. processes • Endless ECO changes • Duplicate CAD symbols • Incorrect PCB footprints in Netlist • Obsolete and non-compliant parts on designs • Poor integration to corporate systems • Communication issues with internal and external resources • National/global locations including CM issues
  • 5. Searching and Selecting Approved Parts • Searching & Selecting parts from a controlled centralized data source • Eliminates manually changing of schematic symbol properties • Removes need for excessive symbol management • Only one Resistor symbol as opposed to hundreds • Reuse known good part data to help eliminate duplicate effort and improve efficiency • Visibility of all parametric data, graphical (symbols/footprints), Component Datasheets & Mfg data Centralized Parts Schematic Sym Library Part data 5 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 6. Verification of Parts • Ensure component data integrity by validating data against database • Visual indication of approved, unapproved and new temporary parts • Track changes of a schematics parts availability and lifecycle • Notification of incorrect data like a wrong footprint prior to netlisting • Catch part errors prior to netlisting and BOM generation Part Manager Approved Undefined Temporary 6 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 7. Automated New Part Introduction • Email notifications • Integration to distributor data and accelerated library building tools • Eliminate copy and paste errors • Controls the number of new parts added • Schematic updated when new part is released or approved • New part synchronization with corporate system 7 © 2014 Cadence Design Systems, Inc. Cadence confidential. Part Updated Part Created Temp Added Part Approved
  • 8. Implementing Zero-Touch BOMs • Eliminates error prone manually editing of BOMs • Ensures all users placing controlled parts from database • Verification of current schematic parts • Consistent BOM exports via standard templates • Incorporation of corporate data and multi-sourced parts • Closed-loop BOM flow between Capture and the corporate system ECAD Database Schematic BOM Data 8 © 2014 Cadence Design Systems, Inc. Cadence confidential. ERP/PLM Corp Data
  • 9. Integration of Corporate Data • Integrate ERP/PLM by mirroring corporate data into engineering environment (Including Multiple Mfg support) • Enhanced engineering decisions by accessing corporate part data (part cost, availability, lead time) in the engineering design environment • Cost savings through part consolidation opportunities by eliminating unnecessary new part introductions • Minimizes administrative overhead (approvals etc) by streamlining the part introduction process • Eliminates manual BOM creation (and errors) ECAD Database Schematic 9 © 2014 Cadence Design Systems, Inc. Cadence confidential. ERP/PLM Corp Data
  • 10. Collaboration and Global Involvement • A common dashboard for all users • Leverage powerful database and web based technology • Direct visibility of approved data between all players • Purchasing, Librarians, Designers, Component Engineers, etc • Email notifications to team members • Multi-site capabilities ECAD Libraries/ Database Site A Users Site B Users Site C Users 10 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 11. Obsolete and Non-compliant Part Notification • Promotes the use of company preferred components to help meet corporate initiatives and goals. • Visual indication of non-compliant and 11 © 2014 Cadence Design Systems, Inc. Cadence confidential. unapproved parts • Site wide filtering of parts Table Parametric Data Released Obsolete In Review
  • 12. Demo • Searching and placing centralized-controlled parts • Creating a new part using distributor data and accelerated symbol building techniques • Managing parts • Highlight “What’s New in CIP 5.0” features and enhancements 12 © 2014 Cadence Design Systems, Inc. Cadence confidential. throughout demo • User interface administration
  • 13. Design Data Management Issues • What projects are currently active across the entire design team and who is working on them? • Where are my project’s schematic files? • Who is working on my design? – Should they be? • What version / revision should I be working on? • What were the changes to the last revision? – Who made them? • How do I ensure my design is locked once I send to layout? How do you reliably answer these questions? 13 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 14. Typical PCB Data Management Environment • Data management occurs outside the CAD tools – Email – Conference calls / meetings – Notes – Shared Drives • None of this valuable data is pushed back into the CAD environment for management and traceability • This can quickly become a management nightmare 14 © 2014 Cadence Design Systems, Inc. Cadence confidential. ?
  • 15. What is OrCAD Engineering Data Management (EDM)? • Comprehensive collaboration and management environment for OrCAD Capture – Integrated directly within the OrCAD Capture environment • Fully integrated project dashboard for concurrently managing multiple projects • Builds a fully traceable audit trail as an inherent part of the design process • Facilitates IP reuse through access into current and previous design projects • Enables multiple engineer, team-based design and management of distributed design data 15 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 16. Engineering Collaboration and Management Environment 16 © 2014 Cadence Design Systems, Inc. Cadence confidential. Reviewer Manufacturer Engineer 1 Engineer 2 Engineer X Design Partner Collaborate and manage in-process designs and data directly inside OrCAD Capture across multiple projects and design teams Design Lead Project Manager
  • 17. 17 © 2014 Cadence Design Systems, Inc. Cadence confidential. Traceability Project When What & Why Who Versions
  • 18. Project Level Management • Manage and track progress across all projects and users – Dashboard with real-time updates – Full revision history – Quick project access inside Capture • Control data access across projects – Assign projects to users – Allow users to add new projects – Archive projects – Invite stakeholders and partners to collaborate in “view-only” mode OrCAD EDM Design Data Repository Project A Project B Project C WIP Data 18 © 2014 Cadence Design Systems, Inc. Cadence confidential. Team Design Read Only Access Engineer A Working on their own design Reviewer Downloads “Read Only” Version of Project B Engineering Team Working Collaboratively on a single project
  • 19. Page-level Management • OrCAD Capture uses a single file system per project – Great for portability…not so much for collaboration • OrCAD EDM allows: – Assign individual pages to users – Assign multiple pages – Allow users to add pages – Recompile pages into master DSN • Best of both worlds – portability and page-level management Power Supply 19 © 2014 Cadence Design Systems, Inc. Cadence confidential. Master .DSN Memory Interface Power Supply Engineer A 1 page checked out for editing Engineer B Multiple pages checked out for editing Engineer C Page locked for editing (by Engineer 1). View only
  • 20. Library Management • OrCAD Capture libraries are built similarly to schematic projects – One .OLB contains multiple symbols • Again great for portability…not so much for collaborative design • OrCAD EDM enables editing and version tracking of individual symbols within OLB files Symbol 1 20 © 2014 Cadence Design Systems, Inc. Cadence confidential. Master .OLB Symbol 2 - X Symbol 1 Engineer A Individual notes, rev. history maintained for any edits Engineer B Editing multiple symbols Engineer C Can only view / place symbol 1. Locked for editing.
  • 21. Administrative Control • Easily assign projects and pages to users – Specific pages – Set of page numbers • Control user rights – What they can edit – What they can view • Access previous revisions with rollback as needed 21 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 22. Change Tracking / Reporting • Full audit trail is maintained – Who made changes – What changes did they make – When were those changes made – Why were the changes made • Get a quick real-time snapshot of – Individual project status – All projects – User tasks/progress • Powerful design management cockpit 22 © 2014 Cadence Design Systems, Inc. Cadence confidential. Engineers/Designers Collaborate & View the Same Data Management/Project Leads
  • 23. Demo Section 23 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 24. OrCAD EDM Benefits • Purpose built solution specifically for collaborative schematic design and data management • Seamlessly integrated with OrCAD Capture schematic entry environment • Build a fully traceable audit trail as an inherent part of design process • Provides single dashboard view of all active OrCAD Capture design projects for users to review and access files • Keep all team members, regardless of geographic location, updated on project status in real-time 24 © 2014 Cadence Design Systems, Inc. Cadence confidential.
  • 25. 25 © 2014 Cadence Design Systems, Inc. Cadence confidential.

Editor's Notes

  1. With many customer engagements, EMA has encountered inefficient and ineffective part and library management. These issues can be a detriment to the time to market or overall control of your companies product. These typical issues include…. [Next Animation] Inaccurate component and corporate data causing hours of hand editing BOM spreadsheets [Next Animation] Inefficient part request and approval processes resulting in accumulated redundant parts in the system [Next Animation] Endless ECO changes due to part issues [Next Animation] Multiple libraries containing duplicate or redundant CAD symbols [Next Animation] Incorrect PCB footprint gets linked to a schematic part because of a disconnect between CAD symbols and component data [Next Animation] Poor integration to corporate systems requiring the search of different data sources for part selection [Next Animation] Critical designs gaps and component part data visibility between national locations, global locations and contract manufacturers [Next Animation] Costly production delays because of re-spins due to inaccurate environment compliance information [Next Animation] Obsolete design parts or long design lead time because of incomplete lifecycle component information
  2. During our day to day use of our ECAD data we run into common issues such as Click - Where are my project’s schematic files? Click - Who is working on my design and should they? Click - What version or revision should I be working on? Click - What were the changes to the last revision and who made them? Click - How do I ensure my design is locked once I send to layout? Click- What projects are currently active across the entire design team and who is working on them? Click - How do you reliably answer these questions today?
  3. Click- In a typical PCB data management environment, data management occurs outside the CAD tools in emails, conference calls, meetings, notes and shared drives. Click- None of this valuable data is pushed back into the CAD environment for management and traceability Click - This can quickly become a management nightmare.
  4. Click- With OrCAD Engineering Data Management these issues now get eliminated! OrCAD EDM offers a comprehensive collaboration and management environment for Cadence OrCAD Capture. Click – With a fully integrated solution to OrCAD Capture, OrCAD EDM enables design teams to take advantage of the time-to-market benefits gained from team based design, while eliminating the challenges associated with managing data across the team. Click – It is a fully integrated project dashboard for concurrently managing multiple projects… Click – … and builds a fully traceable audit trail as an inherent part of the design process. Click – OrCAD EDM facilitates IP reuse through access into current and previous design projects along with Click - … enabling multiple engineer, team-based design and management of distributed design data.
  5. OrCAD EDM allows users to collaborate and manage in-process designs and data directly inside OrCAD Capture across multiple projects and design teams
  6. Also, OrCAD EDM builds a fully traceable audit trail as an inherent part of the design process Around the… Click- The name of the project Click- When downloaded or uploaded Click- The reason Click- Who invoked the action Click- Retrieval of a version
  7. Click - Project leads and users will be able to manage and track progress across all projects and users with a real-time updated dashboard, full revision history and quick project access inside OrCAD Capture Click - Also, able to control data access across projects like assigning projects to users, allowing users to add new projects, archive projects, and invite stakeholders and partners to collaborate in a “view-only” mode
  8. Click- OrCAD Capture uses a single file system per project which is great for portability but not for collaboration. Click- With OrCAD EDM, it will allow assigning individual pages to users, multiple page assignment, add pages, and recompile pages into a master Capture design file. Click- This gives the best of both worlds with portability and page-level management.
  9. Click- OrCAD Capture libraries are built similarly to schematic projects with one .OLB containing multiple symbols Click- Again great for portability…not so much for collaborative design Click- OrCAD EDM enables editing and version tracking of individual symbols within OLB files
  10. Admins and Project Leads can… Click- Easily assign pages to users with specific pages and a set of page numbers. Click- Control user rights on what can be edited and viewed. Click- Accessing previous revisions with rollback as required.
  11. Click- A full audit trail is maintained on who made changes, what changes did they make, when were those changes made and why. Click- Project Leaders can get a quick real-time snapshot of individual project status, all projects and the users tasks or progress. Click- All within a powerful design management cockpit.
  12. To summarize OrCAD Engineering Data Management benefits which includes Click - A purpose built solution specifically for collaborative schematic design and data management Click- … which is seamlessly integrated with OrCAD Capture schematic entry environment. Click- Also, allows for building a fully traceable audit trail as an inherent part of design process. Click- Provides a single dashboard view of all active OrCAD Capture design projects for users to review and access files. Click- Finally, keeps all team members, regardless of geographic location, updated on project status in real-time