1. CAREER PROFILE
I have been in the Automation Industry for more than 9 years and worked with various design software. I am
currently employed as a SCADA SystemApplication Developer whereby I’m involved in Automation and
Control System Projects and the day to day management of the SCADA department. I have extensive
experience in developing, configuring and troubleshooting SCADA and some PLC systems.I have experience
in a vast amount of industries ranging from Oil and Gas, Food and Beverage, Mining and Base Metals.
I am looking to build a strong,long term relationship with an Employer that can offer me a stable,challenging
and stimulating work environment.
KEY SKILLS
I am able to work in the following PLC Languages.
Structured Text
FBD
Ladder
I am able to work in the following HMI scripting Languages.
C++
Certifications and Specialist Training.
Wonderware InTouch for SystemPlatform 2014 R2 Certified Developer
Wonderware Application Developer_Achestra Object Toolkit 3.1 Certified Developer
Wonderware Application Developer_Histrorian Server 11.6 Certified Developer
Wonderware Application Developer_HMI Reports 3.4 Certified Developer
Wonderware Application Server 2014 R2 Certified Developer
Wonderware Historian Client 2014 R2 Certified Developer
Wonderware InBatch 9.6 2012 Certified Developer
Wonderware Information Server 5.6 2014 R2 Certified Developer
ABB Systems 800xa Developer
3
5
7
4
2
0
1
2
3
4
5
6
7
8
PROJECTS COMPLETED
17
4
0
2
4
6
8
10
12
14
16
18
SCADA PLC
PROJECT ROLES
4
1
13
3
1
2
0
2
4
6
8
10
12
14
SOFTWARE PACKAGES
13 SHERWOOD VILLAGE
AMPLIFIER ROAD
RADIOKOP
ROODEPOORT
1724
0796355304
DWAINEDP@GMAIL.COM
LINKEDIN PROFILE
1982-06-08 : DATE OF BIRTH
Dwaine
Juan
DU PREEZ
2. SYSTEM PROFICIENCY
System Primary Skills
Siemens WinCC – Full systemdesign and configuration.
– Icon updates faceplate redesign.
– Complete HMI interface and navigation.
GE Intelligent Platform – Full system design and configuration using ladder logic, structured text
programming.
– Communication networks diagnostics and fault finding.
– Full systemfrom icon design, faceplate design and ladder programming.
ABB 800XA – Full system design and configuration. Communication networks
diagnostics and fault finding.
– Complete HMI design and Implementation.
Rockwell Allen Bradley
Logix5000
– Full system design and configuration using ladder logic, structured text
and function block programming.
– Communication networks diagnostics and fault finding.
Wonderware Archestra – Archestra architecture and systemplatform design.
– Standards and structures development.
Wonderware InTouch – Graphic development and integration with control systems.
PROJECT HIGHLIGHTS
Project
Roles and
Responsibilities
Brief Project Description
SAB Brewhouse System
upgrade
SAB Rosslyn
Duration: 36 months
[Food and Beverage]
Junior Application
Engineer - CSS
Archerstra 2.0 and InTouch 9 design on new
Brew line in SAB Rosslyn Brewery.
SAB Filtration System upgrade
SAB Rosslyn
Duration: 3 months
[Food and Beverage]
Junior Application
Engineer - CSS
Archerstra 2.0 and InTouch 9 design on new
Filteration Line in SAB Rosslyn Brewery.
GE Intelligent Platform
GE United Kingdom
Duration: 3 months
[Oil and Gas]
SCADA System
Application
Developer - Moore
Designing updating and modifying existing
Siemens I/O to accommodate upgrade from
Moore’s ProcessSuite, from icons through to
faceplates to Application Server 2014 R2 – Test
System
GE Intelligent Platform
GE United Kingdom
Duration: 2 months
[Oil and Gas]
SCADA System
Application
Developer - Moore
Designing updating and modifying existing
Rockwell I/O to accommodate upgrade from
Moore’s ProcessSuite, from icons through to
faceplates to Application Server 2014 R2 – Fully
functional IO, Faceplates with alarming and
Security.
FPSO ICSS System upgrades
SBM Oil and Gas
Duration: 36 months
[Oil and Gas]
SCADA Application
Developer - Moore
Three FPSO Vessels from hierarchy design to
complete HMI integration.
GE Intelligent Platform
GE United Kingdom
Duration: 16 months
[Oil and Gas]
SCADA System
Application
Developer - Moore
Designing and configuring of a new library
following specific requirements. From icon design
to faceplates and PLC programming.
Newcastle DCS Boiler Upgrade
ArcelorMittal
Duration: 6 months
[Base Metals]
SCADA Application
Developer - Moore
Full HMI design and implementation using ABB
800xa software.
3. EMPLOYMENT HISTORY
Moore Process Controls, Midrand, Gauteng
SCADA System Application Developer
2010 – Current
Convenient Software Solutions, Amanzimtoti, KZN
JuniorSoftware Engineer
2007 – 2010