GOPALA KRISHNA
BASICS
1. NO & NC CONTACTS
2. CIRCUIT BREAKER AUX SWITCH
3. ISOLATOR AUX SWITCH
4. PRESSURE SWITCH & DENSITY MONITOR
5. ANNUNCIATION
6. INDICATION
7. SEMOPHORE
8. CB OPERATING MECHANISAMS
9. CB ARC QUENCHING METHODS
10. INTERLOCKS BETWEEN CB & ISO
11. INTERLOCKS FOR LOCAL CLOSE OF CB
12. INTERLOCKS FOR REMOTE CLOSE OF CB
13. INTERLOCKS FOR ISOLATOR
14. INTERLOCKS FOR EARTH SWITCH
15. CB CLOSING CIRCUIT
16. CB TRIPPING CIRCUIT
17. WHAT IS BISTABLE RELAYS-NORMAL SWITCH
18. WHAT IS MONOSTABLE RELAYS-BELL SWITCH
19. ANTIPUMPING CONTACTOR
20. WHAT IS TSR & PRE CLOSE & POST CLOSE
21. AC FAIL CONTACTOR
22. DC FAIL CONTACTOR
23. SYNCHROSCOPE SOCKET – REQUIREMENTS – CONDITIONS
24. CB POLE DISCREPANCY RELAY
25. BINARY INPUT & BINARY OUTPUT OF RELAY
26. TNC SWITCH
27. LOCAL REMOTE SWITCH
28. SPRING CHARGE LIMIT SWITCH
29. TYPES OF WIRING- INTRA, INTER & CABLE SCHEDULE
30. PT / CVT IN MB
31. PT DISTRIBUTION
32. BUS PT SELCTION LOGIC
33. BUSPT LINE CVT SELECTOR SWITCH
34. CT IN MB & CORE CLASS & TERMINATION & STAR FORMATION FOR BUS & CIRCUIT
35. STANDARDS FOLLOWING
36. CABLE SCHEDULE
C & R Panel Contains
1. AC Circuits
2. DC Circuits
3. CT Circuits
4. PT/CVT Circuits
PURPOSE OF AC CIRCUITS
1. DOOR LAMP
2. PANEL HEATER
3. PLUG SOCKET
4. AUX SUPPLY TO ANNUNCIATION FACIA
5. AUXILIARY SUPPLY TO TRANSDUCER CKT
6. DC FAIL CIRCUIT
AC CIRCUITS are to be Extended to
1. Control Panel
2. Circuit Breaker Marshaling Box
3. Switch Yard Bay Marshalling Box
4. Current Transformer Marshalling Box
5. CVT / PT / EMVT Marshalling Box
6. ISOLATOR Operation (3-Ph)
7. Circuit Breaker Operating Mechanism Drive(3-Ph)
PURPOSE OF DC CIRCUITS
1. INDICATION CIRCUITS
2. ANNUNCIATION CIRCUITS
3. CB CLOSING COIL & TRIP COIL-1 CKT
4. CB TRIP COIL-2 CKT
5. TO SYNCHRONISATION CIRCUIT
6. TO MAIN-1(21M1/ 87T) PROTECTION
7. TO MAIN-2 or BU(21M2/ 67) PROTECTION
8. TO AC SUPERVISION
9. TO ISOLATOR CONTROL
10. TO ISOLATOR INTERLOCK
INDICATION CIRCUITS
1. CB 52 CLOSE & OPEN
2. CB 52 TC-1 HEALTHY
3. CB 52 TC-2 HEALTHY
4. CB 52 SPRING CHARGED
5. CB 52 CAPACITOR CHARGED
6. CB 52 SEMAPHORE INDICATIOR
7. BUS ISOLATOR 29/89 CLOSE & OPEN
8. BUS ISO 29/89 SEMAPHORE INDICATOR
9. LINE ISOLATOR 29/89L CLOSE & OPEN
10.LINE ISO 29/89L SEMAPHORE
INDICATOR
GROUP - A & GROUP - B TRIPPINGS
For 400KV Stations there shall be two separate Battery systems available for Protection, Control
& Tripping/Closing Operations. To obtain Redundancy and to be able to take Protection out for
Maintenance, while Equipment is in service, the Relays are Electrically and Physically
segregated in to two groups. Grouping is done to the extent possible in such a way that each
group can independently carryout Protective functions with near equal redundancy. Inter
connection of these two groups shall not be generally be attempted.
DISTRIBUTION OF DC SUPPLY SHALL BE DONE BAY WISE TO FEED THE FOLLOWING
1. PROTECTION
2. CB CONTROL
3. ISOLATOR / EARTH SWITCH CONTROL
4. ANNUNCIATION / INDICATION
LINE PROTECTION TRANSFORMER PROTECTION REACTOR PROTECTION
GROUP-A
MAIN-1 PROTECTION
M1 BUILT IN FUNCTIONS
TEED-1 PROTECTION
OVER VOLTAGE STAGE-1 PROT
DIRECT TRIP CHANNEL-1 RECEIVED
GROUP-B
MAIN-2 PROTCTION
M2 BUILT IN FUNCTIONS
TEED-2 PROTECTION
OVER VOLTAGE STAGE-2 PROT
LBB/BFR RELAY
DIRECT TRIP CHANNEL-2 RECEIVED
GROUP-A
T/F DIFFERENTIAL RELAY
T/F HV BACKUP RELAY
T/F IMP / 21T RELAY
T/F HV OVERFLUX RELAY
OIL TEMP HIGH TRIP
PRESURE RELIEF TRIP
TERITIARY DELTA WNDG NDR PROT
GROUP-B
T/F REF / HIGH Z DIFF RELAY
BUCHHOLZ TRIP
T/F LV BACKUP RELAY
T/F NEUTRAL CURRENT / 51 O/C RLY
T/F LV OVERFLUX RELAY
OVER LOAD PROT (ALARM ONLY)
OLTC BUCHHOLZ TRIP
WINDING TEMP HIGH TRIP
LOW/ HIGH OIL LEVEL TRIP
GROUP-A
REACTOR DIFFERENTIAL RELAY
REACTOR BACKUP / 21R RELAY
OIL TEMP HIGH TRIP
PRESURE RELIEF TRIP
GROUP-B
REACTOR REF RELAY
BUCHHOLZ TRIP
WINDING TEMP HIGH TRIP
LOW/ HIGH OIL LEVEL TRIP
FIRE PROTECTION TRIP
VOLTAGE SUPPLY SELECTION
BUS-1 BUS-2
89A 89B
52 CB
3
CT 89L
LINE
PT/EMVT PT/EMVT
WAVE TRAP
CVT LA/SA
IF 89A ISOLATOR CLOSED BUS-1 PT VOLTAGE WILL BE SELECTED
IF 89B ISOLATOR CLOSED BUS-2 PT VOLTAGE WILL BE SELECTED
IF VOLTAGE SELECTOR SWITCH IS KEPT IN BUS THEN BUS PT
VOLTAGE IS EXTENDED TO RELAY
IF VOLTAGE SELECTOR SWITCH IS KEPT IN LINE THEN LINE CVT
VOLTAGE IS EXTENDED TO RELAY
THE CIRCUIT DIAGRAM SHOWN IN NEXT PRESENTATION
BUS-1 & BUS-2 PT IS COMING TO PT DISTRIBUTION BOX AND
DISTRIBUTED FURTHER.
VOLTAGE SUPPLY SELECTION
89A
BUS-1 ISOLATOR
+VE
-VE
R
Y
B
N
BUS-1
PT
SUPPLY
89B
BUS-2 ISOLATOR
+VE
-VE
R
Y
B
N
BUS-2
PT
SUPPLY
89BX
89AX
R
Y
B
N
LINE
CVT
SUPPLY
BUS
PT
LINE
CVT
N
MANUAL
VOLTAGE
SELECTOR
SWITCH.
21 MAIN-1
OR
21 MAIN-2
PROT
RELAY
CT NAME PLATE DETAILS
CORE
CLASS OF
ACCURAC
Y
RATIO
PRIMAR
Y
WINDIN
G
SECONDA
RY
WINDING
KNEE
POINT
VOLTAGE
MAGNETISIN
G CURRENT
CORE
RESISTANC
E
1
PS
(PROTECT
ION)
500/1
PI – P2
1S1 – 1S2 1000V 120mA 2.5 OHMS
1000/1 1S1 – 1S3 2000V 60mA 5.0 OHMS
2000/1 1S1 – 1S4 4000V 30mA 10.0 OHMS
2
PS
(PROTECT
ION)
500/1
PI – P2
2S1 – 2S2 1000V 120mA 2.5 OHMS
1000/1 2S1 – 2S3 2000V 60mA 5.0 OHMS
2000/1 2S1 – 2S4 4000V 30mA 10.0 OHMS
3
0.2
(METERIN
G)
500/1
PI – P2
3S1 – 3S2
BURDEN = 40VA
1000/1 3S1 – 3S3
2000/1 3S1 – 3S4
4
PS
(PROTECT
ION)
500/1
PI – P2
4S1 – 4S2 1000V 120mA 2.5 OHMS
1000/1 4S1 – 4S3 2000V 60mA 5.0 OHMS
2000/1 4S1 – 4S4 4000V 30mA 10.0 OHMS
5
PS
(PROTECT
ION)
500/1
PI – P2
5S1 – 5S2 1000V 120mA 2.5 OHMS
1000/1 5S1 – 5S3 2000V 60mA 5.0 OHMS
2000/1 5S1 – 5S4 4000V 30mA 10.0 OHMS
CVT NAME PLATE DETAILS
CORE
CLASS OF
ACCURACY
PRIMARY
WINDING
SECONDAR
Y WINDING
PRIMARY
VOLTAGE
SECONDARY
VOLTAGE
VA BURDEN
1
3P
(PROTECTIO
N)
P1 – E
1a1 – 1n
1a2 – 1n
220KV / √3 110V / √3 200 VA
2
3P
(PROTECTIO
N)
P1 – E
2a1 – 2n
2a2 – 2n
220KV / √3 110V / √3 200 VA
3
0.2
(METERING)
P1 – E
3a1 – 3n
3a2 – 3n
220KV / √3 110V / √3 100 VA
CORE
CLASS OF
ACCURACY
PRIMARY
WINDING
SECONDAR
Y WINDING
PRIMARY
VOLTAGE
SECONDARY
VOLTAGE
VA BURDEN
1
3P
(PROTECTIO
N)
P1 – E
1a1 – 1n
1a2 – 1n
400KV / √3 110V / √3 200 VA
2
3P
(PROTECTIO
N)
P1 – E
2a1 – 2n
2a2 – 2n
400KV / √3 110V / √3 200 VA
3
0.2
(METERING)
P1 – E
3a1 – 3n
3a2 – 3n
400KV / √3 110V / √3 100 VA
PT / EMVT NAME PLATE DETAILS
CORE
CLASS OF
ACCURACY
PRIMARY
WINDING
SECONDAR
Y WINDING
PRIMARY
VOLTAGE
SECONDARY
VOLTAGE
VA BURDEN
1
0.2
(METERING)
P1 – E
1a1 – 1n
1a2 – 1n
132KV / √3 110V / √3 100 VA
2
0.5
(PROTECTIO
N)
P1 – E
2a1 – 2n
2a2 – 2n
132KV / √3 110V / √3 100 VA
3
3P
(PROTECTIO
N)
P1 – E
3a1 – 3n
3a2 – 3n
132KV / √3 110V / √3 100 VA
CORE
CLASS OF
ACCURACY
PRIMARY
WINDING
SECONDAR
Y WINDING
PRIMARY
VOLTAGE
SECONDARY
VOLTAGE
VA BURDEN
1
3P
(PROTECTIO
N)
P1 – E
1a1 – 1n
1a2 – 1n
220KV / √3 110V / √3 200 VA
2
3P
(PROTECTIO
N)
P1 – E
2a1 – 2n
2a2 – 2n
220KV / √3 110V / √3 200 VA
3 0.2 P1 – E
3a1 – 3n
3a2 – 3n
220KV / √3 110V / √3 100 VA
BUS PT AT YARD
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
BUS-1
PT/EMVT
PRIMARY
VOLTAGE
220
KV
/
1.732
SECONDARY
VOLTAGE
110V/1.732
P1
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
TO
CONTROL
ROOM
PT
DISTRIBUTION
PANEL
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
BUS-2
PT/EMVT
PRIMARY
VOLTAGE
220
KV
/
1.732
SECONDARY
VOLTAGE
110V/1.732
P1
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
TO
CONTROL
ROOM
PT
DISTRIBUTION
PANEL
BUS-1 BUS-2
METERING
CL:
0.2
MAIN-2
PROT
CL:3P
MAIN-1
PROT
CL:3P
OPEN
DELTA
CL:
0.5
METERING
CL:
0.2
MAIN-2
PROT
CL:3P
MAIN-1
PROT
CL:3P
OPEN
DELTA
CL:
0.5
PTMB PTMB
BUS PT DISTRIBUTION PANEL
(EXCEPT FOR 1-1/2CB / DBDCB / RING SYSTEM)
X02
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
X12 X22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
51
52
53
54
55
56
57
58
59
60
61
62
63
64
X02
BUS-1 PT DISTRIBUTION BUS-2 PT DISTRIBUTION
TO INDIVIDUAL
C&R PANEL
EACH SET FOR
EACH CIRCUIT
PT/CVT & CT MARSHLING BOX
TB 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TB 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TB 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TB 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TB 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TB 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TB 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
TB 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
CT MARSHELLING BOX CVT/PT MARSHELLING BOX
TB
6
1
2
3
4
5
6
7
8
9
10
TB
4
1
2
3
4
5
6
7
8
9
10
BAY MARSHLING BOX
TB 1
1
50
TB 2
51
100
TB 3
101
150
TB 4
151
200
TB 5
201
250
BAY MARSHELLING BOX BACK VIEW
TB DISTRIBUTION
BAY MARSHELLING BOX FRONT VIEW
AC DISTRIBUTION
MAIN
MCB
3-PH
100A
MCB
-1
3-PH
25A
MCB
-2
3-PH
25A
MAIN
- 3
3-PH
10A
MCB
- 4
3-PH
10A
MCB
- 5
3-PH
10A
MAIN
- 6
3-PH
10A
MCB
- 8
3-PH
10A
MAIN
- 9
3-PH
10A
MCB
- 10
3-PH
10A
MCB
- 11
3-PH
10A
MAIN
- 12
3-PH
10A
MCB
- 13
3-PH
10A
MAIN
- 1
1-PH
5A
MCB
- 2
1-PH
5A
MCB
- 3
1-PH
5A
MAIN
- 4
1-PH
5A
MCB
- 5
1-PH
5A
IMPORTANT GUIDELINES
CT & VT Earthing
 CT / VT secondary neutrals should be earthed at one
point only.
 VT secondary neutral earthing is done at equipment
itself.
 It is preferable to earth the CT secondary neutral in the
control / protection cubicle in order to provide
maximum security to the operating personnel.
CT POLARITY
 As a practice the P1 terminal of the CT shall be towards
the bus and P2 away from the bus.
 From the above for Main-1, Main-2 & Metering – Primary
current flows from P1 to P2. Accordingly secondary
current Flows S2 to S1. Star formation is all S2s.
 For the BBM & BBC – Primary current flows from P2 to
P1. Accordingly secondary current Flows S1 to S2. Star
formation is all S1s. Please conclude here.
CABLE SCHEDULE
CABLE SCHEDULE
1. NAME OF THE SUBSTATION: 2. NAME OF THE FEEDER/ TRANSFORMER:
3. CB DETAILS: 4. CT DETAILS
5. CVT / PT / EMVT DETAILS: 6. ISOLATOR DETAILS
7. C&R PANEL DETAILS: 8. POWER TRANSFORMER DETAILS :
S.No
FROM TO
DESCRIPTION / PURPOSE
CORE
NO
REFERENCE
PANEL TB No FERRULE PANEL TB No FERRULE
Cable
ID
Cable
& Size
CABLE SCHEDULE
1 2 3 4 5 6 7
S.No
FROM TO
PANEL TB No FERRULE PANEL TB No FERRULE
1
R – PH
CT
CORE
- 5
5S1
CTMB
TB-5-1 R-5S1
2 5S2 TB-5-2 R-5S2
3 5S3 TB-5-3 R-5S3
4 5S4 TB-5-4 R-5S4
5
Y – PH
CT
CORE
- 5
5S1
CTMB
TB-5-6 Y-5S1
6 5S2 TB-5-7 Y-5S2
7 5S3 TB-5-8 Y-5S3
8 5S4 TB-5-9 Y-5S4
9
Y – PH
CT
CORE
- 5
5S1
CTMB
TB-5-11 B-5S1
10 5S2 TB-5-12 B-5S2
11 5S3 TB-5-13 B-5S3
12 5S4 TB-5-14 B-5S4
CABLE SCHEDULE
8 9 10 11 12
DESCRIPTION /
PURPOSE
CABLE
& SIZE
CORE
No
REFERENCE REMARKS
R-PH CT TO
CT MB OF
CORE-5
4C X 2.5
1
DRG NO:
PAGE NO
2
3
4
Y-PH CT TO
CT MB OF
CORE-5
4C X 2.5
1
DRG NO:
PAGE NO
2
3
4
B-PH CT TO
CT MB OF
CORE-5
4C X 2.5
1
DRG NO:
PAGE NO
2
3
4
CIRCUIT BREAKER
S.No DESCRIPTION INCASE OF CGL BREAKER
1 LOCAL CLOSING INTERLOCK K5, K5A
2 LOCAL CLOSE (IN CB CUBICLE) - -
3 REMOTE CLOSE (FROM CONTROL PANEL HAND CLOSE) K1
4 LOCAL TRIP ( IN CB CUBICLE) - -
5 REMOTE TRIP COIL-1 (FROM CONTROL PANEL HAND TRIP) K21A, K21B, K21C
6 REMOTE TRIP COIL-2 (FROM CONTROL PANEL HAND TRIP) K41A, K41B, K41C
7 CB OPEN INDICATION A11, A12-B11,B12-C11,C12
8 CB CLOSE INDICATION A41, A42-B41,B42-C41,C42
9 DC SUPPLY J1, J2 & J11 & J12
10 PROTECTION CLOSE OR AUTO RE-CLOSE K3
11 PROTECTION TRIP COIL-1 & POST CLOSE SUPERVISION K23A, K23B, K23C
12 PROTECTION TRIP COIL-2 & POST CLOSE SUPERVISION K43A, K43B, K43C
13 PRE CLOSE SUPERVISION OF TRIP COIL-1 K31A, K31B, K31C
14 PRE CLOSE SUPERVISION OF TRIP COIL-2 K49A, K49B, K49C
15 CB CONTACT DICTRIBUTION. NOs – 8, NCs – 8
16 CB POLE DISTURBANCE RELAY.
17 CB CONTACT MULTIPLICATION RELAY.
18 CB TROUBLE ALARMS - 63 AR, GA, GL, AL, AG, AA, OA
CIRCUIT BREAKER CLOSING CIRCUIT
52CC
52b
J4
63A
63G
63HO
63N
SPL
52Y
J3
T N C
LCIL
K1 K3
LOCAL
REMOTE
K3A
K5
52Y
52Y
52Y
SLS
52a
86A 86B 96BB
T N C
SSSS
SERVICE
BYPASS
SSS REMOTE
CLOSE
21M1 A/R
21M2 A/R
A/R CLOSE
CONTROL & RELAY PANEL
A/R CLOSE
REMOTE CLOSE INTERLOCK
CIRCUIT BREAKER TRIPPING CIRCUIT
52TC
52a
J4
63A
63G
63HO
63N
J3
T N C
LOCAL
REMOTE
PRE
CLOSE
SUPERVISION
PROTECTION
TRIP
+
POST
CLOSE
SUPERVISION
PB
EMERGENCY TRIP
T N C
52TC
52a
J14
63A
63G
63HO
63N
PRE
CLOSE
SUPERVISION
PROTECTION
TRIP
+
POST
CLOSE
SUPERVISION
LOCAL
REMOTE
J13
C&R PANEL
T N C
PB
EMERGENCY TRIP
NOMINCLATURES
52
a
CB AUX CONTACT OPEN
WHEN CB OPEN
52b CB AUX CONTACT
CLOSE WHEN CB OPEN
52
CC
CB CLSOING COIL 52T
C-1
CB TRIP COIL-1
63
A
AIR PRESSURE
CONTACT
52
TC-
2
CB TRIP COIL-2
63
G
SF6 GAS PRESSURE
CONTACT
63
HO
HYDRAULIC OIL
PRESSURE CONTACT
63
N
NITROGEN PRESSURE
CONTACT
52Y ANTIPUMPING
CONTACTOR
SP
LS
SPRING CHARGE LIMIT
SWITCH
LCIL LOCAL CLOSING
INTERLOCK
K3
A
REMOTE CLOSE TNC TRIP NEUTRAL CLOSE
SWITCH
18
6
28
6
MONOSTABLE & SELF
RESETING
FAST ACTING HIGH
SPEED TRIP RELAYS
86 A
86 B
96
BB
BISTABLE & HAND
RESETING
HIGH SPEED TRIP
RELAY /
MASTER TRIP RELAYS
A/
R
AUTO RECLOSURE SSS
S
SYNCHROSCOPE
SELECTOR SWITCH
SS
S
SYNCHROSCOPE SOCKET PB PUSH BUTTON
LR LOCAL REMOTE SWITCH
Synchronization
Requirements
1. Voltages must be
match
2. Frequency must be
match
3. Phase angle must be
match
1. Line Voltage
2. Bus Voltage
3. DC Supply
4. Closing Permission
LOCAL CLOSING INTERLOCK
TAKE AN EXAMPLE OF SINGLE BUS SYSTEM
52 CB
BUS
89 / 29
89 / 29 E
89 / 29 L
89 / 29 LE
89 / 29 AE
LOCAL CLOSING INTERLOCK DRAWING
89M/B 89 E
89L 89AE
K1 K3
REQUIRED INTERLOCK
FOR LOCAL CLOSING
NORMALLY DURING
MAINTANENCE
1. BUS ISOLATOR OPEN CONDITION
2. LINE ISOLATOR OPEN CONDITION
3. 89E EARTH SWITCH CLOSED
4. 89AE EARTH SWITCH CLOSED
POLE DISTURBANCE RELAY
THIS RELAY COMES IN TO PICTURE THE CIRCUIT BREAKER 3POLES ARE INTER
CONNECTED THROUGH ELECTRICALLY NOT MECHANICALLY.
WHEN THREE POLES ARE SIMULTANEOUSLY NOT OPEN OR CLOSE THEN THE
RELAY ACTS AND TRIPS THE CIRCUIT BREAKER AFTER SOME TIME DELAY.
EXAMPLE: 220KV CB, 400KV CB, 765KV CB AND ABOVE VOLTAGE LEVEL
R Y B 52a
R Y B 52b
+VE
TIME DELAY
RELAY
TO
SER
TO
ANNUN
TO
CB
TRIP
-VE
52 TC-1-R
52 TC-1-Y
52 TC-1-B
52 TC-2-R
52 TC-2-Y
52 TC-2-B
-VE
52 CIRCUIT BREAKER
TRIP CIRCUIT HEALTHY
TO TC-1 HEALTHY INDICATION
TO TC-1 FAULTY ANNUNCIATION
+VE
TO CB PROTECTION TRIP
+ POST CLOSE SUPERVISION
PRE CLOSE SUPERVISION
CONTROL & RELAY PANEL CIRCUIT BREAKER CENTRAL MB
52 TC-1
-VE
CB HEALTHYNESS
TO TC-2 HEALTHY INDICATION
TO TC-2 FAULTY ANNUNCIATION
+VE
TO CB PROTECTION TRIP
+ POST CLOSE SUPERVISION
PRE CLOSE SUPERVISION
52 TC-2
-VE
CB HEALTHYNESS
TSR
TSR
LED
LED
52b
52b
MAIN-1 PROTECTION OPERATED
21 MAIN-1
BINARY OUTPUT
TO LBB
TO TC-1
TO TC-2
TO LBB
TO TC-1
TO TC-2
TO TC-1
TO TC-2
TO TC-1
TO TC-2
TO LBB
TO TC-1
TO TC-2
TO TC-1
TO TC-2
+VE -VE
R PHASE
Y PHASE
B PHASE
186 R1
186 R2
186 Y1
186 Y2
186 B1
186 B2
MAIN-2 PROTECTION OPERATED
21 MAIN-2
BINARY OUTPUT
TO LBB
TO TC-1
TO TC-2
TO LBB
TO TC-1
TO TC-2
TO TC-1
TO TC-2
TO TC-1
TO TC-2
TO LBB
TO TC-1
TO TC-2
TO TC-1
TO TC-2
+VE -VE
R PHASE
Y PHASE
B PHASE
286 R1
286 R2
286 Y1
286 Y2
286 B1
286 B2
86 GA (MASTER TRIP RELAY) OPERATION
21 MAIN-1
TO ANN
+VE
-VE
RESET
OPERATED
PB
TO CL I/L
TO LBB
TO TC-1
TO TC-2
TO M1 DR
TO M2 DR
TO SER
86 GA MASTER TRIP RELAY
M1 BUILT IN
FUNCTIONS
TEED-1 PROTECTION
OVER VOLTAGE
STAGE-1 PROT
DIRECT TRIP
CHANNEL-1
RECEIVED
86 GB (MASTER TRIP RELAY) OPERATION
21 MAIN-2
TO ANN
+VE
-VE
RESET
OPERATED
PB
TO CL I/L
TO LBB
TO TC-1
TO TC-2
TO M1 DR
TO M2 DR
TO SER
86 GB MASTER TRIP RELAY
M2 BUILT IN
FUNCTIONS
TEED-2
PROTECTION
OVER VOLTAGE
STAGE-2 PROT
LBB/BFR RELAY
DIRECT TRIP
CHANNEL-2
RECEIVED
87 BUSBAR-1 PROTECTION
TRIPPING SCHEME
HIGH SPEED
TRIP RELAY
(96BB) FOR
BAY1
HIGH SPEED
TRIP RELAY
(96BB) FOR
BAY2
HIGH SPEED
TRIP RELAY
(96 BB) FOR
BAY3
HIGH SPEED
TRIP RELAY
(96 BB) FOR
BAY4
HIGH SPEED
TRIP RELAY
(96BB)FOR
BAY5
HIGH SPEED
TRIP RELAY
(96 BB) FOR
BAY6
BAY1 CR PANEL
TRIP FROM 50 LBB
TO START 50 LBB
BAY2 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB
BAY3 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB
BAY4 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB
BAY5 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB
BAY6 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB
+VE
BUSBAR PANEL
87 BUSBAR
96 BB (MASTER TRIP RELAY) OPERATION
87 BUSBAR
TO D/T-1
+VE
-VE
RESET
OPERATED
PB
TO CL I/L
TO LBB
TO TC-1
TO TC-2
TO M1 DR
TO M2 DR
TO D/T-2
96 BB MASTER TRIP RELAY
TO ANNUN
TO SER
FROM LBB
TRANSFORMER TROUBLES TRIPPING
GR-A
OIL TEMP TRIP
BUCHHOLZ TRIP
PRD-1 TRIP
PRD-2 TRIP
DIFF RELAY 87T
OL RELAY 51OL
HV O/L+E/F PROT 67
86 AX
86 AY
TO 3PH GR-A 400KV MAIN
TO 3PH GR-A 220KV MAIN
NDR RELAY 151N
HV O/F RELAY 99T
+VE
+VE
-VE
TRANSFORMER TROUBLES TRIPPING
GR-B
REF RELAY 64REF
STUB RELAY 50ST
LV O/L+E/F PROT 67
86 BX
86 BY
TO 3PH GR-B 400KV MAIN
TO 3PH GR-B 220KV MAIN
LV O/F RELAY 99T
OLTC BUCHHOLZ-R TRIP
OLTC BUCHHOLZ-Y TRIP
OLTC BUCHHOLZ –B TRIP
WNDG TEMP-HV TRIP
WNDG TEMP-LV TRIP
WNDG TEMP-IV TRIP
+VE
+VE
-VE
LBB Operation & Output
INITIATION
186 R
186 Y
186 B
286 R
286 Y
286 B
86 GR-A
86 GR-B
96 BB
+VE
TO D/T CH-1
TO D/T CH-2
TO ANNUN
TO MAIN1 DR
TO MAIN2 DR
TO SER
TO 86 GR-A
TO 86 GR-B
TO BUSBAR
-VE
50X
LBB / BFR
TIMER
TRIP COIL-1 CIRCUITS
186R1
186R2
286R1
286R2
86GR-A
86GR-B
96BB
186Y1
186Y2
286Y1
286Y2
186B1
186B2
286B1
286B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2
ARE CB 1-PH TRIP UNIT OF GR-A. THESE
ARE SELF RESETING.
286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2
ARE CB 1-PH TRIP UNIT OF GR-B. THESE
ARE SELF RESETING.
THE BELOW ARE HAND RESETING.
86GR-A, 86GR-B ARE 3-PH TRIP UNITS.
96 BB IS BUSBAR TRIPPING RELAY
TRIP COIL-1
TRIP COIL-2 CIRCUITS
186R1
186R2
286R1
286R2
86GR-A
86GR-B
96BB
186Y1
186Y2
286Y1
286Y2
186B1
186B2
286B1
286B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2
ARE CB 1-PH TRIP UNIT OF GR-A. THESE
ARE SELF RESETING.
286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2
ARE CB 1-PH TRIP UNIT OF GR-B. THESE
ARE SELF RESETING.
THE BELOW ARE HAND RESETING.
86GR-A, 86GR-B ARE 3-PH TRIP UNITS.
96 BB IS BUSBAR TRIPPING RELAY
TRIP COIL-2
CB CONTACT MULTIPLICATION
S.No R-PHASE Y-PHASE B- PHASE REF PURPOSE A-POLE B-POLE C-POLE
1 A11,A12 B11,B12 C11,C12
2 A13,A14 B13,B14 C13,C14
3 A15,A16 B15,B16 C15,C16
4 A17,A18 B17,B18 C17,C18
5 A19,A20 B19,B20 C19,C20
6 A21,A22 B21,B22 C21,C22
7 A23,A24 B23,B24 C23,C24
8 A25,A26 B25,B26 C25,C26
9 A41,A42 B41,B42 C41,C42
10 A43,A44 B43,B44 C43,C44
11 A45,A46 B45,B46 C45,C46
12 A47,A48 B47,B48 C47,C48
13 A49,A50 B49,B50 C49,C50
14 A51,A52 B51,B52 C51,C52
15 A53,A54 B53,B54 C53,C54
16 A55,A56 B55,B56 C55,C56
PROTECTION COUPLER PANEL
C
E
DISPLAY
ACTIVE START TRIP
NSD 50/
NSD 70
G4AC TB: V9LC
1-
2+
5-
6+
9-
10+
13-
14+
TX
TRIP
A(C)
RX
TRIP
A(C)
TX
TRIP
B(D)
RX
TRIP
B(D)
C
S
C
S
C
R
C
R
GA4D TB:V9LD
1-
2+
5-
6+
9-
10+
13-
14+
TX
TRIP
C(A)
RX
TRIP
C(A)
TX
TRIP
D(B)
RX
TRIP
D(B)
C
S
C
S
C
R
C
R
G4AA TB: V9LB
ALARM-1
250V
DC
ALARM-2
250V
DC
5
6
7
8
PROTECTION COUPLERS FOR 400KV LINE
 FOR EACH LINE 2Nos PROTECTION COUPLER PANELS PROVIDED.
 FOR EACH LINE 1NO CARRIER SPEECH PANEL PROVIDED.
 SO, ONE LINE REQUIRES TOTAL 3 PANELS.
 CARRIER SPEECH PANEL PURELY FOR VOICE COMMUNICATION BETWEEN
TWO SUBSTATIONS, i.e THE LINE CONNECTED SUBSTATIONS.
 THE VOICE COMMUNICATION ARE TWO METHODS PROVIDED.
 ONE IS HOTLINE COMMUNICATION/DEDICATED/ LIFT&TALK METHOD.
 ANOTHER IS DIAL METHOD.
 IN PROTECTION COUPLER PANEL-1 TOTAL 3 CARDS ARE IMPORTANT FOR
SENDING & RECEIVING TRIP SIGNALS.
 ONE CARD FOR ALARM i.e G4AA. ONE CARD FOR PERMISSIVE/PROTECTION
TRIP i.e G4AC & ANOTHER CARD FOR DIRECT TRIPS i.e G4AD.
 IN PROTECTION COUPLER-2 PANEL ALSO 3 CARDS ARE PROVIDED SIMILAR TO
PROTECTION COUPLER-1 PANEL.
 THE PROTECTION COUPLER PANEL DRAWING IS SHOWN IN PREVIOUS MENU.
 1SET TX & RX FOR PERMISSIVE/ PROTECTION TRIP(G4AC)
 1SET TX & RX FOR BACKUP FOR PERMISSIVE/ PROTECTION IN ANOTHER
PANEL(G4AC).
 1SET TX & RX FOR DIRECT TRIP CHANNEL-1( G4AD).
 1SET TX & RX FOR SPARE UNDER EMERGENCY(G4AD).
 THE ABOVE ARRANGEMENT SIMILAR FOR PROTECTION COUPLER PANEL-2.
 G4AA CARD FOR ALARM.
MAIN-1 PROTECTION CARRIER INTER TRIPPING
ABB REL521
CR
CS
-VE
CARRIER RECEIVE
CARRIER SEND
ALARM
IN
ABB
NSD
50
OUT
PANEL-1
PANEL-2
G4AC V9LC 1
G4AC V9LC 2
G4AC V9LC 5
G4AC V9LC 6
G4AA V9LB 5
G4AA V9LB 6
ABB
NSD
50
G4AC V9LC 10
G4AC V9LC 14
G4AC V9LC 9
G4AC V9LC 13
THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP
AND CONNECTED IN ANOTHER PANEL
+VE -VE
MAIN-2 PROTECTION CARRIER INTER TRIPPING
ABB REL316
CR
CS
-VE
CARRIER RECEIVE
CARRIER SEND
ALARM
IN
ABB
NSD
50
OUT
PANEL-2
PANEL-1
G4AC V9LC 1
G4AC V9LC 2
G4AC V9LC 5
G4AC V9LC 6
G4AA V9LB 5
G4AA V9LB 6
ABB
NSD
50
G4AC V9LC 10
G4AC V9LC 14
G4AC V9LC 9
G4AC V9LC 13
THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP
AND CONNECTED IN ANOTHER PANEL
+VE -VE
DIRECT TRIP SEND CARRIER CHANNEL-1
T N C
MAIN CB(1-52CB)
CONTROL PANEL
87 BUSBAR TRIP (ZONE-1)
50 LBB/BFR
ABB
NSD 50
DC +VE
FROM PANEL
G4AD V9LC 2
DC –VE FROM PANEL
G4AD V9LC 1
PANEL-1
BUSBAR PROTECTION PANEL
RELAY PANEL
.
OVER VOLTAGE STAGE 1 or 2
DIRECT TRIP SEND CARRIER CHANNEL-2
T N C
MAIN CB(1-52CB)
CONTROL PANEL
87 BUSBAR TRIP (ZONE-1)
50 LBB/BFR
ABB
NSD 50
DC +VE
FROM PANEL
G4AD V9LC 2
DC –VE FROM PANEL
G4AD V9LC 1
PANEL-2
BUSBAR PROTECTION PANEL
RELAY PANEL
.
OVER VOLTAGE STAGE 1 or 2
DIRECT TRIP RECEIVE CHANNEL-1&2
ABB
NSD 50
G4AD V9LC 6
G4AD V9LC 5
ABB
NSD 50
G4AD V9LC 6
G4AD V9LC 5
PANEL-1
PANEL-2
DC +VE
DC +VE
+VE -VE
TO 86-A MASTER TRIP RELAY
(HIGH SPEED TRIP RELAY)
TO 86-B MASTER TRIP RELAY
(HIGH SPEED TRIP RELAY)
DIRECT TRIP-1
CARRIER RECEIVE
RELAY
DIRECT TRIP-2
CARRIER RECEIVE
RELAY
TO ANNUNCIATION
TO MAIN1 DR
TO MAIN2 DR
TO ANNUNCIATION
TO MAIN1 DR
TO MAIN2 DR

More Related Content

What's hot

What's hot (20)

Transformer ppt.
Transformer ppt.Transformer ppt.
Transformer ppt.
 
RTCC & AVR
RTCC & AVRRTCC & AVR
RTCC & AVR
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Relays
RelaysRelays
Relays
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Tap Changer
Tap ChangerTap Changer
Tap Changer
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 
SF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERSF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
 
SWITCHGEAR
SWITCHGEARSWITCHGEAR
SWITCHGEAR
 
Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
 
132 kv
132 kv132 kv
132 kv
 
Pilot protection
Pilot protectionPilot protection
Pilot protection
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential Transformer
 
Testing
TestingTesting
Testing
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Thermocouple as a Transducer
Thermocouple as a TransducerThermocouple as a Transducer
Thermocouple as a Transducer
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 

Similar to INTERFACING.ppt

891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear
michaeljmack
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
saurabhVEC
 
Lm 741 datasheet
Lm 741 datasheetLm 741 datasheet
Lm 741 datasheet
Andy Medina
 

Similar to INTERFACING.ppt (20)

220kv substation
220kv substation220kv substation
220kv substation
 
ppt on industrial training of final year studen from ptcul 132kv substation ...
ppt on industrial training of final year studen  from ptcul 132kv substation ...ppt on industrial training of final year studen  from ptcul 132kv substation ...
ppt on industrial training of final year studen from ptcul 132kv substation ...
 
AUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITSAUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITS
 
891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
 
Presentation (2).pptx
Presentation (2).pptxPresentation (2).pptx
Presentation (2).pptx
 
Electrical
ElectricalElectrical
Electrical
 
Wiring_Diagram_Book.pdf
Wiring_Diagram_Book.pdfWiring_Diagram_Book.pdf
Wiring_Diagram_Book.pdf
 
Lm 741 datasheet
Lm 741 datasheetLm 741 datasheet
Lm 741 datasheet
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
INPUT OUTPUT LIST.pdf
INPUT OUTPUT LIST.pdfINPUT OUTPUT LIST.pdf
INPUT OUTPUT LIST.pdf
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
 
CIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTSCIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTS
 
A110x
A110xA110x
A110x
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
10004239951
1000423995110004239951
10004239951
 

Recently uploaded

Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Nitya salvi
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
eqaqen
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion pills in Kuwait Cytotec pills in Kuwait
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
210303105569
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
drmarathore
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
eeanqy
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 

Recently uploaded (20)

Hackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdfHackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdf
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docx
 
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best ServiceIndependent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 

INTERFACING.ppt

  • 2. BASICS 1. NO & NC CONTACTS 2. CIRCUIT BREAKER AUX SWITCH 3. ISOLATOR AUX SWITCH 4. PRESSURE SWITCH & DENSITY MONITOR 5. ANNUNCIATION 6. INDICATION 7. SEMOPHORE 8. CB OPERATING MECHANISAMS 9. CB ARC QUENCHING METHODS 10. INTERLOCKS BETWEEN CB & ISO 11. INTERLOCKS FOR LOCAL CLOSE OF CB 12. INTERLOCKS FOR REMOTE CLOSE OF CB 13. INTERLOCKS FOR ISOLATOR 14. INTERLOCKS FOR EARTH SWITCH 15. CB CLOSING CIRCUIT 16. CB TRIPPING CIRCUIT 17. WHAT IS BISTABLE RELAYS-NORMAL SWITCH 18. WHAT IS MONOSTABLE RELAYS-BELL SWITCH 19. ANTIPUMPING CONTACTOR 20. WHAT IS TSR & PRE CLOSE & POST CLOSE 21. AC FAIL CONTACTOR 22. DC FAIL CONTACTOR 23. SYNCHROSCOPE SOCKET – REQUIREMENTS – CONDITIONS 24. CB POLE DISCREPANCY RELAY 25. BINARY INPUT & BINARY OUTPUT OF RELAY 26. TNC SWITCH 27. LOCAL REMOTE SWITCH 28. SPRING CHARGE LIMIT SWITCH 29. TYPES OF WIRING- INTRA, INTER & CABLE SCHEDULE 30. PT / CVT IN MB 31. PT DISTRIBUTION 32. BUS PT SELCTION LOGIC 33. BUSPT LINE CVT SELECTOR SWITCH 34. CT IN MB & CORE CLASS & TERMINATION & STAR FORMATION FOR BUS & CIRCUIT 35. STANDARDS FOLLOWING 36. CABLE SCHEDULE
  • 3. C & R Panel Contains 1. AC Circuits 2. DC Circuits 3. CT Circuits 4. PT/CVT Circuits
  • 4. PURPOSE OF AC CIRCUITS 1. DOOR LAMP 2. PANEL HEATER 3. PLUG SOCKET 4. AUX SUPPLY TO ANNUNCIATION FACIA 5. AUXILIARY SUPPLY TO TRANSDUCER CKT 6. DC FAIL CIRCUIT AC CIRCUITS are to be Extended to 1. Control Panel 2. Circuit Breaker Marshaling Box 3. Switch Yard Bay Marshalling Box 4. Current Transformer Marshalling Box 5. CVT / PT / EMVT Marshalling Box 6. ISOLATOR Operation (3-Ph) 7. Circuit Breaker Operating Mechanism Drive(3-Ph)
  • 5. PURPOSE OF DC CIRCUITS 1. INDICATION CIRCUITS 2. ANNUNCIATION CIRCUITS 3. CB CLOSING COIL & TRIP COIL-1 CKT 4. CB TRIP COIL-2 CKT 5. TO SYNCHRONISATION CIRCUIT 6. TO MAIN-1(21M1/ 87T) PROTECTION 7. TO MAIN-2 or BU(21M2/ 67) PROTECTION 8. TO AC SUPERVISION 9. TO ISOLATOR CONTROL 10. TO ISOLATOR INTERLOCK
  • 6. INDICATION CIRCUITS 1. CB 52 CLOSE & OPEN 2. CB 52 TC-1 HEALTHY 3. CB 52 TC-2 HEALTHY 4. CB 52 SPRING CHARGED 5. CB 52 CAPACITOR CHARGED 6. CB 52 SEMAPHORE INDICATIOR 7. BUS ISOLATOR 29/89 CLOSE & OPEN 8. BUS ISO 29/89 SEMAPHORE INDICATOR 9. LINE ISOLATOR 29/89L CLOSE & OPEN 10.LINE ISO 29/89L SEMAPHORE INDICATOR
  • 7. GROUP - A & GROUP - B TRIPPINGS For 400KV Stations there shall be two separate Battery systems available for Protection, Control & Tripping/Closing Operations. To obtain Redundancy and to be able to take Protection out for Maintenance, while Equipment is in service, the Relays are Electrically and Physically segregated in to two groups. Grouping is done to the extent possible in such a way that each group can independently carryout Protective functions with near equal redundancy. Inter connection of these two groups shall not be generally be attempted. DISTRIBUTION OF DC SUPPLY SHALL BE DONE BAY WISE TO FEED THE FOLLOWING 1. PROTECTION 2. CB CONTROL 3. ISOLATOR / EARTH SWITCH CONTROL 4. ANNUNCIATION / INDICATION LINE PROTECTION TRANSFORMER PROTECTION REACTOR PROTECTION GROUP-A MAIN-1 PROTECTION M1 BUILT IN FUNCTIONS TEED-1 PROTECTION OVER VOLTAGE STAGE-1 PROT DIRECT TRIP CHANNEL-1 RECEIVED GROUP-B MAIN-2 PROTCTION M2 BUILT IN FUNCTIONS TEED-2 PROTECTION OVER VOLTAGE STAGE-2 PROT LBB/BFR RELAY DIRECT TRIP CHANNEL-2 RECEIVED GROUP-A T/F DIFFERENTIAL RELAY T/F HV BACKUP RELAY T/F IMP / 21T RELAY T/F HV OVERFLUX RELAY OIL TEMP HIGH TRIP PRESURE RELIEF TRIP TERITIARY DELTA WNDG NDR PROT GROUP-B T/F REF / HIGH Z DIFF RELAY BUCHHOLZ TRIP T/F LV BACKUP RELAY T/F NEUTRAL CURRENT / 51 O/C RLY T/F LV OVERFLUX RELAY OVER LOAD PROT (ALARM ONLY) OLTC BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP GROUP-A REACTOR DIFFERENTIAL RELAY REACTOR BACKUP / 21R RELAY OIL TEMP HIGH TRIP PRESURE RELIEF TRIP GROUP-B REACTOR REF RELAY BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP FIRE PROTECTION TRIP
  • 8. VOLTAGE SUPPLY SELECTION BUS-1 BUS-2 89A 89B 52 CB 3 CT 89L LINE PT/EMVT PT/EMVT WAVE TRAP CVT LA/SA IF 89A ISOLATOR CLOSED BUS-1 PT VOLTAGE WILL BE SELECTED IF 89B ISOLATOR CLOSED BUS-2 PT VOLTAGE WILL BE SELECTED IF VOLTAGE SELECTOR SWITCH IS KEPT IN BUS THEN BUS PT VOLTAGE IS EXTENDED TO RELAY IF VOLTAGE SELECTOR SWITCH IS KEPT IN LINE THEN LINE CVT VOLTAGE IS EXTENDED TO RELAY THE CIRCUIT DIAGRAM SHOWN IN NEXT PRESENTATION BUS-1 & BUS-2 PT IS COMING TO PT DISTRIBUTION BOX AND DISTRIBUTED FURTHER.
  • 9. VOLTAGE SUPPLY SELECTION 89A BUS-1 ISOLATOR +VE -VE R Y B N BUS-1 PT SUPPLY 89B BUS-2 ISOLATOR +VE -VE R Y B N BUS-2 PT SUPPLY 89BX 89AX R Y B N LINE CVT SUPPLY BUS PT LINE CVT N MANUAL VOLTAGE SELECTOR SWITCH. 21 MAIN-1 OR 21 MAIN-2 PROT RELAY
  • 10. CT NAME PLATE DETAILS CORE CLASS OF ACCURAC Y RATIO PRIMAR Y WINDIN G SECONDA RY WINDING KNEE POINT VOLTAGE MAGNETISIN G CURRENT CORE RESISTANC E 1 PS (PROTECT ION) 500/1 PI – P2 1S1 – 1S2 1000V 120mA 2.5 OHMS 1000/1 1S1 – 1S3 2000V 60mA 5.0 OHMS 2000/1 1S1 – 1S4 4000V 30mA 10.0 OHMS 2 PS (PROTECT ION) 500/1 PI – P2 2S1 – 2S2 1000V 120mA 2.5 OHMS 1000/1 2S1 – 2S3 2000V 60mA 5.0 OHMS 2000/1 2S1 – 2S4 4000V 30mA 10.0 OHMS 3 0.2 (METERIN G) 500/1 PI – P2 3S1 – 3S2 BURDEN = 40VA 1000/1 3S1 – 3S3 2000/1 3S1 – 3S4 4 PS (PROTECT ION) 500/1 PI – P2 4S1 – 4S2 1000V 120mA 2.5 OHMS 1000/1 4S1 – 4S3 2000V 60mA 5.0 OHMS 2000/1 4S1 – 4S4 4000V 30mA 10.0 OHMS 5 PS (PROTECT ION) 500/1 PI – P2 5S1 – 5S2 1000V 120mA 2.5 OHMS 1000/1 5S1 – 5S3 2000V 60mA 5.0 OHMS 2000/1 5S1 – 5S4 4000V 30mA 10.0 OHMS
  • 11. CVT NAME PLATE DETAILS CORE CLASS OF ACCURACY PRIMARY WINDING SECONDAR Y WINDING PRIMARY VOLTAGE SECONDARY VOLTAGE VA BURDEN 1 3P (PROTECTIO N) P1 – E 1a1 – 1n 1a2 – 1n 220KV / √3 110V / √3 200 VA 2 3P (PROTECTIO N) P1 – E 2a1 – 2n 2a2 – 2n 220KV / √3 110V / √3 200 VA 3 0.2 (METERING) P1 – E 3a1 – 3n 3a2 – 3n 220KV / √3 110V / √3 100 VA CORE CLASS OF ACCURACY PRIMARY WINDING SECONDAR Y WINDING PRIMARY VOLTAGE SECONDARY VOLTAGE VA BURDEN 1 3P (PROTECTIO N) P1 – E 1a1 – 1n 1a2 – 1n 400KV / √3 110V / √3 200 VA 2 3P (PROTECTIO N) P1 – E 2a1 – 2n 2a2 – 2n 400KV / √3 110V / √3 200 VA 3 0.2 (METERING) P1 – E 3a1 – 3n 3a2 – 3n 400KV / √3 110V / √3 100 VA
  • 12. PT / EMVT NAME PLATE DETAILS CORE CLASS OF ACCURACY PRIMARY WINDING SECONDAR Y WINDING PRIMARY VOLTAGE SECONDARY VOLTAGE VA BURDEN 1 0.2 (METERING) P1 – E 1a1 – 1n 1a2 – 1n 132KV / √3 110V / √3 100 VA 2 0.5 (PROTECTIO N) P1 – E 2a1 – 2n 2a2 – 2n 132KV / √3 110V / √3 100 VA 3 3P (PROTECTIO N) P1 – E 3a1 – 3n 3a2 – 3n 132KV / √3 110V / √3 100 VA CORE CLASS OF ACCURACY PRIMARY WINDING SECONDAR Y WINDING PRIMARY VOLTAGE SECONDARY VOLTAGE VA BURDEN 1 3P (PROTECTIO N) P1 – E 1a1 – 1n 1a2 – 1n 220KV / √3 110V / √3 200 VA 2 3P (PROTECTIO N) P1 – E 2a1 – 2n 2a2 – 2n 220KV / √3 110V / √3 200 VA 3 0.2 P1 – E 3a1 – 3n 3a2 – 3n 220KV / √3 110V / √3 100 VA
  • 13. BUS PT AT YARD U U U U U U U U U U U U U U U U U U BUS-1 PT/EMVT PRIMARY VOLTAGE 220 KV / 1.732 SECONDARY VOLTAGE 110V/1.732 P1 U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U TO CONTROL ROOM PT DISTRIBUTION PANEL U U U U U U U U U U U U U U U U U U BUS-2 PT/EMVT PRIMARY VOLTAGE 220 KV / 1.732 SECONDARY VOLTAGE 110V/1.732 P1 U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U TO CONTROL ROOM PT DISTRIBUTION PANEL BUS-1 BUS-2 METERING CL: 0.2 MAIN-2 PROT CL:3P MAIN-1 PROT CL:3P OPEN DELTA CL: 0.5 METERING CL: 0.2 MAIN-2 PROT CL:3P MAIN-1 PROT CL:3P OPEN DELTA CL: 0.5 PTMB PTMB
  • 14. BUS PT DISTRIBUTION PANEL (EXCEPT FOR 1-1/2CB / DBDCB / RING SYSTEM) X02 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 X12 X22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 51 52 53 54 55 56 57 58 59 60 61 62 63 64 X02 BUS-1 PT DISTRIBUTION BUS-2 PT DISTRIBUTION TO INDIVIDUAL C&R PANEL EACH SET FOR EACH CIRCUIT
  • 15. PT/CVT & CT MARSHLING BOX TB 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TB 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TB 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TB 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TB 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TB 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TB 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TB 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 CT MARSHELLING BOX CVT/PT MARSHELLING BOX TB 6 1 2 3 4 5 6 7 8 9 10 TB 4 1 2 3 4 5 6 7 8 9 10
  • 16. BAY MARSHLING BOX TB 1 1 50 TB 2 51 100 TB 3 101 150 TB 4 151 200 TB 5 201 250 BAY MARSHELLING BOX BACK VIEW TB DISTRIBUTION BAY MARSHELLING BOX FRONT VIEW AC DISTRIBUTION MAIN MCB 3-PH 100A MCB -1 3-PH 25A MCB -2 3-PH 25A MAIN - 3 3-PH 10A MCB - 4 3-PH 10A MCB - 5 3-PH 10A MAIN - 6 3-PH 10A MCB - 8 3-PH 10A MAIN - 9 3-PH 10A MCB - 10 3-PH 10A MCB - 11 3-PH 10A MAIN - 12 3-PH 10A MCB - 13 3-PH 10A MAIN - 1 1-PH 5A MCB - 2 1-PH 5A MCB - 3 1-PH 5A MAIN - 4 1-PH 5A MCB - 5 1-PH 5A
  • 17. IMPORTANT GUIDELINES CT & VT Earthing  CT / VT secondary neutrals should be earthed at one point only.  VT secondary neutral earthing is done at equipment itself.  It is preferable to earth the CT secondary neutral in the control / protection cubicle in order to provide maximum security to the operating personnel. CT POLARITY  As a practice the P1 terminal of the CT shall be towards the bus and P2 away from the bus.  From the above for Main-1, Main-2 & Metering – Primary current flows from P1 to P2. Accordingly secondary current Flows S2 to S1. Star formation is all S2s.  For the BBM & BBC – Primary current flows from P2 to P1. Accordingly secondary current Flows S1 to S2. Star formation is all S1s. Please conclude here.
  • 18. CABLE SCHEDULE CABLE SCHEDULE 1. NAME OF THE SUBSTATION: 2. NAME OF THE FEEDER/ TRANSFORMER: 3. CB DETAILS: 4. CT DETAILS 5. CVT / PT / EMVT DETAILS: 6. ISOLATOR DETAILS 7. C&R PANEL DETAILS: 8. POWER TRANSFORMER DETAILS : S.No FROM TO DESCRIPTION / PURPOSE CORE NO REFERENCE PANEL TB No FERRULE PANEL TB No FERRULE Cable ID Cable & Size
  • 19. CABLE SCHEDULE 1 2 3 4 5 6 7 S.No FROM TO PANEL TB No FERRULE PANEL TB No FERRULE 1 R – PH CT CORE - 5 5S1 CTMB TB-5-1 R-5S1 2 5S2 TB-5-2 R-5S2 3 5S3 TB-5-3 R-5S3 4 5S4 TB-5-4 R-5S4 5 Y – PH CT CORE - 5 5S1 CTMB TB-5-6 Y-5S1 6 5S2 TB-5-7 Y-5S2 7 5S3 TB-5-8 Y-5S3 8 5S4 TB-5-9 Y-5S4 9 Y – PH CT CORE - 5 5S1 CTMB TB-5-11 B-5S1 10 5S2 TB-5-12 B-5S2 11 5S3 TB-5-13 B-5S3 12 5S4 TB-5-14 B-5S4
  • 20. CABLE SCHEDULE 8 9 10 11 12 DESCRIPTION / PURPOSE CABLE & SIZE CORE No REFERENCE REMARKS R-PH CT TO CT MB OF CORE-5 4C X 2.5 1 DRG NO: PAGE NO 2 3 4 Y-PH CT TO CT MB OF CORE-5 4C X 2.5 1 DRG NO: PAGE NO 2 3 4 B-PH CT TO CT MB OF CORE-5 4C X 2.5 1 DRG NO: PAGE NO 2 3 4
  • 21. CIRCUIT BREAKER S.No DESCRIPTION INCASE OF CGL BREAKER 1 LOCAL CLOSING INTERLOCK K5, K5A 2 LOCAL CLOSE (IN CB CUBICLE) - - 3 REMOTE CLOSE (FROM CONTROL PANEL HAND CLOSE) K1 4 LOCAL TRIP ( IN CB CUBICLE) - - 5 REMOTE TRIP COIL-1 (FROM CONTROL PANEL HAND TRIP) K21A, K21B, K21C 6 REMOTE TRIP COIL-2 (FROM CONTROL PANEL HAND TRIP) K41A, K41B, K41C 7 CB OPEN INDICATION A11, A12-B11,B12-C11,C12 8 CB CLOSE INDICATION A41, A42-B41,B42-C41,C42 9 DC SUPPLY J1, J2 & J11 & J12 10 PROTECTION CLOSE OR AUTO RE-CLOSE K3 11 PROTECTION TRIP COIL-1 & POST CLOSE SUPERVISION K23A, K23B, K23C 12 PROTECTION TRIP COIL-2 & POST CLOSE SUPERVISION K43A, K43B, K43C 13 PRE CLOSE SUPERVISION OF TRIP COIL-1 K31A, K31B, K31C 14 PRE CLOSE SUPERVISION OF TRIP COIL-2 K49A, K49B, K49C 15 CB CONTACT DICTRIBUTION. NOs – 8, NCs – 8 16 CB POLE DISTURBANCE RELAY. 17 CB CONTACT MULTIPLICATION RELAY. 18 CB TROUBLE ALARMS - 63 AR, GA, GL, AL, AG, AA, OA
  • 22. CIRCUIT BREAKER CLOSING CIRCUIT 52CC 52b J4 63A 63G 63HO 63N SPL 52Y J3 T N C LCIL K1 K3 LOCAL REMOTE K3A K5 52Y 52Y 52Y SLS 52a 86A 86B 96BB T N C SSSS SERVICE BYPASS SSS REMOTE CLOSE 21M1 A/R 21M2 A/R A/R CLOSE CONTROL & RELAY PANEL A/R CLOSE REMOTE CLOSE INTERLOCK
  • 23. CIRCUIT BREAKER TRIPPING CIRCUIT 52TC 52a J4 63A 63G 63HO 63N J3 T N C LOCAL REMOTE PRE CLOSE SUPERVISION PROTECTION TRIP + POST CLOSE SUPERVISION PB EMERGENCY TRIP T N C 52TC 52a J14 63A 63G 63HO 63N PRE CLOSE SUPERVISION PROTECTION TRIP + POST CLOSE SUPERVISION LOCAL REMOTE J13 C&R PANEL T N C PB EMERGENCY TRIP
  • 24. NOMINCLATURES 52 a CB AUX CONTACT OPEN WHEN CB OPEN 52b CB AUX CONTACT CLOSE WHEN CB OPEN 52 CC CB CLSOING COIL 52T C-1 CB TRIP COIL-1 63 A AIR PRESSURE CONTACT 52 TC- 2 CB TRIP COIL-2 63 G SF6 GAS PRESSURE CONTACT 63 HO HYDRAULIC OIL PRESSURE CONTACT 63 N NITROGEN PRESSURE CONTACT 52Y ANTIPUMPING CONTACTOR SP LS SPRING CHARGE LIMIT SWITCH LCIL LOCAL CLOSING INTERLOCK K3 A REMOTE CLOSE TNC TRIP NEUTRAL CLOSE SWITCH 18 6 28 6 MONOSTABLE & SELF RESETING FAST ACTING HIGH SPEED TRIP RELAYS 86 A 86 B 96 BB BISTABLE & HAND RESETING HIGH SPEED TRIP RELAY / MASTER TRIP RELAYS A/ R AUTO RECLOSURE SSS S SYNCHROSCOPE SELECTOR SWITCH SS S SYNCHROSCOPE SOCKET PB PUSH BUTTON LR LOCAL REMOTE SWITCH Synchronization Requirements 1. Voltages must be match 2. Frequency must be match 3. Phase angle must be match 1. Line Voltage 2. Bus Voltage 3. DC Supply 4. Closing Permission
  • 25. LOCAL CLOSING INTERLOCK TAKE AN EXAMPLE OF SINGLE BUS SYSTEM 52 CB BUS 89 / 29 89 / 29 E 89 / 29 L 89 / 29 LE 89 / 29 AE LOCAL CLOSING INTERLOCK DRAWING 89M/B 89 E 89L 89AE K1 K3 REQUIRED INTERLOCK FOR LOCAL CLOSING NORMALLY DURING MAINTANENCE 1. BUS ISOLATOR OPEN CONDITION 2. LINE ISOLATOR OPEN CONDITION 3. 89E EARTH SWITCH CLOSED 4. 89AE EARTH SWITCH CLOSED
  • 26. POLE DISTURBANCE RELAY THIS RELAY COMES IN TO PICTURE THE CIRCUIT BREAKER 3POLES ARE INTER CONNECTED THROUGH ELECTRICALLY NOT MECHANICALLY. WHEN THREE POLES ARE SIMULTANEOUSLY NOT OPEN OR CLOSE THEN THE RELAY ACTS AND TRIPS THE CIRCUIT BREAKER AFTER SOME TIME DELAY. EXAMPLE: 220KV CB, 400KV CB, 765KV CB AND ABOVE VOLTAGE LEVEL R Y B 52a R Y B 52b +VE TIME DELAY RELAY TO SER TO ANNUN TO CB TRIP -VE 52 TC-1-R 52 TC-1-Y 52 TC-1-B 52 TC-2-R 52 TC-2-Y 52 TC-2-B -VE 52 CIRCUIT BREAKER
  • 27. TRIP CIRCUIT HEALTHY TO TC-1 HEALTHY INDICATION TO TC-1 FAULTY ANNUNCIATION +VE TO CB PROTECTION TRIP + POST CLOSE SUPERVISION PRE CLOSE SUPERVISION CONTROL & RELAY PANEL CIRCUIT BREAKER CENTRAL MB 52 TC-1 -VE CB HEALTHYNESS TO TC-2 HEALTHY INDICATION TO TC-2 FAULTY ANNUNCIATION +VE TO CB PROTECTION TRIP + POST CLOSE SUPERVISION PRE CLOSE SUPERVISION 52 TC-2 -VE CB HEALTHYNESS TSR TSR LED LED 52b 52b
  • 28. MAIN-1 PROTECTION OPERATED 21 MAIN-1 BINARY OUTPUT TO LBB TO TC-1 TO TC-2 TO LBB TO TC-1 TO TC-2 TO TC-1 TO TC-2 TO TC-1 TO TC-2 TO LBB TO TC-1 TO TC-2 TO TC-1 TO TC-2 +VE -VE R PHASE Y PHASE B PHASE 186 R1 186 R2 186 Y1 186 Y2 186 B1 186 B2
  • 29. MAIN-2 PROTECTION OPERATED 21 MAIN-2 BINARY OUTPUT TO LBB TO TC-1 TO TC-2 TO LBB TO TC-1 TO TC-2 TO TC-1 TO TC-2 TO TC-1 TO TC-2 TO LBB TO TC-1 TO TC-2 TO TC-1 TO TC-2 +VE -VE R PHASE Y PHASE B PHASE 286 R1 286 R2 286 Y1 286 Y2 286 B1 286 B2
  • 30. 86 GA (MASTER TRIP RELAY) OPERATION 21 MAIN-1 TO ANN +VE -VE RESET OPERATED PB TO CL I/L TO LBB TO TC-1 TO TC-2 TO M1 DR TO M2 DR TO SER 86 GA MASTER TRIP RELAY M1 BUILT IN FUNCTIONS TEED-1 PROTECTION OVER VOLTAGE STAGE-1 PROT DIRECT TRIP CHANNEL-1 RECEIVED
  • 31. 86 GB (MASTER TRIP RELAY) OPERATION 21 MAIN-2 TO ANN +VE -VE RESET OPERATED PB TO CL I/L TO LBB TO TC-1 TO TC-2 TO M1 DR TO M2 DR TO SER 86 GB MASTER TRIP RELAY M2 BUILT IN FUNCTIONS TEED-2 PROTECTION OVER VOLTAGE STAGE-2 PROT LBB/BFR RELAY DIRECT TRIP CHANNEL-2 RECEIVED
  • 32. 87 BUSBAR-1 PROTECTION TRIPPING SCHEME HIGH SPEED TRIP RELAY (96BB) FOR BAY1 HIGH SPEED TRIP RELAY (96BB) FOR BAY2 HIGH SPEED TRIP RELAY (96 BB) FOR BAY3 HIGH SPEED TRIP RELAY (96 BB) FOR BAY4 HIGH SPEED TRIP RELAY (96BB)FOR BAY5 HIGH SPEED TRIP RELAY (96 BB) FOR BAY6 BAY1 CR PANEL TRIP FROM 50 LBB TO START 50 LBB BAY2 CB PANEL TRIP FROM 50 LBB TO START 50 LBB BAY3 CB PANEL TRIP FROM 50 LBB TO START 50 LBB BAY4 CB PANEL TRIP FROM 50 LBB TO START 50 LBB BAY5 CB PANEL TRIP FROM 50 LBB TO START 50 LBB BAY6 CB PANEL TRIP FROM 50 LBB TO START 50 LBB +VE BUSBAR PANEL 87 BUSBAR
  • 33. 96 BB (MASTER TRIP RELAY) OPERATION 87 BUSBAR TO D/T-1 +VE -VE RESET OPERATED PB TO CL I/L TO LBB TO TC-1 TO TC-2 TO M1 DR TO M2 DR TO D/T-2 96 BB MASTER TRIP RELAY TO ANNUN TO SER FROM LBB
  • 34. TRANSFORMER TROUBLES TRIPPING GR-A OIL TEMP TRIP BUCHHOLZ TRIP PRD-1 TRIP PRD-2 TRIP DIFF RELAY 87T OL RELAY 51OL HV O/L+E/F PROT 67 86 AX 86 AY TO 3PH GR-A 400KV MAIN TO 3PH GR-A 220KV MAIN NDR RELAY 151N HV O/F RELAY 99T +VE +VE -VE
  • 35. TRANSFORMER TROUBLES TRIPPING GR-B REF RELAY 64REF STUB RELAY 50ST LV O/L+E/F PROT 67 86 BX 86 BY TO 3PH GR-B 400KV MAIN TO 3PH GR-B 220KV MAIN LV O/F RELAY 99T OLTC BUCHHOLZ-R TRIP OLTC BUCHHOLZ-Y TRIP OLTC BUCHHOLZ –B TRIP WNDG TEMP-HV TRIP WNDG TEMP-LV TRIP WNDG TEMP-IV TRIP +VE +VE -VE
  • 36. LBB Operation & Output INITIATION 186 R 186 Y 186 B 286 R 286 Y 286 B 86 GR-A 86 GR-B 96 BB +VE TO D/T CH-1 TO D/T CH-2 TO ANNUN TO MAIN1 DR TO MAIN2 DR TO SER TO 86 GR-A TO 86 GR-B TO BUSBAR -VE 50X LBB / BFR TIMER
  • 37. TRIP COIL-1 CIRCUITS 186R1 186R2 286R1 286R2 86GR-A 86GR-B 96BB 186Y1 186Y2 286Y1 286Y2 186B1 186B2 286B1 286B2 186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY TRIP COIL-1
  • 38. TRIP COIL-2 CIRCUITS 186R1 186R2 286R1 286R2 86GR-A 86GR-B 96BB 186Y1 186Y2 286Y1 286Y2 186B1 186B2 286B1 286B2 186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY TRIP COIL-2
  • 39. CB CONTACT MULTIPLICATION S.No R-PHASE Y-PHASE B- PHASE REF PURPOSE A-POLE B-POLE C-POLE 1 A11,A12 B11,B12 C11,C12 2 A13,A14 B13,B14 C13,C14 3 A15,A16 B15,B16 C15,C16 4 A17,A18 B17,B18 C17,C18 5 A19,A20 B19,B20 C19,C20 6 A21,A22 B21,B22 C21,C22 7 A23,A24 B23,B24 C23,C24 8 A25,A26 B25,B26 C25,C26 9 A41,A42 B41,B42 C41,C42 10 A43,A44 B43,B44 C43,C44 11 A45,A46 B45,B46 C45,C46 12 A47,A48 B47,B48 C47,C48 13 A49,A50 B49,B50 C49,C50 14 A51,A52 B51,B52 C51,C52 15 A53,A54 B53,B54 C53,C54 16 A55,A56 B55,B56 C55,C56
  • 40. PROTECTION COUPLER PANEL C E DISPLAY ACTIVE START TRIP NSD 50/ NSD 70 G4AC TB: V9LC 1- 2+ 5- 6+ 9- 10+ 13- 14+ TX TRIP A(C) RX TRIP A(C) TX TRIP B(D) RX TRIP B(D) C S C S C R C R GA4D TB:V9LD 1- 2+ 5- 6+ 9- 10+ 13- 14+ TX TRIP C(A) RX TRIP C(A) TX TRIP D(B) RX TRIP D(B) C S C S C R C R G4AA TB: V9LB ALARM-1 250V DC ALARM-2 250V DC 5 6 7 8
  • 41. PROTECTION COUPLERS FOR 400KV LINE  FOR EACH LINE 2Nos PROTECTION COUPLER PANELS PROVIDED.  FOR EACH LINE 1NO CARRIER SPEECH PANEL PROVIDED.  SO, ONE LINE REQUIRES TOTAL 3 PANELS.  CARRIER SPEECH PANEL PURELY FOR VOICE COMMUNICATION BETWEEN TWO SUBSTATIONS, i.e THE LINE CONNECTED SUBSTATIONS.  THE VOICE COMMUNICATION ARE TWO METHODS PROVIDED.  ONE IS HOTLINE COMMUNICATION/DEDICATED/ LIFT&TALK METHOD.  ANOTHER IS DIAL METHOD.  IN PROTECTION COUPLER PANEL-1 TOTAL 3 CARDS ARE IMPORTANT FOR SENDING & RECEIVING TRIP SIGNALS.  ONE CARD FOR ALARM i.e G4AA. ONE CARD FOR PERMISSIVE/PROTECTION TRIP i.e G4AC & ANOTHER CARD FOR DIRECT TRIPS i.e G4AD.  IN PROTECTION COUPLER-2 PANEL ALSO 3 CARDS ARE PROVIDED SIMILAR TO PROTECTION COUPLER-1 PANEL.  THE PROTECTION COUPLER PANEL DRAWING IS SHOWN IN PREVIOUS MENU.  1SET TX & RX FOR PERMISSIVE/ PROTECTION TRIP(G4AC)  1SET TX & RX FOR BACKUP FOR PERMISSIVE/ PROTECTION IN ANOTHER PANEL(G4AC).  1SET TX & RX FOR DIRECT TRIP CHANNEL-1( G4AD).  1SET TX & RX FOR SPARE UNDER EMERGENCY(G4AD).  THE ABOVE ARRANGEMENT SIMILAR FOR PROTECTION COUPLER PANEL-2.  G4AA CARD FOR ALARM.
  • 42. MAIN-1 PROTECTION CARRIER INTER TRIPPING ABB REL521 CR CS -VE CARRIER RECEIVE CARRIER SEND ALARM IN ABB NSD 50 OUT PANEL-1 PANEL-2 G4AC V9LC 1 G4AC V9LC 2 G4AC V9LC 5 G4AC V9LC 6 G4AA V9LB 5 G4AA V9LB 6 ABB NSD 50 G4AC V9LC 10 G4AC V9LC 14 G4AC V9LC 9 G4AC V9LC 13 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL +VE -VE
  • 43. MAIN-2 PROTECTION CARRIER INTER TRIPPING ABB REL316 CR CS -VE CARRIER RECEIVE CARRIER SEND ALARM IN ABB NSD 50 OUT PANEL-2 PANEL-1 G4AC V9LC 1 G4AC V9LC 2 G4AC V9LC 5 G4AC V9LC 6 G4AA V9LB 5 G4AA V9LB 6 ABB NSD 50 G4AC V9LC 10 G4AC V9LC 14 G4AC V9LC 9 G4AC V9LC 13 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL +VE -VE
  • 44. DIRECT TRIP SEND CARRIER CHANNEL-1 T N C MAIN CB(1-52CB) CONTROL PANEL 87 BUSBAR TRIP (ZONE-1) 50 LBB/BFR ABB NSD 50 DC +VE FROM PANEL G4AD V9LC 2 DC –VE FROM PANEL G4AD V9LC 1 PANEL-1 BUSBAR PROTECTION PANEL RELAY PANEL . OVER VOLTAGE STAGE 1 or 2
  • 45. DIRECT TRIP SEND CARRIER CHANNEL-2 T N C MAIN CB(1-52CB) CONTROL PANEL 87 BUSBAR TRIP (ZONE-1) 50 LBB/BFR ABB NSD 50 DC +VE FROM PANEL G4AD V9LC 2 DC –VE FROM PANEL G4AD V9LC 1 PANEL-2 BUSBAR PROTECTION PANEL RELAY PANEL . OVER VOLTAGE STAGE 1 or 2
  • 46. DIRECT TRIP RECEIVE CHANNEL-1&2 ABB NSD 50 G4AD V9LC 6 G4AD V9LC 5 ABB NSD 50 G4AD V9LC 6 G4AD V9LC 5 PANEL-1 PANEL-2 DC +VE DC +VE +VE -VE TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) DIRECT TRIP-1 CARRIER RECEIVE RELAY DIRECT TRIP-2 CARRIER RECEIVE RELAY TO ANNUNCIATION TO MAIN1 DR TO MAIN2 DR TO ANNUNCIATION TO MAIN1 DR TO MAIN2 DR