SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net
Fax: 001-203-426-3213 web: http://arc-ae.net/
Airport Passenger Terminals
Douglas Tobin Architect Engineer, (DTAE), specialist in Airport Master Planning, Airport Passenger Terminal Building and Systems Project Development.
DTAE has been involved in the development of over 50 Airport Passenger Terminals. DTAE has participated on project teams performing the full scope of
services required for the Master Planning, Design Development, Construction Documents and Construction Implementation Management of the project works.
The following provides an upper management outline of the project development process.
DTAE divides an Airport Passenger Terminal Project into the following Program Development categories:
 Part 1 - Master Planning, Concept Design, Design Development - Phase 1 Report
 Part 2 - Building Facility Architecture and Engineering
 Part 3 - Architectural Engineering Infrastructure, Terminal and Systems
o Architectural Program, Energy Analysis and Life Cycle Evaluations
o Terminal Design – Check-in through Boarding
o Civil, Mechanical, Structural, Electrical, Fire Protection Building Components
o Security Systems, CCTV, Access Control and Screening Systems
o Baggage Handling Systems
o Boarding Control Systems, IT Systems
o Maintenance and Material Handling Systems
o Roadway and Ramp Planning and Design
o Concessions Planning and Design
 Part 4 - Building Design and Engineering, Contract and Construction Documents
 Part 5 - Tender Evaluation, Contract Negotiation and Award
 Part 6 - Project Implementation Management
Our expertise includes the following main components of Passenger Terminal development:
 Project Program Development
 Overall Site and Facility Master Planning
 Facility Planning, Cost & Numerical Analysis
 Building Architecture, Design and Program Management
 Civil, Structural, Mechanical, Electrical Engineering
 Fire Protection and Security Systems Engineering
 Baggage Handling Systems Engineering
 Customs X-ray & Inspection Systems Design Development
Douglas Tobin Architect Engineer
Architect Engineer Planner
Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net
Fax: 001-203-426-3213 web: http://arc-ae.net/
Queen Alia International Airport, QAIA, Amman, Jordan
(Rendering by others) (Photo by others)
Queen Alia International Airport, QAIA, Amman, Jordan
As part of the QAIA Project Management team Douglas Tobin Architect Engineer’s (DTAE) key responsibilities involved project
design review, construction management, testing and commissioning of the new QAIA Passenger Terminal included the following:
 IT systems, Network, Master Clock, FIDS, BIDS, CUPPS, CUSS, Server Configuration, etc.
 General Security Equipment – This includes the ACS, CCTV, PTB CCTV, Software, Specification engineering review
and critique.
 Security Equipment Tender review - Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and
Level 3 X-Ray units, Pre-Board Screen X-Ray units, etc.
 Baggage Handling System engineering design and specifications planning review and report.
 Technical specification compliance testing for the IT, BHS, PBB, VIAGS, GPS, IASS, UPS, and Security Equipment.
 Security and Customs Screening Equipment - Functional Specifications engineering review and report.
 BHS - Baggage Handling System Explosive Detection System design and specification engineering review and report.
 BRS - Baggage Reconciliation System design and specification engineering review and report.
 Passenger Terminal systems testing, debug and commissioning.
Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net
Fax: 001-203-426-3213 web: http://arc-ae.net/
Sir Seewoosagur Ramgoolam International Airport (SSRIA), Mauritius
(Photo by others)
Sir Seewoosagur Ramgoolam International Airport (SSRIA), Mauritius
As part of the SSRIA Project Management team Douglas Tobin Architect Engineer’s (DTAE) key responsibilities involved project
design review, construction management, testing and commissioning of the new SSRIA Passenger Terminal included the following:
 Passenger Terminal Building Envelope Architectural Design, Construction Documents, Construction Management
 IT systems, Network, Master Clock, FIDS, BIDS, CUPPS, CUSS, Server Configuration, etc.
 General Security Equipment – This includes the ACS, CCTV, PTB, CCTV, Software, and engineering review.
 Security Equipment review - Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and Level 3 X-
Ray units, Pre-Board Screen X-Ray units, etc.
 Baggage Handling System engineering design and specifications planning review, implementation and testing.
 Technical specification compliance testing for the IT, BHS, PBB, VIAGS, GPS, IASS, PA, UPS, and Security
Equipment.
 BHS and BRS - Baggage Handling System Explosive Detection and Reconciliation System design and specification
engineering review, implementation and testing.
 Passenger Terminal systems testing, debug and commissioning.
Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net
Fax: 001-203-426-3213 web: http://arc-ae.net/
Pulkovo International Airport – Saint Petersburg, Russia
(Photo by Others)
Airport Passenger Terminal Architecture, Structural Engineering, Quantity Survey Cost Estimating and Value Engineering
As part of the Gensler / Louis Berger Group (LBG) Project team Douglas Tobin Architect Engineer (DTAE) was responsible for the
review and critique of the Master Plan and development of the following project works:
 Architectural Envelope Preliminary Design and Analysis
 Building and Ramp Quantity Survey and Cost estimates for Tendering
 Structural Engineering for the Passenger Terminal
 Structural Engineering of the Terminal Exterior Envelope, Curtain Wall Systems and Structural Skylights and Roofs.
 Structural Engineering and Design for the Underground Passenger Tunnels to Remote building Terminal Satellite.
 Preliminary Structural Engineering and Design of the Aircraft Ramp
 Value Engineering Design Improvements and Recommendations
 Roof Truss Structural Engineering, Cost Estimating and Value Engineering
Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net
Fax: 001-203-426-3213 web: http://arc-ae.net/
Quito International Airport – Quito, Ecuador
Quito International Airport – Project Peer Review and Critique
As part of the Construction Management team Douglas Tobin Architect Engineer’s key responsibilities involved the Engineering
Design and Specifications planning review, critique and Tender Evaluation review and report. Project responsibilities involved the
following Airport Passenger Terminal Systems:
 IT systems, Network, Master Clock, FIDS, BIDS, Server Configuration, etc.
 General Security Equipment – This includes the Airside CCTV, ACAMS, PTB CCTV, Software, Specification
engineering review and critique.
 Security Equipment Tender - The Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and Level 3
X-Ray units, Pre-Board Screen X-Ray units, etc.
 Baggage Handling System engineering design and specifications planning review and report.
 Tender Evaluation of the Technical specification compliance for the IT, BHS, and Security Equipment Tenders.
 Security and Customs Screening Equipment - Functional Specifications engineering review and report.
 Baggage Handling System Explosive Detection System design and specification engineering review and report. BRS -
Baggage Reconciliation System.
Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net
Fax: 001-203-426-3213 web: http://arc-ae.net/
Benazir Bhutto International Airport
New Islamabad International Airport
Islamabad, Pakistan
Louis Berger Group
Baggage Handlings Systems Design & Development
Architectural Engineering and Project Development
Bradley International Airport
Windsor Locks, CT
US Airways Terminal A – Departures Level
Architectural Planning and Design
Check in Counter and Kiosk Design
Albany Municipal Airport
Albany, NY
Temporary Passenger Terminal
FIS Terminal Relocation Project
Douglas J. Tobin Responsible for;
Building Architecture and Engineering
Value Engineering (VE) Study for
New York Port Authority
International Arrivals
Building Redevelopment (IAB)
Passenger Terminal & Baggage Systems Consultant Team
Contact Information:
Douglas J. Tobin P.E., R.A.
Architects Engineers Planners
14 Sand Hill Road
Sandy Hook, CT 06482-1624
203-426-0146
203-426-3213 Fax.
Web: http://arc-ae.net/
E-mail: douglastobin@are-ae.net
arc-djt@att.net
150310-DTAE-Airport Passenger Terminals.doc

Weitere ähnliche Inhalte

Empfohlen

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Empfohlen (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

150414-DTAE-Airport Passenger Terminals

  • 1. Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net Fax: 001-203-426-3213 web: http://arc-ae.net/ Airport Passenger Terminals Douglas Tobin Architect Engineer, (DTAE), specialist in Airport Master Planning, Airport Passenger Terminal Building and Systems Project Development. DTAE has been involved in the development of over 50 Airport Passenger Terminals. DTAE has participated on project teams performing the full scope of services required for the Master Planning, Design Development, Construction Documents and Construction Implementation Management of the project works. The following provides an upper management outline of the project development process. DTAE divides an Airport Passenger Terminal Project into the following Program Development categories:  Part 1 - Master Planning, Concept Design, Design Development - Phase 1 Report  Part 2 - Building Facility Architecture and Engineering  Part 3 - Architectural Engineering Infrastructure, Terminal and Systems o Architectural Program, Energy Analysis and Life Cycle Evaluations o Terminal Design – Check-in through Boarding o Civil, Mechanical, Structural, Electrical, Fire Protection Building Components o Security Systems, CCTV, Access Control and Screening Systems o Baggage Handling Systems o Boarding Control Systems, IT Systems o Maintenance and Material Handling Systems o Roadway and Ramp Planning and Design o Concessions Planning and Design  Part 4 - Building Design and Engineering, Contract and Construction Documents  Part 5 - Tender Evaluation, Contract Negotiation and Award  Part 6 - Project Implementation Management Our expertise includes the following main components of Passenger Terminal development:  Project Program Development  Overall Site and Facility Master Planning  Facility Planning, Cost & Numerical Analysis  Building Architecture, Design and Program Management  Civil, Structural, Mechanical, Electrical Engineering  Fire Protection and Security Systems Engineering  Baggage Handling Systems Engineering  Customs X-ray & Inspection Systems Design Development Douglas Tobin Architect Engineer Architect Engineer Planner
  • 2. Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net Fax: 001-203-426-3213 web: http://arc-ae.net/ Queen Alia International Airport, QAIA, Amman, Jordan (Rendering by others) (Photo by others) Queen Alia International Airport, QAIA, Amman, Jordan As part of the QAIA Project Management team Douglas Tobin Architect Engineer’s (DTAE) key responsibilities involved project design review, construction management, testing and commissioning of the new QAIA Passenger Terminal included the following:  IT systems, Network, Master Clock, FIDS, BIDS, CUPPS, CUSS, Server Configuration, etc.  General Security Equipment – This includes the ACS, CCTV, PTB CCTV, Software, Specification engineering review and critique.  Security Equipment Tender review - Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and Level 3 X-Ray units, Pre-Board Screen X-Ray units, etc.  Baggage Handling System engineering design and specifications planning review and report.  Technical specification compliance testing for the IT, BHS, PBB, VIAGS, GPS, IASS, UPS, and Security Equipment.  Security and Customs Screening Equipment - Functional Specifications engineering review and report.  BHS - Baggage Handling System Explosive Detection System design and specification engineering review and report.  BRS - Baggage Reconciliation System design and specification engineering review and report.  Passenger Terminal systems testing, debug and commissioning.
  • 3. Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net Fax: 001-203-426-3213 web: http://arc-ae.net/ Sir Seewoosagur Ramgoolam International Airport (SSRIA), Mauritius (Photo by others) Sir Seewoosagur Ramgoolam International Airport (SSRIA), Mauritius As part of the SSRIA Project Management team Douglas Tobin Architect Engineer’s (DTAE) key responsibilities involved project design review, construction management, testing and commissioning of the new SSRIA Passenger Terminal included the following:  Passenger Terminal Building Envelope Architectural Design, Construction Documents, Construction Management  IT systems, Network, Master Clock, FIDS, BIDS, CUPPS, CUSS, Server Configuration, etc.  General Security Equipment – This includes the ACS, CCTV, PTB, CCTV, Software, and engineering review.  Security Equipment review - Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and Level 3 X- Ray units, Pre-Board Screen X-Ray units, etc.  Baggage Handling System engineering design and specifications planning review, implementation and testing.  Technical specification compliance testing for the IT, BHS, PBB, VIAGS, GPS, IASS, PA, UPS, and Security Equipment.  BHS and BRS - Baggage Handling System Explosive Detection and Reconciliation System design and specification engineering review, implementation and testing.  Passenger Terminal systems testing, debug and commissioning.
  • 4. Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net Fax: 001-203-426-3213 web: http://arc-ae.net/ Pulkovo International Airport – Saint Petersburg, Russia (Photo by Others) Airport Passenger Terminal Architecture, Structural Engineering, Quantity Survey Cost Estimating and Value Engineering As part of the Gensler / Louis Berger Group (LBG) Project team Douglas Tobin Architect Engineer (DTAE) was responsible for the review and critique of the Master Plan and development of the following project works:  Architectural Envelope Preliminary Design and Analysis  Building and Ramp Quantity Survey and Cost estimates for Tendering  Structural Engineering for the Passenger Terminal  Structural Engineering of the Terminal Exterior Envelope, Curtain Wall Systems and Structural Skylights and Roofs.  Structural Engineering and Design for the Underground Passenger Tunnels to Remote building Terminal Satellite.  Preliminary Structural Engineering and Design of the Aircraft Ramp  Value Engineering Design Improvements and Recommendations  Roof Truss Structural Engineering, Cost Estimating and Value Engineering
  • 5. Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net Fax: 001-203-426-3213 web: http://arc-ae.net/ Quito International Airport – Quito, Ecuador Quito International Airport – Project Peer Review and Critique As part of the Construction Management team Douglas Tobin Architect Engineer’s key responsibilities involved the Engineering Design and Specifications planning review, critique and Tender Evaluation review and report. Project responsibilities involved the following Airport Passenger Terminal Systems:  IT systems, Network, Master Clock, FIDS, BIDS, Server Configuration, etc.  General Security Equipment – This includes the Airside CCTV, ACAMS, PTB CCTV, Software, Specification engineering review and critique.  Security Equipment Tender - The Scope of work consists of the EDS Equipment, Metal Detectors, Level 1 and Level 3 X-Ray units, Pre-Board Screen X-Ray units, etc.  Baggage Handling System engineering design and specifications planning review and report.  Tender Evaluation of the Technical specification compliance for the IT, BHS, and Security Equipment Tenders.  Security and Customs Screening Equipment - Functional Specifications engineering review and report.  Baggage Handling System Explosive Detection System design and specification engineering review and report. BRS - Baggage Reconciliation System.
  • 6. Phone: 001-860-488-5838 e-mail: mailto:arc-djt@att.net Fax: 001-203-426-3213 web: http://arc-ae.net/ Benazir Bhutto International Airport New Islamabad International Airport Islamabad, Pakistan Louis Berger Group Baggage Handlings Systems Design & Development Architectural Engineering and Project Development Bradley International Airport Windsor Locks, CT US Airways Terminal A – Departures Level Architectural Planning and Design Check in Counter and Kiosk Design Albany Municipal Airport Albany, NY Temporary Passenger Terminal FIS Terminal Relocation Project Douglas J. Tobin Responsible for; Building Architecture and Engineering Value Engineering (VE) Study for New York Port Authority International Arrivals Building Redevelopment (IAB) Passenger Terminal & Baggage Systems Consultant Team Contact Information: Douglas J. Tobin P.E., R.A. Architects Engineers Planners 14 Sand Hill Road Sandy Hook, CT 06482-1624 203-426-0146 203-426-3213 Fax. Web: http://arc-ae.net/ E-mail: douglastobin@are-ae.net arc-djt@att.net 150310-DTAE-Airport Passenger Terminals.doc