Project Charter: Purdys Chocolatier Demising & Renovation
September 30th, 2016
Background
Streamline has been hired to provide project management services for Purdys
Chocolatier for their renovation and demise project. This project is needed because; increased
web sales has led to a need for a new packing line/mezzanine. Furthermore, because of the
increase in sales, additional staff must be hired as well. This has led to the need for: new
bathrooms, office space, and a gym to help provide for valued workforce. Finally, we will be
using under-utilized space at 8330 Chester Street to move new tenants into the building, this will
provide a new revenue stream for Purdys. To make this possible; a demising wall will be built,
with accompanying exit corridors, and handicap-accessible ramp.
The current situation for Purdys is a warehouse pack line that cannot meet up with
increased demand. Furthermore, space that could be generating an income is sitting vacant.
We will review all existing operations, review, and oversee the planning, construction, and
closeout process while providing expert project management experience, coupled with strong
communication processes.
Goals
● Work for the client and represent their interests throughout the project life cycle.
● To maximize work efficiency and utilize cost-saving methods whenever necessary.
● Work closely with the general Contractor to ensure as little disruption to Purdys daily
work activities as possible.
● Deliver a product that is on time and meet or exceeds all client expectations.
S t r e a m l i n e F a c i l i t y P l a n n i n g
2
Scope of Work & Deliverables
PHASE 1:
1. Prepare site for construction (signage, equipment set-up, safety meetings, and
introductions)
2. Cutting and coring concrete and preparing site for building demising wall
3. Demise 8330 & 8380 Chester Street (See Appendix A1 for dimensions)
4. Building 4 new interior exit corridors for shared space north and south of demising
wall, and 1 main exit corridor (exterior) exiting onto Kent Street (See B2 for details)
5. Trades will be managed by site contractor, and trades will be responsible for ALL
miscellaneous work related to their tasks (See work breakdown structure)
PHASE 2:
1. Construct 5 female and 5 male washrooms (These will have handicapped accessible
washrooms inside)
Specs. Washrooms will be 3’ - 5
Handicapped Washrooms will be 5’ -5’ (All fixtures will be of commercial grade)
2. Construct new office space and first aid room
3. Building Handicapped accessible ramp for tenant side of building
PHASE 3:
1. Remove racking for floor space
2. Demolition of existing washrooms and change rooms
3. Build new washrooms 7 male 7 female and 1 universal (Specs. Will remain the same as
phase 2 washrooms)
4. Build new gym space (Gym equipment will not be provided or ordered)
5. Supply and install new mezzanine and packline with adjoining coolers this includes:
Foundation, stairwell, and equipment needed (humidity control unit, HVAC unit etc.)
Second floor of mezzanine WILL NOT be worked on but will be available and built so
future operations can be expanded to their as needed. This will not be in existing contract.
S t r e a m l i n e F a c i l i t y P l a n n i n g
3
Key Stakeholders
Client Purdys Chocolates
Sponsor Duncan Johnson (CFO) Available on request
Project manager Earl Vance 604-988-2322
Project team
members
Jim Prichard 778-563-4456
Jesse Sengura 604-988-4511
(Floor Supervisors)
Donny Olson 604-842-5125
(Project Coordinator)
General Contractor: George Stevens 604-921-3342
Bynett Construction
Electrical Engineer: Joshua Merkel 778-651-4456
SML Electrical Consultants
Plumbing/HVAC: Hamid Rekashi 604-567-8932
ByCar Engineering
Sprinklers: Curt Haydenm 604-765-2232
Phaser Fire
Architect:
Edwin Wong 778-451-2311
Structural Engineer:
Bianco Wong 778-988-5678
Geotechnical Engineer:
Sarah Parry 604-229-4356
S t r e a m l i n e F a c i l i t y P l a n n i n g
4
Codes & Regulations
● BCBC (British Columbia Building Code)
● VBBL (Vancouver Building By-Law)
★ ALL trades will be responsible for making sure their work is up to code and follows all by-
laws. Any re-work that must be done due to not following code the trade responsible will
cover the cost from their contract. Contractor will also oversee all daily operations and
keep StreamLine updated.
Project Priorities
● Demising 8380 Chester Street as quickly as possible. This will allow the client to collect
monthly rental income from the under-utilized space.
● Having PHASE 2 washrooms built and ready for use before December 1st, 2016. That is
when the seasonal workforce arrives.
● Having the project completed on time and on budget
Project Milestones
Start Date: February 9th, 2016
Milestone 1: March 10th, 2016 - Permit Application
Milestone 2: July 28th, 2016 - Construction Starts
Milestone 3: April 13th, 2017 - Handover
S t r e a m l i n e F a c i l i t y P l a n n i n g
5
Approval Signatures
Peter Higgins, Project
Client
Duncan Johnson,
Project Sponsor
Earl Vance, Project
Manager

More Related Content

What's hot

Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter SummeryDerek Cooksey
 
Civil Engineering Project Presentation
Civil Engineering Project PresentationCivil Engineering Project Presentation
Civil Engineering Project PresentationIbrahim Ali
 
Construction Projects Feasibility studies
Construction Projects Feasibility studiesConstruction Projects Feasibility studies
Construction Projects Feasibility studiesSubhendu Datta
 
project final year civil
project final year civilproject final year civil
project final year civilAlankar jaiswal
 
Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxRaoAnkitYadav1
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
Report on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridgeReport on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridgeKundan Sanap
 
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEDESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEKaran Patel
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Shabaz Khan
 
Job layout per
Job layout perJob layout per
Job layout perraj balar
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PROAli Meer
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 

What's hot (20)

Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter Summery
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Minor Project Report On Construction of Pipe Culvert
Minor Project Report  On Construction of  Pipe CulvertMinor Project Report  On Construction of  Pipe Culvert
Minor Project Report On Construction of Pipe Culvert
 
Civil Engineering Project Presentation
Civil Engineering Project PresentationCivil Engineering Project Presentation
Civil Engineering Project Presentation
 
Construction Projects Feasibility studies
Construction Projects Feasibility studiesConstruction Projects Feasibility studies
Construction Projects Feasibility studies
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptx
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Report on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridgeReport on Planning & scheduling of a Minor bridge
Report on Planning & scheduling of a Minor bridge
 
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEDESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
 
Pavement design
Pavement designPavement design
Pavement design
 
Project Report
Project ReportProject Report
Project Report
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
Job layout per
Job layout perJob layout per
Job layout per
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 
Strategic Project Management
Strategic Project ManagementStrategic Project Management
Strategic Project Management
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 

Viewers also liked

Presentation1 Web
Presentation1 WebPresentation1 Web
Presentation1 Webmtsaint
 
KR_design portfolio 13
KR_design portfolio 13KR_design portfolio 13
KR_design portfolio 13mklovett
 
Boca Beach Club Renovation
Boca Beach Club RenovationBoca Beach Club Renovation
Boca Beach Club RenovationJoe Bickar
 
Comparative Strategic Analysis of Tim Hortons And Starbucks
Comparative Strategic Analysis of Tim Hortons And StarbucksComparative Strategic Analysis of Tim Hortons And Starbucks
Comparative Strategic Analysis of Tim Hortons And StarbucksAnkit Balyan MBA, B.Tech.
 
Hugo_Afonso_Portfolio_web-email
Hugo_Afonso_Portfolio_web-emailHugo_Afonso_Portfolio_web-email
Hugo_Afonso_Portfolio_web-emailHugo Afonso
 
Tim hortons the challenge of expansion
Tim hortons   the challenge of expansionTim hortons   the challenge of expansion
Tim hortons the challenge of expansionGuximLohja
 
Project Management Presentation
Project Management PresentationProject Management Presentation
Project Management Presentationblakefelson
 
Savannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannahLakesVillage
 
Balance Scorecard
Balance ScorecardBalance Scorecard
Balance ScorecardMurhaf Ashi
 
Competing On Resources Balance Scorecard
Competing On Resources  Balance ScorecardCompeting On Resources  Balance Scorecard
Competing On Resources Balance Scorecardvinod63
 
45100505 balance-scorecard-ppt
45100505 balance-scorecard-ppt45100505 balance-scorecard-ppt
45100505 balance-scorecard-pptSoumya Sahoo
 
Implementing Balance Scorecard
Implementing Balance ScorecardImplementing Balance Scorecard
Implementing Balance ScorecardAnand Subramaniam
 
The Balance Scorecard
The Balance ScorecardThe Balance Scorecard
The Balance ScorecardPreet Gill
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Bookrajensen00
 
Presentation on Balanced Scorecard
Presentation on Balanced Scorecard Presentation on Balanced Scorecard
Presentation on Balanced Scorecard Sumayya Quadri
 

Viewers also liked (20)

1.P-Zone Charter
1.P-Zone Charter1.P-Zone Charter
1.P-Zone Charter
 
Presentation1 Web
Presentation1 WebPresentation1 Web
Presentation1 Web
 
Career powerpoint
Career powerpointCareer powerpoint
Career powerpoint
 
KR_design portfolio 13
KR_design portfolio 13KR_design portfolio 13
KR_design portfolio 13
 
Boca Beach Club Renovation
Boca Beach Club RenovationBoca Beach Club Renovation
Boca Beach Club Renovation
 
Comparative Strategic Analysis of Tim Hortons And Starbucks
Comparative Strategic Analysis of Tim Hortons And StarbucksComparative Strategic Analysis of Tim Hortons And Starbucks
Comparative Strategic Analysis of Tim Hortons And Starbucks
 
Hugo_Afonso_Portfolio_web-email
Hugo_Afonso_Portfolio_web-emailHugo_Afonso_Portfolio_web-email
Hugo_Afonso_Portfolio_web-email
 
Hotel Renovation
Hotel RenovationHotel Renovation
Hotel Renovation
 
Tim hortons the challenge of expansion
Tim hortons   the challenge of expansionTim hortons   the challenge of expansion
Tim hortons the challenge of expansion
 
Lobby tranformation by leading hotel brands june2011
Lobby tranformation by leading hotel brands june2011Lobby tranformation by leading hotel brands june2011
Lobby tranformation by leading hotel brands june2011
 
Project Management Presentation
Project Management PresentationProject Management Presentation
Project Management Presentation
 
Savannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse RenovationSavannah Lakes Village Tara Clubhouse Renovation
Savannah Lakes Village Tara Clubhouse Renovation
 
Balance Scorecard
Balance ScorecardBalance Scorecard
Balance Scorecard
 
Competing On Resources Balance Scorecard
Competing On Resources  Balance ScorecardCompeting On Resources  Balance Scorecard
Competing On Resources Balance Scorecard
 
45100505 balance-scorecard-ppt
45100505 balance-scorecard-ppt45100505 balance-scorecard-ppt
45100505 balance-scorecard-ppt
 
Implementing Balance Scorecard
Implementing Balance ScorecardImplementing Balance Scorecard
Implementing Balance Scorecard
 
The Balance Scorecard
The Balance ScorecardThe Balance Scorecard
The Balance Scorecard
 
Balance scorecard kpi
Balance scorecard kpiBalance scorecard kpi
Balance scorecard kpi
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
 
Presentation on Balanced Scorecard
Presentation on Balanced Scorecard Presentation on Balanced Scorecard
Presentation on Balanced Scorecard
 

Similar to Project Charter Completed

Project management plan
Project management planProject management plan
Project management planDonny Olson
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docxbrian157854
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastMohamed Sayed
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Ayman Mitkees
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016Ronaldo Jugueta
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxmahmoud909178
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and faAl-Amin Ahmed Nabin
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.updateEslam Elsnosy
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateEslam Elsnosy
 

Similar to Project Charter Completed (20)

Project management plan
Project management planProject management plan
Project management plan
 
Tech Proposal
Tech Proposal Tech Proposal
Tech Proposal
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docx
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016
 
Perth metro
Perth metroPerth metro
Perth metro
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Resume
ResumeResume
Resume
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and fa
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.update
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
 

Project Charter Completed

  • 1. PROJECT CHARTER Purdy’s Demising and Renovation Donny Olson OPMT3520
  • 2. S t r e a m l i n e F a c i l i t y P l a n n i n g 1 Project Charter: Purdys Chocolatier Demising & Renovation September 30th, 2016 Background Streamline has been hired to provide project management services for Purdys Chocolatier for their renovation and demise project. This project is needed because; increased web sales has led to a need for a new packing line/mezzanine. Furthermore, because of the increase in sales, additional staff must be hired as well. This has led to the need for: new bathrooms, office space, and a gym to help provide for valued workforce. Finally, we will be using under-utilized space at 8330 Chester Street to move new tenants into the building, this will provide a new revenue stream for Purdys. To make this possible; a demising wall will be built, with accompanying exit corridors, and handicap-accessible ramp. The current situation for Purdys is a warehouse pack line that cannot meet up with increased demand. Furthermore, space that could be generating an income is sitting vacant. We will review all existing operations, review, and oversee the planning, construction, and closeout process while providing expert project management experience, coupled with strong communication processes. Goals ● Work for the client and represent their interests throughout the project life cycle. ● To maximize work efficiency and utilize cost-saving methods whenever necessary. ● Work closely with the general Contractor to ensure as little disruption to Purdys daily work activities as possible. ● Deliver a product that is on time and meet or exceeds all client expectations.
  • 3. S t r e a m l i n e F a c i l i t y P l a n n i n g 2 Scope of Work & Deliverables PHASE 1: 1. Prepare site for construction (signage, equipment set-up, safety meetings, and introductions) 2. Cutting and coring concrete and preparing site for building demising wall 3. Demise 8330 & 8380 Chester Street (See Appendix A1 for dimensions) 4. Building 4 new interior exit corridors for shared space north and south of demising wall, and 1 main exit corridor (exterior) exiting onto Kent Street (See B2 for details) 5. Trades will be managed by site contractor, and trades will be responsible for ALL miscellaneous work related to their tasks (See work breakdown structure) PHASE 2: 1. Construct 5 female and 5 male washrooms (These will have handicapped accessible washrooms inside) Specs. Washrooms will be 3’ - 5 Handicapped Washrooms will be 5’ -5’ (All fixtures will be of commercial grade) 2. Construct new office space and first aid room 3. Building Handicapped accessible ramp for tenant side of building PHASE 3: 1. Remove racking for floor space 2. Demolition of existing washrooms and change rooms 3. Build new washrooms 7 male 7 female and 1 universal (Specs. Will remain the same as phase 2 washrooms) 4. Build new gym space (Gym equipment will not be provided or ordered) 5. Supply and install new mezzanine and packline with adjoining coolers this includes: Foundation, stairwell, and equipment needed (humidity control unit, HVAC unit etc.) Second floor of mezzanine WILL NOT be worked on but will be available and built so future operations can be expanded to their as needed. This will not be in existing contract.
  • 4. S t r e a m l i n e F a c i l i t y P l a n n i n g 3 Key Stakeholders Client Purdys Chocolates Sponsor Duncan Johnson (CFO) Available on request Project manager Earl Vance 604-988-2322 Project team members Jim Prichard 778-563-4456 Jesse Sengura 604-988-4511 (Floor Supervisors) Donny Olson 604-842-5125 (Project Coordinator) General Contractor: George Stevens 604-921-3342 Bynett Construction Electrical Engineer: Joshua Merkel 778-651-4456 SML Electrical Consultants Plumbing/HVAC: Hamid Rekashi 604-567-8932 ByCar Engineering Sprinklers: Curt Haydenm 604-765-2232 Phaser Fire Architect: Edwin Wong 778-451-2311 Structural Engineer: Bianco Wong 778-988-5678 Geotechnical Engineer: Sarah Parry 604-229-4356
  • 5. S t r e a m l i n e F a c i l i t y P l a n n i n g 4 Codes & Regulations ● BCBC (British Columbia Building Code) ● VBBL (Vancouver Building By-Law) ★ ALL trades will be responsible for making sure their work is up to code and follows all by- laws. Any re-work that must be done due to not following code the trade responsible will cover the cost from their contract. Contractor will also oversee all daily operations and keep StreamLine updated. Project Priorities ● Demising 8380 Chester Street as quickly as possible. This will allow the client to collect monthly rental income from the under-utilized space. ● Having PHASE 2 washrooms built and ready for use before December 1st, 2016. That is when the seasonal workforce arrives. ● Having the project completed on time and on budget Project Milestones Start Date: February 9th, 2016 Milestone 1: March 10th, 2016 - Permit Application Milestone 2: July 28th, 2016 - Construction Starts Milestone 3: April 13th, 2017 - Handover
  • 6. S t r e a m l i n e F a c i l i t y P l a n n i n g 5 Approval Signatures Peter Higgins, Project Client Duncan Johnson, Project Sponsor Earl Vance, Project Manager