Cavity Walling

Image courtesy of aeenergysolutions.com
Cavity Walling
Simply stated a cavity is two types of masonry , separated by a cavity
or void of varying dimensions.

The masonry types may consist of solid brick, or concrete masonry
units and bonded together with masonry ties.

? WHAT DO WE MEAN BY MASONARY
Cavity Walling
The cavity (ranging from 50mm to 100mm in width)
may or may not contain insulation.

Either solid or but still maintaining a cavity to ensure
the air flow in the cavity.
FOR WHAT REASON?
Cavity Walling
Cavity Walling
GENERAL
In the construction of a cavity wall there are no changes
required in basic bricklaying techniques, only modifications of

practices commonly used in the construction of any brick
masonry wall.
The fundamental principle in a cavity wall is that there shall be
no bridge of solid material capable of carrying water across the
minimum 50 mm cavity space.
Therefore, the construction of two separate walls, with a clean

cavity, is of prime importance.
Cavity Walling
WORKMANSHIP
The importance of the workmanship used in constructing masonry has

been stressed by many, sometimes to the point that it may appear
that workmanship alone is responsible for the performance of
masonry walls, regardless of the wall design, detailing, or the
materials used.
While this is by no means true, good workmanship is a very important
factor in the construction of high performance masonry.
Cavity Walling
Complete Filling of All Mortar Joints
Extensive laboratory tests at the National Institute of Standards and
Technology, formerly the National Bureau of Standards, and
elsewhere, as well as hundreds of observations of masonry buildings,
indicate that to obtain good masonry performance, there is no
substitute for the complete filling of all mortar joints that are
intended to receive mortar. Partially filled mortar joints result in

leaky walls, reduce the strength of masonry, and may contribute to
spalling due to freezing and thawing in the presence of excessive
moisture. Therefore, all joints intended to receive mortar in both
the exterior and interior should be completely filled as the brick
are laid.
Cavity Walling
Keeping the Cavity Clean
It is vital that the cavity be kept clean of mortar droppings and other

foreign materials. If mortar falls into the cavity, it may form "bridges"
for moisture passage, or it may fall to the flashing, blocking the
weep holes.
Over the years many methods have been developed and considerable
time and discussion have been devoted to the proper method to use
in keeping the cavity clean. One method is to take a wooden or
metal strip, slightly smaller than the cavity width, and place it in the
air space.
This strip rests on the wall ties as the wall is built. Wire or rope is
attached to the strip. Then, as the bricklayer builds the wall, this
strip is easily lifted out. Before the next row of ties is placed, any

mortar which may have fallen into the cavity is removed.
Cavity Walling
Another method is to place every third brick or so in the course
above the flashing of the exterior wall, built dry and wedge it into
proper position so that it can be removed for final cleaning of the
cavity.
Mortar droppings at the base of the cavity can be easily removed
and weep holes provided when the brick are mortared in the wall.
Cavity Walling
In addition to the above mentioned methods of
cleaning the cavity, the bricklayer can use
techniques that, if properly applied, should
eliminate a considerable amount of mortar falling
into the cavity in the first place
Cavity Walling
1. After spreading the mortar bed, the bricklayer
should bevel the cavity edge with the flat of the
trowel.
2. When mortar is spread in this manner, very little
will be squeezed out of the bed joints into the
cavity when the units are laid
Cavity Walling
The brick units are next rolled into place,
keeping most of the mortar on the outside
Cavity Walling
After the bricklayer has placed the
unit on the bed joint any mortar fins
protruding into the cavity should be

flattened over the backs of the unit,
not cut off.
This prevents the mortar from falling
into the cavity and provides a smooth
surface which will not interfere with
insulation materials which may be
placed in the cavity
Cavity Walling
Tie Placement
In a properly constructed cavity wall, both types of masonry must be
adequately and properly tied together.
The main concern to the designer is assurance that all of the ties are in
place and remain operative, firmly embedded in and bonded to the

mortar.
To achieve this, the two types of the cavity must be laid with
completely filled bed joints, and the ties must be in the correct
position so that later disturbance of the wall assembly is unnecessary.
There exists extensive data showing that wall ties have excellent tying
capacity if they are well embedded in the masonry, and also that the
cavity wall is a weak structural member if few working ties must do the

job of many.
Cavity Walling
Tie Placement
Cavity Walling
Tooling
Weather tightness and textural effect are the basic considerations
of mortar joint finish selection and execution. Properly "striking" or
"tooling" the joint helps the mortar and brick units bond together
and seal the wall against moisture. Nine common joint finishes are

shown in Figure 8 in order of their decreasing weather tightness.
Compression of the mortar makes the concave, V, and grapevine
joints the most weather tight and acceptable to use. The remaining
six joint types are not recommended for exterior use. All holes in
the mortar joints should be filled. Joints should be tooled when the
mortar is "thumbprint" hard.
Cavity Walling
Cavity Walling
From a performance standpoint, the most important factors for
wall ties are:
1. Being corrosion resistant.

2. Placing ties at proper spacing. Spacing of ties should be
reduced by one half for ties with drips. Crimping of the metal
ties to form a drip is not necessary, and will decrease the
strength of the tie.
3. Full bedding of the bed joint and placing the wall tie in the
mortar 16mm from either edge of the brick.
Cavity Walling
Protection of Walls from Rain.
Masonry walls exposed to weather and unprotected during

construction can become so saturated with water that they may
require weeks, or even months (depending upon climatic
conditions), to dry out.
This prolonged saturation may cause many of the slightly soluble
salts to go into solution, thus raising the possibility of
efflorescence.
Such conditions may also contribute to the contamination of the
masonry with soluble salts from elsewhere in the construction
(concrete, concrete block, plaster, trim, etc.).
Cavity Walling
During construction, all walls should be kept dry by covering
the top of the wall with a strong, water-resistant membrane at
the end of each day or shutdown period.
The covering should overhang the wall by at least 24 in. (610
mm) on each side, and should be secured against wind.
The covering should remain in place until the top of the cavity
wall is completed or protected by adjacent materials.
Cavity Walling
Cavity Walling
Lets workout the sequence of setting out a cavity wall
What safety should be observed?
What tool are used?
How do we set up the working area?
What do we insert in-between the bricks?
What ties the two leafs together?
What do you call a right angled wall?
What do you call a wall that stops vertically?

More Related Content

What's hot

Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTION
Ravindra Patnayaka
 

What's hot (20)

Cavity walls
Cavity wallsCavity walls
Cavity walls
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Thermal insulation of buildings
Thermal insulation of buildingsThermal insulation of buildings
Thermal insulation of buildings
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonry
 
Tutor l1 cavity wall construction
Tutor l1 cavity wall constructionTutor l1 cavity wall construction
Tutor l1 cavity wall construction
 
Masonary wall
Masonary wallMasonary wall
Masonary wall
 
cladding
claddingcladding
cladding
 
Earthquake resistant buildings
Earthquake resistant buildingsEarthquake resistant buildings
Earthquake resistant buildings
 
Surface finishes(1)
Surface finishes(1)Surface finishes(1)
Surface finishes(1)
 
Mud in architecture
Mud in architectureMud in architecture
Mud in architecture
 
brick as a building material
brick as a building materialbrick as a building material
brick as a building material
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Water proofing
Water proofing Water proofing
Water proofing
 
dome and vault
dome and vaultdome and vault
dome and vault
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTION
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
building defects & remidies
building  defects & remidiesbuilding  defects & remidies
building defects & remidies
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
Concrete block
Concrete blockConcrete block
Concrete block
 

Viewers also liked

1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
Mark Daly
 
Partition wall
Partition wallPartition wall
Partition wall
Kris Kiran
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton Portfolio
Mark Thornton
 
Walls timber-for slideshare
Walls timber-for slideshareWalls timber-for slideshare
Walls timber-for slideshare
Julian Swindell
 
Principles of building construction, information and communication
Principles of building construction, information and communicationPrinciples of building construction, information and communication
Principles of building construction, information and communication
Robbie Blake
 
Presentation on walls and wall opening
Presentation on walls and wall openingPresentation on walls and wall opening
Presentation on walls and wall opening
Sangeeta Satheesan
 

Viewers also liked (20)

Cavity walls
Cavity wallsCavity walls
Cavity walls
 
ADVANTAGES OF CAVITY WALLS
ADVANTAGES OF CAVITY WALLSADVANTAGES OF CAVITY WALLS
ADVANTAGES OF CAVITY WALLS
 
Cavity Wall Ties
Cavity Wall TiesCavity Wall Ties
Cavity Wall Ties
 
Student l1 cavity wall construction
Student l1 cavity wall constructionStudent l1 cavity wall construction
Student l1 cavity wall construction
 
Wall types
Wall typesWall types
Wall types
 
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and StoneAncon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
 
1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
 
Partition wall
Partition wallPartition wall
Partition wall
 
Tutor l1 cavity wall construction
Tutor l1 cavity wall constructionTutor l1 cavity wall construction
Tutor l1 cavity wall construction
 
Wall types
Wall typesWall types
Wall types
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton Portfolio
 
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
 
Masonry Part 2 F 09
Masonry  Part 2  F 09Masonry  Part 2  F 09
Masonry Part 2 F 09
 
Partition walls
Partition wallsPartition walls
Partition walls
 
Partition walls
Partition wallsPartition walls
Partition walls
 
Masonry Components
Masonry ComponentsMasonry Components
Masonry Components
 
Tutor l1 brickwork bonding
Tutor l1 brickwork bondingTutor l1 brickwork bonding
Tutor l1 brickwork bonding
 
Walls timber-for slideshare
Walls timber-for slideshareWalls timber-for slideshare
Walls timber-for slideshare
 
Principles of building construction, information and communication
Principles of building construction, information and communicationPrinciples of building construction, information and communication
Principles of building construction, information and communication
 
Presentation on walls and wall opening
Presentation on walls and wall openingPresentation on walls and wall opening
Presentation on walls and wall opening
 

Similar to Cavity Walling

Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
ADNAN AHMAD
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207
sharad_kadbhane
 

Similar to Cavity Walling (20)

Cavity walls
Cavity wallsCavity walls
Cavity walls
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
 
Concrete Block Walling
Concrete Block WallingConcrete Block Walling
Concrete Block Walling
 
Types of crack-Amit Payal
Types of crack-Amit PayalTypes of crack-Amit Payal
Types of crack-Amit Payal
 
Tutor l1 blockwork
Tutor l1 blockworkTutor l1 blockwork
Tutor l1 blockwork
 
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
Rat Trap Bond - Advantages, Disadvantages, Construction, Purpose, Estimation ...
 
blockwork
 blockwork blockwork
blockwork
 
Tutor l1 blockwork
Tutor l1 blockworkTutor l1 blockwork
Tutor l1 blockwork
 
Tutor l1 blockwork
Tutor l1 blockworkTutor l1 blockwork
Tutor l1 blockwork
 
Classification of cracks rev 00 by hsaung hnin phyu [autosaved]
Classification of cracks rev 00 by hsaung hnin phyu [autosaved]Classification of cracks rev 00 by hsaung hnin phyu [autosaved]
Classification of cracks rev 00 by hsaung hnin phyu [autosaved]
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptx
 
Masonry of Building
Masonry of Building Masonry of Building
Masonry of Building
 
Control joints
Control jointsControl joints
Control joints
 
Cracks in concrete
Cracks in concreteCracks in concrete
Cracks in concrete
 
Types of cracks in concrete
Types of cracks in concreteTypes of cracks in concrete
Types of cracks in concrete
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207
 
Cavity wall
Cavity wall Cavity wall
Cavity wall
 
Methodes of reparing cracks
Methodes of reparing cracksMethodes of reparing cracks
Methodes of reparing cracks
 
12161463.ppt
12161463.ppt12161463.ppt
12161463.ppt
 
cracks.pptx
cracks.pptxcracks.pptx
cracks.pptx
 

More from DjCurrie

Scotland's Listed Buildings and Intervention by Planning Authorities
Scotland's Listed Buildings and Intervention by Planning AuthoritiesScotland's Listed Buildings and Intervention by Planning Authorities
Scotland's Listed Buildings and Intervention by Planning Authorities
DjCurrie
 

More from DjCurrie (20)

Ladders and Stepladders
Ladders and StepladdersLadders and Stepladders
Ladders and Stepladders
 
Mobile Towers and Access Equipment
Mobile Towers  and  Access EquipmentMobile Towers  and  Access Equipment
Mobile Towers and Access Equipment
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Working at Height - The Law
Working at Height - The LawWorking at Height - The Law
Working at Height - The Law
 
Wall and Floor Tiling - Health and Safety 2018
Wall and Floor Tiling - Health and Safety 2018Wall and Floor Tiling - Health and Safety 2018
Wall and Floor Tiling - Health and Safety 2018
 
Wall and Floor Tiling - Perimeter and Area
Wall and Floor Tiling - Perimeter and AreaWall and Floor Tiling - Perimeter and Area
Wall and Floor Tiling - Perimeter and Area
 
Wall and Floor Tiling - Sustainability in Construction
Wall and Floor Tiling - Sustainability in ConstructionWall and Floor Tiling - Sustainability in Construction
Wall and Floor Tiling - Sustainability in Construction
 
Wall and Floor Tiling - Tools and Equipment: An Introduction
Wall and Floor Tiling -  Tools and Equipment: An IntroductionWall and Floor Tiling -  Tools and Equipment: An Introduction
Wall and Floor Tiling - Tools and Equipment: An Introduction
 
SVQ Induction
SVQ InductionSVQ Induction
SVQ Induction
 
Appreciation of Access Platforms and Equipment
Appreciation of Access Platforms and EquipmentAppreciation of Access Platforms and Equipment
Appreciation of Access Platforms and Equipment
 
Scotland's Listed Buildings and Intervention by Planning Authorities
Scotland's Listed Buildings and Intervention by Planning AuthoritiesScotland's Listed Buildings and Intervention by Planning Authorities
Scotland's Listed Buildings and Intervention by Planning Authorities
 
Conservation Charters and Philosophy
Conservation Charters and PhilosophyConservation Charters and Philosophy
Conservation Charters and Philosophy
 
Welcome to Accommodation
Welcome to AccommodationWelcome to Accommodation
Welcome to Accommodation
 
Health, Safety and Welfare in Construction
Health, Safety and Welfare in ConstructionHealth, Safety and Welfare in Construction
Health, Safety and Welfare in Construction
 
Session 5 - Cavity Walling Activities
Session 5 - Cavity Walling ActivitiesSession 5 - Cavity Walling Activities
Session 5 - Cavity Walling Activities
 
Session 4 - Cavity Walling Activities
Session 4 - Cavity Walling ActivitiesSession 4 - Cavity Walling Activities
Session 4 - Cavity Walling Activities
 
Session 3 - Cavity Walling Activities
Session 3 - Cavity Walling ActivitiesSession 3 - Cavity Walling Activities
Session 3 - Cavity Walling Activities
 
Session 2 - Cavity Walling Activities
Session 2 - Cavity Walling ActivitiesSession 2 - Cavity Walling Activities
Session 2 - Cavity Walling Activities
 
Cavity Walling Activities - Session 1
Cavity Walling Activities - Session 1Cavity Walling Activities - Session 1
Cavity Walling Activities - Session 1
 
Working Relationship between Bricks and Block Sand
Working Relationship between Bricks and Block SandWorking Relationship between Bricks and Block Sand
Working Relationship between Bricks and Block Sand
 

Recently uploaded

Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 

Recently uploaded (20)

Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 

Cavity Walling

  • 1. Cavity Walling Image courtesy of aeenergysolutions.com
  • 2. Cavity Walling Simply stated a cavity is two types of masonry , separated by a cavity or void of varying dimensions. The masonry types may consist of solid brick, or concrete masonry units and bonded together with masonry ties. ? WHAT DO WE MEAN BY MASONARY
  • 3. Cavity Walling The cavity (ranging from 50mm to 100mm in width) may or may not contain insulation. Either solid or but still maintaining a cavity to ensure the air flow in the cavity. FOR WHAT REASON?
  • 5. Cavity Walling GENERAL In the construction of a cavity wall there are no changes required in basic bricklaying techniques, only modifications of practices commonly used in the construction of any brick masonry wall. The fundamental principle in a cavity wall is that there shall be no bridge of solid material capable of carrying water across the minimum 50 mm cavity space. Therefore, the construction of two separate walls, with a clean cavity, is of prime importance.
  • 6. Cavity Walling WORKMANSHIP The importance of the workmanship used in constructing masonry has been stressed by many, sometimes to the point that it may appear that workmanship alone is responsible for the performance of masonry walls, regardless of the wall design, detailing, or the materials used. While this is by no means true, good workmanship is a very important factor in the construction of high performance masonry.
  • 7. Cavity Walling Complete Filling of All Mortar Joints Extensive laboratory tests at the National Institute of Standards and Technology, formerly the National Bureau of Standards, and elsewhere, as well as hundreds of observations of masonry buildings, indicate that to obtain good masonry performance, there is no substitute for the complete filling of all mortar joints that are intended to receive mortar. Partially filled mortar joints result in leaky walls, reduce the strength of masonry, and may contribute to spalling due to freezing and thawing in the presence of excessive moisture. Therefore, all joints intended to receive mortar in both the exterior and interior should be completely filled as the brick are laid.
  • 8. Cavity Walling Keeping the Cavity Clean It is vital that the cavity be kept clean of mortar droppings and other foreign materials. If mortar falls into the cavity, it may form "bridges" for moisture passage, or it may fall to the flashing, blocking the weep holes. Over the years many methods have been developed and considerable time and discussion have been devoted to the proper method to use in keeping the cavity clean. One method is to take a wooden or metal strip, slightly smaller than the cavity width, and place it in the air space. This strip rests on the wall ties as the wall is built. Wire or rope is attached to the strip. Then, as the bricklayer builds the wall, this strip is easily lifted out. Before the next row of ties is placed, any mortar which may have fallen into the cavity is removed.
  • 9. Cavity Walling Another method is to place every third brick or so in the course above the flashing of the exterior wall, built dry and wedge it into proper position so that it can be removed for final cleaning of the cavity. Mortar droppings at the base of the cavity can be easily removed and weep holes provided when the brick are mortared in the wall.
  • 10. Cavity Walling In addition to the above mentioned methods of cleaning the cavity, the bricklayer can use techniques that, if properly applied, should eliminate a considerable amount of mortar falling into the cavity in the first place
  • 11. Cavity Walling 1. After spreading the mortar bed, the bricklayer should bevel the cavity edge with the flat of the trowel. 2. When mortar is spread in this manner, very little will be squeezed out of the bed joints into the cavity when the units are laid
  • 12. Cavity Walling The brick units are next rolled into place, keeping most of the mortar on the outside
  • 13. Cavity Walling After the bricklayer has placed the unit on the bed joint any mortar fins protruding into the cavity should be flattened over the backs of the unit, not cut off. This prevents the mortar from falling into the cavity and provides a smooth surface which will not interfere with insulation materials which may be placed in the cavity
  • 14. Cavity Walling Tie Placement In a properly constructed cavity wall, both types of masonry must be adequately and properly tied together. The main concern to the designer is assurance that all of the ties are in place and remain operative, firmly embedded in and bonded to the mortar. To achieve this, the two types of the cavity must be laid with completely filled bed joints, and the ties must be in the correct position so that later disturbance of the wall assembly is unnecessary. There exists extensive data showing that wall ties have excellent tying capacity if they are well embedded in the masonry, and also that the cavity wall is a weak structural member if few working ties must do the job of many.
  • 16. Cavity Walling Tooling Weather tightness and textural effect are the basic considerations of mortar joint finish selection and execution. Properly "striking" or "tooling" the joint helps the mortar and brick units bond together and seal the wall against moisture. Nine common joint finishes are shown in Figure 8 in order of their decreasing weather tightness. Compression of the mortar makes the concave, V, and grapevine joints the most weather tight and acceptable to use. The remaining six joint types are not recommended for exterior use. All holes in the mortar joints should be filled. Joints should be tooled when the mortar is "thumbprint" hard.
  • 18. Cavity Walling From a performance standpoint, the most important factors for wall ties are: 1. Being corrosion resistant. 2. Placing ties at proper spacing. Spacing of ties should be reduced by one half for ties with drips. Crimping of the metal ties to form a drip is not necessary, and will decrease the strength of the tie. 3. Full bedding of the bed joint and placing the wall tie in the mortar 16mm from either edge of the brick.
  • 19. Cavity Walling Protection of Walls from Rain. Masonry walls exposed to weather and unprotected during construction can become so saturated with water that they may require weeks, or even months (depending upon climatic conditions), to dry out. This prolonged saturation may cause many of the slightly soluble salts to go into solution, thus raising the possibility of efflorescence. Such conditions may also contribute to the contamination of the masonry with soluble salts from elsewhere in the construction (concrete, concrete block, plaster, trim, etc.).
  • 20. Cavity Walling During construction, all walls should be kept dry by covering the top of the wall with a strong, water-resistant membrane at the end of each day or shutdown period. The covering should overhang the wall by at least 24 in. (610 mm) on each side, and should be secured against wind. The covering should remain in place until the top of the cavity wall is completed or protected by adjacent materials.
  • 22. Cavity Walling Lets workout the sequence of setting out a cavity wall What safety should be observed? What tool are used? How do we set up the working area? What do we insert in-between the bricks? What ties the two leafs together? What do you call a right angled wall? What do you call a wall that stops vertically?