Presentation Outline
Railways Station and Yards
• Purposes of railway station
• Site selection for railway station
• Requirements of railway station
• Classification of stations
• Classification of Yards
Birla Vishvakarma Mahavidyalaya Engineering College
Purposes of railway station
• For exchange of passengers
• For exchange of goods
• For control of train movements
• For crossing
• For overtaking
• For detaching engines and staff
• For taking diesel or coal and water for locomotives
Birla Vishvakarma Mahavidyalaya Engineering College
Site selection for railway station
• Land Acquisition
• Proximity to town or village
• Nature of land area
• Approach roads to station
Site
• Station site alignment
• Site Drainage
• Station Amenities
• Type of station and Yard
• Role of Authorities
Birla Vishvakarma Mahavidyalaya Engineering College
Acquisition of Land
• Sufficient land area including land width for a
single track or double track system and extra
area to accommodate additional line, station
buildings, platforms, cabins, staff quarters, future
extension etc.
Birla Vishvakarma Mahavidyalaya Engineering College
Proximity
• The station site should be close to the town or
village as far as possible to facilitate the
transport of passengers and goods.
Birla Vishvakarma Mahavidyalaya Engineering College
Nature of Land
• The land area should preferably be a level ground
for convenient and safety of marshalling and
shunting wagons.
• In India, maximum permissible gradient for all
gauges, in station yards is 1 in 400, with desirable
value of 1 in 1000.
Birla Vishvakarma Mahavidyalaya Engineering College
Approach Road
• It is highly essential to encourage rail transport by
providing approach roads connecting a town or
village to station site.
• Maximum transport facilities should be provided
for the type of traffic likely to be handled by the
approach roads.
Birla Vishvakarma Mahavidyalaya Engineering College
Station Site Alignment
• Station site should never be located on curves
and as far as possible should not be near the
curve too.
• The alignment of track for both approaching and
departing trains should be straight otherwise the
signals will either be difficult to sight or out of
sight.
Birla Vishvakarma Mahavidyalaya Engineering College
Site Drainage and
Station Amenities
• The site should have quick drainage facilities and
minimum grade of 1 in 1000 is recommended for
this purpose.
• Amenities like water supply, coal, diesel, electricity
etc. should be provided at
the station site.
• A plentiful supply of drinkable
water is essential.
Birla Vishvakarma Mahavidyalaya Engineering College
Requirements of a Railway
Station
• Public Requirements
• Traffic and Police
• Trains
• Locomotives
• Development of railways
Birla Vishvakarma Mahavidyalaya Engineering College
Public Requirements
• A booking office for tickets
• Goods and passenger platforms
• Drinking water
• Lighting and ventilation
• Waiting rooms and retiring rooms
• Sanitary arrangements and bath rooms
• Refrigerators for cold drinking water
• City map or guide map
• Display boards
Birla Vishvakarma Mahavidyalaya Engineering College
Traffic Staff and Police
Requirements
• Staff rooms
• Retiring rooms
• Quarters for railway staffs
Birla Vishvakarma Mahavidyalaya Engineering College
Train Requirements
• Signals
• Recording of movement of trains
• Sufficient no of sidings
Birla Vishvakarma Mahavidyalaya Engineering College
Locomotive Requirements
• Proper arrangements for supply of
fuel and water
• Arrangements for cleaning,
examining, inspecting and
maintaining the locomotives
Birla Vishvakarma Mahavidyalaya Engineering College
Requirements for development of
railways
• Easy and comfortable approach
roads to stations
• Installation of clocks, guide map,
separate boards for arrival and
departure of trains
• Availability of coolies on the
platforms
• Escalators, mini theatre , big
waiting halls, under ground
passages etc.,
Birla Vishvakarma Mahavidyalaya Engineering College
Classification of stations
• Least expenditure with regard to the provision of
the least number of signals
• Flexibility in shunting operations
• Increasing the line capacity
• Faster movement of trains
Birla Vishvakarma Mahavidyalaya Engineering College
Classification of stations
Birla Vishvakarma Mahavidyalaya Engineering College
Operational Consideration
• Block Station
- A block station is a station at which the driver has
to obtain an 'authority to proceed' in order to enter
the next block section.
- The entire railway line is divided into convenient
block sections of 5 to 10 km and a block station is
provided at the end of each block.
Birla Vishvakarma Mahavidyalaya Engineering College
Operational Consideration
• Non-block stations
- Non-block stations are located between two
block stations and do not form the boundary of any
block section.
- No signals are provided at D class stations
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• The layout of stations varies in size and
importance according to the type and
volume of traffic handled and according to
their locations with respect to cities or
industrial areas
• Broadly speaking, the layouts required for
passenger stations and their yards can be
divided into the following categories for the
purpose of study.
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
Classification
of stations
Halt Flag Station Wayside Junction Terminal
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Halts
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Flag Station
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Wayside
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Wayside
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Wayside
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Junction
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Junction
Birla Vishvakarma Mahavidyalaya Engineering College
Functional Consideration
• Terminal
Birla Vishvakarma Mahavidyalaya Engineering College
Types of Yards
• Passenger bogie Yards
• Goods yards
• Marshalling Yards
• Locomotive Yards / Transits Yards
Birla Vishvakarma Mahavidyalaya Engineering College
Passenger Bogie Yard
• Provides facilities for the safe movement of
passengers and vehicles for the use of
passengers
Birla Vishvakarma Mahavidyalaya Engineering College
Goods Yard
• Provides facilities for receiving, loading and un
loading, delivery of goods and the movement of
goods vehicles
Birla Vishvakarma Mahavidyalaya Engineering College
Marshalling Yard
• Is one where trains and other loads are
received, sorted out and new trains are formed
and dispatched onwards to their destinations
• Functions:
1.Reception
2.Sorting
3.Departure
Birla Vishvakarma Mahavidyalaya Engineering College
Marshalling Yard
Birla Vishvakarma Mahavidyalaya Engineering College
Marshalling Yard
Birla Vishvakarma Mahavidyalaya Engineering College
Layout Plan of Marshalling Yard
Birla Vishvakarma Mahavidyalaya Engineering College
Locomotive Yards
• Trains are received and dispatched without any
shunting on them.
• In such yard generally change of crew, engine,
C&W examination, etc. are carried out.
Birla Vishvakarma Mahavidyalaya Engineering College
Locomotive Yards
Thank You

More Related Content

What's hot

Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in RailwaysAnupama Jha
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railwayRAMPRASAD KUMAWAT
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast T.Naga Anusha
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
Factors in Airport site selection PART-2
Factors in Airport site selection PART-2Factors in Airport site selection PART-2
Factors in Airport site selection PART-2RAMPRASAD KUMAWAT
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent waydhara dattani
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemBathla Tuition Centre
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanencekrishnacp
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingshiranrathva
 

What's hot (20)

Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in Railways
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
Factors in Airport site selection PART-2
Factors in Airport site selection PART-2Factors in Airport site selection PART-2
Factors in Airport site selection PART-2
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Taxiway design
Taxiway designTaxiway design
Taxiway design
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
 

Similar to Railway station and YARD

Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESASHWIN KUMAR
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreAnsh Agarwal
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...RAMPRASAD KUMAWAT
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUTRONAK SUTARIYA
 
Modes of transportation
Modes of transportationModes of transportation
Modes of transportationJAYDEV PATEL
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSKona Mahesh
 
chapter-4 Railway Station.pptx
chapter-4   Railway Station.pptxchapter-4   Railway Station.pptx
chapter-4 Railway Station.pptxMamushLeta
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportationPramod Chinchansur
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportationPramod Chinchansur
 
Elements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainageElements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainagenslinkprecinctprojec
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyAkshey Sharma
 
14 ce2014 te-intro
14 ce2014 te-intro14 ce2014 te-intro
14 ce2014 te-introPrathi Baa
 
Why can't we just?
Why can't we just?Why can't we just?
Why can't we just?JumpingJaq
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaAsitha Jagoda Arachchi
 
Planning for a multimodal transport interchange data collection
Planning for a multimodal transport interchange   data collectionPlanning for a multimodal transport interchange   data collection
Planning for a multimodal transport interchange data collectionGargee Ghosh
 

Similar to Railway station and YARD (20)

Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURES
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, Bangalore
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...
 
ppt
pptppt
ppt
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUT
 
Modes of transportation
Modes of transportationModes of transportation
Modes of transportation
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMS
 
chapter-4 Railway Station.pptx
chapter-4   Railway Station.pptxchapter-4   Railway Station.pptx
chapter-4 Railway Station.pptx
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportation
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportation
 
Elements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainageElements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainage
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
 
14 ce2014 te-intro
14 ce2014 te-intro14 ce2014 te-intro
14 ce2014 te-intro
 
Why can't we just?
Why can't we just?Why can't we just?
Why can't we just?
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
 
sa.pptx
sa.pptxsa.pptx
sa.pptx
 
Planning for a multimodal transport interchange data collection
Planning for a multimodal transport interchange   data collectionPlanning for a multimodal transport interchange   data collection
Planning for a multimodal transport interchange data collection
 

Recently uploaded

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 

Recently uploaded (20)

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 

Railway station and YARD

  • 1.
  • 2. Prepared By : 1. Dhruv Makadia (17CE317) Student of Civil Engineering Birla Vishvakarma Mahavidyalaya College of Engineering and Technology Vallabh Vidyanagar
  • 3. Birla Vishvakarma Mahavidyalaya Engineering College Presentation Outline Railways Station and Yards • Purposes of railway station • Site selection for railway station • Requirements of railway station • Classification of stations • Classification of Yards
  • 4. Birla Vishvakarma Mahavidyalaya Engineering College Purposes of railway station • For exchange of passengers • For exchange of goods • For control of train movements • For crossing • For overtaking • For detaching engines and staff • For taking diesel or coal and water for locomotives
  • 5. Birla Vishvakarma Mahavidyalaya Engineering College Site selection for railway station • Land Acquisition • Proximity to town or village • Nature of land area • Approach roads to station Site • Station site alignment • Site Drainage • Station Amenities • Type of station and Yard • Role of Authorities
  • 6. Birla Vishvakarma Mahavidyalaya Engineering College Acquisition of Land • Sufficient land area including land width for a single track or double track system and extra area to accommodate additional line, station buildings, platforms, cabins, staff quarters, future extension etc.
  • 7. Birla Vishvakarma Mahavidyalaya Engineering College Proximity • The station site should be close to the town or village as far as possible to facilitate the transport of passengers and goods.
  • 8. Birla Vishvakarma Mahavidyalaya Engineering College Nature of Land • The land area should preferably be a level ground for convenient and safety of marshalling and shunting wagons. • In India, maximum permissible gradient for all gauges, in station yards is 1 in 400, with desirable value of 1 in 1000.
  • 9. Birla Vishvakarma Mahavidyalaya Engineering College Approach Road • It is highly essential to encourage rail transport by providing approach roads connecting a town or village to station site. • Maximum transport facilities should be provided for the type of traffic likely to be handled by the approach roads.
  • 10. Birla Vishvakarma Mahavidyalaya Engineering College Station Site Alignment • Station site should never be located on curves and as far as possible should not be near the curve too. • The alignment of track for both approaching and departing trains should be straight otherwise the signals will either be difficult to sight or out of sight.
  • 11. Birla Vishvakarma Mahavidyalaya Engineering College Site Drainage and Station Amenities • The site should have quick drainage facilities and minimum grade of 1 in 1000 is recommended for this purpose. • Amenities like water supply, coal, diesel, electricity etc. should be provided at the station site. • A plentiful supply of drinkable water is essential.
  • 12. Birla Vishvakarma Mahavidyalaya Engineering College Requirements of a Railway Station • Public Requirements • Traffic and Police • Trains • Locomotives • Development of railways
  • 13. Birla Vishvakarma Mahavidyalaya Engineering College Public Requirements • A booking office for tickets • Goods and passenger platforms • Drinking water • Lighting and ventilation • Waiting rooms and retiring rooms • Sanitary arrangements and bath rooms • Refrigerators for cold drinking water • City map or guide map • Display boards
  • 14. Birla Vishvakarma Mahavidyalaya Engineering College Traffic Staff and Police Requirements • Staff rooms • Retiring rooms • Quarters for railway staffs
  • 15. Birla Vishvakarma Mahavidyalaya Engineering College Train Requirements • Signals • Recording of movement of trains • Sufficient no of sidings
  • 16. Birla Vishvakarma Mahavidyalaya Engineering College Locomotive Requirements • Proper arrangements for supply of fuel and water • Arrangements for cleaning, examining, inspecting and maintaining the locomotives
  • 17. Birla Vishvakarma Mahavidyalaya Engineering College Requirements for development of railways • Easy and comfortable approach roads to stations • Installation of clocks, guide map, separate boards for arrival and departure of trains • Availability of coolies on the platforms • Escalators, mini theatre , big waiting halls, under ground passages etc.,
  • 18. Birla Vishvakarma Mahavidyalaya Engineering College Classification of stations • Least expenditure with regard to the provision of the least number of signals • Flexibility in shunting operations • Increasing the line capacity • Faster movement of trains
  • 19. Birla Vishvakarma Mahavidyalaya Engineering College Classification of stations
  • 20. Birla Vishvakarma Mahavidyalaya Engineering College Operational Consideration • Block Station - A block station is a station at which the driver has to obtain an 'authority to proceed' in order to enter the next block section. - The entire railway line is divided into convenient block sections of 5 to 10 km and a block station is provided at the end of each block.
  • 21. Birla Vishvakarma Mahavidyalaya Engineering College Operational Consideration • Non-block stations - Non-block stations are located between two block stations and do not form the boundary of any block section. - No signals are provided at D class stations
  • 22. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • The layout of stations varies in size and importance according to the type and volume of traffic handled and according to their locations with respect to cities or industrial areas • Broadly speaking, the layouts required for passenger stations and their yards can be divided into the following categories for the purpose of study.
  • 23. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration Classification of stations Halt Flag Station Wayside Junction Terminal
  • 24. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Halts
  • 25. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Flag Station
  • 26. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Wayside
  • 27. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Wayside
  • 28. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Wayside
  • 29. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Junction
  • 30. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Junction
  • 31. Birla Vishvakarma Mahavidyalaya Engineering College Functional Consideration • Terminal
  • 32. Birla Vishvakarma Mahavidyalaya Engineering College Types of Yards • Passenger bogie Yards • Goods yards • Marshalling Yards • Locomotive Yards / Transits Yards
  • 33. Birla Vishvakarma Mahavidyalaya Engineering College Passenger Bogie Yard • Provides facilities for the safe movement of passengers and vehicles for the use of passengers
  • 34. Birla Vishvakarma Mahavidyalaya Engineering College Goods Yard • Provides facilities for receiving, loading and un loading, delivery of goods and the movement of goods vehicles
  • 35. Birla Vishvakarma Mahavidyalaya Engineering College Marshalling Yard • Is one where trains and other loads are received, sorted out and new trains are formed and dispatched onwards to their destinations • Functions: 1.Reception 2.Sorting 3.Departure
  • 36. Birla Vishvakarma Mahavidyalaya Engineering College Marshalling Yard
  • 37. Birla Vishvakarma Mahavidyalaya Engineering College Marshalling Yard
  • 38. Birla Vishvakarma Mahavidyalaya Engineering College Layout Plan of Marshalling Yard
  • 39. Birla Vishvakarma Mahavidyalaya Engineering College Locomotive Yards • Trains are received and dispatched without any shunting on them. • In such yard generally change of crew, engine, C&W examination, etc. are carried out.
  • 40. Birla Vishvakarma Mahavidyalaya Engineering College Locomotive Yards