ISPE-CCPIE CHINA CONFERENCE 2010
October 26-29 2010 Beijing
Validation of Legacy Systems
Case Study: ERP Legacy Systems Validation
ISPE-CCPIE CHINA CONFERENCE 2010
David Stokes
Global Head of Life Sciences, Business & Decision
• 25 years experience in computer system validation
and IT compliance
• Automated / Process Control Systems
• Corporate IT Systems
• IT Infrastructure
• Active member of GAMP® Forum
• Contributor to the GAMP® Guide and many
GAMP® Good Practice Guides
• Actively working on a number of computer system
validation projects executed in China
Validation of Legacy Systems
•2
ISPE-CCPIE CHINA CONFERENCE 2010
Topics
• What is a Legacy System?
• Why Validate Legacy Systems?
• How to Validate Legacy Systems
• Case Studies
• Retrospective Validation of Global ERP System for
multinational Medical Devices company
• Validation of Legacy ERP System for Chinese
Pharmaceutical company
Validation of Legacy Systems
•3
ISPE-CCPIE CHINA CONFERENCE 2010
What is a Legacy System?
• “Any GxP relevant system that is in
place and in use, and which is not
deemed to satisfy current regulatory
expectations”
Validation of Legacy Systems
•4
“Legacy Systems”
ISPE Pharmaceutical Engineering,
Nov/Dec 2003, Vol 23 No 6
ISPE-CCPIE CHINA CONFERENCE 2010
What is a Legacy System?
• “…in place and in use…”
• Already in production use
• May have been in use for many years
• “…not deemed to satisfy current regulatory
expectations…”
• Infers not only regulations, but also regulatory
guidance and industry good practice
• Remember that regulatory expectations change
over time
Validation of Legacy Systems
•5
ISPE-CCPIE CHINA CONFERENCE 2010
GAMP® “Legacy Systems” Article
ISPE Pharmaceutical Engineering, Nov/Dec 2003, Vol 23 No 6
• Written in 2003 to principally address issues of
compliance with 21CFR Part 11 (Electronic
Records, Electronic Signatures)
• Note that the US FDA are now exercising
enforcement discretion with respect to
• 21CFR Part 11
• Systems in use prior to August 20, 1997
• Systems implemented after August 20,1997 have
no such enforcement discretion
• 21CFR Part 11 still applies in the USA
• There is no such discretion with respect to the
need to validate legacy systems
Validation of Legacy Systems
•6
ISPE-CCPIE CHINA CONFERENCE 2010
Why Validate Legacy Systems?
• Retrospective Validation
• Some systems have not been validated
that should have been validated
• This may have been because of
• Oversight or ignorance on the part of the
owner
• Deliberate decision to avoid the costs
assumed to be associated with validation
Validation of Legacy Systems
•7
Past
ISPE-CCPIE CHINA CONFERENCE 2010
Why Validate Legacy Systems?
• Change in Use
• Some systems require validation for future use
because they are now being used for
• Different products
• Supply of product to different markets
• As a result of this different regulations may now
apply e.g.
• Bulk chemical manufacturer now manufacturing active
pharmaceutical ingredients
• Local company now starting to export product to the
US and/or Europe
Validation of Legacy Systems
•8
Future
ISPE-CCPIE CHINA CONFERENCE 2010
Why Validate Legacy Systems?
• Change in local regulations
• New expectations are beginning to emerge in
the Chinese market
• Chinese SFDA are already asking local
companies whether their systems are validated
• It is expected that regulations and/or guidelines will
follow
• World Health Organization (WHO) guidelines
already require the validation of GMP systems
in member countries
Validation of Legacy Systems
•9
ISPE-CCPIE CHINA CONFERENCE 2010
Why Validate Legacy Systems
• Validation is no more that appropriately
documented good software engineering
practice
• Validated systems
• Are fit for purpose and better accepted by the
users
• Are more reliable, repeatable and robust
• Have a lower cost of ownership
• Mitigate risks to product quality, patient safety
and data integrity
Validation of Legacy Systems
•10
ISPE-CCPIE CHINA CONFERENCE 2010
Is Retrospective Validation of New Systems
Acceptable?
• No
• Systems should be validated at the time of original
implementation
• It is not acceptable to implement a new system and then
validate it as a ‘legacy system’
• PIC/S PI 011* states that legacy system validation “is not
equivalent to prospective validation and is not an option
for new systems”
*Pharmaceutical Inspection Cooperation Scheme Guidance
“Good Practices for Computerised Systems in
Regulated “GxP” Environments
Validation of Legacy Systems
•11
ISPE-CCPIE CHINA CONFERENCE 2010
Topics
• What is a Legacy System?
• Why Validate Legacy Systems?
• How to Validate Legacy Systems
• Case Studies
• Retrospective Validation of Global ERP System for
multinational Medical Devices company
• Validation of Legacy ERP System for Chinese
Pharmaceutical company
Validation of Legacy Systems
•12
ISPE-CCPIE CHINA CONFERENCE 2010
How to Validate Legacy Systems
• Every system is different
• Function
• Size and Complexity
• History
• The validation of every legacy system is different
• It is not possible to provide a single set of activities
that will apply to every system
• A general process and key principles need to be
applied appropriately
• This requires planning by appropriately educated, trained
or experienced people
Validation of Legacy Systems
•13
ISPE-CCPIE CHINA CONFERENCE 2010
A General Process
• The “Legacy Systems”
guide provides a
general process that
can be followed
• This has been updated
in the following slides
to leverage GAMP® 5
and risk based
validation
Validation of Legacy Systems
•14
ISPE-CCPIE CHINA CONFERENCE 2010
Scoping
• Review and revise the (site) Validation
Master Plan to include the system
• For some corporate systems, there may
be an independent Validation Master
Plan
• Update the inventory of systems to
include the system and its status
Validation of Legacy Systems
•15
ISPE-CCPIE CHINA CONFERENCE 2010
Gap Analysis and Risk Assessment
• Conduct a High Level Risk Assessment
• See GAMP® 5 Appendix M3
• Review (or conduct) a supplier assessment
• May or may not require an audit
• Conduct a Gap Analysis
• What should be done
• What has been done
Validation of Legacy Systems
•16
ISPE-CCPIE CHINA CONFERENCE 2010
What Should Be Done
• Understand the regulations and guidelines that
apply
• Depends on your products and markets
• Most regulatory authorities expect very similar
things in terms of validation
• There are some specific differences between
different regulatory agencies e.g.
• European regulators expect a ‘System Description’
• US regulators expect compliance with 21CFR Part 11
• You need to understand and plan for these
differences
Validation of Legacy Systems
•17
ISPE-CCPIE CHINA CONFERENCE 2010
What Has Been Done?
• Confirm what validation was originally
done
• Review existing project documentation
• Review existing maintenance and
support documentation
• Interview project, maintenance and
support staff
• Interview system users
Validation of Legacy Systems
•18
ISPE-CCPIE CHINA CONFERENCE 2010
Retire or Remediate?
Validation of Legacy Systems
•19
What Has Been
Done
What Should Be
Done
What Needs
to be Done
Documentation,
Interviews
Regulations,
Guidance
System Risk
Assessment
Cost Benefit
Analysis
Retire and
Replace
Remediate
and Validate
Gap AnalysisAssessment Decision
Supplier
Assessment
Detailed Risk
Assessment
ISPE-CCPIE CHINA CONFERENCE 2010
Detailed Risk Assessment
• Assess the risks associated with the each of the
validation gaps
• Identify remediation actions and approximate cost
• Remediation actions and costs should be based on
reducing risk to an acceptable level, focusing on risks to
• Product quality
• Patient safety
• Data integrity
• Compare cost of remediation against the cost of
retirement and replacement
• Decide what to do
Validation of Legacy Systems
•20
ISPE-CCPIE CHINA CONFERENCE 2010
Planning
• Develop a risk-based Validation Plan
• Specific to the system
• Based around the assessed risks
• Leverage actual data about risk
• Real risk likelihood
• Real risk detectability
• Plan only those activities that
• Mitigate real risks
• Establish the necessary baseline for on-going
control in the Operational Phase
Validation of Legacy Systems
•21
ISPE-CCPIE CHINA CONFERENCE 2010
Specification
• Review in detail any
• User Requirements
• Functional Specifications
• Design and Configuration Specifications
• Source Code
• Test documentation
• Compare against
• Current requirements
• Existing system
• Update as required
Validation of Legacy Systems
•22
ISPE-CCPIE CHINA CONFERENCE 2010
Specification
• The “Legacy
Systems”
guide provides
a good
approach
• Focus on
• Understanding
the ‘as is’
• Confirming that
the ‘as is’ is fit
for current
purposes
Validation of Legacy Systems
•23
ISPE-CCPIE CHINA CONFERENCE 2010
(Re) Development
• If the ‘as is’ is no longer fit for purpose
changes will need to be made
• To configurations
• To customizations
• This may specifically be the case if there is a
change in product or market requirements
• Documentation should be created or
updated to reflect this
Validation of Legacy Systems
•24
ISPE-CCPIE CHINA CONFERENCE 2010
Testing
• Testing should be risk-based
• Not everything will need testing
• Other forms of verification can be acceptable
• Focus on
• Higher risk requirements
• What has changed
• What was known not to work
• Leverage existing Test Cases and Test Scripts
where they exist
• Updating as required
Validation of Legacy Systems
•25
ISPE-CCPIE CHINA CONFERENCE 2010
Testing
• The Scope of testing may include
• Unit Testing and Integration Testing
• Where custom functions have been changed
• Where there are specific concerns or known issues
• Functional (User) Testing (OQ and PQ)
• To confirm fitness for current purpose
• IQ is often also required
• Retrospectively qualifying existing IT infrastructure
Validation of Legacy Systems
•26
ISPE-CCPIE CHINA CONFERENCE 2010
Reporting
• Prepare the Validation Report
• Focus on demonstrating that
• Risks were effectively mitigated
• The system is demonstrably fit for purpose
• Focusing on key requirements
• A baseline for on-going operation, maintenance and
support has been established
• This may require developing additional operational
procedures (see GAMP Good Practice Guide)
• Update the system inventory to reflect the
current status
Validation of Legacy Systems
•27
ISPE-CCPIE CHINA CONFERENCE 2010
Topics
• What is a Legacy System?
• Why Validate Legacy Systems?
• How to Validate Legacy Systems
• Case Studies
• Retrospective Validation of Global ERP System for
multinational Medical Devices company
• Validation of Legacy ERP System for Chinese
Pharmaceutical company
Validation of Legacy Systems
•28
ISPE-CCPIE CHINA CONFERENCE 2010
Case Study #1
Retrospective Validation
• Global medical devices organization
• Two instances of large global Enterprise Resource
Planning (ERP) system
• Hosted and maintained in USA
• Supporting 20,000+ users and 30+ business units
• Had not been validated, despite multiple changes
of use for GMP purposes
• Required urgent validation following a series of US FDA
Inspections
• US FDA has closed down one manufacturing facility and
issued Warning Letters
Validation of Legacy Systems
•29
ISPE-CCPIE CHINA CONFERENCE 2010
Validation Planning
• Each system adopted a different approach
• One ERP instance was validated as part of a major
upgrade
• Effectively a re-implementation with prospective validation
• One ERP instance was not being upgraded
• A true retrospective validation
• A risk-based approach was used for both systems
• A new risk-management process and model had to be
developed
• Qualification of the IT Infrastructure was also
required
Validation of Legacy Systems
•30
ISPE-CCPIE CHINA CONFERENCE 2010
Retrospective Validation -
Specification and Testing
• Requirements and specifications
• Had not been well maintained
• Did not reflect the ‘as-is’ use of the system
• Did not take a risk-based approach
• Did not meet ‘current regulatory expectations’
• Test documentation
• Was largely up-to-date
• Used in a well defined and controlled software release
process
• Did not meet ‘current regulatory expectations’
Validation of Legacy Systems
•31
ISPE-CCPIE CHINA CONFERENCE 2010
Retrospective Validation -
Remediation Activities
• Activities included
• Preparation of risk-based Validation Plan
• Updating of all Requirements and Specifications
• Focus on business oriented ‘Use Cases’
• Documentation and verification of all configuration settings
• Formal testing of all customizations
• Formal User Acceptance Testing of all business processes
• Focus on appropriate testing, not OQ and PQ
• Qualification of IT Infrastructure
• Validation Reporting
• 10 month exercise to bring system into an acceptable state of
compliance
Validation of Legacy Systems
•32
ISPE-CCPIE CHINA CONFERENCE 2010
Case Study #2
Validation for Change in Use
• Large Chinese state owned pharmaceutical
organization
• Existing instance of ERP system
• Change in use / change in regulations
• Requirement to validate the system for sale of finished
pharmaceuticals to US and European market (GMP)
• US FDA Inspection pending
• SFDA required validation of the system for distribution of
Active Pharmaceutical Ingredients (APIs) and finished
pharmaceuticals for local Chinese market
Validation of Legacy Systems
•33
ISPE-CCPIE CHINA CONFERENCE 2010
Validation for Change in Use –
Validation Planning
• No previous history or experience of computer
system validation
• System owner has an existing relationship with a
local System Integrator
• Well defined Software Development Life Cycle (SDLC)
• Effective working relationship
• Validation Planning
• Decided to combine initial validation activities with roll out
of new functionality to new sites
• Establish processes and templates that can be applied to
all sites
Validation of Legacy Systems
•34
ISPE-CCPIE CHINA CONFERENCE 2010
Validation for Change in Use –
Validation Planning
• Needed to support the regulatory expectations and
inspection requirements of US FDA and SFDA
• Decided that key documents would be bilingual e.g.
• Validation Master Plan, Functional Specifications, Test Plan,
Validation Report etc
• Other documents would be written for the intended
audience (in Chinese) but would have bilingual headings,
to allow the structure to be understood e.g.
• Functional and Technical Design Specifications, Test Cases
Validation of Legacy Systems
•35
ISPE-CCPIE CHINA CONFERENCE 2010
Validation for Change in Use –
Requirements and Specifications
• Written / updated
to leverage best
practice for ERP
systems
• Leverages the
software vendor
and system
integrators best
practices, with
necessary
content to support
validation e.g.
• Key GMP
Requirements
• Risk Assessment
Validation of Legacy Systems
•36
ISPE-CCPIE CHINA CONFERENCE 2010
Validation for Change in Use –
Testing
• Test Cases were updated to reflect
• New / changed business processes and system
functionality
• Current regulatory expectations
• Based on GAMP® “Testing of GxP Systems” Good
Practice Guide”
• Risk-based testing, leveraging previous
experience with the legacy system i.e.
• Any known issues,
• Actual risk likelihood or risk detectability
Validation of Legacy Systems
•37
ISPE-CCPIE CHINA CONFERENCE 2010
Validation for Change in Use –
Remediation Activities
• Activities included
• Preparation of risk-based Validation Master Plan and site specific
Validation/Project Plan
• Documenting of all GxP Requirements and Specifications
• Documentation and verification of all configuration settings
• Data conversion of legacy data and risk-based data verification
• Formal testing of all customizations by System Integrator
• Formal User Acceptance Testing of all business processes
• Qualification of IT Infrastructure
• Development of maintenance and support procedures
• Leveraging GAMP® and ISO 20000 (ITIL)
• Validation Reporting
• This was a more planned activity, integrating regulatory expectations
into planned and budgeted activities
Validation of Legacy Systems
•38
ISPE-CCPIE CHINA CONFERENCE 2010
Conclusions
• Many legacy systems still need to be validated to
meet current regulatory expectations
• Very often as a result in a change in use or to address
new markets
• Each system needs careful assessment and
planning
• The GAMP® Legacy Systems Guide can help
• Addressing legacy system validation as part of a
defined and budgeted process is more controllable
and cost effective than when addressed as a
matter of short term regulatory enforcement
Validation of Legacy Systems
•39

Weitere ähnliche Inhalte

Was ist angesagt?

Codex validation Group presentation
Codex validation Group presentationCodex validation Group presentation
Codex validation Group presentationWalter Acevedo
 
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10Scott Hamm
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanWolfgang Kuchinke
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideProPharma Group
 
Process and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsProcess and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsArta Doci
 
CSV Audit Presentation
CSV Audit PresentationCSV Audit Presentation
CSV Audit PresentationRobert Ruemer
 
Computer system validations
Computer system validations Computer system validations
Computer system validations Saikiran Koyalkar
 
Computer system validation
Computer system validation Computer system validation
Computer system validation ShameerAbid
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validationNilesh Damale
 
Quality Control for Medical Device Software - It Arena Lviv Presentation
Quality Control for Medical Device Software - It Arena Lviv PresentationQuality Control for Medical Device Software - It Arena Lviv Presentation
Quality Control for Medical Device Software - It Arena Lviv PresentationRoman Lavriv
 
Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Anand Pandya
 
Good Automated Manufacturing Practices
Good Automated Manufacturing PracticesGood Automated Manufacturing Practices
Good Automated Manufacturing PracticesPrashant Tomar
 
Computer system validation
Computer system validationComputer system validation
Computer system validationGaurav Kr
 

Was ist angesagt? (20)

Codex validation Group presentation
Codex validation Group presentationCodex validation Group presentation
Codex validation Group presentation
 
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master Plan
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
 
Computer system validation
Computer system validationComputer system validation
Computer system validation
 
Process and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsProcess and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation Elements
 
CSV Audit Presentation
CSV Audit PresentationCSV Audit Presentation
CSV Audit Presentation
 
Computer system validations
Computer system validations Computer system validations
Computer system validations
 
Computer system validation
Computer system validation Computer system validation
Computer system validation
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validation
 
Cv 1
Cv 1Cv 1
Cv 1
 
Ispe sf ch_gamp
Ispe sf ch_gampIspe sf ch_gamp
Ispe sf ch_gamp
 
Gamp5 new
Gamp5 newGamp5 new
Gamp5 new
 
Quality Control for Medical Device Software - It Arena Lviv Presentation
Quality Control for Medical Device Software - It Arena Lviv PresentationQuality Control for Medical Device Software - It Arena Lviv Presentation
Quality Control for Medical Device Software - It Arena Lviv Presentation
 
Computer systems compliance
Computer systems complianceComputer systems compliance
Computer systems compliance
 
Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics
 
Good Automated Manufacturing Practices
Good Automated Manufacturing PracticesGood Automated Manufacturing Practices
Good Automated Manufacturing Practices
 
Computer system validations
Computer system validationsComputer system validations
Computer system validations
 
Computer system validation
Computer system validationComputer system validation
Computer system validation
 
Csv concepts
Csv conceptsCsv concepts
Csv concepts
 

Ähnlich wie ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)

Data Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in PharmaData Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in PharmaSathish Vemula
 
How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016Greenlight Guru
 
340_18CS35_se_mod1(secab).pdf
340_18CS35_se_mod1(secab).pdf340_18CS35_se_mod1(secab).pdf
340_18CS35_se_mod1(secab).pdfkrishnaraj714229
 
SaaS System Validation, practical tips on getting validated for go-live and t...
SaaS System Validation, practical tips on getting validated for go-live and t...SaaS System Validation, practical tips on getting validated for go-live and t...
SaaS System Validation, practical tips on getting validated for go-live and t...Steffan Stringer
 
Software UAT Case study - Finserv
Software UAT Case study - FinservSoftware UAT Case study - Finserv
Software UAT Case study - FinservOAK Systems Pvt Ltd
 
Tools for Accelerating Validation of Office 365
Tools for Accelerating Validation of Office 365Tools for Accelerating Validation of Office 365
Tools for Accelerating Validation of Office 365Montrium
 
A Pragmatic Approach to REDCap Validation
A Pragmatic Approach to REDCap ValidationA Pragmatic Approach to REDCap Validation
A Pragmatic Approach to REDCap ValidationRick Watts
 
How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...
How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...
How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...Perficient
 
Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...
Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...
Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...NETWAYS
 
Vish- Validation Master Plan
Vish- Validation Master PlanVish- Validation Master Plan
Vish- Validation Master PlanVishal Parikh
 
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s RoleNERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s RoleEnergySec
 
Providing SharePoint Solutions in an FDA Regulated Environment
Providing SharePoint Solutions in an FDA Regulated EnvironmentProviding SharePoint Solutions in an FDA Regulated Environment
Providing SharePoint Solutions in an FDA Regulated EnvironmentDeb Walther
 
Agile for Software as a Medical Device
Agile for Software as a Medical DeviceAgile for Software as a Medical Device
Agile for Software as a Medical DeviceOrthogonal
 
Requirments management traceability.ppt
Requirments  management traceability.pptRequirments  management traceability.ppt
Requirments management traceability.pptubaidullah75790
 
Continuous validation of office 365
Continuous validation of office 365Continuous validation of office 365
Continuous validation of office 365Montrium
 
Overview of Validation in Pharma_Katalyst HLS
Overview of Validation in Pharma_Katalyst HLSOverview of Validation in Pharma_Katalyst HLS
Overview of Validation in Pharma_Katalyst HLSKatalyst HLS
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validationchitralekha48
 
Presentation Fundamentals of V&V
Presentation Fundamentals of V&VPresentation Fundamentals of V&V
Presentation Fundamentals of V&Vmelmaan
 

Ähnlich wie ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English) (20)

Epitome Corporate PPT
Epitome Corporate PPTEpitome Corporate PPT
Epitome Corporate PPT
 
MES systems
MES systemsMES systems
MES systems
 
Data Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in PharmaData Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in Pharma
 
How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016
 
340_18CS35_se_mod1(secab).pdf
340_18CS35_se_mod1(secab).pdf340_18CS35_se_mod1(secab).pdf
340_18CS35_se_mod1(secab).pdf
 
SaaS System Validation, practical tips on getting validated for go-live and t...
SaaS System Validation, practical tips on getting validated for go-live and t...SaaS System Validation, practical tips on getting validated for go-live and t...
SaaS System Validation, practical tips on getting validated for go-live and t...
 
Software UAT Case study - Finserv
Software UAT Case study - FinservSoftware UAT Case study - Finserv
Software UAT Case study - Finserv
 
Tools for Accelerating Validation of Office 365
Tools for Accelerating Validation of Office 365Tools for Accelerating Validation of Office 365
Tools for Accelerating Validation of Office 365
 
A Pragmatic Approach to REDCap Validation
A Pragmatic Approach to REDCap ValidationA Pragmatic Approach to REDCap Validation
A Pragmatic Approach to REDCap Validation
 
How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...
How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...
How to Migrate Drug Safety and Pharmacovigilance Data Cost-Effectively and wi...
 
Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...
Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...
Nagios Conference 2007 | Enterprise Application Monitoring with Nagios by Jam...
 
Vish- Validation Master Plan
Vish- Validation Master PlanVish- Validation Master Plan
Vish- Validation Master Plan
 
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s RoleNERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
 
Providing SharePoint Solutions in an FDA Regulated Environment
Providing SharePoint Solutions in an FDA Regulated EnvironmentProviding SharePoint Solutions in an FDA Regulated Environment
Providing SharePoint Solutions in an FDA Regulated Environment
 
Agile for Software as a Medical Device
Agile for Software as a Medical DeviceAgile for Software as a Medical Device
Agile for Software as a Medical Device
 
Requirments management traceability.ppt
Requirments  management traceability.pptRequirments  management traceability.ppt
Requirments management traceability.ppt
 
Continuous validation of office 365
Continuous validation of office 365Continuous validation of office 365
Continuous validation of office 365
 
Overview of Validation in Pharma_Katalyst HLS
Overview of Validation in Pharma_Katalyst HLSOverview of Validation in Pharma_Katalyst HLS
Overview of Validation in Pharma_Katalyst HLS
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Presentation Fundamentals of V&V
Presentation Fundamentals of V&VPresentation Fundamentals of V&V
Presentation Fundamentals of V&V
 

ISPE-CCPIE China Conference 2010 (Stokes-GAMP Legacy Systems - English)

  • 1. ISPE-CCPIE CHINA CONFERENCE 2010 October 26-29 2010 Beijing Validation of Legacy Systems Case Study: ERP Legacy Systems Validation
  • 2. ISPE-CCPIE CHINA CONFERENCE 2010 David Stokes Global Head of Life Sciences, Business & Decision • 25 years experience in computer system validation and IT compliance • Automated / Process Control Systems • Corporate IT Systems • IT Infrastructure • Active member of GAMP® Forum • Contributor to the GAMP® Guide and many GAMP® Good Practice Guides • Actively working on a number of computer system validation projects executed in China Validation of Legacy Systems •2
  • 3. ISPE-CCPIE CHINA CONFERENCE 2010 Topics • What is a Legacy System? • Why Validate Legacy Systems? • How to Validate Legacy Systems • Case Studies • Retrospective Validation of Global ERP System for multinational Medical Devices company • Validation of Legacy ERP System for Chinese Pharmaceutical company Validation of Legacy Systems •3
  • 4. ISPE-CCPIE CHINA CONFERENCE 2010 What is a Legacy System? • “Any GxP relevant system that is in place and in use, and which is not deemed to satisfy current regulatory expectations” Validation of Legacy Systems •4 “Legacy Systems” ISPE Pharmaceutical Engineering, Nov/Dec 2003, Vol 23 No 6
  • 5. ISPE-CCPIE CHINA CONFERENCE 2010 What is a Legacy System? • “…in place and in use…” • Already in production use • May have been in use for many years • “…not deemed to satisfy current regulatory expectations…” • Infers not only regulations, but also regulatory guidance and industry good practice • Remember that regulatory expectations change over time Validation of Legacy Systems •5
  • 6. ISPE-CCPIE CHINA CONFERENCE 2010 GAMP® “Legacy Systems” Article ISPE Pharmaceutical Engineering, Nov/Dec 2003, Vol 23 No 6 • Written in 2003 to principally address issues of compliance with 21CFR Part 11 (Electronic Records, Electronic Signatures) • Note that the US FDA are now exercising enforcement discretion with respect to • 21CFR Part 11 • Systems in use prior to August 20, 1997 • Systems implemented after August 20,1997 have no such enforcement discretion • 21CFR Part 11 still applies in the USA • There is no such discretion with respect to the need to validate legacy systems Validation of Legacy Systems •6
  • 7. ISPE-CCPIE CHINA CONFERENCE 2010 Why Validate Legacy Systems? • Retrospective Validation • Some systems have not been validated that should have been validated • This may have been because of • Oversight or ignorance on the part of the owner • Deliberate decision to avoid the costs assumed to be associated with validation Validation of Legacy Systems •7 Past
  • 8. ISPE-CCPIE CHINA CONFERENCE 2010 Why Validate Legacy Systems? • Change in Use • Some systems require validation for future use because they are now being used for • Different products • Supply of product to different markets • As a result of this different regulations may now apply e.g. • Bulk chemical manufacturer now manufacturing active pharmaceutical ingredients • Local company now starting to export product to the US and/or Europe Validation of Legacy Systems •8 Future
  • 9. ISPE-CCPIE CHINA CONFERENCE 2010 Why Validate Legacy Systems? • Change in local regulations • New expectations are beginning to emerge in the Chinese market • Chinese SFDA are already asking local companies whether their systems are validated • It is expected that regulations and/or guidelines will follow • World Health Organization (WHO) guidelines already require the validation of GMP systems in member countries Validation of Legacy Systems •9
  • 10. ISPE-CCPIE CHINA CONFERENCE 2010 Why Validate Legacy Systems • Validation is no more that appropriately documented good software engineering practice • Validated systems • Are fit for purpose and better accepted by the users • Are more reliable, repeatable and robust • Have a lower cost of ownership • Mitigate risks to product quality, patient safety and data integrity Validation of Legacy Systems •10
  • 11. ISPE-CCPIE CHINA CONFERENCE 2010 Is Retrospective Validation of New Systems Acceptable? • No • Systems should be validated at the time of original implementation • It is not acceptable to implement a new system and then validate it as a ‘legacy system’ • PIC/S PI 011* states that legacy system validation “is not equivalent to prospective validation and is not an option for new systems” *Pharmaceutical Inspection Cooperation Scheme Guidance “Good Practices for Computerised Systems in Regulated “GxP” Environments Validation of Legacy Systems •11
  • 12. ISPE-CCPIE CHINA CONFERENCE 2010 Topics • What is a Legacy System? • Why Validate Legacy Systems? • How to Validate Legacy Systems • Case Studies • Retrospective Validation of Global ERP System for multinational Medical Devices company • Validation of Legacy ERP System for Chinese Pharmaceutical company Validation of Legacy Systems •12
  • 13. ISPE-CCPIE CHINA CONFERENCE 2010 How to Validate Legacy Systems • Every system is different • Function • Size and Complexity • History • The validation of every legacy system is different • It is not possible to provide a single set of activities that will apply to every system • A general process and key principles need to be applied appropriately • This requires planning by appropriately educated, trained or experienced people Validation of Legacy Systems •13
  • 14. ISPE-CCPIE CHINA CONFERENCE 2010 A General Process • The “Legacy Systems” guide provides a general process that can be followed • This has been updated in the following slides to leverage GAMP® 5 and risk based validation Validation of Legacy Systems •14
  • 15. ISPE-CCPIE CHINA CONFERENCE 2010 Scoping • Review and revise the (site) Validation Master Plan to include the system • For some corporate systems, there may be an independent Validation Master Plan • Update the inventory of systems to include the system and its status Validation of Legacy Systems •15
  • 16. ISPE-CCPIE CHINA CONFERENCE 2010 Gap Analysis and Risk Assessment • Conduct a High Level Risk Assessment • See GAMP® 5 Appendix M3 • Review (or conduct) a supplier assessment • May or may not require an audit • Conduct a Gap Analysis • What should be done • What has been done Validation of Legacy Systems •16
  • 17. ISPE-CCPIE CHINA CONFERENCE 2010 What Should Be Done • Understand the regulations and guidelines that apply • Depends on your products and markets • Most regulatory authorities expect very similar things in terms of validation • There are some specific differences between different regulatory agencies e.g. • European regulators expect a ‘System Description’ • US regulators expect compliance with 21CFR Part 11 • You need to understand and plan for these differences Validation of Legacy Systems •17
  • 18. ISPE-CCPIE CHINA CONFERENCE 2010 What Has Been Done? • Confirm what validation was originally done • Review existing project documentation • Review existing maintenance and support documentation • Interview project, maintenance and support staff • Interview system users Validation of Legacy Systems •18
  • 19. ISPE-CCPIE CHINA CONFERENCE 2010 Retire or Remediate? Validation of Legacy Systems •19 What Has Been Done What Should Be Done What Needs to be Done Documentation, Interviews Regulations, Guidance System Risk Assessment Cost Benefit Analysis Retire and Replace Remediate and Validate Gap AnalysisAssessment Decision Supplier Assessment Detailed Risk Assessment
  • 20. ISPE-CCPIE CHINA CONFERENCE 2010 Detailed Risk Assessment • Assess the risks associated with the each of the validation gaps • Identify remediation actions and approximate cost • Remediation actions and costs should be based on reducing risk to an acceptable level, focusing on risks to • Product quality • Patient safety • Data integrity • Compare cost of remediation against the cost of retirement and replacement • Decide what to do Validation of Legacy Systems •20
  • 21. ISPE-CCPIE CHINA CONFERENCE 2010 Planning • Develop a risk-based Validation Plan • Specific to the system • Based around the assessed risks • Leverage actual data about risk • Real risk likelihood • Real risk detectability • Plan only those activities that • Mitigate real risks • Establish the necessary baseline for on-going control in the Operational Phase Validation of Legacy Systems •21
  • 22. ISPE-CCPIE CHINA CONFERENCE 2010 Specification • Review in detail any • User Requirements • Functional Specifications • Design and Configuration Specifications • Source Code • Test documentation • Compare against • Current requirements • Existing system • Update as required Validation of Legacy Systems •22
  • 23. ISPE-CCPIE CHINA CONFERENCE 2010 Specification • The “Legacy Systems” guide provides a good approach • Focus on • Understanding the ‘as is’ • Confirming that the ‘as is’ is fit for current purposes Validation of Legacy Systems •23
  • 24. ISPE-CCPIE CHINA CONFERENCE 2010 (Re) Development • If the ‘as is’ is no longer fit for purpose changes will need to be made • To configurations • To customizations • This may specifically be the case if there is a change in product or market requirements • Documentation should be created or updated to reflect this Validation of Legacy Systems •24
  • 25. ISPE-CCPIE CHINA CONFERENCE 2010 Testing • Testing should be risk-based • Not everything will need testing • Other forms of verification can be acceptable • Focus on • Higher risk requirements • What has changed • What was known not to work • Leverage existing Test Cases and Test Scripts where they exist • Updating as required Validation of Legacy Systems •25
  • 26. ISPE-CCPIE CHINA CONFERENCE 2010 Testing • The Scope of testing may include • Unit Testing and Integration Testing • Where custom functions have been changed • Where there are specific concerns or known issues • Functional (User) Testing (OQ and PQ) • To confirm fitness for current purpose • IQ is often also required • Retrospectively qualifying existing IT infrastructure Validation of Legacy Systems •26
  • 27. ISPE-CCPIE CHINA CONFERENCE 2010 Reporting • Prepare the Validation Report • Focus on demonstrating that • Risks were effectively mitigated • The system is demonstrably fit for purpose • Focusing on key requirements • A baseline for on-going operation, maintenance and support has been established • This may require developing additional operational procedures (see GAMP Good Practice Guide) • Update the system inventory to reflect the current status Validation of Legacy Systems •27
  • 28. ISPE-CCPIE CHINA CONFERENCE 2010 Topics • What is a Legacy System? • Why Validate Legacy Systems? • How to Validate Legacy Systems • Case Studies • Retrospective Validation of Global ERP System for multinational Medical Devices company • Validation of Legacy ERP System for Chinese Pharmaceutical company Validation of Legacy Systems •28
  • 29. ISPE-CCPIE CHINA CONFERENCE 2010 Case Study #1 Retrospective Validation • Global medical devices organization • Two instances of large global Enterprise Resource Planning (ERP) system • Hosted and maintained in USA • Supporting 20,000+ users and 30+ business units • Had not been validated, despite multiple changes of use for GMP purposes • Required urgent validation following a series of US FDA Inspections • US FDA has closed down one manufacturing facility and issued Warning Letters Validation of Legacy Systems •29
  • 30. ISPE-CCPIE CHINA CONFERENCE 2010 Validation Planning • Each system adopted a different approach • One ERP instance was validated as part of a major upgrade • Effectively a re-implementation with prospective validation • One ERP instance was not being upgraded • A true retrospective validation • A risk-based approach was used for both systems • A new risk-management process and model had to be developed • Qualification of the IT Infrastructure was also required Validation of Legacy Systems •30
  • 31. ISPE-CCPIE CHINA CONFERENCE 2010 Retrospective Validation - Specification and Testing • Requirements and specifications • Had not been well maintained • Did not reflect the ‘as-is’ use of the system • Did not take a risk-based approach • Did not meet ‘current regulatory expectations’ • Test documentation • Was largely up-to-date • Used in a well defined and controlled software release process • Did not meet ‘current regulatory expectations’ Validation of Legacy Systems •31
  • 32. ISPE-CCPIE CHINA CONFERENCE 2010 Retrospective Validation - Remediation Activities • Activities included • Preparation of risk-based Validation Plan • Updating of all Requirements and Specifications • Focus on business oriented ‘Use Cases’ • Documentation and verification of all configuration settings • Formal testing of all customizations • Formal User Acceptance Testing of all business processes • Focus on appropriate testing, not OQ and PQ • Qualification of IT Infrastructure • Validation Reporting • 10 month exercise to bring system into an acceptable state of compliance Validation of Legacy Systems •32
  • 33. ISPE-CCPIE CHINA CONFERENCE 2010 Case Study #2 Validation for Change in Use • Large Chinese state owned pharmaceutical organization • Existing instance of ERP system • Change in use / change in regulations • Requirement to validate the system for sale of finished pharmaceuticals to US and European market (GMP) • US FDA Inspection pending • SFDA required validation of the system for distribution of Active Pharmaceutical Ingredients (APIs) and finished pharmaceuticals for local Chinese market Validation of Legacy Systems •33
  • 34. ISPE-CCPIE CHINA CONFERENCE 2010 Validation for Change in Use – Validation Planning • No previous history or experience of computer system validation • System owner has an existing relationship with a local System Integrator • Well defined Software Development Life Cycle (SDLC) • Effective working relationship • Validation Planning • Decided to combine initial validation activities with roll out of new functionality to new sites • Establish processes and templates that can be applied to all sites Validation of Legacy Systems •34
  • 35. ISPE-CCPIE CHINA CONFERENCE 2010 Validation for Change in Use – Validation Planning • Needed to support the regulatory expectations and inspection requirements of US FDA and SFDA • Decided that key documents would be bilingual e.g. • Validation Master Plan, Functional Specifications, Test Plan, Validation Report etc • Other documents would be written for the intended audience (in Chinese) but would have bilingual headings, to allow the structure to be understood e.g. • Functional and Technical Design Specifications, Test Cases Validation of Legacy Systems •35
  • 36. ISPE-CCPIE CHINA CONFERENCE 2010 Validation for Change in Use – Requirements and Specifications • Written / updated to leverage best practice for ERP systems • Leverages the software vendor and system integrators best practices, with necessary content to support validation e.g. • Key GMP Requirements • Risk Assessment Validation of Legacy Systems •36
  • 37. ISPE-CCPIE CHINA CONFERENCE 2010 Validation for Change in Use – Testing • Test Cases were updated to reflect • New / changed business processes and system functionality • Current regulatory expectations • Based on GAMP® “Testing of GxP Systems” Good Practice Guide” • Risk-based testing, leveraging previous experience with the legacy system i.e. • Any known issues, • Actual risk likelihood or risk detectability Validation of Legacy Systems •37
  • 38. ISPE-CCPIE CHINA CONFERENCE 2010 Validation for Change in Use – Remediation Activities • Activities included • Preparation of risk-based Validation Master Plan and site specific Validation/Project Plan • Documenting of all GxP Requirements and Specifications • Documentation and verification of all configuration settings • Data conversion of legacy data and risk-based data verification • Formal testing of all customizations by System Integrator • Formal User Acceptance Testing of all business processes • Qualification of IT Infrastructure • Development of maintenance and support procedures • Leveraging GAMP® and ISO 20000 (ITIL) • Validation Reporting • This was a more planned activity, integrating regulatory expectations into planned and budgeted activities Validation of Legacy Systems •38
  • 39. ISPE-CCPIE CHINA CONFERENCE 2010 Conclusions • Many legacy systems still need to be validated to meet current regulatory expectations • Very often as a result in a change in use or to address new markets • Each system needs careful assessment and planning • The GAMP® Legacy Systems Guide can help • Addressing legacy system validation as part of a defined and budgeted process is more controllable and cost effective than when addressed as a matter of short term regulatory enforcement Validation of Legacy Systems •39