SlideShare a Scribd company logo
1 of 1
Download to read offline
 
DARSHIT	
  MEGHANI	
  
305	
  Atwood	
  Street,	
  Pittsburgh,	
  PA,	
  15213	
  |	
  Contact:	
  857-­‐777-­‐8055	
  |	
  Email:	
  darshitmeghani@gmail.com	
  
	
  
OBJECTIVE	
  
Construction	
  management	
  graduate	
  student	
  with	
  experience	
  in	
  fieldwork,	
  equipped	
  with	
  excellent	
  planning	
  and	
  time	
  
management	
  skills	
  seeking	
  position	
  of	
  a	
  Project	
  Engineer.	
  
	
  
EDUCATION	
  
Master	
  of	
  Science	
  in	
  Civil	
  Engineering-­‐University	
  of	
  Pittsburgh,	
  Pittsburgh,	
  PA	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  GPA:	
  3.77	
  
Concentration	
  in	
  Construction	
  Management	
  	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
   	
  	
  	
  	
  Aug’14-­‐Dec’15	
  
Bachelor	
  of	
  Technology	
  in	
  Civil	
  Engineering-­‐U.V.	
  Patel	
  College	
  of	
  Engineering,	
  India	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  CGPA:	
  7.23/10	
  
Concentration	
  in	
  Civil	
  Engineering	
   	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
   	
   	
   	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  Apr’10-­‐Apr	
  ‘14	
  
Relevant	
   Coursework:	
   Construction	
   scheduling,	
   Construction	
   cost	
   estimating,	
   Construction	
   methods	
   and	
   equipment,	
  
Construction	
  law	
  and	
  risk	
  management,	
  Construction	
  finance	
  and	
  cost	
  control,	
  Construction	
  and	
  cost	
  of	
  electrical	
  supply,	
  
Green	
  building	
  design	
  and	
  construction,	
  Life	
  cycle	
  assessment,	
  Engineering	
  design	
  and	
  sustainability	
  
	
  
ACADEMIC	
  PROJECTS	
  
Scheduling	
  Project	
  on	
  Primavera	
  P6,	
  University	
  of	
  Pittsburgh	
  	
  	
   	
   	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  Jan’15-­‐Apr’15	
  
•   Served	
  as	
  a	
  team	
  lead	
  for	
  class	
  project	
  to	
  prepare	
  a	
  workable	
  construction	
  schedule	
  of	
  a	
  live	
  project	
  using	
  Primavera	
  	
  
•   Established	
  a	
  suitable	
  WBS	
  for	
  the	
  project,	
  developed	
  a	
  list	
  of	
  activities,	
  defined	
  logical	
  relationship	
  between	
  them	
  
and	
  generated	
  a	
  constructible	
  schedule	
  	
  
Project	
  on	
  Indoor	
  Air	
  Quality	
  Assessment-­‐City	
  County	
  Building,	
  University	
  of	
  Pittsburgh	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  Jan’15-­‐Apr’15	
  	
  
•   Examined	
  the	
  building	
  blue	
  prints	
  and	
  established	
  a	
  protocol	
  to	
  be	
  implemented	
  for	
  IAQ	
  testing	
  	
  
•   Used	
  the	
  Graywolf	
  Air	
  Quality	
  System	
  to	
  measure	
  various	
  parameters	
  that	
  had	
  impact	
  on	
  the	
  indoor	
  air	
  quality	
  	
  
•   Analyzed	
  the	
  data	
  obtained	
  from	
  the	
  testing	
  to	
  conclude	
  the	
  indoor	
  air	
  quality	
  of	
  the	
  building	
  	
  
•   Provided	
  applicable	
  recommendations	
  to	
  improve	
  its	
  indoor	
  air	
  quality	
  	
  
Project	
  on	
  Soil	
  stabilization/Improvement	
  in	
  soil	
  properties	
  using	
  lime	
  and	
  fly	
  ash,	
  UVPCE	
  	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  Jan’14-­‐	
  May	
  ‘14	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
•   Tested	
  the	
  soil	
  beneath	
  a	
  highly	
  undulated	
  road	
  (low	
  CBR)	
  to	
  determine	
  the	
  type	
  of	
  the	
  soil	
  and	
  its	
  index	
  properties	
  	
  
•   Performed	
  CBR	
  tests	
  to	
  determine	
  the	
  optimum	
  quantities	
  of	
  fly	
  ash	
  and	
  lime	
  required	
  to	
  stabilize	
  the	
  soil	
  	
  
•   Compared	
  the	
  properties	
  of	
  the	
  stabilized	
  soil	
  with	
  the	
  original	
  soil	
  to	
  demonstrate	
  the	
  improvement	
  in	
  its	
  properties	
  	
  
Software:	
  AutoCAD;	
  Autodesk	
  Revit;	
  Primavera	
  P6;	
  HCSS-­‐Heavybid;	
  SimaPro-­‐LCA;	
  Microsoft	
  Word,	
  Excel,	
  Power	
  point	
  	
  
	
  
EXPERIENCE	
  
Site	
  engineer-­‐	
  Trilokesh	
  Infrastructure	
  Developers,	
  Gujarat,	
  India	
   	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
   	
  June’13-­‐	
  July’14	
  
•   Addressed	
  issues	
  raised	
  by	
  the	
  owner	
  during	
  project	
  meetings,	
  managed	
  workforce	
  and	
  resources	
  as	
  per	
  requirement	
  	
  
•   Assisted	
  in	
  preparing	
  work	
  schedules,	
  progress	
  reports	
  and	
  presented	
  them	
  weekly	
  to	
  the	
  project	
  manager	
  	
  
•   Analyzed	
  vendor	
  proposals	
  for	
  the	
  construction	
  materials	
  and	
  selected	
  the	
  appropriate	
  one	
  for	
  the	
  project	
  
•   Organized	
  seminars	
  and	
  impromptu	
  safety	
  drills	
  to	
  demonstrate	
  the	
  importance	
  of	
  safety	
  during	
  construction	
  which	
  
resulted	
  in	
  30-­‐35%	
  less	
  accidents	
  and	
  injuries,	
  thus	
  reducing	
  insurance	
  costs	
  
•   Monitored	
  work	
  progress,	
  schedule	
  of	
  work	
  and	
  also	
  worked	
  closely	
  with	
  the	
  field	
  crew	
  to	
  ensure	
  progress	
  according	
  
to	
  the	
  rules	
  and	
  regulations	
  laid	
  down	
  by	
  the	
  governing	
  body	
  	
  
Intern-­‐	
  Jason	
  Infrastructure,	
  Ahmedabad,	
  Gujarat,	
  India	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
   	
  	
  	
  Apr’12-­‐	
  Aug‘12	
  
•   Generated	
  a	
  3-­‐D	
  model	
  of	
  site	
  office	
  using	
  Autodesk	
  Revit	
  to	
  make	
  the	
  scope	
  of	
  work	
  clear	
  to	
  field	
  staff	
  
•   Estimated	
  material	
  takeoff	
  quantities	
  and	
  prepared	
  a	
  comparative	
  preliminary	
  estimate	
  for	
  the	
  design	
  alternatives	
  	
  
•   Supervised	
  the	
  construction	
  of	
  site	
  office	
  to	
  ensure	
  it	
  was	
  completed	
  properly	
  and	
  in	
  a	
  timely	
  manner	
  	
  
•   Developed	
  a	
  technical	
  marketing	
  strategy	
  with	
  the	
  marketing	
  department	
  which	
  increased	
  the	
  sales	
  by	
  30-­‐35%	
  
Intern,	
  Gujarat	
  Industrial	
  Development	
  Corporation	
  (GIDC),	
  Gujarat,	
  India	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
   	
  	
  May’11-­‐July’11	
  	
  	
  
•   Worked	
  with	
  officials	
  to	
  figure	
  out	
  the	
  problems	
  faced	
  by	
  the	
  corporation	
  in	
  maintenance	
  of	
  the	
  estates	
  	
  
•   Conducted	
  meetings	
  with	
  the	
  land	
  owners	
  and	
  inspected	
  the	
  estates	
  to	
  determine	
  the	
  cause	
  of	
  the	
  problems	
  
•   Provided	
  applicable	
  recommendations	
  to	
  the	
  owners	
  for	
  improving	
  the	
  condition	
  of	
  the	
  estates	
  
•   Presented	
  the	
  work	
  done	
  on	
  this	
  project	
  to	
  a	
  group	
  of	
  15	
  officials	
  at	
  GIDC	
  to	
  discuss	
  and	
  justify	
  the	
  feasibility	
  of	
  the	
  
recommendations	
  provided	
  

More Related Content

What's hot

CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghuRaghu p
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar Khan
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPSagar Kaptan
 
Resource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft ProjectResource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft ProjectSagar Kaptan
 
Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...IRJET Journal
 
AJIN VIJAY_CV.
AJIN VIJAY_CV.AJIN VIJAY_CV.
AJIN VIJAY_CV.AJIN VIJAY
 

What's hot (20)

CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
 
Cherukuri
CherukuriCherukuri
Cherukuri
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Resource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft ProjectResource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft Project
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
BASEEM
BASEEMBASEEM
BASEEM
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...
 
AJIN VIJAY_CV.
AJIN VIJAY_CV.AJIN VIJAY_CV.
AJIN VIJAY_CV.
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
Choudhary Divyang Resume
Choudhary Divyang ResumeChoudhary Divyang Resume
Choudhary Divyang Resume
 

Viewers also liked

Teleran Briefing July 2014
Teleran Briefing July 2014Teleran Briefing July 2014
Teleran Briefing July 2014Howard Meadow
 
Micah 3 commentary
Micah 3 commentaryMicah 3 commentary
Micah 3 commentaryGLENN PEASE
 
Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...
Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...
Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...Mehdi Ghobadi , PhD., MBA
 
SBP 01022015 Cloud Forcast Article
SBP 01022015 Cloud Forcast ArticleSBP 01022015 Cloud Forcast Article
SBP 01022015 Cloud Forcast ArticlePaul Kane
 
Two dimensional Pool Boiling
Two dimensional Pool BoilingTwo dimensional Pool Boiling
Two dimensional Pool BoilingRobvanGils
 
Peter Emmanuel Cookey PhD
Peter Emmanuel Cookey PhDPeter Emmanuel Cookey PhD
Peter Emmanuel Cookey PhDPeter Cookey
 
Lean startup workshop - Bangalore - April 2014
Lean startup workshop - Bangalore - April 2014Lean startup workshop - Bangalore - April 2014
Lean startup workshop - Bangalore - April 2014Rammohan Reddy
 
The Nature of Power - Presented by Erica & Ernie Wisner
The Nature of Power - Presented by Erica & Ernie WisnerThe Nature of Power - Presented by Erica & Ernie Wisner
The Nature of Power - Presented by Erica & Ernie WisnerDiegoFooter
 
Microencapsulation
MicroencapsulationMicroencapsulation
MicroencapsulationThemani55555
 

Viewers also liked (12)

CV English
CV EnglishCV English
CV English
 
Teleran Briefing July 2014
Teleran Briefing July 2014Teleran Briefing July 2014
Teleran Briefing July 2014
 
Micah 3 commentary
Micah 3 commentaryMicah 3 commentary
Micah 3 commentary
 
Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...
Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...
Two Phase Flow Measurements under Static and Dynamic Conditions for Predictin...
 
SBP 01022015 Cloud Forcast Article
SBP 01022015 Cloud Forcast ArticleSBP 01022015 Cloud Forcast Article
SBP 01022015 Cloud Forcast Article
 
Two dimensional Pool Boiling
Two dimensional Pool BoilingTwo dimensional Pool Boiling
Two dimensional Pool Boiling
 
Peter Emmanuel Cookey PhD
Peter Emmanuel Cookey PhDPeter Emmanuel Cookey PhD
Peter Emmanuel Cookey PhD
 
Lean startup workshop - Bangalore - April 2014
Lean startup workshop - Bangalore - April 2014Lean startup workshop - Bangalore - April 2014
Lean startup workshop - Bangalore - April 2014
 
The Nature of Power - Presented by Erica & Ernie Wisner
The Nature of Power - Presented by Erica & Ernie WisnerThe Nature of Power - Presented by Erica & Ernie Wisner
The Nature of Power - Presented by Erica & Ernie Wisner
 
Role of wto in marketing
Role of wto in marketingRole of wto in marketing
Role of wto in marketing
 
Microencapsulation
MicroencapsulationMicroencapsulation
Microencapsulation
 
Adams8031 00
Adams8031 00Adams8031 00
Adams8031 00
 

Similar to Construction Management Graduate Seeks Project Engineer Role

Similar to Construction Management Graduate Seeks Project Engineer Role (20)

Aarth_Resume 2016
Aarth_Resume 2016Aarth_Resume 2016
Aarth_Resume 2016
 
Prasun_resume
Prasun_resumePrasun_resume
Prasun_resume
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
Sasikumar Resume
Sasikumar ResumeSasikumar Resume
Sasikumar Resume
 
Resume_ShreyanshParakh
Resume_ShreyanshParakhResume_ShreyanshParakh
Resume_ShreyanshParakh
 
Sunil Final Resume
Sunil Final ResumeSunil Final Resume
Sunil Final Resume
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Construction estimator
Construction estimatorConstruction estimator
Construction estimator
 
Construction Estimator
Construction EstimatorConstruction Estimator
Construction Estimator
 
Project engineer resume
Project engineer resumeProject engineer resume
Project engineer resume
 
My resume.pdf
My resume.pdfMy resume.pdf
My resume.pdf
 
Anusha
AnushaAnusha
Anusha
 
Richie Resume
Richie Resume Richie Resume
Richie Resume
 
TOUSIM QURESHI RESUME
TOUSIM QURESHI RESUMETOUSIM QURESHI RESUME
TOUSIM QURESHI RESUME
 
Ritwik resume- July
Ritwik resume- JulyRitwik resume- July
Ritwik resume- July
 
Amjad CV Updated
Amjad CV UpdatedAmjad CV Updated
Amjad CV Updated
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CV
 

Construction Management Graduate Seeks Project Engineer Role

  • 1.   DARSHIT  MEGHANI   305  Atwood  Street,  Pittsburgh,  PA,  15213  |  Contact:  857-­‐777-­‐8055  |  Email:  darshitmeghani@gmail.com     OBJECTIVE   Construction  management  graduate  student  with  experience  in  fieldwork,  equipped  with  excellent  planning  and  time   management  skills  seeking  position  of  a  Project  Engineer.     EDUCATION   Master  of  Science  in  Civil  Engineering-­‐University  of  Pittsburgh,  Pittsburgh,  PA                                                  GPA:  3.77   Concentration  in  Construction  Management                                                                                                                                                                                      Aug’14-­‐Dec’15   Bachelor  of  Technology  in  Civil  Engineering-­‐U.V.  Patel  College  of  Engineering,  India                                                                            CGPA:  7.23/10   Concentration  in  Civil  Engineering                                                                              Apr’10-­‐Apr  ‘14   Relevant   Coursework:   Construction   scheduling,   Construction   cost   estimating,   Construction   methods   and   equipment,   Construction  law  and  risk  management,  Construction  finance  and  cost  control,  Construction  and  cost  of  electrical  supply,   Green  building  design  and  construction,  Life  cycle  assessment,  Engineering  design  and  sustainability     ACADEMIC  PROJECTS   Scheduling  Project  on  Primavera  P6,  University  of  Pittsburgh                                                                                Jan’15-­‐Apr’15   •   Served  as  a  team  lead  for  class  project  to  prepare  a  workable  construction  schedule  of  a  live  project  using  Primavera     •   Established  a  suitable  WBS  for  the  project,  developed  a  list  of  activities,  defined  logical  relationship  between  them   and  generated  a  constructible  schedule     Project  on  Indoor  Air  Quality  Assessment-­‐City  County  Building,  University  of  Pittsburgh                                                                    Jan’15-­‐Apr’15     •   Examined  the  building  blue  prints  and  established  a  protocol  to  be  implemented  for  IAQ  testing     •   Used  the  Graywolf  Air  Quality  System  to  measure  various  parameters  that  had  impact  on  the  indoor  air  quality     •   Analyzed  the  data  obtained  from  the  testing  to  conclude  the  indoor  air  quality  of  the  building     •   Provided  applicable  recommendations  to  improve  its  indoor  air  quality     Project  on  Soil  stabilization/Improvement  in  soil  properties  using  lime  and  fly  ash,  UVPCE                                    Jan’14-­‐  May  ‘14                             •   Tested  the  soil  beneath  a  highly  undulated  road  (low  CBR)  to  determine  the  type  of  the  soil  and  its  index  properties     •   Performed  CBR  tests  to  determine  the  optimum  quantities  of  fly  ash  and  lime  required  to  stabilize  the  soil     •   Compared  the  properties  of  the  stabilized  soil  with  the  original  soil  to  demonstrate  the  improvement  in  its  properties     Software:  AutoCAD;  Autodesk  Revit;  Primavera  P6;  HCSS-­‐Heavybid;  SimaPro-­‐LCA;  Microsoft  Word,  Excel,  Power  point       EXPERIENCE   Site  engineer-­‐  Trilokesh  Infrastructure  Developers,  Gujarat,  India                                                                                      June’13-­‐  July’14   •   Addressed  issues  raised  by  the  owner  during  project  meetings,  managed  workforce  and  resources  as  per  requirement     •   Assisted  in  preparing  work  schedules,  progress  reports  and  presented  them  weekly  to  the  project  manager     •   Analyzed  vendor  proposals  for  the  construction  materials  and  selected  the  appropriate  one  for  the  project   •   Organized  seminars  and  impromptu  safety  drills  to  demonstrate  the  importance  of  safety  during  construction  which   resulted  in  30-­‐35%  less  accidents  and  injuries,  thus  reducing  insurance  costs   •   Monitored  work  progress,  schedule  of  work  and  also  worked  closely  with  the  field  crew  to  ensure  progress  according   to  the  rules  and  regulations  laid  down  by  the  governing  body     Intern-­‐  Jason  Infrastructure,  Ahmedabad,  Gujarat,  India                                                                                                                                                                      Apr’12-­‐  Aug‘12   •   Generated  a  3-­‐D  model  of  site  office  using  Autodesk  Revit  to  make  the  scope  of  work  clear  to  field  staff   •   Estimated  material  takeoff  quantities  and  prepared  a  comparative  preliminary  estimate  for  the  design  alternatives     •   Supervised  the  construction  of  site  office  to  ensure  it  was  completed  properly  and  in  a  timely  manner     •   Developed  a  technical  marketing  strategy  with  the  marketing  department  which  increased  the  sales  by  30-­‐35%   Intern,  Gujarat  Industrial  Development  Corporation  (GIDC),  Gujarat,  India                                                                                    May’11-­‐July’11       •   Worked  with  officials  to  figure  out  the  problems  faced  by  the  corporation  in  maintenance  of  the  estates     •   Conducted  meetings  with  the  land  owners  and  inspected  the  estates  to  determine  the  cause  of  the  problems   •   Provided  applicable  recommendations  to  the  owners  for  improving  the  condition  of  the  estates   •   Presented  the  work  done  on  this  project  to  a  group  of  15  officials  at  GIDC  to  discuss  and  justify  the  feasibility  of  the   recommendations  provided