SlideShare ist ein Scribd-Unternehmen logo
1 von 27
Power Usage Effectiveness
(PUE) Status & Directions
Kathrin Winkler
Director, The Green Grid
VP, EMC Corporation
Copyright © 2010, The Green Grid
About The Green Grid
• A not-for-profit global consortium focused on driving
energy efficiency in the computing ecosystem
• Developing meaningful and user-centric metrics to
help IT and Facilities better manage their computing
resources
• Developing and promoting standards, measurement
methods, best practices and technologies that
support these metrics
2
2
Copyright © 2010, The Green Grid
Why Create Metrics?
Awareness
• “If you can’t
measure it, you
can’t improve it”
• Finding the hot
spots
Benchmarking
• Continuous
improvement of
operations
• Comparing across
the industry
• Improvement
over time/
generation to
generation
• Validate claims
Consistency
• Common
Vocabulary
• Industry &
Government
Collaboration
• Better Efficiency
3
3
Copyright © 2010, The Green Grid
Impact of IT Power Consumption
4
Lighting power
consumption
1% - 2%
Server Power Consumption Impacts Power
throughout the Datacenter
Computer Room Air
Conditioner power
consumption
23% - 54%
Battery Backup power
consumption
6% - 13%
Server, network and storage
power consumption
38% - 63%
Copyright © 2010, The Green Grid
Data Center Power Efficiency Metrics:
PUE and DCiE
5
PUE = Power Usage Effectiveness =
Total Facility Power
IT Equipment Power
1
PUE
IT Equipment Power
Total Facility Power
=
Data Center
Infrastructure Efficiency
DCiE = =
Copyright © 2010, The Green Grid
PUE Refined
Total Facility Power or Energy
IT Equipment Power or Energy
PUE =
Point of
Measurement
Frequency of
Measurement
Duration of
Measurement
60Sources: The Green Grid Metrics: Data Center Infrastructure Efficiency (DCiE) Detailed Analysis (white paper #14)
Usage and Public Reporting Guidelines for The Green Grid's Infrastructure Metrics PUE/DCiE (white paper #22)
6
Copyright © 2010, The Green Grid
PUE clarifications
• PUEs of < 1.0 and DCiEs of > 1.0 are *not* allowed
• These elements are always ≥ 0
– Power consumed by IT equipment
– Power lost in distribution
– Power consumed by cooling equipment
• PUE measures use within the data center, and does
not include
– Re-use of waste heat
– Distributed power generation
77
Copyright © 2010, The Green Grid
PUE Nomenclature
Official PUE reports provide these information
with subscripts appended to the metric
x = Precision level of measurement (L1, L2, L3)
y = Timeframe and collection frequency:
PUEx,y DCiEx,y
or
D = Daily
W = Weekly
M = Monthly
Y = Yearly
C = Continuously
8
Copyright © 2010, The Green Grid
Reporting Precision
9
Level 1
(Basic)
Level 2
(Intermediate)
Level 3
(Advanced)
IT Equipment Power
Measurement From…
UPS PDU
Server, Storage
device, Router,
etc.
Total Facility Power
Measurement From…
Data Center
input power
Data Center
input less
shared HVAC
Data Center
input less
shared HVAC
plus building
lighting,
security, etc.
Minimum
Measurement Interval
Monthly/
Weekly
Daily Continuous
Copyright © 2010, The Green Grid
Example Reported Results
0.45 DCiEL1,--
Single DCiE measurement (0.45) taken using a Level 1 meter
placement
0.51 DCiEL1,YM
Yearly average DCiE (0.51), using data points gathered monthly
with a Level 1 meter placement
1.6 PUEL1,MW
Monthly average PUE (1.6) using data points gathered weekly with
a Level 1 meter placement
0.43DCiEL1,WD
Weekly average DCiE (0.43), using data points gathered daily with a
Level 1 meter placement
1.8 PUEL2,WC
Weekly average PUE using data points gathered continuously with
a Level 2 meter placement.
2.1 PUEL3,YC
Yearly average PUE (2.1) using continuous measurements with a
Level 3 meter placement.
10
Copyright © 2010, The Green Grid
Classes of Measurement
ResultsClass Description Benefit to Reporting Organization
Unrecognized A publicly reported result with no
claims of following TGG’s guidelines.
TGG will not comment on unrecognized
results.
Reported A publicly reported result by the
reporting organization claiming they
followed TGG’s measurement
recommendations and nomenclature
guidelines. TGG will not comment on
Reported results.
Reporting organization can
use standard materials from
The Green Grid to explain
process and results to
audience.
Registered A publicly reported result, with key
report contextual data provided to TGG
by the reporting organization to TGG’s
data center performance database.
Official registration of
reported result. Receipt of a
registration number from TGG.
Link to public report data from
TGG’s website.
Certified A publicly reported result, with key
additional data required for third-party
validation or certification of results,
provided to TGG by the reporting
organization.
All benefits applicable to
registered results, plus,
consideration of reported
results in future TGG award or
recognition programs.
11
Copyright © 2010, The Green Grid
Putting Metrics into Global Action
12
• PUE Reporting Tool
• PUE Estimator Tool
• Power Configuration Efficiency Tool
Copyright © 2010, The Green Grid
PUE Scalability Metric
13
Copyright © 2010, The Green Grid
Partial PUE Definition
• PUE = Total Facility Power divided by the
IT Equipment Power
• This takes into account power use within a
facility
• Partial PUE is for power use within a
boundary
• So:
pPUE = Total Power within a boundary divided
by the IT Equipment Power within that
boundary
14
Copyright © 2010, The Green Grid
pPUE Example
15
• PUE = 121/95 = 1.27
• pPUE of Container = 100/95 = 1.05
Chiller
Transformer
UPS
IT Equipment
30 tons
Cooling
5 kW
95 kW
15 kW
115 kW
6 kW
121 kW
100 kW
Container
Copyright © 2010, The Green Grid
Energy Reuse Factor
D
B+A
=PUE
D
F-B+A
=ERF
Both PUE & ERF valid metrics
Data Center
Boundary
Utility
UPS PDU
ICT
Cool
E
F
B
A
DC
Absorp
Chiller
H
G
I
rejected
Non-DC
space
16
Copyright © 2010, The Green Grid
TGG Metrics
Total Facility Power
IT Equipment PowerPUE=
What % of facility power is
delivered to my IT
equipment?
How efficient is my facility in
delivering power to IT
equipment?
IT Equipment Power
Total Facility Power
DCiE=
How Much Work Can My IT
Equipment Do, In My Facility?
x 100%
Useful Work
Total Facility PowerDCP=
Copyright © 2010, The Green Grid18
Data Center Energy Productivity
• Data Center Energy Productivity (DCeP)
• First attempt to define useful work metric
• Very comprehensive, very accurate
• However, difficult to measure
• Some terms require user interpretation
– eg., Ui(t,T) is the utility (value) of a transaction
– Subjective, could be different for each organization
Copyright © 2010, The Green Grid
Alternative Proposal - Proxies
• Proxies indicate how much work is being
done without measuring work directly
 Should be highly correlated to useful work
 Should be easier, cheaper, faster to collect
• Proxies are often used where complex
measures would be impractical
 eg., EPA Miles Per Gallon,
marketing focus group,
Dow Jones Industrial Average,
or CNN Audience Reaction Meter
19
Copyright © 2010, The Green Grid
Proxy Proposals
20
1. DCeP-based Proxies
• Simplified DCeP
• Productivity Link
• Sample workload
2. Bits per kWH
3. CPU-based proxies
• SPECint_rate
• SPECpower
• CUPS
4. OS images per Watt
Copyright © 2010, The Green Grid
Proxy Shortcomings
In general, the proxy proposals:
• Aren’t meant for comparison between data centers
 Useful for tracking progress within a data center over time
 No guidelines for use and reporting, so wide variation
possible
• Don’t address all data center devices equally
 Proposals tend to be server-centric
 Storage, networking, telephony, appliances, co-processors,
etc
• Don’t consider the value of stored data
• Don’t account for interaction between devices
21
Copyright © 2010, The Green Grid
Where to Next?
• Proxies
• Currently testing IT Productivity Proxies with the US
National Labs
• Using instrumented applications as a control
• Starting with the Intel Energy Checker SDK as a basis for
instrumenting applications within the Data Center Design
Guide effort
• Sharing results with other organizations globally
22
Copyright © 2010, The Green Grid
Metric Harmonization
Efforts• Global Metric Harmonization
 Ministry of Economy, Trade and Industry (METI)
 Green IT Promotional Council (GIPC)
 The U.S. Department of Energy (DOE)
 The U.S. Environmental Protection Agency (EPA)
 The European Union (EU)
 The Green Grid (TGG)
• US Industry Consensus Session
 Environmental Protection Agency (EPA)
 Department of Energy (DOE)
 7x24 Exchange
 American Socienty of Heating, Refrigerating and Air-conditioning
Engineers (ASHRAE)
 Silicon Valley Leadership Group (SVLG)
 The Green Grid (TGG)
 Uptime Institute
 United States Green Building Council (USGBC)
23
Copyright © 2010, The Green Grid
Possible New PUE Variations
• M&M WG has an approved AR to review
and identify if we will proceed with any
further possible variations of PUE
• PUE Estimated
• PUE Calculated
• Design PUE
• Design Day PUE
• Virtual PUE
• ….
24
Copyright © 2010, The Green Grid
PUE Related Information
Material• Current White Papers:
1. Describing Data Center Power Efficiency
2. PUE and DCiE Efficiency Metrics
3. DCiE Detailed Analysis
4. PUE Scalability
5. Usage and Public Reporting Guidelines
• Future Possible White Papers:
1. DCiE Detailed Analysis II
2. Partial PUE
3. Energy Re-use Factor & Re-use Energy Ratio
4. Possible new variations of PUE
25
Copyright © 2010, The Green Grid
For More Information
• www.thegreengrid.org
for whitepapers, training,
and content
• For membership, please contact us:
+1 503-619-0653 or
admin@lists.thegreengrid.org
26
Thank you to our members for your
continued dedication and involvement in
ICT energy efficiency efforts!
Copyright © 2010, The Green Grid
Thank you!
For more information please go to
www.thegreengrid.org

Weitere ähnliche Inhalte

Was ist angesagt?

Facility Optimization
Facility OptimizationFacility Optimization
Facility Optimizationcwoodson
 
How Green Is Your Data Center
How Green Is Your Data CenterHow Green Is Your Data Center
How Green Is Your Data Centerdgillespie13
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerSchneider Electric
 
An improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersAn improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersSchneider Electric India
 
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Schneider Electric
 
SC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC SoftwareSC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC Softwareinside-BigData.com
 
SunGard - Defining Sustainability Metrics (KpIs)
SunGard - Defining Sustainability Metrics (KpIs)SunGard - Defining Sustainability Metrics (KpIs)
SunGard - Defining Sustainability Metrics (KpIs)Harmeda
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best directionSchneider Electric
 
LSI Seminar on Marina Zapater's PhD Thesis
LSI Seminar on Marina Zapater's PhD ThesisLSI Seminar on Marina Zapater's PhD Thesis
LSI Seminar on Marina Zapater's PhD ThesisGreenLSI Team, LSI, UPM
 
Essential elements of data center operations
Essential elements of data center operationsEssential elements of data center operations
Essential elements of data center operationsSchneider Electric
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...JISC's Green ICT Programme
 
Trends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel Final
Trends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel FinalTrends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel Final
Trends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel FinalRamkumar Nagappan
 
Green cloud computing
Green cloud computingGreen cloud computing
Green cloud computingJauwadSyed
 
Cutting costs with pc power management approaches, pitfalls and best practices
Cutting costs with pc power management approaches, pitfalls and best practicesCutting costs with pc power management approaches, pitfalls and best practices
Cutting costs with pc power management approaches, pitfalls and best practicesInterop
 
Benchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterBenchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterAFCOM
 

Was ist angesagt? (20)

Energy Efficiency in Data Centers
Energy Efficiency in Data CentersEnergy Efficiency in Data Centers
Energy Efficiency in Data Centers
 
Facility Optimization
Facility OptimizationFacility Optimization
Facility Optimization
 
How Green Is Your Data Center
How Green Is Your Data CenterHow Green Is Your Data Center
How Green Is Your Data Center
 
Energy Efficiency Reducing Impact Energy
Energy Efficiency Reducing Impact EnergyEnergy Efficiency Reducing Impact Energy
Energy Efficiency Reducing Impact Energy
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
 
An improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersAn improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centers
 
It&smart grid
It&smart gridIt&smart grid
It&smart grid
 
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
 
SC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC SoftwareSC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC Software
 
Customer Case Study - PIK
Customer Case Study - PIKCustomer Case Study - PIK
Customer Case Study - PIK
 
SunGard - Defining Sustainability Metrics (KpIs)
SunGard - Defining Sustainability Metrics (KpIs)SunGard - Defining Sustainability Metrics (KpIs)
SunGard - Defining Sustainability Metrics (KpIs)
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best direction
 
LSI Seminar on Marina Zapater's PhD Thesis
LSI Seminar on Marina Zapater's PhD ThesisLSI Seminar on Marina Zapater's PhD Thesis
LSI Seminar on Marina Zapater's PhD Thesis
 
Essential elements of data center operations
Essential elements of data center operationsEssential elements of data center operations
Essential elements of data center operations
 
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...Ppt4   exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - ...
 
Trends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel Final
Trends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel FinalTrends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel Final
Trends in HPC Power Metrics and where to from here Ramkumar Nagappan Intel Final
 
Green cloud computing
Green cloud computingGreen cloud computing
Green cloud computing
 
Cutting costs with pc power management approaches, pitfalls and best practices
Cutting costs with pc power management approaches, pitfalls and best practicesCutting costs with pc power management approaches, pitfalls and best practices
Cutting costs with pc power management approaches, pitfalls and best practices
 
Presentation on Green Data Centres
Presentation on Green Data CentresPresentation on Green Data Centres
Presentation on Green Data Centres
 
Benchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterBenchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data Center
 

Ähnlich wie Power Usage Effectiveness (PUE): Status & Directions. By K. Winkler

Estado actual y proyecciones futuras de PUE/DCiE
Estado actual y proyecciones futuras de PUE/DCiEEstado actual y proyecciones futuras de PUE/DCiE
Estado actual y proyecciones futuras de PUE/DCiEData Center Consultores
 
Bringing Enterprise IT into the 21st Century: A Management and Sustainabilit...
Bringing Enterprise IT into the 21st Century:  A Management and Sustainabilit...Bringing Enterprise IT into the 21st Century:  A Management and Sustainabilit...
Bringing Enterprise IT into the 21st Century: A Management and Sustainabilit...Jonathan Koomey
 
PUE Reconsidered - AFCOM (MI), July 2009
PUE Reconsidered - AFCOM (MI), July 2009PUE Reconsidered - AFCOM (MI), July 2009
PUE Reconsidered - AFCOM (MI), July 2009Henry Hsu
 
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Upsite Technologies
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centrepaul_mathews
 
BLOG-POST_HOW STAKEHOLDERS VIEW PUE
BLOG-POST_HOW STAKEHOLDERS VIEW PUEBLOG-POST_HOW STAKEHOLDERS VIEW PUE
BLOG-POST_HOW STAKEHOLDERS VIEW PUEDaniel Bodenski
 
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleUnlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleJason Burt
 
Green data center_rahul ppt
Green data center_rahul pptGreen data center_rahul ppt
Green data center_rahul pptRAHUL KAUSHAL
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operationsSchneider Electric
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center ManagementScottMadden, Inc.
 
Supermicro and The Green Grid (TGG)
Supermicro and The Green Grid (TGG)Supermicro and The Green Grid (TGG)
Supermicro and The Green Grid (TGG)Rebekah Rodriguez
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operationsSchneider Electric
 

Ähnlich wie Power Usage Effectiveness (PUE): Status & Directions. By K. Winkler (20)

Estado actual y proyecciones futuras de PUE/DCiE
Estado actual y proyecciones futuras de PUE/DCiEEstado actual y proyecciones futuras de PUE/DCiE
Estado actual y proyecciones futuras de PUE/DCiE
 
Bringing Enterprise IT into the 21st Century: A Management and Sustainabilit...
Bringing Enterprise IT into the 21st Century:  A Management and Sustainabilit...Bringing Enterprise IT into the 21st Century:  A Management and Sustainabilit...
Bringing Enterprise IT into the 21st Century: A Management and Sustainabilit...
 
PUE Reconsidered - AFCOM (MI), July 2009
PUE Reconsidered - AFCOM (MI), July 2009PUE Reconsidered - AFCOM (MI), July 2009
PUE Reconsidered - AFCOM (MI), July 2009
 
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
 
Green Computing
Green ComputingGreen Computing
Green Computing
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
 
BLOG-POST_HOW STAKEHOLDERS VIEW PUE
BLOG-POST_HOW STAKEHOLDERS VIEW PUEBLOG-POST_HOW STAKEHOLDERS VIEW PUE
BLOG-POST_HOW STAKEHOLDERS VIEW PUE
 
Tresa
TresaTresa
Tresa
 
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleUnlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
 
Green data center_rahul ppt
Green data center_rahul pptGreen data center_rahul ppt
Green data center_rahul ppt
 
Can the Cloud Be Green?
Can the Cloud Be Green?Can the Cloud Be Green?
Can the Cloud Be Green?
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
PUE Reconsidered
PUE ReconsideredPUE Reconsidered
PUE Reconsidered
 
009
009009
009
 
Google ppt. mis
Google ppt. misGoogle ppt. mis
Google ppt. mis
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center Management
 
Supermicro and The Green Grid (TGG)
Supermicro and The Green Grid (TGG)Supermicro and The Green Grid (TGG)
Supermicro and The Green Grid (TGG)
 
B7 merlin
B7 merlinB7 merlin
B7 merlin
 
What Makes Software Green?
What Makes Software Green?What Makes Software Green?
What Makes Software Green?
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 

Mehr von DCC Mission Critical

Data Center as a service, by Avelino Miguelez, from Grupo CESA
Data Center as a service, by Avelino Miguelez, from Grupo CESAData Center as a service, by Avelino Miguelez, from Grupo CESA
Data Center as a service, by Avelino Miguelez, from Grupo CESADCC Mission Critical
 
Claves para el diseño conceptual de su centro de datos, por Alexander Monestel
Claves para el diseño conceptual de su centro de datos, por Alexander MonestelClaves para el diseño conceptual de su centro de datos, por Alexander Monestel
Claves para el diseño conceptual de su centro de datos, por Alexander MonestelDCC Mission Critical
 
Diseñando el Centro de Datos del Futuro, por Andres Vicente.
Diseñando el Centro de Datos del Futuro, por Andres Vicente.Diseñando el Centro de Datos del Futuro, por Andres Vicente.
Diseñando el Centro de Datos del Futuro, por Andres Vicente.DCC Mission Critical
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridDCC Mission Critical
 
Tier program services, by Dana Smith. Data Center Summit
Tier program services, by Dana Smith. Data Center SummitTier program services, by Dana Smith. Data Center Summit
Tier program services, by Dana Smith. Data Center SummitDCC Mission Critical
 
Uptime institue overview, by julian kudritzki
Uptime institue overview, by julian kudritzkiUptime institue overview, by julian kudritzki
Uptime institue overview, by julian kudritzkiDCC Mission Critical
 
Betty Bezos: bicsi 002 data center standard
Betty Bezos: bicsi 002 data center standardBetty Bezos: bicsi 002 data center standard
Betty Bezos: bicsi 002 data center standardDCC Mission Critical
 

Mehr von DCC Mission Critical (7)

Data Center as a service, by Avelino Miguelez, from Grupo CESA
Data Center as a service, by Avelino Miguelez, from Grupo CESAData Center as a service, by Avelino Miguelez, from Grupo CESA
Data Center as a service, by Avelino Miguelez, from Grupo CESA
 
Claves para el diseño conceptual de su centro de datos, por Alexander Monestel
Claves para el diseño conceptual de su centro de datos, por Alexander MonestelClaves para el diseño conceptual de su centro de datos, por Alexander Monestel
Claves para el diseño conceptual de su centro de datos, por Alexander Monestel
 
Diseñando el Centro de Datos del Futuro, por Andres Vicente.
Diseñando el Centro de Datos del Futuro, por Andres Vicente.Diseñando el Centro de Datos del Futuro, por Andres Vicente.
Diseñando el Centro de Datos del Futuro, por Andres Vicente.
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green grid
 
Tier program services, by Dana Smith. Data Center Summit
Tier program services, by Dana Smith. Data Center SummitTier program services, by Dana Smith. Data Center Summit
Tier program services, by Dana Smith. Data Center Summit
 
Uptime institue overview, by julian kudritzki
Uptime institue overview, by julian kudritzkiUptime institue overview, by julian kudritzki
Uptime institue overview, by julian kudritzki
 
Betty Bezos: bicsi 002 data center standard
Betty Bezos: bicsi 002 data center standardBetty Bezos: bicsi 002 data center standard
Betty Bezos: bicsi 002 data center standard
 

Kürzlich hochgeladen

Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 

Kürzlich hochgeladen (20)

Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 

Power Usage Effectiveness (PUE): Status & Directions. By K. Winkler

  • 1. Power Usage Effectiveness (PUE) Status & Directions Kathrin Winkler Director, The Green Grid VP, EMC Corporation
  • 2. Copyright © 2010, The Green Grid About The Green Grid • A not-for-profit global consortium focused on driving energy efficiency in the computing ecosystem • Developing meaningful and user-centric metrics to help IT and Facilities better manage their computing resources • Developing and promoting standards, measurement methods, best practices and technologies that support these metrics 2 2
  • 3. Copyright © 2010, The Green Grid Why Create Metrics? Awareness • “If you can’t measure it, you can’t improve it” • Finding the hot spots Benchmarking • Continuous improvement of operations • Comparing across the industry • Improvement over time/ generation to generation • Validate claims Consistency • Common Vocabulary • Industry & Government Collaboration • Better Efficiency 3 3
  • 4. Copyright © 2010, The Green Grid Impact of IT Power Consumption 4 Lighting power consumption 1% - 2% Server Power Consumption Impacts Power throughout the Datacenter Computer Room Air Conditioner power consumption 23% - 54% Battery Backup power consumption 6% - 13% Server, network and storage power consumption 38% - 63%
  • 5. Copyright © 2010, The Green Grid Data Center Power Efficiency Metrics: PUE and DCiE 5 PUE = Power Usage Effectiveness = Total Facility Power IT Equipment Power 1 PUE IT Equipment Power Total Facility Power = Data Center Infrastructure Efficiency DCiE = =
  • 6. Copyright © 2010, The Green Grid PUE Refined Total Facility Power or Energy IT Equipment Power or Energy PUE = Point of Measurement Frequency of Measurement Duration of Measurement 60Sources: The Green Grid Metrics: Data Center Infrastructure Efficiency (DCiE) Detailed Analysis (white paper #14) Usage and Public Reporting Guidelines for The Green Grid's Infrastructure Metrics PUE/DCiE (white paper #22) 6
  • 7. Copyright © 2010, The Green Grid PUE clarifications • PUEs of < 1.0 and DCiEs of > 1.0 are *not* allowed • These elements are always ≥ 0 – Power consumed by IT equipment – Power lost in distribution – Power consumed by cooling equipment • PUE measures use within the data center, and does not include – Re-use of waste heat – Distributed power generation 77
  • 8. Copyright © 2010, The Green Grid PUE Nomenclature Official PUE reports provide these information with subscripts appended to the metric x = Precision level of measurement (L1, L2, L3) y = Timeframe and collection frequency: PUEx,y DCiEx,y or D = Daily W = Weekly M = Monthly Y = Yearly C = Continuously 8
  • 9. Copyright © 2010, The Green Grid Reporting Precision 9 Level 1 (Basic) Level 2 (Intermediate) Level 3 (Advanced) IT Equipment Power Measurement From… UPS PDU Server, Storage device, Router, etc. Total Facility Power Measurement From… Data Center input power Data Center input less shared HVAC Data Center input less shared HVAC plus building lighting, security, etc. Minimum Measurement Interval Monthly/ Weekly Daily Continuous
  • 10. Copyright © 2010, The Green Grid Example Reported Results 0.45 DCiEL1,-- Single DCiE measurement (0.45) taken using a Level 1 meter placement 0.51 DCiEL1,YM Yearly average DCiE (0.51), using data points gathered monthly with a Level 1 meter placement 1.6 PUEL1,MW Monthly average PUE (1.6) using data points gathered weekly with a Level 1 meter placement 0.43DCiEL1,WD Weekly average DCiE (0.43), using data points gathered daily with a Level 1 meter placement 1.8 PUEL2,WC Weekly average PUE using data points gathered continuously with a Level 2 meter placement. 2.1 PUEL3,YC Yearly average PUE (2.1) using continuous measurements with a Level 3 meter placement. 10
  • 11. Copyright © 2010, The Green Grid Classes of Measurement ResultsClass Description Benefit to Reporting Organization Unrecognized A publicly reported result with no claims of following TGG’s guidelines. TGG will not comment on unrecognized results. Reported A publicly reported result by the reporting organization claiming they followed TGG’s measurement recommendations and nomenclature guidelines. TGG will not comment on Reported results. Reporting organization can use standard materials from The Green Grid to explain process and results to audience. Registered A publicly reported result, with key report contextual data provided to TGG by the reporting organization to TGG’s data center performance database. Official registration of reported result. Receipt of a registration number from TGG. Link to public report data from TGG’s website. Certified A publicly reported result, with key additional data required for third-party validation or certification of results, provided to TGG by the reporting organization. All benefits applicable to registered results, plus, consideration of reported results in future TGG award or recognition programs. 11
  • 12. Copyright © 2010, The Green Grid Putting Metrics into Global Action 12 • PUE Reporting Tool • PUE Estimator Tool • Power Configuration Efficiency Tool
  • 13. Copyright © 2010, The Green Grid PUE Scalability Metric 13
  • 14. Copyright © 2010, The Green Grid Partial PUE Definition • PUE = Total Facility Power divided by the IT Equipment Power • This takes into account power use within a facility • Partial PUE is for power use within a boundary • So: pPUE = Total Power within a boundary divided by the IT Equipment Power within that boundary 14
  • 15. Copyright © 2010, The Green Grid pPUE Example 15 • PUE = 121/95 = 1.27 • pPUE of Container = 100/95 = 1.05 Chiller Transformer UPS IT Equipment 30 tons Cooling 5 kW 95 kW 15 kW 115 kW 6 kW 121 kW 100 kW Container
  • 16. Copyright © 2010, The Green Grid Energy Reuse Factor D B+A =PUE D F-B+A =ERF Both PUE & ERF valid metrics Data Center Boundary Utility UPS PDU ICT Cool E F B A DC Absorp Chiller H G I rejected Non-DC space 16
  • 17. Copyright © 2010, The Green Grid TGG Metrics Total Facility Power IT Equipment PowerPUE= What % of facility power is delivered to my IT equipment? How efficient is my facility in delivering power to IT equipment? IT Equipment Power Total Facility Power DCiE= How Much Work Can My IT Equipment Do, In My Facility? x 100% Useful Work Total Facility PowerDCP=
  • 18. Copyright © 2010, The Green Grid18 Data Center Energy Productivity • Data Center Energy Productivity (DCeP) • First attempt to define useful work metric • Very comprehensive, very accurate • However, difficult to measure • Some terms require user interpretation – eg., Ui(t,T) is the utility (value) of a transaction – Subjective, could be different for each organization
  • 19. Copyright © 2010, The Green Grid Alternative Proposal - Proxies • Proxies indicate how much work is being done without measuring work directly  Should be highly correlated to useful work  Should be easier, cheaper, faster to collect • Proxies are often used where complex measures would be impractical  eg., EPA Miles Per Gallon, marketing focus group, Dow Jones Industrial Average, or CNN Audience Reaction Meter 19
  • 20. Copyright © 2010, The Green Grid Proxy Proposals 20 1. DCeP-based Proxies • Simplified DCeP • Productivity Link • Sample workload 2. Bits per kWH 3. CPU-based proxies • SPECint_rate • SPECpower • CUPS 4. OS images per Watt
  • 21. Copyright © 2010, The Green Grid Proxy Shortcomings In general, the proxy proposals: • Aren’t meant for comparison between data centers  Useful for tracking progress within a data center over time  No guidelines for use and reporting, so wide variation possible • Don’t address all data center devices equally  Proposals tend to be server-centric  Storage, networking, telephony, appliances, co-processors, etc • Don’t consider the value of stored data • Don’t account for interaction between devices 21
  • 22. Copyright © 2010, The Green Grid Where to Next? • Proxies • Currently testing IT Productivity Proxies with the US National Labs • Using instrumented applications as a control • Starting with the Intel Energy Checker SDK as a basis for instrumenting applications within the Data Center Design Guide effort • Sharing results with other organizations globally 22
  • 23. Copyright © 2010, The Green Grid Metric Harmonization Efforts• Global Metric Harmonization  Ministry of Economy, Trade and Industry (METI)  Green IT Promotional Council (GIPC)  The U.S. Department of Energy (DOE)  The U.S. Environmental Protection Agency (EPA)  The European Union (EU)  The Green Grid (TGG) • US Industry Consensus Session  Environmental Protection Agency (EPA)  Department of Energy (DOE)  7x24 Exchange  American Socienty of Heating, Refrigerating and Air-conditioning Engineers (ASHRAE)  Silicon Valley Leadership Group (SVLG)  The Green Grid (TGG)  Uptime Institute  United States Green Building Council (USGBC) 23
  • 24. Copyright © 2010, The Green Grid Possible New PUE Variations • M&M WG has an approved AR to review and identify if we will proceed with any further possible variations of PUE • PUE Estimated • PUE Calculated • Design PUE • Design Day PUE • Virtual PUE • …. 24
  • 25. Copyright © 2010, The Green Grid PUE Related Information Material• Current White Papers: 1. Describing Data Center Power Efficiency 2. PUE and DCiE Efficiency Metrics 3. DCiE Detailed Analysis 4. PUE Scalability 5. Usage and Public Reporting Guidelines • Future Possible White Papers: 1. DCiE Detailed Analysis II 2. Partial PUE 3. Energy Re-use Factor & Re-use Energy Ratio 4. Possible new variations of PUE 25
  • 26. Copyright © 2010, The Green Grid For More Information • www.thegreengrid.org for whitepapers, training, and content • For membership, please contact us: +1 503-619-0653 or admin@lists.thegreengrid.org 26 Thank you to our members for your continued dedication and involvement in ICT energy efficiency efforts!
  • 27. Copyright © 2010, The Green Grid Thank you! For more information please go to www.thegreengrid.org