SlideShare a Scribd company logo
1 of 23
Download to read offline
1
MARDIGU
WOWIEK
PRASANTYO
PROFILE
2
FORMAL EDUCATION
•	 Bachelor degree SFSU San Fransisco State University,	
Master Applied Psychology in Criminal mind & Forensic Investigators
PROFESIONAL WORKING EXPERIENCE
•	 Panin Bank, Treasury Manager 1990-1993
•	 PT Megasino Investama, Director 1993-1999
•	 Interogator dan investigator for extra ordinary crime (esp : teroris) 2006 - 2011
•	 Mengajar di sekolah tinggi Intelegen Nasional, Sandha,, BIN, BAIS – Present
•	 KEIN Pokja energy 2015 - Present
•	 Staf ahli Anstra Kemenhan – 2015 - Present
BUSINESS EXPERIENCE
•	 Owner & founder PT Titis Sampurna Oil & Gas company (sold)
•	 Owner & Founder PT Laksel company
•	 Owner & Founder PT Cipta lintang Investment company
•	 Owner & Founder PT Narapatih Inspiratama Business
•	 Consultant Company
MARDIGU
WOWIEK
PRASANTYO
3
Company
Overview
4
major
experiences
in GAS
PIPELINES
East Java Gas Transmission System O&M
(1997 – 2007)
•	 Acting as an Operations and Maintenance (“O&M”)
contractor for PERTAMINA for a  440 km gas pipeline
(28” onshore & offshore), from Pagerungan Island to
Gersik with 200 MMSCFD Gas Flow Rate.
•	 Pipeline capacity : 600 mmscfd with SCADA control
system
5
Grissik - Duri Gas
Transmission System
O&M (1997 – 2003)
•	 In Cooperation with Nova
TransCanada Pipelines, Titis
Sampurna acting as an O&M
contractor for PT Perusahaan
Gas Negara (PGN) for 536 km
28” gas pipeline, from Grissik to
Duri (Central Sumatera) with 310
MMSCFD Gas Flow Rate.
6
West Natuna to Singapore Gas
Transmission System (2000)
Supervision, Verification and Certification of EPC and
Offshore Pipeline Installation and Testing for 656 Km
28”, 22”, 16” and 15” gas pipeline. The Pipeline is a cross-
border between Indonesia and Singapore start from
Block B - Conoco, Block A – Premier, Block Kakap – Gulf  
(Indonesia) to Sakra Island (Singapore).
West Natuna to Malaysia Gas
Transmission System (2001)
Supervision, Verification and Certification of EPC and
Offshore Pipeline Installation and Testing for 135 Km
12”, 14”, 18” gas pipeline. The Pipeline is a cross-border
between Indonesia and Malaysia start from Kijing Field -
Keong Field – Hangtuah Platform (Conoco-Indonesia) to
Duyong Central Processing Platform (Petronas-Malaysia)
7
KM 53 - Bontang Gas Transmission System
(Start 2000), Own Investment
•	 The project (BOO) comprises of a 13 km 20” gas
pipeline in Bontang, East Kalimantan including
supporting facilities with 165 – 300 MMSCFD gas flow
rate.
•	 The gas is supplied by PERTAMINA and consumed by
Mitsui and Mitsubishi (Ammonia Plant).
•	 EPC were done by Titis Sampurna
8
Sub-sea Control System
Project Pagerungan Block C,
ARCO (1995 – 1996)
•	 Engineering Design, Fabrication &
Installation of the Sub-sea Control
System and associated equipment
to the existing Pagerungan-C Facility,
including the interfaces with existing
Facilities.
•	 The Work including the onshore and
offshore equipment such as: Sub-sea
Control System, Chemical Injection
System, Sub-sea Service Umbilicals,
Sub-sea Venturi Meter
major
experiences in
ENGINEERING &
CONSTRUCTION
9
Poleng Gas Field Re-activation
Project, East Java (1996 - 1999)
•	 An EPC and turnkey project for re-activating
and enhancing of five offshore’ wells name
Poleng Field of KODECO Energy.
•	 Scope of Work : Detailed Engineer,	
Fabricate, Install, Hook-up and pre
commission the new facilities  
Kamojang Geothermal Power
Plant
•	 Front End Engineering Design (FEED) 2004
Lahendong Geothermal Power
Plant
•	 Front End Engineering Design (FEED) 2005
•	 Project Management Consultant  2006
10
3 X 1500 HP Gas
Compressors&
DehydrationUnit
4 X 1500 HP Gas
Compressors&
DehydrationUnit
AIR SERDANG
LIMAUTIMUR
BERINGIN
Project
Location
27.5 km 10” GasPipeline
14 MMSCFD Flowrate
32.5 km 8” Gas Pipeline
22 MMSCFD Flowrate
LPG Plant (200 MTD LPG,
1500BBLD Condensate)
& CO2 Removal
PROJECT
LOCATION
Prabumulih
11
south sumatera
GAS UTILIZATION
Gas Transmission System- 60 km
Gas Compressor Stations - 7 x 1500 hp
Gas Extraction Facility (36 MMSCFD Feed Natural Gas)
•	 CO2 Removal
•	 LPG Plant (200 MTD LPG, 1500 BBLD Stabilized Condensate)
12
LIMAU TIMUR
LPG extraction
plant + co2
removal
13
BLORA
REMBANG
PATI
KUDUS
CEPU
SURABAYA
Semanggi
GasField
1- 5 mmscfd
82 km from
Mother
Station
97 km from
Mother
Station
CNG Mother
Station
DEMAK
120 km from
Mother
Station
SEMANGGI BLOCK,
central java
Flared Gas Utilization	
For CNG Business
14
CNG FACILITIES,
central java
15
Gas Supply
To Tambak
Lorok Ccgt
Power Plant
Central Java
Investment of 140 km 20
gas pipeline with 6,000 hp
compressorsfrom gundih area
to tambak lorok power plant,
central java
16
GAS LOCATION
Proposed 20”
130km Gas Pipeline
Gas Compressor
Station
Gas Delivery Point
Gas Receiving Station
PROJECT
LOCATION
17
ARRA
AMANDARU
HOTEL CEPU
18
ARRA LEMBAH
PINUS HOTEL
CILOTO PUNCAK
19
NUSA PENIDA
CRYSTAL BAY
20
AREA 247
KETAPANG
BANYUWANGI
21
stay
connected
fb.com/wowiek
mardiguwp
mardiguwp
23
WWW.CYRONIUM.COM

More Related Content

What's hot (9)

Penerapan inovasi dan manajemen produk di perusahaan LEGO
Penerapan inovasi dan manajemen produk di perusahaan LEGOPenerapan inovasi dan manajemen produk di perusahaan LEGO
Penerapan inovasi dan manajemen produk di perusahaan LEGO
 
Peristiwa rengasdengklok
Peristiwa rengasdengklokPeristiwa rengasdengklok
Peristiwa rengasdengklok
 
Tokoh Orde Baru dan Peranan Pentingnya
Tokoh Orde Baru dan Peranan PentingnyaTokoh Orde Baru dan Peranan Pentingnya
Tokoh Orde Baru dan Peranan Pentingnya
 
BAB I - IV (PEMBUATAN ROTI TAWAR)-AGUSTINA DKK.
BAB I - IV (PEMBUATAN ROTI TAWAR)-AGUSTINA DKK.BAB I - IV (PEMBUATAN ROTI TAWAR)-AGUSTINA DKK.
BAB I - IV (PEMBUATAN ROTI TAWAR)-AGUSTINA DKK.
 
Artichoke final 2013 stanford e245
Artichoke final 2013 stanford e245Artichoke final 2013 stanford e245
Artichoke final 2013 stanford e245
 
Kerajaan Ternate
Kerajaan TernateKerajaan Ternate
Kerajaan Ternate
 
Sejarah Indonesia SMA Kelas XI - Lahirnya VOC 1602-1799
Sejarah Indonesia SMA Kelas XI - Lahirnya VOC 1602-1799Sejarah Indonesia SMA Kelas XI - Lahirnya VOC 1602-1799
Sejarah Indonesia SMA Kelas XI - Lahirnya VOC 1602-1799
 
Kebijakan – kebijakan pemerintah kolonialisme & pengaruhnya
Kebijakan – kebijakan pemerintah kolonialisme & pengaruhnyaKebijakan – kebijakan pemerintah kolonialisme & pengaruhnya
Kebijakan – kebijakan pemerintah kolonialisme & pengaruhnya
 
PKI dan Kekejaman Terhadap Ulama
PKI dan Kekejaman Terhadap UlamaPKI dan Kekejaman Terhadap Ulama
PKI dan Kekejaman Terhadap Ulama
 

Similar to Profil Mardigu Wowiek

GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)
ian glass
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
Mohd Yunus
 
Pt Sankyu Indonesia International
Pt Sankyu Indonesia InternationalPt Sankyu Indonesia International
Pt Sankyu Indonesia International
armenaldrin
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
Nixon Das
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
isbengineering
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
zuraidi Ismail
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
John Adams
 

Similar to Profil Mardigu Wowiek (20)

GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Presentasi Media Gathering dari Rekind
Presentasi Media Gathering dari RekindPresentasi Media Gathering dari Rekind
Presentasi Media Gathering dari Rekind
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
CV-FEB2016
CV-FEB2016CV-FEB2016
CV-FEB2016
 
Pt Sankyu Indonesia International
Pt Sankyu Indonesia InternationalPt Sankyu Indonesia International
Pt Sankyu Indonesia International
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
Corrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOCorrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSO
 
SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
 
CASA Company Profile 2013-2014
CASA Company Profile 2013-2014CASA Company Profile 2013-2014
CASA Company Profile 2013-2014
 
QCI's Capability Statement - Hydrology and Hydrogeology Engineering
QCI's Capability Statement - Hydrology and Hydrogeology EngineeringQCI's Capability Statement - Hydrology and Hydrogeology Engineering
QCI's Capability Statement - Hydrology and Hydrogeology Engineering
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
My CV
My CVMy CV
My CV
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Bhavdeep Resume
Bhavdeep ResumeBhavdeep Resume
Bhavdeep Resume
 
Ang kwang Wee_CV-Hertel
Ang kwang Wee_CV-HertelAng kwang Wee_CV-Hertel
Ang kwang Wee_CV-Hertel
 

Recently uploaded

Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
 
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
 
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
 
Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
 
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 
7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Vip Call Girls Rasulgada😉 Bhubaneswar 9777949614 Housewife Call Girls Servic...
Vip Call Girls Rasulgada😉  Bhubaneswar 9777949614 Housewife Call Girls Servic...Vip Call Girls Rasulgada😉  Bhubaneswar 9777949614 Housewife Call Girls Servic...
Vip Call Girls Rasulgada😉 Bhubaneswar 9777949614 Housewife Call Girls Servic...
 
Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Yamuna Vihar  (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Yamuna Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Benefits & Risk Of Stock Loans
Benefits & Risk Of Stock LoansBenefits & Risk Of Stock Loans
Benefits & Risk Of Stock Loans
 
logistics industry development power point ppt.pdf
logistics industry development power point ppt.pdflogistics industry development power point ppt.pdf
logistics industry development power point ppt.pdf
 
✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...
✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...
✂️ 👅 Independent Bhubaneswar Escorts Odisha Call Girls With Room Bhubaneswar ...
 
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdfSeeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
 
W.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdfW.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdf
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...
 
Pension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdfPension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdf
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...
 
Strategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationStrategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate Presentation
 

Profil Mardigu Wowiek

  • 2. 2 FORMAL EDUCATION • Bachelor degree SFSU San Fransisco State University, Master Applied Psychology in Criminal mind & Forensic Investigators PROFESIONAL WORKING EXPERIENCE • Panin Bank, Treasury Manager 1990-1993 • PT Megasino Investama, Director 1993-1999 • Interogator dan investigator for extra ordinary crime (esp : teroris) 2006 - 2011 • Mengajar di sekolah tinggi Intelegen Nasional, Sandha,, BIN, BAIS – Present • KEIN Pokja energy 2015 - Present • Staf ahli Anstra Kemenhan – 2015 - Present BUSINESS EXPERIENCE • Owner & founder PT Titis Sampurna Oil & Gas company (sold) • Owner & Founder PT Laksel company • Owner & Founder PT Cipta lintang Investment company • Owner & Founder PT Narapatih Inspiratama Business • Consultant Company MARDIGU WOWIEK PRASANTYO
  • 4. 4 major experiences in GAS PIPELINES East Java Gas Transmission System O&M (1997 – 2007) • Acting as an Operations and Maintenance (“O&M”) contractor for PERTAMINA for a 440 km gas pipeline (28” onshore & offshore), from Pagerungan Island to Gersik with 200 MMSCFD Gas Flow Rate. • Pipeline capacity : 600 mmscfd with SCADA control system
  • 5. 5 Grissik - Duri Gas Transmission System O&M (1997 – 2003) • In Cooperation with Nova TransCanada Pipelines, Titis Sampurna acting as an O&M contractor for PT Perusahaan Gas Negara (PGN) for 536 km 28” gas pipeline, from Grissik to Duri (Central Sumatera) with 310 MMSCFD Gas Flow Rate.
  • 6. 6 West Natuna to Singapore Gas Transmission System (2000) Supervision, Verification and Certification of EPC and Offshore Pipeline Installation and Testing for 656 Km 28”, 22”, 16” and 15” gas pipeline. The Pipeline is a cross- border between Indonesia and Singapore start from Block B - Conoco, Block A – Premier, Block Kakap – Gulf (Indonesia) to Sakra Island (Singapore). West Natuna to Malaysia Gas Transmission System (2001) Supervision, Verification and Certification of EPC and Offshore Pipeline Installation and Testing for 135 Km 12”, 14”, 18” gas pipeline. The Pipeline is a cross-border between Indonesia and Malaysia start from Kijing Field - Keong Field – Hangtuah Platform (Conoco-Indonesia) to Duyong Central Processing Platform (Petronas-Malaysia)
  • 7. 7 KM 53 - Bontang Gas Transmission System (Start 2000), Own Investment • The project (BOO) comprises of a 13 km 20” gas pipeline in Bontang, East Kalimantan including supporting facilities with 165 – 300 MMSCFD gas flow rate. • The gas is supplied by PERTAMINA and consumed by Mitsui and Mitsubishi (Ammonia Plant). • EPC were done by Titis Sampurna
  • 8. 8 Sub-sea Control System Project Pagerungan Block C, ARCO (1995 – 1996) • Engineering Design, Fabrication & Installation of the Sub-sea Control System and associated equipment to the existing Pagerungan-C Facility, including the interfaces with existing Facilities. • The Work including the onshore and offshore equipment such as: Sub-sea Control System, Chemical Injection System, Sub-sea Service Umbilicals, Sub-sea Venturi Meter major experiences in ENGINEERING & CONSTRUCTION
  • 9. 9 Poleng Gas Field Re-activation Project, East Java (1996 - 1999) • An EPC and turnkey project for re-activating and enhancing of five offshore’ wells name Poleng Field of KODECO Energy. • Scope of Work : Detailed Engineer, Fabricate, Install, Hook-up and pre commission the new facilities Kamojang Geothermal Power Plant • Front End Engineering Design (FEED) 2004 Lahendong Geothermal Power Plant • Front End Engineering Design (FEED) 2005 • Project Management Consultant 2006
  • 10. 10 3 X 1500 HP Gas Compressors& DehydrationUnit 4 X 1500 HP Gas Compressors& DehydrationUnit AIR SERDANG LIMAUTIMUR BERINGIN Project Location 27.5 km 10” GasPipeline 14 MMSCFD Flowrate 32.5 km 8” Gas Pipeline 22 MMSCFD Flowrate LPG Plant (200 MTD LPG, 1500BBLD Condensate) & CO2 Removal PROJECT LOCATION Prabumulih
  • 11. 11 south sumatera GAS UTILIZATION Gas Transmission System- 60 km Gas Compressor Stations - 7 x 1500 hp Gas Extraction Facility (36 MMSCFD Feed Natural Gas) • CO2 Removal • LPG Plant (200 MTD LPG, 1500 BBLD Stabilized Condensate)
  • 13. 13 BLORA REMBANG PATI KUDUS CEPU SURABAYA Semanggi GasField 1- 5 mmscfd 82 km from Mother Station 97 km from Mother Station CNG Mother Station DEMAK 120 km from Mother Station SEMANGGI BLOCK, central java Flared Gas Utilization For CNG Business
  • 15. 15 Gas Supply To Tambak Lorok Ccgt Power Plant Central Java Investment of 140 km 20 gas pipeline with 6,000 hp compressorsfrom gundih area to tambak lorok power plant, central java
  • 16. 16 GAS LOCATION Proposed 20” 130km Gas Pipeline Gas Compressor Station Gas Delivery Point Gas Receiving Station PROJECT LOCATION
  • 21. 21