Anzeige
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
Nächste SlideShare
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Wird geladen in ... 3
1 von 2
Anzeige

Más contenido relacionado

Anzeige

Chris Kuntz Resume LinkedIn

  1. Christopher A. Kuntz M: 510-719-6416 ckuntz537@gmail.com ckuntz@coca-cola.com Visionary IT Infrastructure and Service Delivery Manager Lead, develop and direct in the execution of IT initiatives and infrastructure services. Responsible for forming strategic partnerships with leadership to develop and implement improved business processes in support of business objectives. Partner with fellow technology teams in pursuit of implementing a total IT strategy. Exceptional business partnering and communication skills. A proven leader with one of the most recognized brands in the world. Strong understanding of: Infrastructure Project management Vendor management Operational Excellence SDLC FMCG Training Governance Security Disaster recovery Business continuity Professional Highlights  Over 15 years in IT Infrastructure management and service delivery  Information Technology Infrastructure Library (ITIL v3) Foundation certified  8 years managing cross functional teams throughout the Western US  Managed the Los Angeles Tier II data center for 3 years  Experienced creating Service Level Management strategy and established Service Level Agreements  Supply Chain Initiative Area Manager for the Atlanta Division SAP WM implementation  A facility maintenance professional responsible for coordinating all facets of maintenance and repairs Professional Experience Coca-Cola (2006–Present): Field IT Market Unit Manager  Managed an annual OPEX budget ranging from $1.8mm to $2.2mm, supporting nearly 1000 internal customers in 25 diverse facilities.  Managed the implementation of SAP WMS in our San Leandro production facility. This required a completely new wireless infrastructure, IDF’s, controllers, servers, and the installation of 52 vehicle mounted units. With a constantly moving target date, we determined success for us meant to be prepared at the earliest date possible. The infrastructure was ready to go two weeks before the implementation date which al lowed warehouse and production workers training to commence earlier than planned and shortened the overall length of the project.  Lead the IT team integrating Sacramento Coca-Cola into The Coca Cola Company (TCCC™) adding 2 distribution centers, a production facility, and over 300 additional customers. With an initial budget of $876,726, through business intelligence and process improvements, the final IT spend was only $661,038 for a savings of $215,688.  Collaborating with facility managers, contractors, and maintenance personnel, managed numerous site remodels. Through extensive knowledge of infrastructure requirementand, leveraging vendor relationships, applied a variety of solutions to achieve desired results and leverage IT resources more effectively  Lead the West in developing wireless solutions for a myriad of applications. Partnering with equipment vendors, developed standard configurations, enhancing flexibility and effectiveness, leading to significant savings of setup time and capital spend.
  2.  As a charter member of company Operational Excellence (OE) team wrote detailed process plans for tracking and life cycle management of assets. Enabled nearly 200 technical analysts with process flow, creating more reliable tracking of assets, a Sarbanes Oxley requirement  Managed Los Angeles Data Center for two years from 2008-2011. This was a Tier II facility which housed AS/400, imaging servers, application, and file and print servers Coca-Cola (1999-2006): Lead Technical Analyst  Lead the Northern California mobile device deployment, a multi-million dollar project collaborated with a large number of groups, internal and external. Analyzed delivery routes, developed training and deployment schedule. Coca-Cola realized immediate increase in delivery efficiencies, decreased overtime and enhanced work experience of our logistics and distribution force  Coordinated all PBX and IP telephony installations, working with local user’s, corporate Telco entities, LEC’ s, CLEC’s, equipment vendors, cable vendors, and business partners to ensure efficient installations with virtually no disruptions to the business Coca-Cola (2004-2005): Supply Chain Initiative Area Manager  Reviewed application and process team’s requirements for the implementation of SAP WM in the Atlanta Division, leading the team responsible for determined all hardware requirements  Conducted product evaluation to determine compatibility, survivability, and supportability in the various critical environments, including production and customer facing sales  Worked with Architectural Assessment teams to determine viability of introducing each new piece of equipment in to the Coca-Cola network  Determined component review standards for differentiating capabilities never before utilized by the company, including fixed scanners, and VMU’s to take full advantage of SAP WM.  Through process integration and leveraging unparalleled vendor cooperation, realized a 30% savings on the $2.2M project Additional Professional Experience US Navy: Electronics Technician  Experienced technician, manager, and leader in the electronics and information systems field  Formal instructor on maintenance and repair of a variety of equipment  Developed preventive maintenance schedules and procedures  Managed all external maintenance for the USS Flint, including diving service, hull repairs, HVAC, plumbing, boiler, computer, electrical, and structural  Naval Air Station Lemoore; Honorable Discharge Affiliations International Facilities Management Association ID: 908221 IFMA Information Technology Council Community Emergency Response Team (CERT)
Anzeige