SlideShare a Scribd company logo
1 of 45
Submission to Assessment 
Committee 
The 3068 Group (Inc) 
Chris Goodman, President
The 3068 Group opposes this project 
• The 3068 Group is opposed to any proposal that links the Eastern 
Freeway to the Tullamarine Freeway because it will increase traffic, air 
pollution and climate change. 
• The 3068 Group is completely opposed to this Reference Project, for 
its impacts on heritage and the residents of Clifton Hill (in particular). 
• Modifications discussed in this presentation are not an endorsement 
of the proposal to link the freeways, but may help explain how poorly 
designed the reference project is. 
• The 3068 Group will support sustainable transport projects 
• The 3068 Group is a supporter of YCAT
‘Unreasonable impacts on the established City interfaces’ – McGauran doc#128 
Tower is irrelevant intrusion into 
context of a historic urban 
neighbourhood. Not in CIS plans 
Hoddle St raised to Freeway 
standard. 
Over-designed for modelled traffic 
Higher than railway and 
buildings. Road is higher 
than Queens Parade on 
Visual impact on 
Darling Gardens 
Increased noise, pollution and hilltop. 
emissions impacting Clifton Hill 
and Collingwood. Noise Barriers 
1.5m high 
There is no 
freeway here? 
Higher than the historic 
Shot tower 
Obliterates one side of a gold 
rush era street and demeans the 
other side to a fate worse than 
demolition. 
Impacts during construction would be of 
high significance Long term impacts 
would be associated with elevated east-bound 
on-ramp CIS ch.10
Northbound cyclists and pedestrians are worse off
Topography of Interchange 
• Eastern Freeway lies in the Yarra Valley (which it destroyed) 
• Escarpment west of Merri Creek (edge of lava flows) 
• Reilly St Drain (Alexandra Parade) is a low point for region. 
• Collingwood Flat (history of flooding) 
• Clifton Hill is a hill 
Keep the new road in the valley to reduce impacts on Clifton Hill.
Darling Gardens 
“There has been minimal consideration of the role of local parks such as Darling 
Gardens for community activity including informal recreation and possible loss of 
amenity due to noise, dust and increased traffic during the construction phase of 
the project.” 
- Beverly Kliger, “Report on 
the Social Impact Assessment 
of the CIS for the City of 
Yarra, February, 2014,p p.6- 
10
Hoddle Freeway is not part of the Declared Project 
“proposed freeway-standard link between the Eastern Freeway and the 
Tullamarine Freeway generally along the Alexandra Parade corridor, with a 
further southerly connection to the Port of Melbourne area", 
- The declared project to which the act applies. 
“There is no scope for the LMA to seek to implement the Project beyond the 
terms of the Premier's declaration” 
- LMA closing submission. 
The overpass is solving a problem on VicRoads wish list. It is out of scope of 
this project.
VicRoads Plan for 2040 – FOI Published in 2010
Flyover will not help Hoddle St Congestion 
“car travel to the CBD is forecast to decrease from all directions.”-CIS Ch7 
“the congestion is not due to a lack of traffic lane capacity but rather 
delays caused by competing east-west routes” 
- CIS Annex E, p62. Table 19 ‘Reasons for Congestion’ 
Strategic traffic modelling results indicate that traffic volumes along 
Hoddle Street (between Alexandra Avenue and Victoria Street) 
remain generally constant between the 2031 with and without East 
West Link - Eastern Section scenarios. 
- CIS Ch7 pg32
Today on the Q loop - 2862/hr in PM peak 
• GHD - Hoddle Street Preliminary Traffic Advice Sept 2008 – High Level 
• Provided to Hoddle Street Study Options Assessment
Document 223 Response to Document 158 
Traffic to/from Hoddle Street is one 
such situation where traffic 
redistribution is predicted to occur. 
However, as stated before, the traffic 
volumes for future years should be 
read with consideration of the nature 
of strategic traffic forecasting and be 
considered as indicative, not definitive
east west bicycle route 
Reduced impacts on 
Bendigo St- no incline. 
Bus in left lane 
No change to journey 
access opportunities 
Avoid railway disruption 
Move Exit Ramps to 
Hoddle St South along 
bridge 
Move Portals from Gold 
St to Hoddle Street 
Move Alexandra Pde 
Westbound lanes next to 
Eastbound lanes 
Dedicated NB Bicycle Lane/Footpath 
at grade without lights. 
Tighter curve than reference 
design but at grade 
Hoddle NB to Eastern 
Freeway passes under 
Hoddle bridge
The curve and gradient is no tighter than Citylink 
Compare to CityLink exit to Punt Road. 
Note Shared Bike Path. 
Mature Elms were moved by crane. 
CityLink curve overlaid on Hoddle Street Bridge
The 3068 Group considered and rejected this design 
Serious Heritage Impacts 
on Woolworks 
Social Housing impacts 
If envelope must be 
extended, least impact is 
north east corner. 
- Doc #236 Hoddle St 
alternative option LMA
EB Portals inside Q loop 
Retains Q loop – no bus lane 
Three lane Tunnel Portals WB 
Hoddle Street NB ramp to 
Tunnel 
Retains most of 
Bendigo St 
Tunnel aligns with south 
of Alexandra Parade 
Interchange Concepts, VicRoads 1999 - Released to Northern Central City Corridor Study
Performance 
Criteria 
Reference Project Flyover Hoddle EB Ramp under Hoddle Bridge 
Scope Declared Project defines project boundary. Same alignment and project boundary. Consistent with 
the Terms of Reference. Does not prejudice the 
connection of the East West Link to Hoddle Street. No 
change to weaving issues on Hoddle NB or freeway WB. 
Traffic Full array of journey choices. Flyover 
exceeds capacity. 60-80km/hr. 
Same journey choices at required capacity. . 40-60km/hr. 
No additional signalling at intersections. EB ramp meets 
capacity. 
Cycling/Footpaths NB cyclists cross under the flyover and 
several lights. Bike lane in Alex. Pde median 
is unusable. Move pedestrian bridge away 
from route for height clearance. 
At-grade shared path without lights. 
Bike lane on either side of Alexandra. Pde 
No impact on existing pedestrian bridge 
Bus lanes New EB bus lane. New EB bus lane 
Portals At Gold St. Next to Shot Tower & school. West of Hoddle St – Portals further East. Allows tunnel to 
start east of Gold to reduce impacts.
Performance 
Criteria 
Reference Project Flyover Hoddle EB Ramp under Hoddle Bridge 
Visual Intrusion on heritage/residential 
environment. 
No structures above Hoddle Bridge. 
Noise Additional noise generated due to 
grade change and portals at Gold St. 
All roads retained in freeway valley or Hoddle Street. 
No climbing. Moving portals to Hoddle St reduces noise. 
Emissions 34m grade change traversed by 14,000 
vpd will have significant new 
emissions. 
Removes the climb above railway. Tunnel covered to Hoddle 
St reduces emissions in Collingwood and Clifton Hill. 
Open Space No change to usable open space. 
Road to Gold St twice as bad as today. 
Alexandra Pde Median made usable for Collingwood. 
Covered tunnel improves amenity, no Darling Gardens. 
Vent location LMA refuse to be drawn. Leave it to 
the successful bidder to decide. 
As far east as possible, away from residences and schools. 
Logistics Demolish Clifton Hill, no impact on 
motorists. Impact railway will 
encourage mode shift to car. 
Phased development, reduced lanes for motorists during 
construction may encourage mode shift to PT. No impact on 
proposed railways.
Tunnel Vent Stack location 
Distant from sensitive receptors 
Pollution, noise and visual impact
Conclusion – Remove the Flyover 
• The flyover (Hoddle Street Loop Bridge) has no strategic justification 
• The benefits are only cost and temporary logistics 
• The flyover is a cheap option selected by an organisation that values 
motoring over the local community because it will not disrupt traffic – 
only trains. 
• More people cross this interchange by train than by car. 
• The impacts on Collingwood, Clifton Hill and Abbotsford are 
unacceptable. 
• The net benefit is negative. 
• Submit that Committee direct LMA to remove the flyover.
Will the Project Integrate with Public Transport? 
“No date for the start of the railway line has been fixed.”
North-South Tram Priority 
The Eastern Freeway impaired Public Transport services in the inner 
northern suburbs. 
Tram Priority across Alexandra Parade was first promised by Premier 
Hamer in 1978. Has never been delivered. 
North-South priority is again being promised in this CIS. 
And it still won’t be delivered according to traffic projections. 
Yet it is mandated in the performance criteria?
Transport Connectivity 
Evaluation Objective 1, CIS Ch.18.4.1 
Lower traffic volumes on surface roads would contribute to unlocking road space, which 
would relieve congestion and provide scope to improve connectivity for some road-based 
public transport and active transport modes such as walking and cycling. 
A reduction in traffic volumes along Alexandra Parade would improve connectivity in and 
around this road. 
• There is no commitment to improve connectivity in the CIS. 
• Will future toll road operator allow buses to run along or adjacent to its 
asset? 
• Will the toll road owner demand compensation if Doncaster Rail or Metro 
is ever built – inhibiting connectivity? 
• Will Alexandra Parade simply be repossessed by motorists and rat runners? 
• Plan is to retain all existing lanes for motoring – no bus lane proposed.
Proposed Skybus express lane to Airport killed 
• Details of the Melbourne Airport bus rapid transit project were revealed to Fairfax Media 
through freedom of information (Jan 2013). 
• The Parsons Brinckerhoff study provided three options for improving travel times, with 
the department's preferred one involving creating an express bus lane and putting 
SkyBus on a public transport fare. 
• SkyBus was designed to offer a 20-minute run to the airport but takes 50 mins during 
peak periods. 
• Minister Mulder … confirmed the government would not proceed with the bus express 
lane proposal (Oct 2013). 
• CityLink operator Transurban opposed the bus lane concept and lobbied the 
government to expand the toll road for general traffic, as part of negotiations known as 
Project Zebra. 
• Melbourne Airport also opposed bus lane as it would be a significant reduction in its 
$87m car parking revenue. 
The Age October 31, 2013: New off-ramp part of state's east-west link revamp 
The Age, Jan 3 2013 Skybus lane faces fight
Can we protect ourselves from repeating this? 
Any future EWL toll road operator will have a direct financial interest in: 
• Doncaster Rail – in all its forms will impact toll revenue. 
• Buses through the tunnel and along Alexandra Parade. 
• PT to the expanded Parkville hospital Precinct – Not all patients drive. 
• Limiting the car capacity of any roads that feed the toll road 
Private monopoly interests have already killed the Skybus express lane. 
This is not in the best interest of the State. 
How can we prevent falling into the same trap? Sorry, I don’t know.
PTV Plan - Doncaster and South Morang Lines 
same alignment as EWL 
Why Can’t they join Doncaster with Parkville? 
PTV Network Development Plan – Metropolitan Rail December 2012
South Morang Alignment 
Doncaster Rail Study Chapter 9, Conclusions 
9.3 RECOMMENDATIONS FOR STUDY 
DURING PHASE TWO 
9.3.1 FURTHER ANALYSIS OF THE 
RAPID TRANSIT 1 OPTION 
“an evaluation of options for a new 
South Morang alignment, including 
potential new station locations, 
interfaces with the existing rail 
network, costs, benefits and timing. 
A variation to the RT1 Alignment should be 
considered that would exit the Eastern Freeway 
median near chandler Highway and follow an 
alternative alignment to a connection with the 
Hurstbridge line near Fairfield station. 
A future interchange with the de-coupled South 
Morang line could then be provided at Clifton Hill 
station, offering the potential benefit of a faster 
connection that services the strong demand for the 
Parkville area. 
“Consideration should be given to the 
opportunity for staged use of the Eastern 
Freeway median as a scalable approach to 
improved public transport This should enable 
an understanding of the benefits of 
developing a median busway (including City 
connections) that could be ultimately 
transformed into a rail service when the bus 
service reaches capacity limits. 
More specific engineering along the Eastern 
Freeway alignment should be undertaken. 
alongside further work around station 
locations to determine a right-of-way 
boundary, enabling the protection of an 
appropriate rail corridor.”
Where’s the Eastern Freeway Rail Reservation 
• Where is the PTV in this process? 
• Has the study heard from the Doncaster Rail Study team? The study 
recommended more study on the reservation alignment. 
• Why is the Eastern Railway Reservation now forced to go over Dight’s 
Falls? 
• Is the committee satisfied it has all the information on the railway 
easements from the LMA 
• How could South Morang pass under the tunnel -or even pass under 
the freeway?
Alexandra Parade 
A wide central median separates the two 
carriageways for the length of Alexandra Parade. 
How many lanes are required for Alexandra Parade? 
What will be the impact on turning queues – north 
and south? 
“A settler, in 1849, for no explained reason, ran a plough across the 
middle of it, In three of four years the furrow became a wide creek, 
requiring, as roads were made, several timber bridges, of 12 to 15 feet 
span across it. The creek in summer, became the common receptacle 
for rubbish and dead animals, so it had to be filled in and replaced by a 
storm-water channel about a mile long. Thus the settler ‘turned the 
first sod’ of what was to eventually become the Reilly Street drain [now 
Alexandra Parade]”. 
- Collingwood Centenary 1855 - 1955 
Alexandra Pde was also called Reilly Street and North Government Rd 10 lanes is not enough
Realign Central Median? 
• Realigning the Parade would free up the centre media as usable open 
space. More than the entire open space in Collingwood. 
• Improves building interface on the south side. 
• Less width could be more permeable for cycling and pedestrians 
• Easier to manage noise. 
• Trees have an important role in soaking up Carbon Monoxide 
• Mature elms should be moved and replanted as was done in Gosh’s 
paddock for CityLink. Particularly elm at Wellington St identified by 
Patrick. 
• Potential to impact Public Transport reservation and so contravene 
the TIA. PT Corridors needs further study
No Open Space in Collingwood
Not much Open Space in Fitzroy
Open Space Strategy 
“Collingwood has very little public open space, and the reserves that exist are small in size. To 
access larger open space reserves residents need to cross major arterial roads, which restricts safe 
and reasonable walking access to them. 
“The precinct is bounded by major arterial roads including Hoddle Street, Alexandra Parade, Victoria 
Parade and Smith Street, and dissected by Secondary Arterials including Johnston Street, Wellington 
Street and Langridge Street. 
“There has been some small scale conversions of industrial premises to residential scattered 
through the industrial precinct. In the longer term if this conversion continues, there may be an 
increased demand to provide a Local park in this neighbourhood.” 
“Collingwood between Alexander Parade and Johnston Street is predominantly residential with 
some industrial area in the south west of this precinct. Within this area there are only two Small 
Local open space reserves.” The reserves that do exist are all smaller than 0.1ha in size and are all 
classified as Small Local open space. Their location and the lack of good connectivity further reduces 
their function. 
Proportion of open space in the precinct 0.1%, or 0.23sqm per resident.
Alexandra Parade Collingwood interface
Alexandra Parade 
Fitzroy interface
No Temporary road in Clifton Hill 
• The proposed temporary road on the south of Clifton Hill has 
unacceptable impact for poor benefits. 
• Compulsory acquisitions 
• Residents next to the temporary road 
• For noise and air pollution for 5 years 
• Primary school 
• Heritage demolition is unacceptable. 
• Urban renewal of former industrial sites is irrelevant to this project 
• Intact Heritage Streetscapes should not be replaced 
• What alternatives have been considered? 
• Boring instead of cut and cover to Hoddle Street. 
• Portals near Hoddle Street instead of Gold Street 
• Use of the wide median in Alexandra Parade and Queens Parade detours.
NCCC – Demand Side Options 
Northern Central City Corridor - Draft Strategy 2003 
Recommended Demand-side management initiatives 
“To encourage greater use of public transport and non-motorised modes in 
conjunction with physical proposals” 
Study found this easily meets the net public benefit test and business case 
test. 
But the 2008 EWLNA (Eddington Study) was silent on this. 
LMA remains silent on this. 
Scoping directions make clear the Government doesn’t want to hear about 
this. 
Demand management is the elephant in the room.
Why do we need a strategy for the NCCC? 
It is clear that, without intervention, traffic in and through the area will continue to grow 
– although it will be hampered by growing congestion. Forecasts suggest that, by 2021, the 
number of inner north vehicle trips will increase by about 18%, distance of travel will 
increase by 21% and time taken by about 46% 
This will give rise to an additional 6.3 million hours of travel time a year, which would cost 
around $55 million a year in lost time and reduce daily average vehicle speeds in the inner 
north from 34km/h to 28km/h. 
Melbourne 2030 – the Government’s blueprint for the future of metropolitan Melbourne – 
lays out directions for future land use and transport right across Melbourne, and includes 
significant changes in the location of growth areas and the way transport is provided 
throughout the metropolitan area. 
The changes include improvements to public transport services and measures to 
promote large increases in public transport use, walking and cycling. 
Department of Infrastructure - Reasons for NCCC Strategy (2003) 
Background information on the Northern Central City Corridor Strategy 
http://ycat.org.au/NCCCS/Northern%20Central%20City%20Corridoor%20Strategy.pdf
Conclusion of the NCCC Draft Strategy 
“If the NCCC Strategy is successful, traffic modelling indicates car traffic levels at or below today’s 
levels on most roads in the inner north. In this event there would be no need for additional road 
capacity; its provision would go against the basic philosophy of Melbourne 2030 and the NCCC 
Strategy, to reduce private car travel. 
“The NCCCS Scenario Appraisal Report concluded that no further investigation should take place 
on road tunnel options in the inner north. As a result, they are not included in the NCCC Strategy. 
“Given this conclusion there is little expectation that freight traffic levels will be reduced in the 
inner north; they will continue to grow in line with growth in economic activity, although growth in 
the inner north will also be influenced by the limited road space availability and the outcomes of 
the Victorian Freight and Logistics Strategy. “ 
- NCCC Strategy (2003) 13.5 pg35 
http://ycat.org.au/NCCCS/Northern%20Central%20City%20Corridoor%20Strategy.pdf
Paradigm Shifts in Travel Behaviour 
(TravelSmart Initiatives) 
“Some key model parameters, such as how people value their time and make 
trade-offs when deciding whether, where and how to travel, may change over 
time. 
In the model these travel behaviour characteristics and preferences are 
assumed to remain constant over time. The model makes no attempt to 
predict “paradigm shifts” in travel behaviour that might occur in the future. In 
fact the model assumes that such changes will not occur.” 
“It is not only plausible, but likely, that travel behaviour will change in the 
future in response to such issues as concern for the environment. There is 
also some evidence that travel behaviour can be influenced by government.” 
- Veitch Lister Consulting Pty Ltd – Report for EWLNA 2008
Birds in Clifton Hill 
 Wee Bill 
 Rainbow Lorikeet (nesting each year) 
 Magpie (nesting for 20+ years) 
 Yellow-tailed Black Cockatoo 
 Willie Wagtail 
 Red Wattlebird 
 Little Wattlebird 
 Magpie Lark 
 Black-faced cuckoo shrike 
 Australian Raven 
 Grey Fantail 
 Crested Pigeon 
 Galah 
 Eastern Rosella 
Native Birds observed in a backyard near Darling Gardens 
 Red- rumped parrot 
 Yellow-faced honey eater 
 Grey Butcherbird 
 Pied Currawong 
 Tawny Frogmouth 
 Red Wattlebird 
 Little Wattlebird 
 Sulphur Crested Cockatoo 
 Welcome Swallow 
 Powerful Owl 
SEEN FLYING OVER: 
 Australian White Ibis 
 Pacific black duck 
 Silver Gull 
Tawny Frogmouth
Principle of Transparency 
CIS Ch18 meeting our obligations 
The principle of transparency means members of the public should have 
access to reliable and relevant information in appropriate forms to 
facilitate a good understanding of transport issues and the process by 
which decisions in relation the transport system are made. 
• No Business Case 
• Alternative Designs and Options 
• Peer review of modelling- Sensitivity Analysis – Induce Traffic, Tolls 
• Hoddle Freeway
The Principle of Intergenerational Equity 
CIS Ch18 meeting our obligations 
“Principle of equity The principle 
of equity means: 
a) Equity between persons 
irrespective of their: personal 
attributes, including age, physical 
ability, ethnicity, culture, gender 
and financial situation; or 
location, including whether in a 
growth, urban, regional, rural or 
remote area. 
b) Equity between generations by 
not compromising the ability of 
future generations to meet their 
needs. “ 
LMA Response 
“The proposed PPP procurement 
and delivery model for the project 
ensures the funding burden of the 
project is shared across 
generations.” 
Passing a funding burden to a 
future generation along with 
climate change is not equitable.
Is Performance Criteria sufficient protection? 
• LMA has less regard for local impacts than for motorist’s amenity. 
• The successful bidder will have even less regard for impacts due to 
the profit imperative. 
• If the committee does not direct certain outcomes, then we can’t 
expect the contractor to do more than the bare minimum. 
• This is highlighted in LMA’s refusal to say where the vent stacks 
should go. 
• The bidder will be bound to find the most cost effective location that 
meets the poorly established performance criteria.
If the Reference Design does not meet the 
criteria, then what? 
• The Reference Project is not the declared project. 
• The CIS is not comprehensive and does not address impacts such as 
health. 
• The committee is open to find that the proposal does not comply 
with legislation (P&E, EPA, TIA) or local policies such as heritage 
• The undue haste forced upon this project is disorderly planning 
• Victoria will pay the consequence for a long time 
• The committee should recommend that no approvals be given

More Related Content

What's hot

Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor WideCrosstown TO
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointMay Begum
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointHayley Sharp
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardinerEast
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017City of Toronto Planning
 
What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came downemilypeckenham
 
Jay Street Pedestrian Plaza
Jay Street Pedestrian PlazaJay Street Pedestrian Plaza
Jay Street Pedestrian Plazasubtle116
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open houseCrosstown TO
 
Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Crosstown TO
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardinerEast
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDMWilliam Grogan
 
The State of Rail in Illinois
The State of Rail in IllinoisThe State of Rail in Illinois
The State of Rail in IllinoisAusrine Rakauskaite
 
Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014Toronto Public Consultation Unit
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureAuckland Transport
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg bookletGardinerEast
 
Remove oma+amo boards
Remove oma+amo boardsRemove oma+amo boards
Remove oma+amo boardsGardinerEast
 
AdamGosney_WritingSample2
AdamGosney_WritingSample2AdamGosney_WritingSample2
AdamGosney_WritingSample2Adam Gosney
 

What's hot (20)

Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017
 
What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came down
 
Jay Street Pedestrian Plaza
Jay Street Pedestrian PlazaJay Street Pedestrian Plaza
Jay Street Pedestrian Plaza
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDM
 
The State of Rail in Illinois
The State of Rail in IllinoisThe State of Rail in Illinois
The State of Rail in Illinois
 
Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's future
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 
Poster 3
Poster 3Poster 3
Poster 3
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg booklet
 
Remove oma+amo boards
Remove oma+amo boardsRemove oma+amo boards
Remove oma+amo boards
 
AdamGosney_WritingSample2
AdamGosney_WritingSample2AdamGosney_WritingSample2
AdamGosney_WritingSample2
 

Viewers also liked

Security and Your Salesforce Org
Security and Your Salesforce OrgSecurity and Your Salesforce Org
Security and Your Salesforce OrgSalesforce Admins
 
Office 365 Security: How to Safeguard Your Data
Office 365 Security: How to Safeguard Your DataOffice 365 Security: How to Safeguard Your Data
Office 365 Security: How to Safeguard Your DataBitglass
 
Bridging the Office 365 Security Gap - Redmond Media
Bridging the Office 365 Security Gap - Redmond MediaBridging the Office 365 Security Gap - Redmond Media
Bridging the Office 365 Security Gap - Redmond MediaBitglass
 
4 Essential Components of Office 365 Security
4 Essential Components of Office 365 Security4 Essential Components of Office 365 Security
4 Essential Components of Office 365 SecurityBitglass
 
Sharing and security in Salesforce
Sharing and security in SalesforceSharing and security in Salesforce
Sharing and security in SalesforceSaurabh Kulkarni
 
Getting started with Salesforce security
Getting started with Salesforce securityGetting started with Salesforce security
Getting started with Salesforce securitySalesforce Admins
 
Salesforce Security with Visibility, Control & Data Protection
Salesforce Security with Visibility, Control & Data ProtectionSalesforce Security with Visibility, Control & Data Protection
Salesforce Security with Visibility, Control & Data ProtectionCipherCloud
 
Introduction to the Salesforce Security Model
Introduction to the Salesforce Security ModelIntroduction to the Salesforce Security Model
Introduction to the Salesforce Security ModelSalesforce Developers
 
Office 365 security concerns, EU General Data Protection Regulation (GDPR)
Office 365 security concerns, EU General Data Protection Regulation (GDPR) Office 365 security concerns, EU General Data Protection Regulation (GDPR)
Office 365 security concerns, EU General Data Protection Regulation (GDPR) Sonja Madsen
 
How to Secure Access Control in Office 365 Environments
How to Secure Access Control in Office 365 EnvironmentsHow to Secure Access Control in Office 365 Environments
How to Secure Access Control in Office 365 EnvironmentsQuest
 
CASBs and Office 365: The Security Menace
CASBs and Office 365: The Security MenaceCASBs and Office 365: The Security Menace
CASBs and Office 365: The Security MenaceBitglass
 

Viewers also liked (11)

Security and Your Salesforce Org
Security and Your Salesforce OrgSecurity and Your Salesforce Org
Security and Your Salesforce Org
 
Office 365 Security: How to Safeguard Your Data
Office 365 Security: How to Safeguard Your DataOffice 365 Security: How to Safeguard Your Data
Office 365 Security: How to Safeguard Your Data
 
Bridging the Office 365 Security Gap - Redmond Media
Bridging the Office 365 Security Gap - Redmond MediaBridging the Office 365 Security Gap - Redmond Media
Bridging the Office 365 Security Gap - Redmond Media
 
4 Essential Components of Office 365 Security
4 Essential Components of Office 365 Security4 Essential Components of Office 365 Security
4 Essential Components of Office 365 Security
 
Sharing and security in Salesforce
Sharing and security in SalesforceSharing and security in Salesforce
Sharing and security in Salesforce
 
Getting started with Salesforce security
Getting started with Salesforce securityGetting started with Salesforce security
Getting started with Salesforce security
 
Salesforce Security with Visibility, Control & Data Protection
Salesforce Security with Visibility, Control & Data ProtectionSalesforce Security with Visibility, Control & Data Protection
Salesforce Security with Visibility, Control & Data Protection
 
Introduction to the Salesforce Security Model
Introduction to the Salesforce Security ModelIntroduction to the Salesforce Security Model
Introduction to the Salesforce Security Model
 
Office 365 security concerns, EU General Data Protection Regulation (GDPR)
Office 365 security concerns, EU General Data Protection Regulation (GDPR) Office 365 security concerns, EU General Data Protection Regulation (GDPR)
Office 365 security concerns, EU General Data Protection Regulation (GDPR)
 
How to Secure Access Control in Office 365 Environments
How to Secure Access Control in Office 365 EnvironmentsHow to Secure Access Control in Office 365 Environments
How to Secure Access Control in Office 365 Environments
 
CASBs and Office 365: The Security Menace
CASBs and Office 365: The Security MenaceCASBs and Office 365: The Security Menace
CASBs and Office 365: The Security Menace
 

Similar to The 3068 Group - Presentation to East West Link Assessment Panel

Campbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfCampbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfKatrinaMcCullough2
 
Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgewilliam perrin
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Josia Tannos, EIT
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxfordshireCC
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDavid H Moloney
 
BiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman WittmanBiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman Wittmanjazztothebone
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Crosstown TO
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County
 
Melbourne metro tunnel project
Melbourne metro tunnel projectMelbourne metro tunnel project
Melbourne metro tunnel projectJumpingJaq
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Toronto Public Consultation Unit
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation Sandra Idio
 
Overpass Solution
Overpass SolutionOverpass Solution
Overpass Solutionjgabateman
 
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert
volumeone
 
Ottawa fall construction season 2016
Ottawa fall construction season 2016Ottawa fall construction season 2016
Ottawa fall construction season 2016Devyn Barrie
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown UpdateCrosstown TO
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boardsGardinerEast
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureMobility Lab
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Fairfax County
 

Similar to The 3068 Group - Presentation to East West Link Assessment Panel (20)

Campbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfCampbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdf
 
Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridge
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in Tunnels
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
BiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman WittmanBiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman Wittman
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Melbourne metro tunnel project
Melbourne metro tunnel projectMelbourne metro tunnel project
Melbourne metro tunnel project
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation
 
Overpass Solution
Overpass SolutionOverpass Solution
Overpass Solution
 
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert

 
Ottawa fall construction season 2016
Ottawa fall construction season 2016Ottawa fall construction season 2016
Ottawa fall construction season 2016
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown Update
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boards
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
 

Recently uploaded

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable PackagingDr. Salem Baidas
 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfBasel Ahmed
 
Types of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationTypes of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationmarygraceaque1
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 

Recently uploaded (20)

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
 
Types of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationTypes of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentation
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 

The 3068 Group - Presentation to East West Link Assessment Panel

  • 1. Submission to Assessment Committee The 3068 Group (Inc) Chris Goodman, President
  • 2. The 3068 Group opposes this project • The 3068 Group is opposed to any proposal that links the Eastern Freeway to the Tullamarine Freeway because it will increase traffic, air pollution and climate change. • The 3068 Group is completely opposed to this Reference Project, for its impacts on heritage and the residents of Clifton Hill (in particular). • Modifications discussed in this presentation are not an endorsement of the proposal to link the freeways, but may help explain how poorly designed the reference project is. • The 3068 Group will support sustainable transport projects • The 3068 Group is a supporter of YCAT
  • 3. ‘Unreasonable impacts on the established City interfaces’ – McGauran doc#128 Tower is irrelevant intrusion into context of a historic urban neighbourhood. Not in CIS plans Hoddle St raised to Freeway standard. Over-designed for modelled traffic Higher than railway and buildings. Road is higher than Queens Parade on Visual impact on Darling Gardens Increased noise, pollution and hilltop. emissions impacting Clifton Hill and Collingwood. Noise Barriers 1.5m high There is no freeway here? Higher than the historic Shot tower Obliterates one side of a gold rush era street and demeans the other side to a fate worse than demolition. Impacts during construction would be of high significance Long term impacts would be associated with elevated east-bound on-ramp CIS ch.10
  • 4. Northbound cyclists and pedestrians are worse off
  • 5. Topography of Interchange • Eastern Freeway lies in the Yarra Valley (which it destroyed) • Escarpment west of Merri Creek (edge of lava flows) • Reilly St Drain (Alexandra Parade) is a low point for region. • Collingwood Flat (history of flooding) • Clifton Hill is a hill Keep the new road in the valley to reduce impacts on Clifton Hill.
  • 6. Darling Gardens “There has been minimal consideration of the role of local parks such as Darling Gardens for community activity including informal recreation and possible loss of amenity due to noise, dust and increased traffic during the construction phase of the project.” - Beverly Kliger, “Report on the Social Impact Assessment of the CIS for the City of Yarra, February, 2014,p p.6- 10
  • 7. Hoddle Freeway is not part of the Declared Project “proposed freeway-standard link between the Eastern Freeway and the Tullamarine Freeway generally along the Alexandra Parade corridor, with a further southerly connection to the Port of Melbourne area", - The declared project to which the act applies. “There is no scope for the LMA to seek to implement the Project beyond the terms of the Premier's declaration” - LMA closing submission. The overpass is solving a problem on VicRoads wish list. It is out of scope of this project.
  • 8. VicRoads Plan for 2040 – FOI Published in 2010
  • 9. Flyover will not help Hoddle St Congestion “car travel to the CBD is forecast to decrease from all directions.”-CIS Ch7 “the congestion is not due to a lack of traffic lane capacity but rather delays caused by competing east-west routes” - CIS Annex E, p62. Table 19 ‘Reasons for Congestion’ Strategic traffic modelling results indicate that traffic volumes along Hoddle Street (between Alexandra Avenue and Victoria Street) remain generally constant between the 2031 with and without East West Link - Eastern Section scenarios. - CIS Ch7 pg32
  • 10. Today on the Q loop - 2862/hr in PM peak • GHD - Hoddle Street Preliminary Traffic Advice Sept 2008 – High Level • Provided to Hoddle Street Study Options Assessment
  • 11. Document 223 Response to Document 158 Traffic to/from Hoddle Street is one such situation where traffic redistribution is predicted to occur. However, as stated before, the traffic volumes for future years should be read with consideration of the nature of strategic traffic forecasting and be considered as indicative, not definitive
  • 12. east west bicycle route Reduced impacts on Bendigo St- no incline. Bus in left lane No change to journey access opportunities Avoid railway disruption Move Exit Ramps to Hoddle St South along bridge Move Portals from Gold St to Hoddle Street Move Alexandra Pde Westbound lanes next to Eastbound lanes Dedicated NB Bicycle Lane/Footpath at grade without lights. Tighter curve than reference design but at grade Hoddle NB to Eastern Freeway passes under Hoddle bridge
  • 13. The curve and gradient is no tighter than Citylink Compare to CityLink exit to Punt Road. Note Shared Bike Path. Mature Elms were moved by crane. CityLink curve overlaid on Hoddle Street Bridge
  • 14. The 3068 Group considered and rejected this design Serious Heritage Impacts on Woolworks Social Housing impacts If envelope must be extended, least impact is north east corner. - Doc #236 Hoddle St alternative option LMA
  • 15.
  • 16. EB Portals inside Q loop Retains Q loop – no bus lane Three lane Tunnel Portals WB Hoddle Street NB ramp to Tunnel Retains most of Bendigo St Tunnel aligns with south of Alexandra Parade Interchange Concepts, VicRoads 1999 - Released to Northern Central City Corridor Study
  • 17. Performance Criteria Reference Project Flyover Hoddle EB Ramp under Hoddle Bridge Scope Declared Project defines project boundary. Same alignment and project boundary. Consistent with the Terms of Reference. Does not prejudice the connection of the East West Link to Hoddle Street. No change to weaving issues on Hoddle NB or freeway WB. Traffic Full array of journey choices. Flyover exceeds capacity. 60-80km/hr. Same journey choices at required capacity. . 40-60km/hr. No additional signalling at intersections. EB ramp meets capacity. Cycling/Footpaths NB cyclists cross under the flyover and several lights. Bike lane in Alex. Pde median is unusable. Move pedestrian bridge away from route for height clearance. At-grade shared path without lights. Bike lane on either side of Alexandra. Pde No impact on existing pedestrian bridge Bus lanes New EB bus lane. New EB bus lane Portals At Gold St. Next to Shot Tower & school. West of Hoddle St – Portals further East. Allows tunnel to start east of Gold to reduce impacts.
  • 18. Performance Criteria Reference Project Flyover Hoddle EB Ramp under Hoddle Bridge Visual Intrusion on heritage/residential environment. No structures above Hoddle Bridge. Noise Additional noise generated due to grade change and portals at Gold St. All roads retained in freeway valley or Hoddle Street. No climbing. Moving portals to Hoddle St reduces noise. Emissions 34m grade change traversed by 14,000 vpd will have significant new emissions. Removes the climb above railway. Tunnel covered to Hoddle St reduces emissions in Collingwood and Clifton Hill. Open Space No change to usable open space. Road to Gold St twice as bad as today. Alexandra Pde Median made usable for Collingwood. Covered tunnel improves amenity, no Darling Gardens. Vent location LMA refuse to be drawn. Leave it to the successful bidder to decide. As far east as possible, away from residences and schools. Logistics Demolish Clifton Hill, no impact on motorists. Impact railway will encourage mode shift to car. Phased development, reduced lanes for motorists during construction may encourage mode shift to PT. No impact on proposed railways.
  • 19. Tunnel Vent Stack location Distant from sensitive receptors Pollution, noise and visual impact
  • 20. Conclusion – Remove the Flyover • The flyover (Hoddle Street Loop Bridge) has no strategic justification • The benefits are only cost and temporary logistics • The flyover is a cheap option selected by an organisation that values motoring over the local community because it will not disrupt traffic – only trains. • More people cross this interchange by train than by car. • The impacts on Collingwood, Clifton Hill and Abbotsford are unacceptable. • The net benefit is negative. • Submit that Committee direct LMA to remove the flyover.
  • 21. Will the Project Integrate with Public Transport? “No date for the start of the railway line has been fixed.”
  • 22. North-South Tram Priority The Eastern Freeway impaired Public Transport services in the inner northern suburbs. Tram Priority across Alexandra Parade was first promised by Premier Hamer in 1978. Has never been delivered. North-South priority is again being promised in this CIS. And it still won’t be delivered according to traffic projections. Yet it is mandated in the performance criteria?
  • 23. Transport Connectivity Evaluation Objective 1, CIS Ch.18.4.1 Lower traffic volumes on surface roads would contribute to unlocking road space, which would relieve congestion and provide scope to improve connectivity for some road-based public transport and active transport modes such as walking and cycling. A reduction in traffic volumes along Alexandra Parade would improve connectivity in and around this road. • There is no commitment to improve connectivity in the CIS. • Will future toll road operator allow buses to run along or adjacent to its asset? • Will the toll road owner demand compensation if Doncaster Rail or Metro is ever built – inhibiting connectivity? • Will Alexandra Parade simply be repossessed by motorists and rat runners? • Plan is to retain all existing lanes for motoring – no bus lane proposed.
  • 24. Proposed Skybus express lane to Airport killed • Details of the Melbourne Airport bus rapid transit project were revealed to Fairfax Media through freedom of information (Jan 2013). • The Parsons Brinckerhoff study provided three options for improving travel times, with the department's preferred one involving creating an express bus lane and putting SkyBus on a public transport fare. • SkyBus was designed to offer a 20-minute run to the airport but takes 50 mins during peak periods. • Minister Mulder … confirmed the government would not proceed with the bus express lane proposal (Oct 2013). • CityLink operator Transurban opposed the bus lane concept and lobbied the government to expand the toll road for general traffic, as part of negotiations known as Project Zebra. • Melbourne Airport also opposed bus lane as it would be a significant reduction in its $87m car parking revenue. The Age October 31, 2013: New off-ramp part of state's east-west link revamp The Age, Jan 3 2013 Skybus lane faces fight
  • 25. Can we protect ourselves from repeating this? Any future EWL toll road operator will have a direct financial interest in: • Doncaster Rail – in all its forms will impact toll revenue. • Buses through the tunnel and along Alexandra Parade. • PT to the expanded Parkville hospital Precinct – Not all patients drive. • Limiting the car capacity of any roads that feed the toll road Private monopoly interests have already killed the Skybus express lane. This is not in the best interest of the State. How can we prevent falling into the same trap? Sorry, I don’t know.
  • 26. PTV Plan - Doncaster and South Morang Lines same alignment as EWL Why Can’t they join Doncaster with Parkville? PTV Network Development Plan – Metropolitan Rail December 2012
  • 27. South Morang Alignment Doncaster Rail Study Chapter 9, Conclusions 9.3 RECOMMENDATIONS FOR STUDY DURING PHASE TWO 9.3.1 FURTHER ANALYSIS OF THE RAPID TRANSIT 1 OPTION “an evaluation of options for a new South Morang alignment, including potential new station locations, interfaces with the existing rail network, costs, benefits and timing. A variation to the RT1 Alignment should be considered that would exit the Eastern Freeway median near chandler Highway and follow an alternative alignment to a connection with the Hurstbridge line near Fairfield station. A future interchange with the de-coupled South Morang line could then be provided at Clifton Hill station, offering the potential benefit of a faster connection that services the strong demand for the Parkville area. “Consideration should be given to the opportunity for staged use of the Eastern Freeway median as a scalable approach to improved public transport This should enable an understanding of the benefits of developing a median busway (including City connections) that could be ultimately transformed into a rail service when the bus service reaches capacity limits. More specific engineering along the Eastern Freeway alignment should be undertaken. alongside further work around station locations to determine a right-of-way boundary, enabling the protection of an appropriate rail corridor.”
  • 28. Where’s the Eastern Freeway Rail Reservation • Where is the PTV in this process? • Has the study heard from the Doncaster Rail Study team? The study recommended more study on the reservation alignment. • Why is the Eastern Railway Reservation now forced to go over Dight’s Falls? • Is the committee satisfied it has all the information on the railway easements from the LMA • How could South Morang pass under the tunnel -or even pass under the freeway?
  • 29. Alexandra Parade A wide central median separates the two carriageways for the length of Alexandra Parade. How many lanes are required for Alexandra Parade? What will be the impact on turning queues – north and south? “A settler, in 1849, for no explained reason, ran a plough across the middle of it, In three of four years the furrow became a wide creek, requiring, as roads were made, several timber bridges, of 12 to 15 feet span across it. The creek in summer, became the common receptacle for rubbish and dead animals, so it had to be filled in and replaced by a storm-water channel about a mile long. Thus the settler ‘turned the first sod’ of what was to eventually become the Reilly Street drain [now Alexandra Parade]”. - Collingwood Centenary 1855 - 1955 Alexandra Pde was also called Reilly Street and North Government Rd 10 lanes is not enough
  • 30. Realign Central Median? • Realigning the Parade would free up the centre media as usable open space. More than the entire open space in Collingwood. • Improves building interface on the south side. • Less width could be more permeable for cycling and pedestrians • Easier to manage noise. • Trees have an important role in soaking up Carbon Monoxide • Mature elms should be moved and replanted as was done in Gosh’s paddock for CityLink. Particularly elm at Wellington St identified by Patrick. • Potential to impact Public Transport reservation and so contravene the TIA. PT Corridors needs further study
  • 31. No Open Space in Collingwood
  • 32. Not much Open Space in Fitzroy
  • 33. Open Space Strategy “Collingwood has very little public open space, and the reserves that exist are small in size. To access larger open space reserves residents need to cross major arterial roads, which restricts safe and reasonable walking access to them. “The precinct is bounded by major arterial roads including Hoddle Street, Alexandra Parade, Victoria Parade and Smith Street, and dissected by Secondary Arterials including Johnston Street, Wellington Street and Langridge Street. “There has been some small scale conversions of industrial premises to residential scattered through the industrial precinct. In the longer term if this conversion continues, there may be an increased demand to provide a Local park in this neighbourhood.” “Collingwood between Alexander Parade and Johnston Street is predominantly residential with some industrial area in the south west of this precinct. Within this area there are only two Small Local open space reserves.” The reserves that do exist are all smaller than 0.1ha in size and are all classified as Small Local open space. Their location and the lack of good connectivity further reduces their function. Proportion of open space in the precinct 0.1%, or 0.23sqm per resident.
  • 36. No Temporary road in Clifton Hill • The proposed temporary road on the south of Clifton Hill has unacceptable impact for poor benefits. • Compulsory acquisitions • Residents next to the temporary road • For noise and air pollution for 5 years • Primary school • Heritage demolition is unacceptable. • Urban renewal of former industrial sites is irrelevant to this project • Intact Heritage Streetscapes should not be replaced • What alternatives have been considered? • Boring instead of cut and cover to Hoddle Street. • Portals near Hoddle Street instead of Gold Street • Use of the wide median in Alexandra Parade and Queens Parade detours.
  • 37. NCCC – Demand Side Options Northern Central City Corridor - Draft Strategy 2003 Recommended Demand-side management initiatives “To encourage greater use of public transport and non-motorised modes in conjunction with physical proposals” Study found this easily meets the net public benefit test and business case test. But the 2008 EWLNA (Eddington Study) was silent on this. LMA remains silent on this. Scoping directions make clear the Government doesn’t want to hear about this. Demand management is the elephant in the room.
  • 38. Why do we need a strategy for the NCCC? It is clear that, without intervention, traffic in and through the area will continue to grow – although it will be hampered by growing congestion. Forecasts suggest that, by 2021, the number of inner north vehicle trips will increase by about 18%, distance of travel will increase by 21% and time taken by about 46% This will give rise to an additional 6.3 million hours of travel time a year, which would cost around $55 million a year in lost time and reduce daily average vehicle speeds in the inner north from 34km/h to 28km/h. Melbourne 2030 – the Government’s blueprint for the future of metropolitan Melbourne – lays out directions for future land use and transport right across Melbourne, and includes significant changes in the location of growth areas and the way transport is provided throughout the metropolitan area. The changes include improvements to public transport services and measures to promote large increases in public transport use, walking and cycling. Department of Infrastructure - Reasons for NCCC Strategy (2003) Background information on the Northern Central City Corridor Strategy http://ycat.org.au/NCCCS/Northern%20Central%20City%20Corridoor%20Strategy.pdf
  • 39. Conclusion of the NCCC Draft Strategy “If the NCCC Strategy is successful, traffic modelling indicates car traffic levels at or below today’s levels on most roads in the inner north. In this event there would be no need for additional road capacity; its provision would go against the basic philosophy of Melbourne 2030 and the NCCC Strategy, to reduce private car travel. “The NCCCS Scenario Appraisal Report concluded that no further investigation should take place on road tunnel options in the inner north. As a result, they are not included in the NCCC Strategy. “Given this conclusion there is little expectation that freight traffic levels will be reduced in the inner north; they will continue to grow in line with growth in economic activity, although growth in the inner north will also be influenced by the limited road space availability and the outcomes of the Victorian Freight and Logistics Strategy. “ - NCCC Strategy (2003) 13.5 pg35 http://ycat.org.au/NCCCS/Northern%20Central%20City%20Corridoor%20Strategy.pdf
  • 40. Paradigm Shifts in Travel Behaviour (TravelSmart Initiatives) “Some key model parameters, such as how people value their time and make trade-offs when deciding whether, where and how to travel, may change over time. In the model these travel behaviour characteristics and preferences are assumed to remain constant over time. The model makes no attempt to predict “paradigm shifts” in travel behaviour that might occur in the future. In fact the model assumes that such changes will not occur.” “It is not only plausible, but likely, that travel behaviour will change in the future in response to such issues as concern for the environment. There is also some evidence that travel behaviour can be influenced by government.” - Veitch Lister Consulting Pty Ltd – Report for EWLNA 2008
  • 41. Birds in Clifton Hill  Wee Bill  Rainbow Lorikeet (nesting each year)  Magpie (nesting for 20+ years)  Yellow-tailed Black Cockatoo  Willie Wagtail  Red Wattlebird  Little Wattlebird  Magpie Lark  Black-faced cuckoo shrike  Australian Raven  Grey Fantail  Crested Pigeon  Galah  Eastern Rosella Native Birds observed in a backyard near Darling Gardens  Red- rumped parrot  Yellow-faced honey eater  Grey Butcherbird  Pied Currawong  Tawny Frogmouth  Red Wattlebird  Little Wattlebird  Sulphur Crested Cockatoo  Welcome Swallow  Powerful Owl SEEN FLYING OVER:  Australian White Ibis  Pacific black duck  Silver Gull Tawny Frogmouth
  • 42. Principle of Transparency CIS Ch18 meeting our obligations The principle of transparency means members of the public should have access to reliable and relevant information in appropriate forms to facilitate a good understanding of transport issues and the process by which decisions in relation the transport system are made. • No Business Case • Alternative Designs and Options • Peer review of modelling- Sensitivity Analysis – Induce Traffic, Tolls • Hoddle Freeway
  • 43. The Principle of Intergenerational Equity CIS Ch18 meeting our obligations “Principle of equity The principle of equity means: a) Equity between persons irrespective of their: personal attributes, including age, physical ability, ethnicity, culture, gender and financial situation; or location, including whether in a growth, urban, regional, rural or remote area. b) Equity between generations by not compromising the ability of future generations to meet their needs. “ LMA Response “The proposed PPP procurement and delivery model for the project ensures the funding burden of the project is shared across generations.” Passing a funding burden to a future generation along with climate change is not equitable.
  • 44. Is Performance Criteria sufficient protection? • LMA has less regard for local impacts than for motorist’s amenity. • The successful bidder will have even less regard for impacts due to the profit imperative. • If the committee does not direct certain outcomes, then we can’t expect the contractor to do more than the bare minimum. • This is highlighted in LMA’s refusal to say where the vent stacks should go. • The bidder will be bound to find the most cost effective location that meets the poorly established performance criteria.
  • 45. If the Reference Design does not meet the criteria, then what? • The Reference Project is not the declared project. • The CIS is not comprehensive and does not address impacts such as health. • The committee is open to find that the proposal does not comply with legislation (P&E, EPA, TIA) or local policies such as heritage • The undue haste forced upon this project is disorderly planning • Victoria will pay the consequence for a long time • The committee should recommend that no approvals be given