SlideShare a Scribd company logo
1 of 14
C270 (HK BIODIESEL PLANT)   Safety Report
SAFETY STATISTICS

Month:                                 Apr 2012   May 2012
Total Accumulated man-hour:             167,151    201,951
Man-hour without lost time injury:      167,151    201,951
Days worked since project commenced:     173        204
Days since last Time lost accident :     N/A        N/A
Cumulative Accident Frequency Rate:        0%        0%



 You are an important stakeholder !
SAFETY INSPECTION / MEETING




  Physical site safety walks   Weekly Safety Meetings
AREA NEED IMPROVEMENT

                                      PROMPT RECTIFICATION



                                      Improvement – equipment stored at
                                      safe distant from floor edge



HOUSEKEEPING
Storage of equipment close to floor
edge
AREA NEED IMPROVEMENT

                                      PROMPT RECTIFICATION



                                      Improvement – sharp end of reinforce
                                      bar protected by reused plastic bottle



HOUSEKEEPING
Sharp end of reinforce bar prone to
bodily injury
AREA NEED IMPROVEMENT

                                         PROMPT RECTIFICATION


                                         Improvement – safety warning and
                                         name and contact no. of responsible
                                         electrician clearly displayed


ELECTRIC SHOCK HAZARD
No safety warning sign and
information of responsible electrician
POSITIVE POINTERS




All workers using safety harness attached to
safe anchorage points at work


                                               Team work / Signal man deployed for
                                               safe lifting work
POSITIVE POINTERS




Provision of safe access and safety sign   Provision of safe working platform for
                                           working at height
SAFETY TRAINING




                                                 INDUCTION
                                                    TRAINING




  Site Specific Safety                        Accumulate
                         Current Month
       Induction                         (Oct 2011 – May 2012)


     No. of class            19                 142

    No. of Attendee          84                 712
TOOL BOX TALK
SAFETY TRAINING
TRAINING




                                            Accumulated Total : 1,724 nos.

                       Topic                              No. of attendee
 Occupational Safety     Prevention of Slip & Trip            66 nos.
 Occupational Safety           Site Housekeeping              38 nos.
 Occupational Safety           Accident Reporting             63 nos.
 Occupational Safety      Emergency Procedures                71 nos.
 Occupational Safety           Safe Use of Ladder             64 nos.
                                Current Month Total           305 nos.
GUEST VISIT




 Introduction seminar held by Project   Visitors accompanied by Project
 Director and Project Manager           Management Team
GOVERNMENT / AUTHORITIES VISIT
             NO reported injury accident recorded in May 2012; all
             subcontractors reported neither site accident nor dangerous
             occurrence happened in their subcontracted responsible
             area at the Weekly Safety Meetings with CHEC / AECOM /
             Jacob.




BD inspection on 17/5/2012           BD conduct testing
SAFETY & HEALTH & ENVIRONMENTAL ASSURANCE
               Safety & Health Audit – at interval of every 6 months by
                  Independent Registered Safety Auditor
               Environmental Monitoring – monthly by Independent
                  Environmental Checker
               Environmental Audit – at interval of every 6 months by CHEC
                  Environmental Officer




 Safety Audit conducted by               Environmental Audit conducted by
 Independent Safety Auditor on           Independent Environmental Checker
 15/5/2012                               on 22/5/2012
THE END

Thanks for watching!!

More Related Content

What's hot

Monthly Safety Report 2013 08_Aug
Monthly Safety Report 2013 08_AugMonthly Safety Report 2013 08_Aug
Monthly Safety Report 2013 08_Aug
ChinaHarbour
 
Monthly safety report 2013 04
Monthly safety report 2013 04Monthly safety report 2013 04
Monthly safety report 2013 04
ChinaHarbour
 
Monthly safety report 2013 01
Monthly safety report 2013 01Monthly safety report 2013 01
Monthly safety report 2013 01
ChinaHarbour
 
Monthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_JulMonthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_Jul
ChinaHarbour
 
Monthly safety report 2012 10_october
Monthly safety report 2012 10_octoberMonthly safety report 2012 10_october
Monthly safety report 2012 10_october
ChinaHarbour
 
Monthly Safety Report Aug 2012
Monthly Safety Report Aug 2012Monthly Safety Report Aug 2012
Monthly Safety Report Aug 2012
ChinaHarbour
 
Tims Resume (3)
Tims Resume (3)Tims Resume (3)
Tims Resume (3)
Tim Bork
 
Sohail resume Safety specialist
Sohail resume Safety specialistSohail resume Safety specialist
Sohail resume Safety specialist
Sohail Akbar
 

What's hot (14)

Monthly Safety Report 2013 08_Aug
Monthly Safety Report 2013 08_AugMonthly Safety Report 2013 08_Aug
Monthly Safety Report 2013 08_Aug
 
Monthly safety report 2013 04
Monthly safety report 2013 04Monthly safety report 2013 04
Monthly safety report 2013 04
 
Monthly safety report 2013 01
Monthly safety report 2013 01Monthly safety report 2013 01
Monthly safety report 2013 01
 
Monthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_JulMonthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_Jul
 
Ntagnia
NtagniaNtagnia
Ntagnia
 
NT AGNI SOLUTIONS PVT LTD
NT AGNI SOLUTIONS PVT LTDNT AGNI SOLUTIONS PVT LTD
NT AGNI SOLUTIONS PVT LTD
 
Monthly safety report 2012 10_october
Monthly safety report 2012 10_octoberMonthly safety report 2012 10_october
Monthly safety report 2012 10_october
 
Monthly Safety Report Aug 2012
Monthly Safety Report Aug 2012Monthly Safety Report Aug 2012
Monthly Safety Report Aug 2012
 
Pqr In A Glance
Pqr In A GlancePqr In A Glance
Pqr In A Glance
 
Tims Resume (3)
Tims Resume (3)Tims Resume (3)
Tims Resume (3)
 
Sohail resume Safety specialist
Sohail resume Safety specialistSohail resume Safety specialist
Sohail resume Safety specialist
 
Alarm systems Ireland | rostek.ie
Alarm systems Ireland | rostek.ieAlarm systems Ireland | rostek.ie
Alarm systems Ireland | rostek.ie
 
Arul CV 2017
Arul CV 2017Arul CV 2017
Arul CV 2017
 
Ex Products - nuovo
Ex Products - nuovoEx Products - nuovo
Ex Products - nuovo
 

Viewers also liked (17)

Contoh Monthly Reports
Contoh  Monthly  ReportsContoh  Monthly  Reports
Contoh Monthly Reports
 
Safety officer (k3 officer)
Safety officer (k3 officer)Safety officer (k3 officer)
Safety officer (k3 officer)
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure
 
Monthly safety report 2012 12_december
Monthly safety report 2012 12_decemberMonthly safety report 2012 12_december
Monthly safety report 2012 12_december
 
Ebook bosan kerja resign aja goukm.id
Ebook bosan kerja resign aja goukm.idEbook bosan kerja resign aja goukm.id
Ebook bosan kerja resign aja goukm.id
 
My view imprint 2007 11 - 2
My view imprint 2007   11 - 2My view imprint 2007   11 - 2
My view imprint 2007 11 - 2
 
HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual Performance
 
Hse frm 09 hse flyer
Hse frm 09 hse flyerHse frm 09 hse flyer
Hse frm 09 hse flyer
 
Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)
 
6th smester
6th smester6th smester
6th smester
 
JAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTJAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORT
 
5S Urdu Training
5S Urdu Training5S Urdu Training
5S Urdu Training
 
Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)
 
FIRE DRILL
FIRE DRILLFIRE DRILL
FIRE DRILL
 
Induction QHSE
Induction QHSEInduction QHSE
Induction QHSE
 
Safety Engineering - Compilation of Reports
Safety Engineering - Compilation of ReportsSafety Engineering - Compilation of Reports
Safety Engineering - Compilation of Reports
 

Similar to Monthly safety report may 2012

Monthly safety report apr 2012
Monthly safety report apr 2012Monthly safety report apr 2012
Monthly safety report apr 2012
ChinaHarbour
 
Monthly safety report 2012 09
Monthly safety report 2012 09Monthly safety report 2012 09
Monthly safety report 2012 09
ChinaHarbour
 
Monthly safety report Sep 2012
Monthly safety report Sep 2012Monthly safety report Sep 2012
Monthly safety report Sep 2012
ChinaHarbour
 
Missing safety during construction
Missing safety during constructionMissing safety during construction
Missing safety during construction
Gzing Muhamed
 
Monthly safety report 2013 02
Monthly safety report 2013 02Monthly safety report 2013 02
Monthly safety report 2013 02
ChinaHarbour
 
SALAM SHAIK ABDUL NEW Feb 2015
SALAM SHAIK ABDUL NEW Feb 2015SALAM SHAIK ABDUL NEW Feb 2015
SALAM SHAIK ABDUL NEW Feb 2015
Salam Shaik Abdul
 
Monthly Safety Report March 2012
Monthly Safety Report March 2012Monthly Safety Report March 2012
Monthly Safety Report March 2012
ChinaHarbour
 

Similar to Monthly safety report may 2012 (20)

Monthly safety report apr 2012
Monthly safety report apr 2012Monthly safety report apr 2012
Monthly safety report apr 2012
 
Monthly safety report 2012 09
Monthly safety report 2012 09Monthly safety report 2012 09
Monthly safety report 2012 09
 
Monthly safety report Sep 2012
Monthly safety report Sep 2012Monthly safety report Sep 2012
Monthly safety report Sep 2012
 
Missing safety during construction
Missing safety during constructionMissing safety during construction
Missing safety during construction
 
Monthly safety report 2013 02
Monthly safety report 2013 02Monthly safety report 2013 02
Monthly safety report 2013 02
 
SALAM SHAIK ABDUL NEW Feb 2015
SALAM SHAIK ABDUL NEW Feb 2015SALAM SHAIK ABDUL NEW Feb 2015
SALAM SHAIK ABDUL NEW Feb 2015
 
RESUME
RESUMERESUME
RESUME
 
GHULAM MARCH 2015
GHULAM MARCH 2015GHULAM MARCH 2015
GHULAM MARCH 2015
 
Itcdc
ItcdcItcdc
Itcdc
 
RAFIQ HSE
RAFIQ HSERAFIQ HSE
RAFIQ HSE
 
Risk Assessment Awareness by Dominic Lim
Risk Assessment Awareness by Dominic LimRisk Assessment Awareness by Dominic Lim
Risk Assessment Awareness by Dominic Lim
 
Safety in construction
Safety in constructionSafety in construction
Safety in construction
 
ENGINEER cv
ENGINEER cvENGINEER cv
ENGINEER cv
 
SEUN UPDATED CV NEW
SEUN UPDATED CV NEWSEUN UPDATED CV NEW
SEUN UPDATED CV NEW
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
Jayakumar-15032015
Jayakumar-15032015Jayakumar-15032015
Jayakumar-15032015
 
Monthly Safety Report March 2012
Monthly Safety Report March 2012Monthly Safety Report March 2012
Monthly Safety Report March 2012
 
SARAVANAN RESUME
SARAVANAN RESUMESARAVANAN RESUME
SARAVANAN RESUME
 
Safety Manual .docx
Safety Manual .docxSafety Manual .docx
Safety Manual .docx
 
Naushad Azam-Resume
Naushad Azam-ResumeNaushad Azam-Resume
Naushad Azam-Resume
 

Recently uploaded

Recently uploaded (20)

Renal Replacement Therapy in Acute Kidney Injury -time modality -Dr Ayman Se...
Renal Replacement Therapy in Acute Kidney Injury -time  modality -Dr Ayman Se...Renal Replacement Therapy in Acute Kidney Injury -time  modality -Dr Ayman Se...
Renal Replacement Therapy in Acute Kidney Injury -time modality -Dr Ayman Se...
 
Is Rheumatoid Arthritis a Metabolic Disorder.pptx
Is Rheumatoid Arthritis a Metabolic Disorder.pptxIs Rheumatoid Arthritis a Metabolic Disorder.pptx
Is Rheumatoid Arthritis a Metabolic Disorder.pptx
 
TEST BANK For Lewis's Medical Surgical Nursing in Canada, 4th Edition by Jane...
TEST BANK For Lewis's Medical Surgical Nursing in Canada, 4th Edition by Jane...TEST BANK For Lewis's Medical Surgical Nursing in Canada, 4th Edition by Jane...
TEST BANK For Lewis's Medical Surgical Nursing in Canada, 4th Edition by Jane...
 
Gallbladder Double-Diverticular: A Case Report المرارة مزدوجة التج: تقرير حالة
Gallbladder Double-Diverticular: A Case Report  المرارة مزدوجة التج: تقرير حالةGallbladder Double-Diverticular: A Case Report  المرارة مزدوجة التج: تقرير حالة
Gallbladder Double-Diverticular: A Case Report المرارة مزدوجة التج: تقرير حالة
 
World Hypertension Day 17th may 2024 ppt
World Hypertension Day 17th may 2024 pptWorld Hypertension Day 17th may 2024 ppt
World Hypertension Day 17th may 2024 ppt
 
Denture base resins materials and its mechanism of action
Denture base resins materials and its mechanism of actionDenture base resins materials and its mechanism of action
Denture base resins materials and its mechanism of action
 
Premium ℂall Girls In Mumbai Airport👉 Dail ℂALL ME: 📞9833325238 📲 ℂall Richa ...
Premium ℂall Girls In Mumbai Airport👉 Dail ℂALL ME: 📞9833325238 📲 ℂall Richa ...Premium ℂall Girls In Mumbai Airport👉 Dail ℂALL ME: 📞9833325238 📲 ℂall Richa ...
Premium ℂall Girls In Mumbai Airport👉 Dail ℂALL ME: 📞9833325238 📲 ℂall Richa ...
 
Dermatome and myotome test & pathology.pdf
Dermatome and myotome test & pathology.pdfDermatome and myotome test & pathology.pdf
Dermatome and myotome test & pathology.pdf
 
CONGENITAL HYPERTROPHIC PYLORIC STENOSIS by Dr M.KARTHIK EMMANUEL
CONGENITAL HYPERTROPHIC PYLORIC STENOSIS  by Dr M.KARTHIK EMMANUELCONGENITAL HYPERTROPHIC PYLORIC STENOSIS  by Dr M.KARTHIK EMMANUEL
CONGENITAL HYPERTROPHIC PYLORIC STENOSIS by Dr M.KARTHIK EMMANUEL
 
Creating Accessible Public Health Communications
Creating Accessible Public Health CommunicationsCreating Accessible Public Health Communications
Creating Accessible Public Health Communications
 
Case presentation on Antibody screening- how to solve 3 cell and 11 cell panel?
Case presentation on Antibody screening- how to solve 3 cell and 11 cell panel?Case presentation on Antibody screening- how to solve 3 cell and 11 cell panel?
Case presentation on Antibody screening- how to solve 3 cell and 11 cell panel?
 
Overview on the Automatic pill identifier
Overview on the Automatic pill identifierOverview on the Automatic pill identifier
Overview on the Automatic pill identifier
 
VVIP Yelahanka ℂall Girls 6350482085 Heat-immolating { Bangalore } Coveted Gi...
VVIP Yelahanka ℂall Girls 6350482085 Heat-immolating { Bangalore } Coveted Gi...VVIP Yelahanka ℂall Girls 6350482085 Heat-immolating { Bangalore } Coveted Gi...
VVIP Yelahanka ℂall Girls 6350482085 Heat-immolating { Bangalore } Coveted Gi...
 
Premium ℂall Girls In Mira Road👉 Dail ℂALL ME: 📞9004268417 📲 ℂall Richa VIP ℂ...
Premium ℂall Girls In Mira Road👉 Dail ℂALL ME: 📞9004268417 📲 ℂall Richa VIP ℂ...Premium ℂall Girls In Mira Road👉 Dail ℂALL ME: 📞9004268417 📲 ℂall Richa VIP ℂ...
Premium ℂall Girls In Mira Road👉 Dail ℂALL ME: 📞9004268417 📲 ℂall Richa VIP ℂ...
 
Our Hottest 💘 Surat ℂall Girls Serviℂe 💘Pasodara📱 8527049040📱450+ ℂall Girl C...
Our Hottest 💘 Surat ℂall Girls Serviℂe 💘Pasodara📱 8527049040📱450+ ℂall Girl C...Our Hottest 💘 Surat ℂall Girls Serviℂe 💘Pasodara📱 8527049040📱450+ ℂall Girl C...
Our Hottest 💘 Surat ℂall Girls Serviℂe 💘Pasodara📱 8527049040📱450+ ℂall Girl C...
 
TEST BANK For Huether and McCance's Understanding Pathophysiology, Canadian 2...
TEST BANK For Huether and McCance's Understanding Pathophysiology, Canadian 2...TEST BANK For Huether and McCance's Understanding Pathophysiology, Canadian 2...
TEST BANK For Huether and McCance's Understanding Pathophysiology, Canadian 2...
 
Unlocking Holistic Wellness: Addressing Depression, Mental Well-Being, and St...
Unlocking Holistic Wellness: Addressing Depression, Mental Well-Being, and St...Unlocking Holistic Wellness: Addressing Depression, Mental Well-Being, and St...
Unlocking Holistic Wellness: Addressing Depression, Mental Well-Being, and St...
 
The Orbit & its contents by Dr. Rabia I. Gandapore.pptx
The Orbit & its contents by Dr. Rabia I. Gandapore.pptxThe Orbit & its contents by Dr. Rabia I. Gandapore.pptx
The Orbit & its contents by Dr. Rabia I. Gandapore.pptx
 
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
5CL-ADB powder supplier 5cl adb 5cladba 5cl raw materials vendor on sale now
 
Unveiling Alcohol Withdrawal Syndrome: exploring it's hidden depths
Unveiling Alcohol Withdrawal Syndrome: exploring it's hidden depthsUnveiling Alcohol Withdrawal Syndrome: exploring it's hidden depths
Unveiling Alcohol Withdrawal Syndrome: exploring it's hidden depths
 

Monthly safety report may 2012

  • 1. C270 (HK BIODIESEL PLANT) Safety Report
  • 2. SAFETY STATISTICS Month: Apr 2012 May 2012 Total Accumulated man-hour: 167,151 201,951 Man-hour without lost time injury: 167,151 201,951 Days worked since project commenced: 173 204 Days since last Time lost accident : N/A N/A Cumulative Accident Frequency Rate: 0% 0% You are an important stakeholder !
  • 3. SAFETY INSPECTION / MEETING Physical site safety walks Weekly Safety Meetings
  • 4. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – equipment stored at safe distant from floor edge HOUSEKEEPING Storage of equipment close to floor edge
  • 5. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – sharp end of reinforce bar protected by reused plastic bottle HOUSEKEEPING Sharp end of reinforce bar prone to bodily injury
  • 6. AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – safety warning and name and contact no. of responsible electrician clearly displayed ELECTRIC SHOCK HAZARD No safety warning sign and information of responsible electrician
  • 7. POSITIVE POINTERS All workers using safety harness attached to safe anchorage points at work Team work / Signal man deployed for safe lifting work
  • 8. POSITIVE POINTERS Provision of safe access and safety sign Provision of safe working platform for working at height
  • 9. SAFETY TRAINING INDUCTION TRAINING Site Specific Safety Accumulate Current Month Induction (Oct 2011 – May 2012) No. of class 19 142 No. of Attendee 84 712
  • 10. TOOL BOX TALK SAFETY TRAINING TRAINING Accumulated Total : 1,724 nos. Topic No. of attendee Occupational Safety Prevention of Slip & Trip 66 nos. Occupational Safety Site Housekeeping 38 nos. Occupational Safety Accident Reporting 63 nos. Occupational Safety Emergency Procedures 71 nos. Occupational Safety Safe Use of Ladder 64 nos. Current Month Total 305 nos.
  • 11. GUEST VISIT Introduction seminar held by Project Visitors accompanied by Project Director and Project Manager Management Team
  • 12. GOVERNMENT / AUTHORITIES VISIT NO reported injury accident recorded in May 2012; all subcontractors reported neither site accident nor dangerous occurrence happened in their subcontracted responsible area at the Weekly Safety Meetings with CHEC / AECOM / Jacob. BD inspection on 17/5/2012 BD conduct testing
  • 13. SAFETY & HEALTH & ENVIRONMENTAL ASSURANCE Safety & Health Audit – at interval of every 6 months by Independent Registered Safety Auditor Environmental Monitoring – monthly by Independent Environmental Checker Environmental Audit – at interval of every 6 months by CHEC Environmental Officer Safety Audit conducted by Environmental Audit conducted by Independent Safety Auditor on Independent Environmental Checker 15/5/2012 on 22/5/2012
  • 14. THE END Thanks for watching!!