Charles Suh
Savills Studley Project Experience
1
Kia Motors America North American HQ (2006)
 230,000 SF high profile building at the gateway
to Irvine off the 5 freeway, featuring a 4 acre
reflecting pond.
 Two story building included office,
conference/presentation center, 10,000 SF data
center, two central plants and service garage
 Integration of tilt-up and steel structure building
design
 Challenged with a design team that over-
designed details but project met target schedule
& budget goals.
 Architect: SOM
 Project Duration: 20 months, Completion: Dec 2006
 Project cost: $62 Million
Emulex Roseville (2007)
 38,700 SF Tenant Improvement project in Roseville, CA.
 Project included office, data center, conferencing area, workout
facility and high tech electronics lab with Starline Bus Systems for
electrical distribution.
 Project schedule started in Feb 2007 and included pre-transaction
project management to assist with base building requirements and
specifications.
 Project Scope included Design, Construction, Data Cable, Audio
Visual, Security, Signage, Furniture, Fitness Equipment and
Relocation
 Studley worked closely with City of Roseville to expedite approvals
and to get building transformer upgrades from Roseville Electric
within the 14 week construction schedule.
 Architect: LPA
 Project Duration: 7 months, Completion: Oct 2007
 Project Cost $5.3 Million
Kia Motors America Parts Distribution Center (2008)
 404,000 SF Build-to-Suit, warehouse in Riverside, CA.
 Studley Project Management Services hired to assist
in development of Outline Specifications and provide
oversight of Developer’s work.
 Studley Project Management was also engaged to
provide oversight of Development, Tenant
Improvements and manage all third party vendors.
 Project had an unusually tight schedule but
successfully made required move-in dates while still
saving client approximately $1.3 Million.
 Architect: RGA
 Project Duration: 9 months, Completion: Jan 2008
 Project Cost $5.5 Million (Client out of Pocket costs)
Charles Suh
Savills Studley Project Experience
2
Fox Studios – Building 104 (2008)
 36,400 SF four-story Build-to-Suit office building at
Century City Studio Lot
 Studley Project Management Services hired by Fox
Real Estate after project budget was missed by $2
Million
 Project maintained original construction schedule
despite Studley’s re-design effort and resulted in costs
savings of $1.2 Million
 LEED® decision was made during VE re-design and
Project achieved LEED® Certification
 Architect: Gensler
 Project Duration: 16 months, Completion: May 2008
 Project Cost $12.9 Million
McDermott Will & Emery – San Diego (2008)
 23,000 SF High-end Tenant Improvement project in
San Diego, CA.
 Project included office area, data center, high density
file storage and employee lounge.
 With value engineering efforts, Studley saved over
$200,000 in furniture and construction costs.
 Project Scope included Design, Construction, Data
Cable, Audio Visual, Security, Signage, Furniture and
Relocation
 Architect: Howard Sneed
 Project Duration: 5 months, Completion: Dec 2008
 Project Cost $1.8 Million
Yard House (2010)
 25,000 SF Tenant Improvement project in Irvine,
CA.
 Project included office area, data center, training
room and employee lounge.
 Project Scope included Design, Construction, Data
Cable, Audio Visual, Security, Signage, Furniture
and Relocation
 Architect: LPA
 Project Duration: 5 months, Completion: Jun 2010
 Project Cost $1.4 Million
Charles Suh
Savills Studley Project Experience
3
Western Digital (2010)
 350,000 SF Tenant Improvement project in
Irvine.
 TI included office and electronic test lab
space
 The lab space required complete
replacement of electrical and HVAC systems
entailing a new central plant and equipment
yard
 Studley was engaged to provide oversight of
Landlord performance to mitigate risks for
Western Digital
 Studley project management was also involved with the cost analyses for the lease transaction
 Architect: LPA
 Project Duration: 12 months, Completion: Dec 2010
 Project cost: $40 Million
Mercury Payment Systems, LLC (2013)
 51,000 SF Fast-tracked high-end technology
based Tenant Improvement project in Denver,
Colorado
 Project included high security office area, data
center, generator for data center and 24 hour
customer service areas.
 Project Scope included Design, Construction,
Data Cable, Audio Visual, Security, Signage,
Furniture and Relocation
 As a result of continuous risk management &
close oversight, project came in 10% under
projected budget.
 Architect: Dekker, Perich, Sabatini
 Project Duration: 5 months, Completion: May 2013
 Project Cost $6.0 Million
Mercury Payment Systems, LLC (2014)
 Phase 1 is an 86,000 SF Build to Suit Headquarter development project
in Durango Colorado.
 Project included site infrastructure for the 30 acre Mercury Village
Master Planned Project including City of Durango roads, sewer storm
drains and utilities. Also includes CDOT access off highway 160/550.
 Studley was engaged to manage overall Village development along with
the Mercury Headquarters Building and to oversee the sale of remaining
out parcels.
 Studley is worked closely with City of Durango for all zoning & approvals
including formulation of a Planned Development Agreement.
 Project was targeted for LEED® Silver but achieved LEED® Gold
Certification.
 Architect: Dekker/Perich/Sabatini
 Project Duration: 28 months, Completion: June 2014
 Project cost: $34 Million total ($6M Site Infrastructure / $28M HQ Building)
Charles Suh
Savills Studley Project Experience
4
ReachLocal, Inc. (2014)
 100,000 SF High-density (approx. 155 SF per
employee) technology based Tenant Improvement
project in Plano, Texas
 Oversight of landlord/developer construction of new
building to ReachLocal specifications
 Project included secure office area, 10,000 SF training
center, server room, generator for communication
systems and 24 hour customer service areas,
cafeteria, work out facility and other employee
amenities.
 Project Scope included Design, Construction, Data
Cable, Audio Visual, Security, Signage, Furniture and Relocation
 Architect: Merriman & Associates
 Project Duration: 12 months, Completion: October 2014
 Project Cost: $7.00 Million (not including building shell).
ibotta (2016)
 37,710 SF Tenant Improvement project in
Denver, Colorado
 Project entailed creation of new open area office
standards for high growth technology firm. The
design pioneered 100% sit/stand adjustable work
surfaces.
 SSI integral in reduction of $280,000 in annual
operating costs by incorporation of 24-hour HVAC
system for customer service areas in lieu of using
Landlord’s off-hours HVAC.
 Project Scope included Design, Construction,
Data Cable, Audio Visual, Security, Signage, Furniture and Relocation
 Architect: Studio B2SJ
 Project Duration: 4 months, Completion: March 2016
 Project Cost: $3.3 Million.
Additional Client List:

More Related Content

Similar to CSuh Project Experience

Similar to CSuh Project Experience (20)

RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
Mario Perez: Resume + Sample Projects 2013
Mario Perez: Resume + Sample Projects 2013Mario Perez: Resume + Sample Projects 2013
Mario Perez: Resume + Sample Projects 2013
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway Resume
 
CV
CVCV
CV
 
Mike najarian resume
Mike najarian resumeMike najarian resume
Mike najarian resume
 
Greene, David
Greene, DavidGreene, David
Greene, David
 
James Paul Resume March 2011
James Paul Resume   March 2011James Paul Resume   March 2011
James Paul Resume March 2011
 
Mohanraj Resume
Mohanraj ResumeMohanraj Resume
Mohanraj Resume
 
Operations class project
Operations class projectOperations class project
Operations class project
 
DMcNeil PM Design Projects
DMcNeil PM Design ProjectsDMcNeil PM Design Projects
DMcNeil PM Design Projects
 
chesbro resume
chesbro resumechesbro resume
chesbro resume
 
Dennis M. Usky resume 9-14-2015
Dennis M. Usky resume 9-14-2015Dennis M. Usky resume 9-14-2015
Dennis M. Usky resume 9-14-2015
 
Resume - Jonas Mendiola
Resume - Jonas MendiolaResume - Jonas Mendiola
Resume - Jonas Mendiola
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
CV - ken wood on 12th feb 2016 2 pages
CV - ken wood  on  12th feb 2016   2 pagesCV - ken wood  on  12th feb 2016   2 pages
CV - ken wood on 12th feb 2016 2 pages
 
Andrew Kuplevakhskyi Expertise Overview
Andrew Kuplevakhskyi Expertise OverviewAndrew Kuplevakhskyi Expertise Overview
Andrew Kuplevakhskyi Expertise Overview
 
101014 Melton Jennifer Resume
101014 Melton Jennifer Resume101014 Melton Jennifer Resume
101014 Melton Jennifer Resume
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdf
 
Mohsin-Hussain Resume-31122014
Mohsin-Hussain Resume-31122014Mohsin-Hussain Resume-31122014
Mohsin-Hussain Resume-31122014
 

CSuh Project Experience

  • 1. Charles Suh Savills Studley Project Experience 1 Kia Motors America North American HQ (2006)  230,000 SF high profile building at the gateway to Irvine off the 5 freeway, featuring a 4 acre reflecting pond.  Two story building included office, conference/presentation center, 10,000 SF data center, two central plants and service garage  Integration of tilt-up and steel structure building design  Challenged with a design team that over- designed details but project met target schedule & budget goals.  Architect: SOM  Project Duration: 20 months, Completion: Dec 2006  Project cost: $62 Million Emulex Roseville (2007)  38,700 SF Tenant Improvement project in Roseville, CA.  Project included office, data center, conferencing area, workout facility and high tech electronics lab with Starline Bus Systems for electrical distribution.  Project schedule started in Feb 2007 and included pre-transaction project management to assist with base building requirements and specifications.  Project Scope included Design, Construction, Data Cable, Audio Visual, Security, Signage, Furniture, Fitness Equipment and Relocation  Studley worked closely with City of Roseville to expedite approvals and to get building transformer upgrades from Roseville Electric within the 14 week construction schedule.  Architect: LPA  Project Duration: 7 months, Completion: Oct 2007  Project Cost $5.3 Million Kia Motors America Parts Distribution Center (2008)  404,000 SF Build-to-Suit, warehouse in Riverside, CA.  Studley Project Management Services hired to assist in development of Outline Specifications and provide oversight of Developer’s work.  Studley Project Management was also engaged to provide oversight of Development, Tenant Improvements and manage all third party vendors.  Project had an unusually tight schedule but successfully made required move-in dates while still saving client approximately $1.3 Million.  Architect: RGA  Project Duration: 9 months, Completion: Jan 2008  Project Cost $5.5 Million (Client out of Pocket costs)
  • 2. Charles Suh Savills Studley Project Experience 2 Fox Studios – Building 104 (2008)  36,400 SF four-story Build-to-Suit office building at Century City Studio Lot  Studley Project Management Services hired by Fox Real Estate after project budget was missed by $2 Million  Project maintained original construction schedule despite Studley’s re-design effort and resulted in costs savings of $1.2 Million  LEED® decision was made during VE re-design and Project achieved LEED® Certification  Architect: Gensler  Project Duration: 16 months, Completion: May 2008  Project Cost $12.9 Million McDermott Will & Emery – San Diego (2008)  23,000 SF High-end Tenant Improvement project in San Diego, CA.  Project included office area, data center, high density file storage and employee lounge.  With value engineering efforts, Studley saved over $200,000 in furniture and construction costs.  Project Scope included Design, Construction, Data Cable, Audio Visual, Security, Signage, Furniture and Relocation  Architect: Howard Sneed  Project Duration: 5 months, Completion: Dec 2008  Project Cost $1.8 Million Yard House (2010)  25,000 SF Tenant Improvement project in Irvine, CA.  Project included office area, data center, training room and employee lounge.  Project Scope included Design, Construction, Data Cable, Audio Visual, Security, Signage, Furniture and Relocation  Architect: LPA  Project Duration: 5 months, Completion: Jun 2010  Project Cost $1.4 Million
  • 3. Charles Suh Savills Studley Project Experience 3 Western Digital (2010)  350,000 SF Tenant Improvement project in Irvine.  TI included office and electronic test lab space  The lab space required complete replacement of electrical and HVAC systems entailing a new central plant and equipment yard  Studley was engaged to provide oversight of Landlord performance to mitigate risks for Western Digital  Studley project management was also involved with the cost analyses for the lease transaction  Architect: LPA  Project Duration: 12 months, Completion: Dec 2010  Project cost: $40 Million Mercury Payment Systems, LLC (2013)  51,000 SF Fast-tracked high-end technology based Tenant Improvement project in Denver, Colorado  Project included high security office area, data center, generator for data center and 24 hour customer service areas.  Project Scope included Design, Construction, Data Cable, Audio Visual, Security, Signage, Furniture and Relocation  As a result of continuous risk management & close oversight, project came in 10% under projected budget.  Architect: Dekker, Perich, Sabatini  Project Duration: 5 months, Completion: May 2013  Project Cost $6.0 Million Mercury Payment Systems, LLC (2014)  Phase 1 is an 86,000 SF Build to Suit Headquarter development project in Durango Colorado.  Project included site infrastructure for the 30 acre Mercury Village Master Planned Project including City of Durango roads, sewer storm drains and utilities. Also includes CDOT access off highway 160/550.  Studley was engaged to manage overall Village development along with the Mercury Headquarters Building and to oversee the sale of remaining out parcels.  Studley is worked closely with City of Durango for all zoning & approvals including formulation of a Planned Development Agreement.  Project was targeted for LEED® Silver but achieved LEED® Gold Certification.  Architect: Dekker/Perich/Sabatini  Project Duration: 28 months, Completion: June 2014  Project cost: $34 Million total ($6M Site Infrastructure / $28M HQ Building)
  • 4. Charles Suh Savills Studley Project Experience 4 ReachLocal, Inc. (2014)  100,000 SF High-density (approx. 155 SF per employee) technology based Tenant Improvement project in Plano, Texas  Oversight of landlord/developer construction of new building to ReachLocal specifications  Project included secure office area, 10,000 SF training center, server room, generator for communication systems and 24 hour customer service areas, cafeteria, work out facility and other employee amenities.  Project Scope included Design, Construction, Data Cable, Audio Visual, Security, Signage, Furniture and Relocation  Architect: Merriman & Associates  Project Duration: 12 months, Completion: October 2014  Project Cost: $7.00 Million (not including building shell). ibotta (2016)  37,710 SF Tenant Improvement project in Denver, Colorado  Project entailed creation of new open area office standards for high growth technology firm. The design pioneered 100% sit/stand adjustable work surfaces.  SSI integral in reduction of $280,000 in annual operating costs by incorporation of 24-hour HVAC system for customer service areas in lieu of using Landlord’s off-hours HVAC.  Project Scope included Design, Construction, Data Cable, Audio Visual, Security, Signage, Furniture and Relocation  Architect: Studio B2SJ  Project Duration: 4 months, Completion: March 2016  Project Cost: $3.3 Million. Additional Client List: