1. CLIENT PROJECT POSITION LOCATION TYPE
Approx. Proj.
Cost
NDPR Ltd.
Outside Boundry Limits of the Ogebella,
Nigeria 11,000 BOPD Refinery
Project Manager
River County,
Nigeria
E,P $19MM
Sinclair Wyoming Refining Co.
Reformer and Alky vessel and piping
engineering.
Q/A Manager Sinclair, Wy E $20MM
Kennecott (Rio Tinto) Flash Smelter Furnace Jacket Cooling Project Manager Copperton, Ut E $3MM
Chevron El Segundo Refinery Coke Movement Improvement Project Project Mgr. El Segundo, Ca. E, P, C $34MM
Elkview Mine HM Coal Plant
Assit. PM, Assit.
Const. Mgr.
Sparwood, B.C.,
Canada
E, P, C $65MM
Kennecott (Rio Tinto) Seal Water Project (MAP) Project Manager Copperton, Ut E $14MM
South Wall Maintenance Facility Design, estimate Main Mine, Ut E $ 30,000
Cullinary Water Well Supply Study Project Manager Magna, Ut E $ 10,000
Tailings Barge Relocation Engineer Magna, Ut E $ 50,000
Calavaras Cement Crusher, DG Waste, Balance, Conveyor Project Engineer Calavaras, Ca E $35MM
Savage Services Corp. Conveyor and transfer modifications Project Manager Carbon Co., Ut. E $ 250,000
University of North Carolina,
Chapel Hill
Coal Silo and Conveyor Replacement
Architect, Project
Engineer
Chapel Hill, NC E, CM $25MM
ARC Coal Creek Mine Train Load-out Conveyor Modifications Project Engineer Soilder Creek, Ut E $ 150,000
B.H.P. Billiton Conveyor Chute Modifications Project Manager Farmington, NM E $ 50,000
Arizona Public Power Feed Silo Conveyor Replacement Project Manager Huntington, Az E,P,C $8MM
BHP South Bay Refinery Replace burned out conveyor Project Engineer Los Angeles, Ca E $1MM
California Portland Cement Kiln Oxygen Enrichment Plant Project Manager Mohave, Ca E $ 75,000
Davey Johnson Power Plant Fuel Supply Conveyor System Washdown Project Manager Cody, Wy E $ 80,000
Ash Slurry Movement Study E $34M
Headwaters/Covol Fuels Coal Briquetting Project Manger Salt Lake, Ut. E $1MM
Cary Jones - Project Portfollio
Petrochemical
Intermountain Consumer Professional Engineers (ICPE)
Petrochemical and Mining
Roberts & Schaefer Company (KBR)
Mining, Material Handling and Petrochemical
Chemex Modular, LLC
1
2. Cary Jones - Project Portfollio
Barrick Gold Carbon Column Crane Study Project Manager Elko, Nv E $ 20,000
Hexcel-Carbon Fiber Division R&D Fiber Line Modifications Project Manager West Valley, Ut E $ 120,000
Line 3 Oven and Drive Upgrade Project Manager West Valley, Ut E $3MM
Line 3 Sizing Replacement Project Manager West Valley, Ut E $ 80,000
Line 3 Pan Creel Redesign Project Manager West Valley, Ut E $ 30,000
Line 4 Expanded Bicarb and Sizing Project Manager West Valley, Ut E $ 400,000
Line 5 Expanded Bicarb and Sizing Project Manager West Valley, Ut E $ 400,000
Fiberline 8 New Construction Facility
Project Manager,
Architect
West Valley, Ut A, E $55MM
Fiberline 10 New Construction Facility
Project Manager,
Architect
West Valley, Ut A, E $60MM
Cyanco Cyanide Manufacturing Modifications Project Manager Winnemucca, Nv E $ 425,000
Cyanide and Caustic Storage Tank Facility $ 150,000
Hexcel-Compsite Division Resin Mixing Unit Resite Project Manager West Valley, Ut E $ 200,000
Pre-preg oil heater replacement Project Manager West Valley, Ut E $ 50,000
Mezzanine addition for tape prepreg line Project Manager West Valley, Ut E $ 125,000
Pre-preg testing lab remodel Project Manager West Valley, Ut E $ 15,000
Antelope Coal
Mining Truck Maintenance Shop, Company
Training Center
Project Manager,
Architect
Wright, Wy A, E, CM $2MM
Borax Inc.
Mining Truck Maintenance Shop,
Administrative Offices, Truck Wash
Project Manager Boron, Ca. E, CM $4MM
Bridger Coal Company
Mining Truck Maintenance Shop, Admin.
Offices, Dry Rooms, Break Room
Project Manager,
Architect
Point of Rocks,
Wy
A, E $3MM
Kennecott (Rio Tinto) Locomotive Shop Architect Magna, Ut A, E $5MM
Independence Mine
Underground Truck Maintenance Shop, Dry
Rooms, Offices
Project Manager,
Architect
60 mi. north of
Elko, Nv
A, E $2MM
TitanAmerica Cement Plant
Cement Automated Test Lab and Office
Facility
Project Manager,
Architect
Miami, FL E $2MM
Hexcel-Carbon Fiber Division Pan Storage Addition Project Manager West Valley, Ut E $1MM
ARCHITECTURE AND ENGINEERING
Manufacturing
2
3. Cary Jones - Project Portfollio
Chevron Raton Coal Mine Haul Truck Maintenance Shop
Project Manager,
Architect
Raton, NM A, E $1MM
Carlota Copper Mine Truck Shop and 6 Ancillary Buildings
Design, draft,
estimate
Miami, Az A $4MM
B.H.P. Billiton Truck Shop Study
Design, draft,
estimate
Farmington, NM A, E $ 15,000
Chilian Mine Truck Shop and 5 Ancillary Buildings
Design, draft,
estimate
Chili, S.A. A $5MM
Port of Tacoma Conveyor V.S. Trucking dredged material Project Manager Tacoma, Wa E $ 40,000
Alta Ski Company Albion Day Lodge Job Captain Alta, Ut 1MM
Alta Ski Company Albion Ticket and Office Building Job Captain Alta, Ut
Valley Bank and Trust Co. Operations Center, Lunch Room Job Captain Salt Lake City, Ut A $ 700000
Implemed Surgical Co. Implemend Surgical Center Job Captain Salt Lake City, Ut A $ 400000
FHP Redwood Road Medical
Center
FHP (Now U of Utah Health Center) Job Captain Salt Lake City, Ut A $1MM
Salt Lake City Catholic Diocese Judge Memorial Auditorium Job Captain Salt Lake City, Ut A $ 600000
Church of Jesus Christ of Latter
Day Saints
Stake Center, Scipio, Utah Job Captain Scipio, Utah A $ 300000
Deon Dove Doves Double Discount Job Captain Richfield, Utah A $ 300000
Scott, Louie and Browning, Architects
3