INDUSTRIALISED BUILDING SYSTEMS
Building Technology 1
Tutor : Mr Mohamed Rizal Mohamed
GROUP MEMBERS STUDENT ID
CARMEN CHAN SHEN WEN 0326485
CHAN JIA CHIN 0326560
CHAI PHEY CHIAT 0334480
CHRISTAL WONG CHING LING 0326715
KHOO SUE LING 0326470
1. Concept and Framework of Selected IBS Category
1.1 Introduction to IBS System
1.2 IBS System
1.3 Case Studies
1.3.1 Introduction
1.3.2 Construction Process
1.3.3 Exploded Axonometric
1.3.4 Standard Size of Components
1.3.5 Standard Size of Components in Seri Jati Apartment
2. Architectural Drawings
2.1.1 Ground Floor Plan
2.1.2 First Floor Plan
2.1.3 Second Floor Plan
2.1.4 Roof Plan
2.1.5 North Elevation
2.1.6 South Elevation
2.1.7 East Elevation
2.1.8 West Elevation
2.1.9 Section X1
2.1.10 Section X2
2.1.11 Section X3
2.1.12 Section Y1
Construction Drawings
2.2.1 Foundation Layout Plan
2.2.2 Ground Floor Beam Layout Plan
2.2.3 First Floor Beam Layout Plan
2.2.4 Second Floor Beam Layout Plan
2.2.5 Roof Beam Layout Plan
2.2.6 Isometric
3. IBS Components
3.1 Apartment Design Features
3.2 Cast In Situ Pad Foundation
3.3 Precast Column
3.4 Precast Beam
3.5 Reinforced Precast Hollow Core Floor Slab
3.6 Precast Wall Panels
3.7 Precast Staircase
3.8 Roof - Steel Framing
4. Sequence of Construction
5. Schedule of Modular Components
6. IBS Score Calculation
7. Conclusion
8. Reference
TABLE OF CONTENTS
CONCEPT &
FRAMEWORK OF IBS
SELECTED CATEGORY
1
1.1 INTRODUCTION TO IBS
Industrialised Building Systems (IBS) is a construction technique that uses components that
are manufactured in a controlled environment such as factories. In other countries, IBS is also
known as Prefabricated Construction, Off-site Construction and Modern Method of
Construction (MMC).
The components are produced in a modular manner in order to allow for industrialised mass
production.
There are two kinds of systems under IBS:
1. Open System refers to the standardisation of components that allows compatibility and
interchangeability among different manufacturers in any project.
2. Closed System refers to specific components that can only be used in specific
projects by certain manufacturers.
IBS started in Malaysia in the 1960s as an effort to increase quality while decrease cost,
manpower and construction time. The low-cost flats in Jalan Pekeliling are an example of
early IBS buildings in Malaysia. However, conventional construction methods still remained
vastly more popular than IBS.
From the 1990s, the government started to advocate and promote IBS by passing legislations
such as guidelines, regulations and circulars. Combined with the increased need for new
development, IBS has been increasing in popularity.
1.1.3 Types of IBS used in Malaysia
1. Precast Concrete System
Precast concrete components
are produced by casting
concrete in reusable formwork
in a factory. Components
available are columns, slabs,
walls, beams and components
such as stairs and balconies.
2. Blockwork System
Blockwork components are
concrete blocks that are able
to interlock and stack on
each other to create a
structure. Blockwork
components are load
bearing.
3. Formwork System
This system uses a series of
modular formwork for in-situ
concrete. Formworks can be
reused up to 80 times.
4. Steel Framing System
Steel frame components are
produced in a factory before
delivered to site for assembly. It
is widely used in factories and
large span structures where the
strength of steel are valued over
its high initial cost.
5. Timber System
Timber frame components
are produced in a factory off
site. Components available
are columns, beams, wall
frames and roof trusses. It is
popular due to its aesthetic
values.
6. Hybrid System
Hybrid systems use a
combination of 2 or more
IBS systems. This is to
utilise the advantages and
minimise the disadvantages
of different systems.
1.1.1 Advantages & Disadvantages of IBS
Advantages
- Cost effective
- Reduce manual labour needs
- Less wastage
- Increase productivity
- Increase quality
- Reduce safety risks
Disadvantages
- Expensive for small scale projects
- Require skilled experienced labour
- Decreased flexibility of design
- Improper planning could pose serious problems
- Require enough space for storage
1.1.2 IBS Workframe
1. Design &
planning
2. Fabrication of
components in
factory
3. Transportation
of components
4. Assembly of
components.
5. Installation
of finishes
Walls
1.2 PROPOSED IBS SYSTEM
Precast concrete systems are the most popular method of IBS construction in Malaysia.
Precast concrete components are produced by casting concrete in reusable formwork made
of steel or fibreglass in a controlled environment such as factories before transported to the
construction site for assembly and installation.
Precast concrete components are available as columns, beams, slabs, walls and 3D
components such as staircases, balconies, etc.
1.2.2 Example Types of Precast Concrete Components
Advantages
- Widely available due to its popularity
- Easy to install
- Does not need further insulation
- Reduces time & manual labour needs
- Wide variety of options for finishes (can be
left without finishes)
Disadvantages
- Require heavy duty vehicles for
transportation
- Require cranes for installation
- Large space for storage
- Transportation issues might lead to delays
1.2.1 Advantages & Disadvantages
SlabsColumns Beams 3D Components
Load Bearing - support structure
Infill - does not support structure
Number of corbels depends on the
number of beam connections
Prestressed - increased strength
which allows for longer spans
Conventional - ledge allows slabs
to rest on it (Spindel / ledgers)
Hollow Core - void in the centre to
reduce self-weight
Solid - minimise the depth of slab
Precast Stairs
Precast Refuse Chute
1.3 CASE STUDY - Seri Jati Apartment, Setia Alam
The scoring point of this construction apartment is in the design. Its design features
elements in vertical and horizontal repetition. This contributed to the consistent quality.
According to the score, repetition in floor to floor height, vertical repetition and horizontal
repetition of structural floor layout are 83% respectively. The spatial configuration within a
singular unit consists of no columns and projected beams. Consistent squareness and
quality is maintained throughout the unit.
1.3.1 Introduction
Seri Jati is a 6 block Seri Jati residential apartments. It has 948 units in total with each apartment
block spanning 10 storeys in a single phase development.
The other scoring point is that it utilised precast structural frame with in-situ concrete floor using
Reusable Formwork System. The Reusable Formwork System is a temporary structure that can be
applied into the permanent structure. It reduces half the value of typical cast-in concrete, thus reducing
forming and construction cost. Due to the regular and repetitive features of the building, this type of
reusable formwork system is therefore suitable for this construction.
The way the residential apartment Seri Jati complies to the IBS Guidelines shows that the construction
planning has taken many considerations into account mainly to save cost. This includes planning of wall
layout, work sequencing, crane’s capacity and movement.
1. Installation of Foundation 2. Installation of Precast Concrete Columns 3. In-Situ Ground Floor Slab
4. In-Situ First Floor Slab
5. Installation of Precast Components for First Floor 6. In-Situ Second Floor Slab 7. The construction process had been repeated until 10th floors
1.3.2 Construction Process:
1.3.3 Exploded Axonometric
Prefabricated Steel Roof Trusses
Precast Walls for Roof
In-Situ Typical Floor Slabs
Precast Components:
‱ Precast Load Bearing Wall
‱ Precast Non-Bearing Walls
‱ Precast Staircase & Landing Slabs
‱ Precast Lift Core Walls
‱ Precast Bathroom Slabs
‱ Precast Air-Cond Ledges
Conventional Construction
‱ Foundation
‱ Ground Floor
‱ Transfer Beam
‱ RC Slab
1.3.4 Standard Size of Components
Sizes of the Components are made according to MS 1064:
Precast Concrete Column 150mm X 150mm Width
Precast Concrete Beam 150mm Width X 300mm Depth
Precast Concrete Wall 150mm Width X 900mm Length
Precast Concrete Slab 200mm Thk. X 4200mm Length
Prefabricated Steel Roof Trusses
Precast Concrete Column
150mm X 150mm Width Precast Concrete Wall 150mm Width
Precast Staircase 3000mm Height with
167mm Riser and 250mm Thread
Windows Size 1200mm Height with
1200mm Width
Standard Door Size 2100mm Height
with 900mm Width
1.3.5 Standard Size of Components in Seri Jati Apartment, Setia Alam
Standard Toilet Size
1500mm X 2800mm
Precast Lift Core Walls
PROPOSED IBS
BUILDING
2
2.1.1 Ground Floor Plan Scale 1:150
2.1 ARCHITECTURAL DRAWINGS
2.1.2 First Floor Plan Scale 1:150
2.1.3 Second Floor Plan Scale 1:150
2.1.4 Roof Plan Scale 1:150
2.1.5 North Elevation Scale 1:100
2.1.6 East Elevation Scale 1:100
2.1.7 West Elevation Scale 1:100
2.1.8 South Elevation Scale 1:100
2.1.9 Section X1 Scale 1:100
2.1.10 Section X2 Scale 1:100
2.1.11 Section X3 Scale 1:100
2.1.12 Section Y1 Scale 1:100
2.2.1 Foundation Layout Plan Scale 1:150
2.2 Structural Drawings
2.2.2 Ground Floor Beam Layout Plan Scale 1:150
2.2.3 First Floor Beam Layout Plan Scale 1:150
2.2.4 Second Floor Beam Layout Plan scale 1:150
2.2.5 Roof Beam Layout Plan Scale 1:150
2.2.6 Isometric
IBS COMPONENTS3
3.2 Cast in Situ Pad Foundation
Cast in Situ Pad Foundation is a type of foundation which is created on site, support point loads such as columns
and ground beams in this construction. To support a precast concrete structural frame, the pad foundation is
connected to the precast concrete columns by anchor bolting. Anchor bolts will transfer tension, compression and
shear forces to the base structure. To properly connect using this method, anchor bolts are drilled into the foundation
pads before connection with the columns. This is followed by the precast concrete columns which are connected to
column shoes, where it is made feasible for connection. This type of connection does not require bracing to be
reinforced.
Installation Procedure :
1. In the precast factory, foundation is drilled with anchor bolts.
2. Column is connected with column shoe.
3. Column is then connected to the anchor bolts in the pad footings.
3.1 Apartment Design Features
This apartment introduces design features. It is simple in simple geometrical design,
its rectangular grid is the optimal grid configuration. It is also repetitive in design. This
apartment also utilises structural precast skeletal frame, which comprises of columns
and beams with a precast floor system. The frame for this structural system is
moment resisting. This design has taken the IBS guidelines into consideration, hence
this influences the choices of the IBS components.
Repetitive Features
Rectangular Grid
Structural Precast Skeletal Frame
Suitability :
1. Versatile for simple connection, does not require complex connections which may cause
complications in the future
2. Fabricated and reinforced to resist up to high stresses during construction
3. Able to resist superior loads from structure
Connection Detail :
Fabrication Process :
1. Excavate small site for
pad foundation
2. Create formwork 3. Install starter bars 4. Pour concrete into
formwork as column
stump
Cast in Plate
Precast Column
Dry Pack
Screwed Anchor
Cast in Situ Foundation Pad
Shims
3.3 Precast Column
Precast columns are manufactured as either multi-storeyed corbelled columns or
single floor-to-floor corbel elements. In this case, this construction utilises single
floor-to-floor corbel elements, because they are simple in design, detail and
constructed, complementing the repetition feature in this apartment design. For this
construction, initial column profiles and edge column profiles are implemented to
support walls.
3.4 Precast Beam
Precast beams are simple and practical in design. For this construction, the Spandrel - L shaped, and the
Ledger - inverted Tee profile are applied. They are designed to be continuous to improve further loads. The
precast floor components sit directly on the protruded ledge of the inverted Tee.
Installation Procedure :
1. To connect column to beam, the corbel of the column is applied in the
connection.
2. Weld column and beam using steel angles.
Installation Procedure :
1. Install U-shaped bars into precast beam.
2. Install continuous longitudinal bars at the top of precast beam.
Suitability :
1. Intentional manufacturing - maintain consistency in connection and bearing
of loads from other structural components, thus reducing construction cost
2. Already manufactured to be fire-rated
3. Versatile in variety of sizing and configuration (initial corbel column/edge
corbel column)
Suitability :
1. Like the precast columns, precast beams have high potential in producing highly consistent connections
and construction outcome.
2. Sturdy and dense character limits noise transfer from floor to floor - feasible for residential buildings such
as this
Fabrication Process :
Connection Detail :
Fabrication Process :
Connection Detail :
1. Insert rebar
cage that will act
as reinforcement.
Then, set up
formwork.
2. Secure formwork
with kickers as
bracing.
3. Pour concrete into
formwork. Then,
poker is used to
spread concrete
evenly.
4. Smoothen
concrete with slider.
1. Fix the beam
reinforcement.
2. Place the beam
cage into the mould.
3. Pour concrete into
the formwork.
Column of
top floor
Welded
steel
angle
Grout
Column of
bottom
floor
Initial
Column
Edge
Column
4. Smoothing the
concrete with slider.
(Details of precast beam connection by Cheng, 2016)
3.5 Reinforced Precast Hollow Core Floor Slab
For this construction, hollow core slabs are used because it has an optimum span range,
its maximum span reaching a capacity of 2.4KN/sqm over a 16 metre span. This optimum
range is influenced by direct cost such as transportation, and also indirect cost during
erection and the method of connecting to the beams. These slabs are highly efficient. Due
to its optimised profiles, they are very versatile that they can achieve span to depth ratios,
unlike other floor types.Hollow core slabs are layered with a structural screed to tie the
structure together and help provide diaphragm action in the floor system. These slabs are
also capable in being reused and recycled at the end of its life cycle.
3.6 Precast Wall Panels
The precast walls built in this apartment is a face finish similar to a cast-in-place walls. These wall panels are
incorporated with door and window openings. The precast wall panels are designated with connection points,
which are important to support the structural load of the apartment. The types of precast walls used here are
load bearing walls which resist and transfer loads and shear walls which provide lateral load resistance.
Installation Procedure :
1. Secure bolt onto L-shaped bracket which is on wall panel.
Installation Procedure :
1. Grout the reinforcing bars on the slab keyways of the hollow core floor slab
2. Set hollow core floor slab on bearing pad
Suitability :
1. Precast hollow core slabs reduce in self slab weight, therefore maximising
structural stability.
2. Act as a barrier for sound and fire - ideal for residential units such as these
3. Require no drilling for electrical installation.
Fabrication Process :
Connection Detail :
Suitability :
1. Energy efficient due to its high thermal mass - helps prevent the building from getting too hot
2. Possess load bearing capabilities - act as a lateral stabiliser to support structural load from roofs and
wind
Fabrication Process :
Connection Detail :
1. Insert rebar cage. 2. Set drillers into the
framework in place to
create openings in
the slab.
3. Spread concrete
evenly
4. Smoothen concrete
using slider.
1. Assembly of
Wall Panel mould.
2. Fixing of Rebars. 3. Pouring concrete
into the mould.
4. Curing of concrete. 5. Demoulding.
Precast Hollow core
floor slab
Bearing Pad
Reinforcing bars
Precast concrete wall
Precast concrete wall
Bolt
3.7 Precast Staircase
The type of precast staircase used is the arrangement which a complete flight with
number of steps required. This fabricated staircase include landings, support points
layered with sound insulation. They are a separate component away from the wall
panels.
3.8 Roof Steel Framing
Suitability :
1. Do not require fixing or propping during erection.
2. Highly flexible and accurate in the production process.
Fabrication Process :
Connection Detail :
Suitability :
1. Lightweight - reduce transportation cost
2. High resistance against weathering and insect infestations.
Fabrication Process :
Connection Detail :
The type of roof truss used in this construction is the howe type. In comparison to timber roof framing, steel roof
framing are more expensive, however they are more durable and require minimal maintenance. In comparison to
timber roof framing, steel roof framing do not require treatment to resist natural substance. The nature of steel
roof framing makes it environmentally conscious by being easily recyclable.
Installation Procedure :
1. Secure anchor bolt in in top of column.
2. Install sill plate on top of column.
3. Bolt roof truss to connect to sill plate.
Installation Procedure :
1. Cast rebate in precast floor slab
2. Install angle at edge of staircase and edge of rebate cast.
1. Insert reinforcing bars
into formwork.
2. Set up and reinforce
formwork.
3. Pour and poke
concrete to spread it
evenly.
4. Once cured and set,
lift made precast
staircase for
transportation.
1.Cut the steel into the
correct shape to start the
forming process.
2.Press and bake the
steel.
3. Welding the pieces
of steel together to
form the truss.
Connection for
top landing :
Rebate cast in
floor slab for
angle
connection
Connection for
bottom landing :
Rebate cast in
floor slab for angle
connection
(Connection detail of roof to column from Hilti, 2015)
Min 4 bars
(continuous)
Precast concrete
wall
Anchor bolt
Sill plate
Roof truss
SEQUENCE OF
CONSTRUCTION
4
1.Installation of foundation pad
footings.
2. Installation of precast concrete
columns onto the pad footings.
3. Installation of ground floor slabs.
4. Installation of precast walls on ground
floor slabs. Some wall panels have been
cut to accommodate the opening sizes.
Next, the installation of prefabricated
windows and doors.
5. Installation of precast staircase. 7. Repeat sequence of installation
of columns, floor slabs, walls,
staircase, windows and doors for
1st and 2nd floor.
4.1 CONSTRUCTION PROCESS
8. Roof structure is supported by the
repeating order of column and
beams. Prefabricated steel roof
trusses are placed above the column
and beams of 2nd floor.
10. Interior ceiling covering, wire
mesh, insulator and roof tiles were
then laid on site to complete the
building.
11. Finishing it up by exterior wall
paintings and interior tile finishings.
SCHEDULE OF
MODULAR
COMPONENTS
5
Component Columns
C1 C2 C3 C4
Isometric
Plan
T, Thickness (mm) 300 300 300 300
W, Width (mm) 300 300 300 300
H, Height (mm) 3200 3200 3200 3200
Quantity 6 24 60 72
W W W W
TT
TT
5.1 PRECAST COLUMNS
Component Slabs
SL 1 SL 2 SL 3 SL 4
Isometric
Plan
T, Thickness
(mm)
200 200 200 200
W, Width (mm) 3300 3000 3300 3300
L, Length (mm) 5400 5400 4800 2400
Quantity 12 24 12 6
W
L
W
L
W
L
W
L
5.2 PRECAST FLOOR SLABS
Component Slabs
SL5 SL6 Roof Slab Staircase Slab
Isometric
Plan
T, Thickness
(mm)
200 200 200 200
W, Width (mm) 3000 3000 2100 1600
L, Length (mm) 2400 2100 4500 2000
Quantity 24 24 2 4
W
L
W
L
W
L
W
L
5.2 PRECAST FLOOR SLABS
Component Beams
Name EB 1 EB 2 EB 3 EB 4 EB 5
Isometric
Front
Elevation
T, Thickness
(mm)
200 200 200 200 200
L, Length
(mm)
5700 5100 3600 3300 2400
D, Depth
(mm)
350 350 350 350 350
Quantity 12 12 12 52 4
D
T
5.3 PRECAST BEAMS
5.31 Edge Beams
Component Beams
Name IB1 IB2 IB3 IB4 IB5 IB6
Isometric
Front
Elevation
T, Thickness
(mm)
200 200 200 200 200 200
L, Length
(mm)
7200 5700 3600 3300 2700 2400
D, Depth
(mm)
350 350 350 350 350 350
Quantity 12 30 15 36 30 16
D
T
5.3 PRECAST BEAMS
5.32 Intermediate Beams
Component Beams
Name (to support walls above only)
Isometric
Front
Elevation
T, Thickness
(mm)
200 200 200
L, Length
(mm)
1600, 4800 1600, 2400 2400
D, Depth
(mm)
350 350 350
Quantity 4 4 4
5.3 PRECAST BEAMS
5.33 Special Beams
T
D
Component Wall Panels
Isometric
Front Elevation
Thickness (mm) 200 200 200 200 200
Width (mm) 3000 3300 5400 5400 4200
Height (mm) 3000 1200 3000 3000 3000
Quantity 24 12 18 12 12
5.4 PRECAST WALL PANELS
Component Wall Panels
Isometric
Front Elevation
Thickness (mm) 200 200 200 200 200
Width (mm) 3000 3000 3000 2400 2400
Height (mm) 3000 3000 3000 3000 3000
Quantity 12 12 12 12 30
5.4 PRECAST WALL PANELS
Component Wall Panels
Isometric
Front Elevation
Thickness (mm) 200 200 200 200 200
Width (mm) 2000 1500 3000 2100 2100
Height (mm) 3000 3000 3000 3000 1200
Quantity 12 12 12 12 16
5.4 PRECAST WALL PANELS
Component Wall Panels
Isometric
Front Elevation
Thickness (mm) 200 200 200 200
Width (mm) 4500 2100 900 3600
Height (mm) 3000 3000 3000 3000
Quantity 18 12 6 12
5.4 PRECAST WALL PANELS
Component Door 1 Door 2
Isometric
Front Elevation
W, Width (mm) 900 2700
H, Height (mm) 2100 2100
Quantity(mm) 21 (7 Doors Each Unit) 6 (1 Sliding Door Each Unit)
Specification Wooden Panel with Steel Frame Glass Panel with Steel Frame
5.4 PRECAST WALL PANELS
Component Staircase
Name ST 1 and ST2
Isometric
Plan
Thread (mm) 250
Riser (mm) 167
Floor to Floor Height (mm) 3000
Quantity 6
System
Specification 18 Steps Concrete Staircase
167mm
5.5 PRECAST STAIRCASE
Component Windows
Isometric
Front Elevation
Width (mm) 600 1200 1800
Height (mm) 600 1200 1200
Quantity 24 (2 per unit) 24 (2 per unit) 24 (2 per unit)
Specification Steel Frame with Single-Glazed
Glass
Steel Frame with Single-Glazed Glass Double Swing Glass Window
5.6 PREFABRICATED OPENINGS
Component Roof Steel Truss
Isometric
Plan
Quantity 9
5.7 PREFABRICATED STEEL ROOF TRUSS
IBS SCORE
CALCULATION
6
ELEMENTS AREA (mÂČ) /
LENGTH (m)
IBS
FACTOR
COVERAGE (%) IBS SCORE
PART 1: Structural Systems
Ground Floor
- Precast column & beam + precast concrete slab
First Floor
- Precast column & beam + precast concrete slab
- Precast column & beam + no slab
Second Floor
- Precast column & beam + precast concrete slab
- Precast column & beam + no slab
Prefabricated Steel Roof Trusses
407.3mÂČ
382.1mÂČ
25.2mÂČ
382.1mÂČ
25.2mÂČ
407.3mÂČ
1.0
1.0
1.0
1.0
1.0
1.0
(407.3/1629.2) = 0.25
(382.1/1629.2) = 0.23
(25.2/1629.2) = 0.02
(382.1/1629.2) = 0.23
(25.2/1629.2) = 0.02
(407.3/1629.2) = 0.25
1.0 x 0.25 x 50 = 12.5
1.0 x 0.23 x 50 = 11.5
1.0 x 0.02 x 50 = 1.0
1.0 x 0.23 x 50 = 11.5
1.0 x 0.02 x 50 = 1.0
1.0 x 0.25 x 50 = 12.5
TOTAL 1629.2mÂČ 1.0 50
PART 2: Wall Systems
Precast concrete panels
- Exterior
- Interior
90.6m
228.3m
1.0
(90.6/318.9) = 0.28
(228.3/318.9) = 0.72
1.0 x 0.28 x 20 = 5.6
1.0 x 0.72 x 20 = 14.4
TOTAL 318.9m 1.0 20
PART 3: Other Simplified Construction Solutions
Utilisation of Standardised Components Based on MS 1064
- Beams
- Columns
- Walls
- Slabs
- Doors
- Windows
Repetition of Structural Layouts
- Repetition of floor to floor height
- Vertical repetition of structural floor layout
- Horizontal repetition of structural floor layout
Other Productivity Enhancing Solutions
- Usage of prefab bathroom units (PBU)
- Usage of prefab staircases
- Usage of BIM models for IBS Score submission
- Usage of Modular grid lines in drawings
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
100%
0%
4
4
4
4
4
4
2
2
2
0
2
6
0
TOTAL 30
TOTAL IBS SCORE (PART 1 + PART 2 + PART 3) 100
CONCLUSION7
Overall, our 3-storey apartment has managed to reach a fully Industrialized Building System with
a score of 100% from the Ground Floor to the Roof. This is achieved through the use of all
Precast components adhering to standard dimensions of manufacture. The IBS Components
that was implemented are the precast columns, precast beams, precast hollow core slabs,
precast wall panels and prefabricated steel roof truss.
This project has familiarized us with the IBS method of construction and its advantages. IBS is a
very suitable method to be implemented in modern construction projects due to its efficiency. It is
time saving and requires less manpower. However, we learn that to produce an efficient IBS
based building, we should plan ahead on the details well that will assemble the building.
The project has increased our knowledge in all the IBS components through our research and
our opportunity to design an apartment. This project has also taught us that we can still be
creative and innovative with the use of mass produce components. The physical model also
gave us a hands on approach in experiencing the sequence of construction.
REFERENCES8
References
E-Books
Calculation for IBS Score. (2010). [Ebook] (pp. 1-7).
Precast Fabrication. [Ebook] (pp. 11-22).
Websites
3 ways to connect precast columns to foundation – choose yours!. (2017). Retrieved from https://www.peikko.com/blog/3-ways-to-connect-precast-columns-to-foundation-choose-yours/
Anon, (2019). [online] Available at: https://www.academia.edu/21345729/A_study_of_precast_concrete_in_Malaysia [Accessed 16 May 2019].
Anon, (2019). [online] Available at: https://www.researchgate.net/publication/260202572_A_study_of_precast_concrete_in_Malaysia [Accessed 16 May 2019].
Bhd, I. (2019). Industrialised Building System - A Brief Background. [online] Ibsmodular.blogspot.com. Available at: http://ibsmodular.blogspot.com/2008/02/industrialised-building-system-brief.html [Accessed 16 May 2019].
Cidb.gov.my. (2019). Act 520. [online] Available at: http://www.cidb.gov.my/index.php/en/legislation/act-520 [Accessed 16 May 2019].
E. Gaudette, P. (2016). Precast Concrete Wall Systems | WBDG - Whole Building Design Guide. Retrieved from https://www.wbdg.org/guides-specifications/building-envelope-design-guide/wall-systems/precast-concrete-wall-systems
Experimental Study on Seismic Strengthening of Reinforced Concrete Frames by Precast Concrete Panels. (2011). ACI Structural Journal, 108(2).
Introduction to Steel Roof Trusses. (2019). Retrieved from http://mychina.biz/sh/index.php/en/90-tech-en/215-roof
Metric Concrete Industries. Retrieved from http://www.metric.com.my/content/hollow-core-slab.html
Modern Concrete Formwork Systems: Types, Reuse, Reliability & Risk Assessment. (2019). Retrieved from https://www.masterbuilder.co.in/modern-concrete-formwork-systems-types-reuse-reliability-risk-assessment/
Nasrullah, M. Retrieved from https://www.academia.edu/27033997/Precast_Concrete_-_Frames_Guide
OKA IBS CONCRETE PRODUCTS MALAYSIA. Retrieved from http://www.oka.com.my/index.asp?LanguagesID=1&TitleReferenceID=1216&CompanyID=29
Precast Concrete Column Beam Connections - New Images Beam. (2018). Retrieved from http://www.fotoimage.org/precast-concrete-column-beam-connections/
Therumahmurah.com. (2019). Selangorku Jade Hills 42k 100k 220k 250k (Type A,B,C,D). [online] Available at: http://therumahmurah.com/project-detail-selangorku-jade-hills-42k-100k-220k-250k-type-a-b-c-d-.php [Accessed 16 May 2019].

Weitere Àhnliche Inhalte

Was ist angesagt?

Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Group AssignmentIBS System
Group AssignmentIBS SystemGroup AssignmentIBS System
Group AssignmentIBS System마 읎환
 
Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building SolutionLee Wan Xuan
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case StudyNik Munawwar Nik Din
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMFarah Sham
 
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1DavidJPCChai
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] finalmiranazrin
 
Building service project2
Building service project2Building service project2
Building service project2limziahuei
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case StudyBolin Loong
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...Haziq1511
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design SolutionJia Xin Chee
 

Was ist angesagt? (20)

Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Group AssignmentIBS System
Group AssignmentIBS SystemGroup AssignmentIBS System
Group AssignmentIBS System
 
Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building Solution
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
ibs 304
ibs 304ibs 304
ibs 304
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1
 
Building Technology II Project 1
Building Technology II Project 1Building Technology II Project 1
Building Technology II Project 1
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] final
 
Building service project2
Building service project2Building service project2
Building service project2
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 

Ähnlich wie B.tech Project 1 - Industrialised Building Systems

Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyQuinn Liew
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 ReportBolin Loong
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1chongyih2
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology IOng Shi Hui
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdfyenweizheng
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressedWeng Chuan
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Soh Shing
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline KH
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Reportdouglasloon
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Gertrude Lee
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 
404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................KeshavaPrajwal
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Yee Len Wan
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)Nicole Foo
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction systemchirag aggarwal
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsJing Fan Koh
 
Rapid construction techniques
Rapid construction techniques Rapid construction techniques
Rapid construction techniques Deepak Pradhan
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniquekvijay31
 

Ähnlich wie B.tech Project 1 - Industrialised Building Systems (20)

Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
 
Btech report
Btech reportBtech report
Btech report
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdf
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressed
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................404128086-mivan-ppt-0-pptx.pptx.................
404128086-mivan-ppt-0-pptx.pptx.................
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Ct3
Ct3Ct3
Ct3
 
Rapid construction techniques
Rapid construction techniques Rapid construction techniques
Rapid construction techniques
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
 

Mehr von Carmen Chan

Construction Solutions
Construction SolutionsConstruction Solutions
Construction SolutionsCarmen Chan
 
CALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGNCALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGNCarmen Chan
 
Acoustic Analysis on Permata Pintar Auditorium (Report)
Acoustic Analysis on Permata Pintar Auditorium (Report)Acoustic Analysis on Permata Pintar Auditorium (Report)
Acoustic Analysis on Permata Pintar Auditorium (Report)Carmen Chan
 
Acoustic Analysis on Permata Pintar Auditorium (presentation)
Acoustic Analysis on Permata Pintar Auditorium (presentation)Acoustic Analysis on Permata Pintar Auditorium (presentation)
Acoustic Analysis on Permata Pintar Auditorium (presentation)Carmen Chan
 
Interpretation and Analysis
Interpretation and AnalysisInterpretation and Analysis
Interpretation and AnalysisCarmen Chan
 
Food and Culture : Chow Kit
Food and Culture : Chow KitFood and Culture : Chow Kit
Food and Culture : Chow KitCarmen Chan
 
Comparative Essay - Carmen Chan 0326485
Comparative Essay - Carmen Chan 0326485Comparative Essay - Carmen Chan 0326485
Comparative Essay - Carmen Chan 0326485Carmen Chan
 
Structural Analysis of SIRI House
Structural Analysis of SIRI HouseStructural Analysis of SIRI House
Structural Analysis of SIRI HouseCarmen Chan
 
Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Carmen Chan
 
Building Services Catalogue on Fragments
Building Services Catalogue on FragmentsBuilding Services Catalogue on Fragments
Building Services Catalogue on FragmentsCarmen Chan
 
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCase Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCarmen Chan
 
Group 1 Proposal - In Search of a Learning Space
Group 1 Proposal - In Search of a Learning SpaceGroup 1 Proposal - In Search of a Learning Space
Group 1 Proposal - In Search of a Learning SpaceCarmen Chan
 
My Portfolio of FNBE Works
My Portfolio of FNBE WorksMy Portfolio of FNBE Works
My Portfolio of FNBE WorksCarmen Chan
 
Design Process Journal of Wonder Woman
Design Process Journal of Wonder WomanDesign Process Journal of Wonder Woman
Design Process Journal of Wonder WomanCarmen Chan
 
My Design Booklet
My Design BookletMy Design Booklet
My Design BookletCarmen Chan
 
The Rube Goldberg Idea Journal
The Rube Goldberg Idea JournalThe Rube Goldberg Idea Journal
The Rube Goldberg Idea JournalCarmen Chan
 
The Cube Idea Journal
The Cube Idea JournalThe Cube Idea Journal
The Cube Idea JournalCarmen Chan
 
The Mask Idea Journal
The Mask Idea JournalThe Mask Idea Journal
The Mask Idea JournalCarmen Chan
 
The Flying Egg Idea Journal
The Flying Egg Idea JournalThe Flying Egg Idea Journal
The Flying Egg Idea JournalCarmen Chan
 
Bukit Bintang Site Analysis
Bukit Bintang Site AnalysisBukit Bintang Site Analysis
Bukit Bintang Site AnalysisCarmen Chan
 

Mehr von Carmen Chan (20)

Construction Solutions
Construction SolutionsConstruction Solutions
Construction Solutions
 
CALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGNCALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGN
 
Acoustic Analysis on Permata Pintar Auditorium (Report)
Acoustic Analysis on Permata Pintar Auditorium (Report)Acoustic Analysis on Permata Pintar Auditorium (Report)
Acoustic Analysis on Permata Pintar Auditorium (Report)
 
Acoustic Analysis on Permata Pintar Auditorium (presentation)
Acoustic Analysis on Permata Pintar Auditorium (presentation)Acoustic Analysis on Permata Pintar Auditorium (presentation)
Acoustic Analysis on Permata Pintar Auditorium (presentation)
 
Interpretation and Analysis
Interpretation and AnalysisInterpretation and Analysis
Interpretation and Analysis
 
Food and Culture : Chow Kit
Food and Culture : Chow KitFood and Culture : Chow Kit
Food and Culture : Chow Kit
 
Comparative Essay - Carmen Chan 0326485
Comparative Essay - Carmen Chan 0326485Comparative Essay - Carmen Chan 0326485
Comparative Essay - Carmen Chan 0326485
 
Structural Analysis of SIRI House
Structural Analysis of SIRI HouseStructural Analysis of SIRI House
Structural Analysis of SIRI House
 
Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)
 
Building Services Catalogue on Fragments
Building Services Catalogue on FragmentsBuilding Services Catalogue on Fragments
Building Services Catalogue on Fragments
 
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCase Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
 
Group 1 Proposal - In Search of a Learning Space
Group 1 Proposal - In Search of a Learning SpaceGroup 1 Proposal - In Search of a Learning Space
Group 1 Proposal - In Search of a Learning Space
 
My Portfolio of FNBE Works
My Portfolio of FNBE WorksMy Portfolio of FNBE Works
My Portfolio of FNBE Works
 
Design Process Journal of Wonder Woman
Design Process Journal of Wonder WomanDesign Process Journal of Wonder Woman
Design Process Journal of Wonder Woman
 
My Design Booklet
My Design BookletMy Design Booklet
My Design Booklet
 
The Rube Goldberg Idea Journal
The Rube Goldberg Idea JournalThe Rube Goldberg Idea Journal
The Rube Goldberg Idea Journal
 
The Cube Idea Journal
The Cube Idea JournalThe Cube Idea Journal
The Cube Idea Journal
 
The Mask Idea Journal
The Mask Idea JournalThe Mask Idea Journal
The Mask Idea Journal
 
The Flying Egg Idea Journal
The Flying Egg Idea JournalThe Flying Egg Idea Journal
The Flying Egg Idea Journal
 
Bukit Bintang Site Analysis
Bukit Bintang Site AnalysisBukit Bintang Site Analysis
Bukit Bintang Site Analysis
 

KĂŒrzlich hochgeladen

Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)lakshayb543
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...SeĂĄn Kennedy
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 

KĂŒrzlich hochgeladen (20)

Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
Visit to a blind student's school🧑‍🩯🧑‍🩯(community medicine)
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỏ VÀO LỚP 10 - TIáșŸNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 

B.tech Project 1 - Industrialised Building Systems

  • 1. INDUSTRIALISED BUILDING SYSTEMS Building Technology 1 Tutor : Mr Mohamed Rizal Mohamed GROUP MEMBERS STUDENT ID CARMEN CHAN SHEN WEN 0326485 CHAN JIA CHIN 0326560 CHAI PHEY CHIAT 0334480 CHRISTAL WONG CHING LING 0326715 KHOO SUE LING 0326470
  • 2. 1. Concept and Framework of Selected IBS Category 1.1 Introduction to IBS System 1.2 IBS System 1.3 Case Studies 1.3.1 Introduction 1.3.2 Construction Process 1.3.3 Exploded Axonometric 1.3.4 Standard Size of Components 1.3.5 Standard Size of Components in Seri Jati Apartment 2. Architectural Drawings 2.1.1 Ground Floor Plan 2.1.2 First Floor Plan 2.1.3 Second Floor Plan 2.1.4 Roof Plan 2.1.5 North Elevation 2.1.6 South Elevation 2.1.7 East Elevation 2.1.8 West Elevation 2.1.9 Section X1 2.1.10 Section X2 2.1.11 Section X3 2.1.12 Section Y1 Construction Drawings 2.2.1 Foundation Layout Plan 2.2.2 Ground Floor Beam Layout Plan 2.2.3 First Floor Beam Layout Plan 2.2.4 Second Floor Beam Layout Plan 2.2.5 Roof Beam Layout Plan 2.2.6 Isometric 3. IBS Components 3.1 Apartment Design Features 3.2 Cast In Situ Pad Foundation 3.3 Precast Column 3.4 Precast Beam 3.5 Reinforced Precast Hollow Core Floor Slab 3.6 Precast Wall Panels 3.7 Precast Staircase 3.8 Roof - Steel Framing 4. Sequence of Construction 5. Schedule of Modular Components 6. IBS Score Calculation 7. Conclusion 8. Reference TABLE OF CONTENTS
  • 3. CONCEPT & FRAMEWORK OF IBS SELECTED CATEGORY 1
  • 4. 1.1 INTRODUCTION TO IBS Industrialised Building Systems (IBS) is a construction technique that uses components that are manufactured in a controlled environment such as factories. In other countries, IBS is also known as Prefabricated Construction, Off-site Construction and Modern Method of Construction (MMC). The components are produced in a modular manner in order to allow for industrialised mass production. There are two kinds of systems under IBS: 1. Open System refers to the standardisation of components that allows compatibility and interchangeability among different manufacturers in any project. 2. Closed System refers to specific components that can only be used in specific projects by certain manufacturers. IBS started in Malaysia in the 1960s as an effort to increase quality while decrease cost, manpower and construction time. The low-cost flats in Jalan Pekeliling are an example of early IBS buildings in Malaysia. However, conventional construction methods still remained vastly more popular than IBS. From the 1990s, the government started to advocate and promote IBS by passing legislations such as guidelines, regulations and circulars. Combined with the increased need for new development, IBS has been increasing in popularity. 1.1.3 Types of IBS used in Malaysia 1. Precast Concrete System Precast concrete components are produced by casting concrete in reusable formwork in a factory. Components available are columns, slabs, walls, beams and components such as stairs and balconies. 2. Blockwork System Blockwork components are concrete blocks that are able to interlock and stack on each other to create a structure. Blockwork components are load bearing. 3. Formwork System This system uses a series of modular formwork for in-situ concrete. Formworks can be reused up to 80 times. 4. Steel Framing System Steel frame components are produced in a factory before delivered to site for assembly. It is widely used in factories and large span structures where the strength of steel are valued over its high initial cost. 5. Timber System Timber frame components are produced in a factory off site. Components available are columns, beams, wall frames and roof trusses. It is popular due to its aesthetic values. 6. Hybrid System Hybrid systems use a combination of 2 or more IBS systems. This is to utilise the advantages and minimise the disadvantages of different systems. 1.1.1 Advantages & Disadvantages of IBS Advantages - Cost effective - Reduce manual labour needs - Less wastage - Increase productivity - Increase quality - Reduce safety risks Disadvantages - Expensive for small scale projects - Require skilled experienced labour - Decreased flexibility of design - Improper planning could pose serious problems - Require enough space for storage 1.1.2 IBS Workframe 1. Design & planning 2. Fabrication of components in factory 3. Transportation of components 4. Assembly of components. 5. Installation of finishes
  • 5. Walls 1.2 PROPOSED IBS SYSTEM Precast concrete systems are the most popular method of IBS construction in Malaysia. Precast concrete components are produced by casting concrete in reusable formwork made of steel or fibreglass in a controlled environment such as factories before transported to the construction site for assembly and installation. Precast concrete components are available as columns, beams, slabs, walls and 3D components such as staircases, balconies, etc. 1.2.2 Example Types of Precast Concrete Components Advantages - Widely available due to its popularity - Easy to install - Does not need further insulation - Reduces time & manual labour needs - Wide variety of options for finishes (can be left without finishes) Disadvantages - Require heavy duty vehicles for transportation - Require cranes for installation - Large space for storage - Transportation issues might lead to delays 1.2.1 Advantages & Disadvantages SlabsColumns Beams 3D Components Load Bearing - support structure Infill - does not support structure Number of corbels depends on the number of beam connections Prestressed - increased strength which allows for longer spans Conventional - ledge allows slabs to rest on it (Spindel / ledgers) Hollow Core - void in the centre to reduce self-weight Solid - minimise the depth of slab Precast Stairs Precast Refuse Chute
  • 6. 1.3 CASE STUDY - Seri Jati Apartment, Setia Alam The scoring point of this construction apartment is in the design. Its design features elements in vertical and horizontal repetition. This contributed to the consistent quality. According to the score, repetition in floor to floor height, vertical repetition and horizontal repetition of structural floor layout are 83% respectively. The spatial configuration within a singular unit consists of no columns and projected beams. Consistent squareness and quality is maintained throughout the unit. 1.3.1 Introduction Seri Jati is a 6 block Seri Jati residential apartments. It has 948 units in total with each apartment block spanning 10 storeys in a single phase development. The other scoring point is that it utilised precast structural frame with in-situ concrete floor using Reusable Formwork System. The Reusable Formwork System is a temporary structure that can be applied into the permanent structure. It reduces half the value of typical cast-in concrete, thus reducing forming and construction cost. Due to the regular and repetitive features of the building, this type of reusable formwork system is therefore suitable for this construction. The way the residential apartment Seri Jati complies to the IBS Guidelines shows that the construction planning has taken many considerations into account mainly to save cost. This includes planning of wall layout, work sequencing, crane’s capacity and movement.
  • 7. 1. Installation of Foundation 2. Installation of Precast Concrete Columns 3. In-Situ Ground Floor Slab 4. In-Situ First Floor Slab 5. Installation of Precast Components for First Floor 6. In-Situ Second Floor Slab 7. The construction process had been repeated until 10th floors 1.3.2 Construction Process:
  • 8. 1.3.3 Exploded Axonometric Prefabricated Steel Roof Trusses Precast Walls for Roof In-Situ Typical Floor Slabs Precast Components: ‱ Precast Load Bearing Wall ‱ Precast Non-Bearing Walls ‱ Precast Staircase & Landing Slabs ‱ Precast Lift Core Walls ‱ Precast Bathroom Slabs ‱ Precast Air-Cond Ledges Conventional Construction ‱ Foundation ‱ Ground Floor ‱ Transfer Beam ‱ RC Slab 1.3.4 Standard Size of Components Sizes of the Components are made according to MS 1064: Precast Concrete Column 150mm X 150mm Width Precast Concrete Beam 150mm Width X 300mm Depth Precast Concrete Wall 150mm Width X 900mm Length Precast Concrete Slab 200mm Thk. X 4200mm Length Prefabricated Steel Roof Trusses
  • 9. Precast Concrete Column 150mm X 150mm Width Precast Concrete Wall 150mm Width Precast Staircase 3000mm Height with 167mm Riser and 250mm Thread Windows Size 1200mm Height with 1200mm Width Standard Door Size 2100mm Height with 900mm Width 1.3.5 Standard Size of Components in Seri Jati Apartment, Setia Alam Standard Toilet Size 1500mm X 2800mm Precast Lift Core Walls
  • 11. 2.1.1 Ground Floor Plan Scale 1:150 2.1 ARCHITECTURAL DRAWINGS
  • 12. 2.1.2 First Floor Plan Scale 1:150
  • 13. 2.1.3 Second Floor Plan Scale 1:150
  • 14. 2.1.4 Roof Plan Scale 1:150
  • 15. 2.1.5 North Elevation Scale 1:100
  • 16. 2.1.6 East Elevation Scale 1:100
  • 17. 2.1.7 West Elevation Scale 1:100
  • 18. 2.1.8 South Elevation Scale 1:100
  • 19. 2.1.9 Section X1 Scale 1:100
  • 20. 2.1.10 Section X2 Scale 1:100
  • 21. 2.1.11 Section X3 Scale 1:100
  • 22. 2.1.12 Section Y1 Scale 1:100
  • 23. 2.2.1 Foundation Layout Plan Scale 1:150 2.2 Structural Drawings
  • 24. 2.2.2 Ground Floor Beam Layout Plan Scale 1:150
  • 25. 2.2.3 First Floor Beam Layout Plan Scale 1:150
  • 26. 2.2.4 Second Floor Beam Layout Plan scale 1:150
  • 27. 2.2.5 Roof Beam Layout Plan Scale 1:150
  • 30. 3.2 Cast in Situ Pad Foundation Cast in Situ Pad Foundation is a type of foundation which is created on site, support point loads such as columns and ground beams in this construction. To support a precast concrete structural frame, the pad foundation is connected to the precast concrete columns by anchor bolting. Anchor bolts will transfer tension, compression and shear forces to the base structure. To properly connect using this method, anchor bolts are drilled into the foundation pads before connection with the columns. This is followed by the precast concrete columns which are connected to column shoes, where it is made feasible for connection. This type of connection does not require bracing to be reinforced. Installation Procedure : 1. In the precast factory, foundation is drilled with anchor bolts. 2. Column is connected with column shoe. 3. Column is then connected to the anchor bolts in the pad footings. 3.1 Apartment Design Features This apartment introduces design features. It is simple in simple geometrical design, its rectangular grid is the optimal grid configuration. It is also repetitive in design. This apartment also utilises structural precast skeletal frame, which comprises of columns and beams with a precast floor system. The frame for this structural system is moment resisting. This design has taken the IBS guidelines into consideration, hence this influences the choices of the IBS components. Repetitive Features Rectangular Grid Structural Precast Skeletal Frame Suitability : 1. Versatile for simple connection, does not require complex connections which may cause complications in the future 2. Fabricated and reinforced to resist up to high stresses during construction 3. Able to resist superior loads from structure Connection Detail : Fabrication Process : 1. Excavate small site for pad foundation 2. Create formwork 3. Install starter bars 4. Pour concrete into formwork as column stump Cast in Plate Precast Column Dry Pack Screwed Anchor Cast in Situ Foundation Pad Shims
  • 31. 3.3 Precast Column Precast columns are manufactured as either multi-storeyed corbelled columns or single floor-to-floor corbel elements. In this case, this construction utilises single floor-to-floor corbel elements, because they are simple in design, detail and constructed, complementing the repetition feature in this apartment design. For this construction, initial column profiles and edge column profiles are implemented to support walls. 3.4 Precast Beam Precast beams are simple and practical in design. For this construction, the Spandrel - L shaped, and the Ledger - inverted Tee profile are applied. They are designed to be continuous to improve further loads. The precast floor components sit directly on the protruded ledge of the inverted Tee. Installation Procedure : 1. To connect column to beam, the corbel of the column is applied in the connection. 2. Weld column and beam using steel angles. Installation Procedure : 1. Install U-shaped bars into precast beam. 2. Install continuous longitudinal bars at the top of precast beam. Suitability : 1. Intentional manufacturing - maintain consistency in connection and bearing of loads from other structural components, thus reducing construction cost 2. Already manufactured to be fire-rated 3. Versatile in variety of sizing and configuration (initial corbel column/edge corbel column) Suitability : 1. Like the precast columns, precast beams have high potential in producing highly consistent connections and construction outcome. 2. Sturdy and dense character limits noise transfer from floor to floor - feasible for residential buildings such as this Fabrication Process : Connection Detail : Fabrication Process : Connection Detail : 1. Insert rebar cage that will act as reinforcement. Then, set up formwork. 2. Secure formwork with kickers as bracing. 3. Pour concrete into formwork. Then, poker is used to spread concrete evenly. 4. Smoothen concrete with slider. 1. Fix the beam reinforcement. 2. Place the beam cage into the mould. 3. Pour concrete into the formwork. Column of top floor Welded steel angle Grout Column of bottom floor Initial Column Edge Column 4. Smoothing the concrete with slider. (Details of precast beam connection by Cheng, 2016)
  • 32. 3.5 Reinforced Precast Hollow Core Floor Slab For this construction, hollow core slabs are used because it has an optimum span range, its maximum span reaching a capacity of 2.4KN/sqm over a 16 metre span. This optimum range is influenced by direct cost such as transportation, and also indirect cost during erection and the method of connecting to the beams. These slabs are highly efficient. Due to its optimised profiles, they are very versatile that they can achieve span to depth ratios, unlike other floor types.Hollow core slabs are layered with a structural screed to tie the structure together and help provide diaphragm action in the floor system. These slabs are also capable in being reused and recycled at the end of its life cycle. 3.6 Precast Wall Panels The precast walls built in this apartment is a face finish similar to a cast-in-place walls. These wall panels are incorporated with door and window openings. The precast wall panels are designated with connection points, which are important to support the structural load of the apartment. The types of precast walls used here are load bearing walls which resist and transfer loads and shear walls which provide lateral load resistance. Installation Procedure : 1. Secure bolt onto L-shaped bracket which is on wall panel. Installation Procedure : 1. Grout the reinforcing bars on the slab keyways of the hollow core floor slab 2. Set hollow core floor slab on bearing pad Suitability : 1. Precast hollow core slabs reduce in self slab weight, therefore maximising structural stability. 2. Act as a barrier for sound and fire - ideal for residential units such as these 3. Require no drilling for electrical installation. Fabrication Process : Connection Detail : Suitability : 1. Energy efficient due to its high thermal mass - helps prevent the building from getting too hot 2. Possess load bearing capabilities - act as a lateral stabiliser to support structural load from roofs and wind Fabrication Process : Connection Detail : 1. Insert rebar cage. 2. Set drillers into the framework in place to create openings in the slab. 3. Spread concrete evenly 4. Smoothen concrete using slider. 1. Assembly of Wall Panel mould. 2. Fixing of Rebars. 3. Pouring concrete into the mould. 4. Curing of concrete. 5. Demoulding. Precast Hollow core floor slab Bearing Pad Reinforcing bars Precast concrete wall Precast concrete wall Bolt
  • 33. 3.7 Precast Staircase The type of precast staircase used is the arrangement which a complete flight with number of steps required. This fabricated staircase include landings, support points layered with sound insulation. They are a separate component away from the wall panels. 3.8 Roof Steel Framing Suitability : 1. Do not require fixing or propping during erection. 2. Highly flexible and accurate in the production process. Fabrication Process : Connection Detail : Suitability : 1. Lightweight - reduce transportation cost 2. High resistance against weathering and insect infestations. Fabrication Process : Connection Detail : The type of roof truss used in this construction is the howe type. In comparison to timber roof framing, steel roof framing are more expensive, however they are more durable and require minimal maintenance. In comparison to timber roof framing, steel roof framing do not require treatment to resist natural substance. The nature of steel roof framing makes it environmentally conscious by being easily recyclable. Installation Procedure : 1. Secure anchor bolt in in top of column. 2. Install sill plate on top of column. 3. Bolt roof truss to connect to sill plate. Installation Procedure : 1. Cast rebate in precast floor slab 2. Install angle at edge of staircase and edge of rebate cast. 1. Insert reinforcing bars into formwork. 2. Set up and reinforce formwork. 3. Pour and poke concrete to spread it evenly. 4. Once cured and set, lift made precast staircase for transportation. 1.Cut the steel into the correct shape to start the forming process. 2.Press and bake the steel. 3. Welding the pieces of steel together to form the truss. Connection for top landing : Rebate cast in floor slab for angle connection Connection for bottom landing : Rebate cast in floor slab for angle connection (Connection detail of roof to column from Hilti, 2015) Min 4 bars (continuous) Precast concrete wall Anchor bolt Sill plate Roof truss
  • 35. 1.Installation of foundation pad footings. 2. Installation of precast concrete columns onto the pad footings. 3. Installation of ground floor slabs. 4. Installation of precast walls on ground floor slabs. Some wall panels have been cut to accommodate the opening sizes. Next, the installation of prefabricated windows and doors. 5. Installation of precast staircase. 7. Repeat sequence of installation of columns, floor slabs, walls, staircase, windows and doors for 1st and 2nd floor. 4.1 CONSTRUCTION PROCESS
  • 36. 8. Roof structure is supported by the repeating order of column and beams. Prefabricated steel roof trusses are placed above the column and beams of 2nd floor. 10. Interior ceiling covering, wire mesh, insulator and roof tiles were then laid on site to complete the building. 11. Finishing it up by exterior wall paintings and interior tile finishings.
  • 38. Component Columns C1 C2 C3 C4 Isometric Plan T, Thickness (mm) 300 300 300 300 W, Width (mm) 300 300 300 300 H, Height (mm) 3200 3200 3200 3200 Quantity 6 24 60 72 W W W W TT TT 5.1 PRECAST COLUMNS
  • 39. Component Slabs SL 1 SL 2 SL 3 SL 4 Isometric Plan T, Thickness (mm) 200 200 200 200 W, Width (mm) 3300 3000 3300 3300 L, Length (mm) 5400 5400 4800 2400 Quantity 12 24 12 6 W L W L W L W L 5.2 PRECAST FLOOR SLABS
  • 40. Component Slabs SL5 SL6 Roof Slab Staircase Slab Isometric Plan T, Thickness (mm) 200 200 200 200 W, Width (mm) 3000 3000 2100 1600 L, Length (mm) 2400 2100 4500 2000 Quantity 24 24 2 4 W L W L W L W L 5.2 PRECAST FLOOR SLABS
  • 41. Component Beams Name EB 1 EB 2 EB 3 EB 4 EB 5 Isometric Front Elevation T, Thickness (mm) 200 200 200 200 200 L, Length (mm) 5700 5100 3600 3300 2400 D, Depth (mm) 350 350 350 350 350 Quantity 12 12 12 52 4 D T 5.3 PRECAST BEAMS 5.31 Edge Beams
  • 42. Component Beams Name IB1 IB2 IB3 IB4 IB5 IB6 Isometric Front Elevation T, Thickness (mm) 200 200 200 200 200 200 L, Length (mm) 7200 5700 3600 3300 2700 2400 D, Depth (mm) 350 350 350 350 350 350 Quantity 12 30 15 36 30 16 D T 5.3 PRECAST BEAMS 5.32 Intermediate Beams
  • 43. Component Beams Name (to support walls above only) Isometric Front Elevation T, Thickness (mm) 200 200 200 L, Length (mm) 1600, 4800 1600, 2400 2400 D, Depth (mm) 350 350 350 Quantity 4 4 4 5.3 PRECAST BEAMS 5.33 Special Beams T D
  • 44. Component Wall Panels Isometric Front Elevation Thickness (mm) 200 200 200 200 200 Width (mm) 3000 3300 5400 5400 4200 Height (mm) 3000 1200 3000 3000 3000 Quantity 24 12 18 12 12 5.4 PRECAST WALL PANELS
  • 45. Component Wall Panels Isometric Front Elevation Thickness (mm) 200 200 200 200 200 Width (mm) 3000 3000 3000 2400 2400 Height (mm) 3000 3000 3000 3000 3000 Quantity 12 12 12 12 30 5.4 PRECAST WALL PANELS
  • 46. Component Wall Panels Isometric Front Elevation Thickness (mm) 200 200 200 200 200 Width (mm) 2000 1500 3000 2100 2100 Height (mm) 3000 3000 3000 3000 1200 Quantity 12 12 12 12 16 5.4 PRECAST WALL PANELS
  • 47. Component Wall Panels Isometric Front Elevation Thickness (mm) 200 200 200 200 Width (mm) 4500 2100 900 3600 Height (mm) 3000 3000 3000 3000 Quantity 18 12 6 12 5.4 PRECAST WALL PANELS
  • 48. Component Door 1 Door 2 Isometric Front Elevation W, Width (mm) 900 2700 H, Height (mm) 2100 2100 Quantity(mm) 21 (7 Doors Each Unit) 6 (1 Sliding Door Each Unit) Specification Wooden Panel with Steel Frame Glass Panel with Steel Frame 5.4 PRECAST WALL PANELS
  • 49. Component Staircase Name ST 1 and ST2 Isometric Plan Thread (mm) 250 Riser (mm) 167 Floor to Floor Height (mm) 3000 Quantity 6 System Specification 18 Steps Concrete Staircase 167mm 5.5 PRECAST STAIRCASE
  • 50. Component Windows Isometric Front Elevation Width (mm) 600 1200 1800 Height (mm) 600 1200 1200 Quantity 24 (2 per unit) 24 (2 per unit) 24 (2 per unit) Specification Steel Frame with Single-Glazed Glass Steel Frame with Single-Glazed Glass Double Swing Glass Window 5.6 PREFABRICATED OPENINGS
  • 51. Component Roof Steel Truss Isometric Plan Quantity 9 5.7 PREFABRICATED STEEL ROOF TRUSS
  • 53. ELEMENTS AREA (mÂČ) / LENGTH (m) IBS FACTOR COVERAGE (%) IBS SCORE PART 1: Structural Systems Ground Floor - Precast column & beam + precast concrete slab First Floor - Precast column & beam + precast concrete slab - Precast column & beam + no slab Second Floor - Precast column & beam + precast concrete slab - Precast column & beam + no slab Prefabricated Steel Roof Trusses 407.3mÂČ 382.1mÂČ 25.2mÂČ 382.1mÂČ 25.2mÂČ 407.3mÂČ 1.0 1.0 1.0 1.0 1.0 1.0 (407.3/1629.2) = 0.25 (382.1/1629.2) = 0.23 (25.2/1629.2) = 0.02 (382.1/1629.2) = 0.23 (25.2/1629.2) = 0.02 (407.3/1629.2) = 0.25 1.0 x 0.25 x 50 = 12.5 1.0 x 0.23 x 50 = 11.5 1.0 x 0.02 x 50 = 1.0 1.0 x 0.23 x 50 = 11.5 1.0 x 0.02 x 50 = 1.0 1.0 x 0.25 x 50 = 12.5 TOTAL 1629.2mÂČ 1.0 50 PART 2: Wall Systems Precast concrete panels - Exterior - Interior 90.6m 228.3m 1.0 (90.6/318.9) = 0.28 (228.3/318.9) = 0.72 1.0 x 0.28 x 20 = 5.6 1.0 x 0.72 x 20 = 14.4 TOTAL 318.9m 1.0 20 PART 3: Other Simplified Construction Solutions Utilisation of Standardised Components Based on MS 1064 - Beams - Columns - Walls - Slabs - Doors - Windows Repetition of Structural Layouts - Repetition of floor to floor height - Vertical repetition of structural floor layout - Horizontal repetition of structural floor layout Other Productivity Enhancing Solutions - Usage of prefab bathroom units (PBU) - Usage of prefab staircases - Usage of BIM models for IBS Score submission - Usage of Modular grid lines in drawings 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 100% 100% 0% 4 4 4 4 4 4 2 2 2 0 2 6 0 TOTAL 30 TOTAL IBS SCORE (PART 1 + PART 2 + PART 3) 100
  • 55. Overall, our 3-storey apartment has managed to reach a fully Industrialized Building System with a score of 100% from the Ground Floor to the Roof. This is achieved through the use of all Precast components adhering to standard dimensions of manufacture. The IBS Components that was implemented are the precast columns, precast beams, precast hollow core slabs, precast wall panels and prefabricated steel roof truss. This project has familiarized us with the IBS method of construction and its advantages. IBS is a very suitable method to be implemented in modern construction projects due to its efficiency. It is time saving and requires less manpower. However, we learn that to produce an efficient IBS based building, we should plan ahead on the details well that will assemble the building. The project has increased our knowledge in all the IBS components through our research and our opportunity to design an apartment. This project has also taught us that we can still be creative and innovative with the use of mass produce components. The physical model also gave us a hands on approach in experiencing the sequence of construction.
  • 57. References E-Books Calculation for IBS Score. (2010). [Ebook] (pp. 1-7). Precast Fabrication. [Ebook] (pp. 11-22). Websites 3 ways to connect precast columns to foundation – choose yours!. (2017). Retrieved from https://www.peikko.com/blog/3-ways-to-connect-precast-columns-to-foundation-choose-yours/ Anon, (2019). [online] Available at: https://www.academia.edu/21345729/A_study_of_precast_concrete_in_Malaysia [Accessed 16 May 2019]. Anon, (2019). [online] Available at: https://www.researchgate.net/publication/260202572_A_study_of_precast_concrete_in_Malaysia [Accessed 16 May 2019]. Bhd, I. (2019). Industrialised Building System - A Brief Background. [online] Ibsmodular.blogspot.com. Available at: http://ibsmodular.blogspot.com/2008/02/industrialised-building-system-brief.html [Accessed 16 May 2019]. Cidb.gov.my. (2019). Act 520. [online] Available at: http://www.cidb.gov.my/index.php/en/legislation/act-520 [Accessed 16 May 2019]. E. Gaudette, P. (2016). Precast Concrete Wall Systems | WBDG - Whole Building Design Guide. Retrieved from https://www.wbdg.org/guides-specifications/building-envelope-design-guide/wall-systems/precast-concrete-wall-systems Experimental Study on Seismic Strengthening of Reinforced Concrete Frames by Precast Concrete Panels. (2011). ACI Structural Journal, 108(2). Introduction to Steel Roof Trusses. (2019). Retrieved from http://mychina.biz/sh/index.php/en/90-tech-en/215-roof Metric Concrete Industries. Retrieved from http://www.metric.com.my/content/hollow-core-slab.html Modern Concrete Formwork Systems: Types, Reuse, Reliability & Risk Assessment. (2019). Retrieved from https://www.masterbuilder.co.in/modern-concrete-formwork-systems-types-reuse-reliability-risk-assessment/ Nasrullah, M. Retrieved from https://www.academia.edu/27033997/Precast_Concrete_-_Frames_Guide OKA IBS CONCRETE PRODUCTS MALAYSIA. Retrieved from http://www.oka.com.my/index.asp?LanguagesID=1&TitleReferenceID=1216&CompanyID=29 Precast Concrete Column Beam Connections - New Images Beam. (2018). Retrieved from http://www.fotoimage.org/precast-concrete-column-beam-connections/ Therumahmurah.com. (2019). Selangorku Jade Hills 42k 100k 220k 250k (Type A,B,C,D). [online] Available at: http://therumahmurah.com/project-detail-selangorku-jade-hills-42k-100k-220k-250k-type-a-b-c-d-.php [Accessed 16 May 2019].