1.
Colin
Lawton
–
Work
Experience
Note,
Addi8onal
Informa8on
added
from
slide
20
to
30.
Date
11
January
2015
2. Colin
Lawton
-‐
Experience
Summary
Contents
Experience
Overview
Health,
Safety,
Security
and
Environment
Construc8on
Management
Cri8cal
Skills
and
Capabili8es
in
Fabrica8on
and
Construc8on
-‐
Offshore
Key
Experience
Requirements
–
Onshore
and
Offshore
Module
Assembly
and
Hook
Up
Personal
AWributes
Capability
Statement
Project
Execu8on
Engineering
and
Procurement
Risk
Management
Interface
Management
Assurance
and
Quality
Control
Contract
Management
Pre
Commissioning
and
Commissioning
Addi8onal
Informa8on
3. Colin
Lawton
-‐
Experience
Summary
Over
thirty
five
years
experience
in
the
Oil
and
Gas
Industry
in
the
areas
of
Project,
Fabrica8on,
Construc8on
Commissioning
and
Management.
During
this
8me
I
have
fulfilled
the
roles
of
Company
Representa8ve,
In
Country
Manager,
Company
Representa8ve,
Construc8on
Manager,
Site
Manager,
Fabrica8on
Manager
and
Project
Manager.
I
am
well
versed
in
all
facets
of
the
Heavy
Fabrica8on,
Equipment
and
Pipe
Spool
manufacture,
Module/Jacket
Fabrica8on
and
Installa8on,
Load
out
and
Transporta8on.
I
am
also
experienced
managing
LNG
Plant
Construc8on,
Compressor
and
Meter
Sta8on,
Cross
Country
Pipelines,
Compressor
and
Meter
Sta8ons,
Refineries
and
Chemical
Plants,
Project
Comple8on
and
Hand
Over.
I
regard
the
implementa8on
of
HSSE
to
be
a
fundamental
part
of
my
normal
du8es
and
essen8al
to
the
success
of
any
project
and
fully
commiWed
to
ensuring
the
Companies
HSSE
Policies
and
Governance
requirements
are
enforced.
I
communicate
well
at
all
levels
and
consider
that
a
robust
interface
management
plan
is
essen8al
in
ensuring
a
One
Team
approach
is
adopted
throughout
the
project.
My
past
experience
in
Risk
Assurance,
Quality
Assurance,
Flawless
Start
Up
and
HSSE
has
given
me
valuable
strengths
in
being
able
to
come
up
to
speed
quickly
with
projects
and
implement
requirements
in
the
most
effec8ve
and
efficient
manner.
I
have
worked
for
companies
such
as,
Fluor
Daniel,
William
Brothers,
Woodside
Energy
Limited,
Duke
Energy
Interna8onal,
Western
Mining
Corpora8on,
San`e,
Occidental,
Babcock
and
Wilcox,
Shell,
BG/QGC
and
worked
in
loca8ons,
such
Germany,
Malaysia,
Korea,
Australia,
Thailand,
Russia
and
throughout
the
United
Kingdom.
I
am
a
hands
on
Manager,
who
earns
the
respect
of
his
team.
I
have
high
Business
Ethics
and
ensure
the
Companies
Interests
are
treated
with
the
utmost
respect.
I
take
care
of
my
team,
their
families
and
site
visitors.
My
Strengths
are
in
my
style
of
Communica8on,
I
am
a
good
organizer,
decision
maker,
adaptable,
persistent,
resilient
and
problem
solver.
4. Colin
Lawton
Experience
Summary
HEALTH,
SAFETY,
SECURITY
&
ENVIRONMENT
• Totally
commiWed
to
Leading
and
Promo8ng
Safety
and
Protec8ng
the
Environment
• Ensures
Company
and
Contractor
HSSE
Policies,
Plans
and
Procedures
are
in
place
• Personally
take
care
of
the
Health,
Safety
and
Welfare
of
my
Team
&
their
Families
• Ensures
Site
Visitors
are
properly
Inducted
and
their
Safety
and
Welfare
is
taken
care
of
• Ensures
the
Security
and
Environmental
Protec8on
of
Company
Assets
is
taken
care
of
• Enforces
Companies
Rules
on
HSSE
• Works
with
Contractors
&
Sub
Contractors
to
ensure
HSSE
is
in
Compliance
• Works
with
and
fully
support
HSSE
Advisor
• Has
completed
Tap
Root
Inves8ga8on
Training
and
conducted
Tap
Root
Inves8ga8ons
• Involved
in
Safety
Reviews,
Incident
Inves8ga8ons
and
HSSE
Audits
• Prepares
Cri8cal
Procedures
and
Risk
Assessments
• Involved
with
the
prepara8on
of
Job
Hazard
Analysis
for
Cri8cal
ac8vi8es
• Joins
the
Workforce
in
Tool
box
Mee8ngs
and
conducts
Site
Safety
Inspec8ons
• Con8nually
improves
Safety
Performance
• Develops
and
Managed
numerous
Emergency
Exercises
5. Colin
Lawton
Experience
Summary
CONSTRUCTION
MANAGEMENT
35
years
in
the
Oil
and
Gas
Industry
-‐
On
and
Offshore,
involving:
• Site
Construc8on
Management,
Module
Fabrica8on,
Assembly,
Commissioning,
Load
Out
and
Transporta8on
• Equipment
Manufacture,
Pipe
spooling,
Cross
country
Pipelines,
Compressor
&
Meter
Sta8ons
• Mechanical
Comple8on,
Pre
Commissioning
&
Commissioning
• Structural,
Mechanical,
Welding,
Civils,
Buildings,
Bridges,
Roads,
Piping,
Scaffolding,
Equipment,
Architectural,
Electrical,
Instrumenta8on,
Telemetry
&
Coa8ngs
• Site
Set
Up,
Training,
Mobiliza8on,
Admin,
Security,
IR,
HR,
&
De
Mobiliza8on
etc.
Posi8ons
Held
• Company
Representa8ve,
Construc8on
Manager,
Site
Manager,
Fabrica8on
Manager,
In
Country
Manager
and
Project
Manager
Countries
Worked
Pre
Fabrica8on
Assessments
in:
•
Korea,
Malaysia,
Japan,
Philippines,
Singapore,
Thailand,
UK
and
Australia
Worked
in
the
Following
Countries:
• United
Kingdom,
Germany,
Australia,
Korea,
Russia
and
Thailand
6. Colin
Lawton
Experience
Summary
Cri7cal
Skills
and
Capabili7es
in
Fabrica7on
and
Construc7on
-‐
Offshore,
Total
4
years
Claymore
and
Thistle
Pla`orms
–
Hook
Up
-‐
Occidental
&
Santé
Fe.
97
to
98,
1
year
Involved
managing
Incomplete
Work,
Job
Packs,
Punch
list
close
out,
Dossier
Prepara8on
and
obtaining
Lloyds
Cer8fica8on
to
Opera8on.
Interfacing
with
Hook
Up
teams,
Client,
Third
Party
Vendors,
the
OIM
&
Lloyds
Register
North
Rankin
A
Jacket
Pile
Installa8on
–
Herema
Offshore.
82
to
83,
1
year.
Involved
managing
NDT
and
Field
Inspec8on
of
Installed
Piles.
Directly
Interfacing
with
Herema
Management,
both
on
and
offshore
and
directly
managing
a
mul8
discipline
team
of
Inspectors
and
NDT
Technicians
South
Pepper
and
North
Herald
Pla`orms
–
Mc
DermoW/Western
Mining
96
to
89,
2
years.
Involved
directly
managing
the
Fabrica8on,
Pre
Assembly,
Load
Out
and
Installa8on
of
two
Pla`orms
with
Integrated
Decks.
This
involved
direct
Client
and
main
Contractor
management,
direct
supervision
of
a
Fabrica8on
Team,
managing
the
Fabrica8on
Facility,
transporta8on,
Load
Out
and
Installa8on
North
Rankin
40inch
Sub
Sea
Pipeline
–
ETPM
Clough
82
to
83,
1
year.
Involved
managing
NDT
and
Field
Inspec8on
of
Sub
Sea
Pipeline
Installa8on.
This
involved
directly
managing
and
coordina8ng
a
team
of
40
people
and
interfacing
with
the
Client
7. Colin
Lawton
Experience
Summary
Key
Experience
Requirements
–
Onshore
and
Offshore,
Total
10
Years
Extensive
experience
in
Mul8
Discipline
Supervisory
Experience
in
Fabrica8on
and
Construc8on,
including
direct
exposure
to
Disciplines
such
as,
Structural,
Piping,
E&I,
Coa8ngs,
Insula8on,
Scaffolding,
Welding
&
Tes8ng
• This
requirement
is
fully
demonstrated
via
the
below
and
the
contents
of
my
Resume.
I
have
gained
extensive
experience
in
On
and
Offshore,
rela8ng
to
Pipeline,
Meter
and
Compressor
Sta8ons,
Maintenance
Base
Construc8on,
Jacket
and
Module
Construc8on,
Offshore
Hook
Up,
Jacket
Installa8on,
Sub
Sea
Pipelines,
Refineries,
Vessel
and
Equipment
Manufacture,
Fabricators
and
Vendor
Assessment's,
NDT
and
Welding
Procedure
Qualifica8on
and
Approval.
Vendor
Inspec8ons,
Coa8ng
Trials
and
Applica8on.
All
of
these
have
included
the
Management
and
supervision
of
personnel,
Opera8ons,
Government
Officials,
Stake
Holders,
NGO,s
and
Client
Interface.
Min
15
years
broad
experience
in
Mechanical
and
Fabrica8on
engineering,
sound
understanding
of
sta8c
equipment
and
Rota8ng
Equipment
used
in
Oil
and
Gas
Modular
Projects.
Total
15
years
• WMC,
1997
–
1999.
Comple8ons
Manager.
Olympic
Dam
Project.
Waste
Heat
Recovery
Unit,
Mixer/SeWler
Tanks,
Cranes,
Pumps,
Tanks,
Drive
Heads,
Gas
Engines,
Under
Ground
Train,
Tunnels,
Hoppers,
Fire
Pumps,
Emergency
Shut
Down
Valves.
This
involved
the
supervision
of
a
600
strong
work
force.
Total
2
years.
• Duke
Energy,
1999
-‐2001.
Construc8on
Manager,
Construc8on
of
Compressor
and
Two
Meter
Sta8ons.
Taurus
60
Gas
Compressors,
Air
Fin
Cooler,
Pumps,
Tanks,
Motorized
Block
Valves.
Total
2
years.
• Sakhalin
Energy,
2004
–
2009.
Principal
Project
Engineer.
Commissioning
of
above
Block
Valves,
Equipment
shelters,
Piping,
Sta8c
(Air
Receivers/Tanks)
and
Rota8ng
Equipment
(Gas
fired
Generators)
Total
5
years.
• Woodside
Energy
Limited,
2001
–
2004.
Principal
Project
Engineer.
Pre
Commissioning
and
Commissioning
of
LNG
Train
IV.
Compressors,
Pumps,
Turbines,
Heat
Exchanger,
Air
Fin
Coolers,
Oil
filtra8on,
etc.
Total
3
years.
• Woodside
Energy,
1990
-‐
1993
&
2009
–
2010.
QA
Manager/
Mechanical
Comple8ons
Coordinator.
NR2
Re
Development
25k
Ton
Integrated
Deck.
Turbines,
Compressors,
Motorized
Valves,
Vessels,
Columns,
Air
Fin
Coolers,
Tanks,
Vendors
Skids.
Total
4
years.
8. Colin
Lawton
Experience
Summary
Key
Experience
Requirements
(con7nued)
–
Onshore
and
Offshore
Extensive
experience
in
Mul8
Discipline
Supervisory
Experience
in
Fabrica8on
and
Construc8on,
including
direct
exposure
to
Disciplines
such
as,
Structural,
Piping,
E&I,
Coa8ngs,
Insula8on,
Scaffolding,
Welding
&
Tes8ng
Experience
in
a
Supervisory
role,
Supervising
5
individuals
or
more.
Total
10
years
• JLV
Constructor
Yard,
1986
–
1988.
Project
Manager.
Owner
JLV.
Total
2
years.
• HHI,s
Yard
1990
–
1993
&
2009
–
2010.
QA
Manager/
Mechanical
comple8ons
Coordinator.
Woodside.
Total
4
years.
• United
Construc8ons
Yard
1993
–
1994.
Site
Representa8ve.
Woodside.
Total
1
Year.
• STPI,s
Yard
2010
–
2013.
Fabrica8on
Manager.
BG/QGC.
Total
3
Years.
Experience
in
working
in
Module
Yards,
or
similar
in
South
East
Asia.
Total
10
years
Worked
in:
• JLV
Constructor
Yard,
1986
–
1988.
Project
Manager.
Owner
JLV.
Total
2
years.
• HHI,s
Yard
1990
–
1993
&
2009
–
2010..
QA
Manager.
Woodside.
Total
4
years.
• United
Construc8ons
Yard
1993
–
1994..
Site
Representa8ve.
Woodside.
Total
1
Year.
• STPI,s
Yard
2010
–
2013.
Fabrica8on
Manager.
BG/QGC.
Total
3
Years.
Demonstrated
Module
Construc8on
Experience.
Total
92,000/100
Plus
Modules
• BG,
80
LNG
Modules,
45,000
Ton.
Woodside
1
Integrated
Deck
25,000
Ton.
Woodside
5
Process
Modules,
20,000
Ton.
Woodside
1
PLQ,
2000
Ton
9. Colin
Lawton
Experience
Summary
MODULE
ASSEMBLY
and
Hook
Up
77-‐78
Santé
Fe
and
Occidental
–
North
Sea
Pla`orm
Hook
Up
• Claymore
and
Thistle
Pla`orm
Up
81-‐82
Woodside
Offshore
Petroleum
Australia
–
North
Rankin
A
• Plate
Girder,
Deck
Pre
Assembly
and
Onsite
Assembly
of
Process
and
U8lity
Modules
86-‐88
JLV
Constructors
Australia
-‐
South
Pepper
and
North
Herald
Offshore
Pla`orms
• Managed
the
Heavy
Fabrica8on
Division,
Various
On
Shore
and
Offshore
Contracts,
Heavy
Structural
Steel,
Plate
Girders,
Sub
Assemblies,
Jackets
and
Topsides
and
Load
Out
90-‐93
Woodside
Offshore
Petroleum
Korea
Goodwyn
A
–
5
Process
Modules
• Fabrica8on,
Assembly,
Pre
Commissioning
and
Load
Out
93-‐94
Woodside
Offshore
Petroleum
Australia
-‐
of
Goodwyn
A
-‐
Personnel
Living
Quarters
• Fabrica8on,
Construc8on,
Pre
Commissioing,
Commissioning
and
Load
Out
10. Colin
Lawton
Experience
Summary
MODULE
ASSEMBLY
-‐
con7nued
01-‐04
Woodside
Offshore
Petroleum
Korea
• Fabrica8on,
Assembly,
Pre
Commissioning
and
Load
Out
of
72
LNG
Air
Fin
Coolers
09-‐10
Woodside
Offshore
Petroleum
Korea
-‐
NR2
24,000
Tone
Integrated
Deck
• Fabrica8on,
Assembly,
Pre
Commissioning,
Commissioning
and
Load
Out
10-‐13
BG/QGC
Thailand
-‐
80
Modules,
45,000
Ton
LNG
Modules
• Fabrica8on,
Assembly,
Pre
Commissioning
and
Load
Out
11. Colin
Lawton
Experience
Summary
PERSONAL
ATRIBUTES
• CommiWed
to
Leading
and
Promo8ng
Safety
• Takes
an
ac8vely
role
in
Safety
Inves8ga8ons
(Trained
in
Tap
Root)
• Understands
the
Team,
Earns
their
Respect
and
Takes
Care
of
them
• Highly
Organized,
Self
Mo8vated
and
Good
Communicator
• Maintains
Business
Focus
• Appreciates
local
Culture
and
Respect
their
Laws
and
Regula8ons
• Supports
Local
Chari8es
• Fosters
good
Inter
Team
Rela8onships
• Recognizes
and
Rewards
achievement
• Respects
and
cares
for
all
personnel
• Promotes
confidence
in
the
Team
• Open
and
Honest
and
Keep
my
Word
• Be
Personally
Accountable
• Fair,
Understanding
and
were
necessary
Firm
• Delivers
Results
on
8me,
Safely
• Holds
People
Accountable
• Persuades
and
influences
others
in
achieving
an
Acceptable
and
Safe
Outcome
12. Colin
Lawton
Experience
Profile
CAPABILTY
STATEMENT
• Strong
Experience
In
Module
Construc8on,
Fabrica8on
and
Commissioning
Management
• Experienced
with
Mega
Projects
• Last
Project
–
4.5
Months
Early,
No
Claims,
No
Carry
Over
Work,
Excellent
Safety
Record
• Worked
in
Harsh
Environment
• Adapts
quickly
to
Cultural
Change
and
Different
Management
styles
• Can
communicate
(limited)
in
Korean,
Russia
and
Thai
• Works
well
with
a
Wide
Cross
Sec8on
Na8onali8es
• Ins8lls
Camaraderie,
Team
Work
and
Top
Class
Collabora8on,
Can
do
Aptude
• Is
a
Professional
and
maintains
High
Ethical
standards
• Provides
Confidence
within
Team,
Management
and
Contractors
• Brings
Specialized
Skills
in
Safety,
Security,
Risks
Mi8ga8on
&
Flawless
Start
Up
• Provides
Hands-‐on
Knowledge
of
all
Construc8on
and
Commissioning
Disciplines
• Quickly
to
Comes
up
to
Speed
in
all
areas
• S8mulates
Energy
and
Passion
into
the
Team
13. Colin
Lawton
Experience
Summary
PROJECT
EXECUTION
• Collaborates
with
Contractor
ensuring
we
are
working
to
the
same
Goal
• Ensure
Company
and
Contractor
HSSE
Plans
are
Complied
with
• Develops
Management
Strategies,
Execu8on
and
Construc8on
Plans
• Interrogates
the
schedule
to
verify
progress
and
look
for
ways
to
improve
• Takes
ac8on
to
avert
and
or
arrest
Schedule
Slippage
• Manages
Company
Governance,
Regulatory
and
Third
Party
requirements
• Monitors
and
Verifies
the
Works
• Iden8fies,
Manages
and
Controls
Risks
• Sets
KPI
requirements
and
works
with
the
Team
to
beWer
them
• Uses
Ac8on
Tracking
to
monitor
and
Close
Out
Cri8cal
issues
• Uses
Lessons
Learnt
for
future
improvement
• Closely
monitor
Equipment/Material
ROS
Dates
to
ensure
deliveries
are
8mely
• Ensures
Engineering
Work
Packages
are
progressed
in
accordance
with
the
schedule
• Monitor
Vendor
and
Fabricator
Assessment
Reports
• Works
with
all
groups
to
ensure
Interfaces
are
addressed
and
ac8ons
are
8mely
• Ensure
Team
is
properly
Trained
• Ensures
site
Visitors
are
properly
Inducted
and
their
Welfare
is
taken
care
of
14. Colin
Lawton
Experience
Summary
ENGINEERING
&
PROCUREMENT
• Monitors
and
Verifies
the
Progress
of
the
Design
• Ensures
Work
Packages
are
Defined
and
logically
Broken
Down
• Ensures
Engineering
Work
Packages
are
progressed
with
the
schedule
• Par8cipates
in
Verifying
Module
Defini8on
is
accurately
carried
out
• Verifies
Engineering
Deliverables
are
Integrated
into
the
Schedule
• Par8cipates
in
Model
reviews
• Plans
and
conducts
Constructability
reviews
• Manages
Risk
Work
Shop,
establishing
Risks
and
Mi8ga8ons
• Ensures
Lessons
Learnt
are
Recorded
15. Colin
Lawton
Experience
Summary
RISK
MANAGEMENT
Over
the
years
been
involved
in
numerous
Risk
Work
Shops
and
Managing
Risks
• Goodwyn
A
Process
Modules
Fabrica8on,
Assembly
and
Load
Out
• Woodside
LNG
Train
IV
–
Fabrica8on
&
Installa8on
Par8cipated
in
Team
Risks
• SEIC
Onshore
Pipeline
Facility
Commissioning
–
Managed
Project
Risks
• Woodside
NR2
Re
Development
–
25
Ton
Integrated
Deck
–
Managed
Project
Risks
• QGC/BG
80
Modules/45,000
Ton
–
Managed
Projects
Risks
16. Colin
Lawton
Experience
Summary
INTERFACE
MANAGEMENT
My
key
Goals
and
Objec8ves
are:
• To
ensure
all
par8es
are
aligned
with
the
scope
of
work
• Plans
and
procedures
and
Interface
points
are
clearly
iden8fied
• Informa8on
is
received
when
it
is
required
and
by
the
people
who
need
it
• Ensure
an
Interface
Management
Plan
is
in
place
• Ensures
proper
communica8on
and
coordina8on
between
the
teams
• Holds
Bi
monthly
Interface
Management
Coordina8on
mee8ngs
• Iden8fies
any
new
interface
requirements/monitors
exis8ng
interfaces
• Ensures
that
necessary
coordina8on
and
planning
is
working
to
meet
the
project
schedule
• Works
with
the
Engineering
Teams/Contractors/Licensors/Government
Organiza8ons
17. Colin
Lawton
Experience
Summary
ASSURANCE
&
QUALITY
CONTROL
• Development
of
Management
systems
and
Opera8ng
procedures
• Training
and
Approved
as
Lead
assessor
–
PE
Batalas
• Managed
the
successful
Accredita8on
of
major
Engineering
Company
• Conducts
Management
reviews
and
Audits
• Review
and
approval
of
third
part
suppliers
and
fabricators
• Follows
up
on
Correc8ve
and
Improvement
No8ces
• Fully
supports
the
Quality
Assurance
and
Control
effort
18. Colin
Lawton
Experience
Summary
CONTRACT
MANAGEMENT
• As
a
high
priority
Reads
and
Understands
the
Contact
and
its
Responsibili8es
• Ensures
Companies
Governance
requirements
are
fully
Implemented
• Ensures
Integrity
and
Conformance
for
Ethical
Conduct
• Trains
Team
to
understand
Contractual
requirements
and
their
implica8ons
• Ensures
Contract
is
fully
Complied
with
• Implements
process's
for
Claims
Avoidance
and
Defense
• Has
represented
large
Company
in
High
Court
on
Li8ga8on
MaWers
• As
site
Manager
has
applied
Liquidated
Damages
• Review
and
Approves
Progress
Payments
19. Colin
Lawton
Experience
Profile
PRE
COMMISSIONING
AND
COMMISSIONING
• Manages
Pre
commissioning
&
Commissioning
• Manages
Project
Comple8on
• Manages
Project
Hand
Over
and
Close
Out
with
Opera8ons/Client
• Understands
and
Develops
Commissionable
Systems
• Develops
Work
Break
Down
Structures
• Develops
Mechanical
Comple8on
Strategies,
Plans
and
Processes
• Develops
Pre
Commissioning
and
Commissioning
Plans
and
Procedures
• Used
and
understands
WinPCS
and
or
similar
Comple8ons
Data
Base
21. Colin
Lawton
Experience
Work
Scope
-‐
Korea
Experience
1990
-‐1993
-‐
Goodwyn
A
Gas
Pla`orm,
5
Process
Modules
• Client
–
Woodside
Offshore
Petroleum
• Contractor
Hyundai
• Sub
Contractors
-‐
Various
• Loca8on
Ulsan
Dong
Gu
• Manage
the
Companies
Quality
and
Quality
Assurance
requirements
directly
with
Contractor,
achieved
DNV
Cer8ficate
for
Load
out
and
Sail
away
2001
–
2002
–
LNG
Train
IV
72
Air
Cooled
Heat
Exchangers
• Client
–
Woodside
Energy
Limited
• Contractor
–
Jord
Engineering
• Sub
Contractor
–
Jong
Up
Heat
Exchangers
• Loca8on
–
Neaangsang
• Part
of
my
du8es
was
to
monitor
offshore
Contracts,
one
in
par8cular
was
a
the
Contract
for
the
LNG
Train
Air
Fin
Coolers,
which
was
not
performing
well
and
was
a
major
risk
to
the
building
of
the
LNG
Trains.
Such
a
special
assignment
issued
by
the
Onshore
General
Manager
to
have
me
deal
directly
with
the
Sub
Contractor,
resolve
all
issues
and
have
the
Air
Fin
Coolers
Built
Commissioned
and
shipped
to
Australia,
which
I
did
successfully
and
without
impact
to
the
Project.
This
posi8on
in
Korea
became
a
permanent
assignment
un8l
all
work
was
loaded
out
22. Colin
Lawton
Experience
Work
Scope
-‐
Korea
Experience
Con7nued
2009
–
2010
North
Rankin
A
Project
–
24,000
Tone
Integrated
Deck
• Client
–
Woodside
Energy
• Contractor
–
Hyundai
• Sub
Contractors
–
Various
• Loca8on
–
Ulsan
Dong
Gu
–
Korea
• Responsible
for
Managing
all
aspects
of
Mechanical
Comple8on,
developing
the
MC
system,
and
Managing
Companies
Risk
Management
and
Flawless
Start
Up
process.
Interfacing
with
all
disciplines
and
Commissioning.
These
ac8vi8es
also
involved
working
directly
with
the
Contractor
23. Colin
Lawton
Experience
Work
Scope
-‐
Korea
Experience
Con7nued
2010
–
2013
–
Cur8s
Island
LNG
Project
• Client
–
QGC/Bri8sh
Gas
• Contractor
Bechtel
• Sub
Contractor
–
Ilsan
Pressure
Vessel
Company
• Loca8on
Ilsan
Korea
Whilst
managing
the
Module
Contract
in
Thailand,
it
became
evident
that
the
delivery
of
Pressure
Vessels
were
being
delayed
due
to
the
Sub
Contractor
having
finance
difficul8es.
As
a
result
of
this
and
my
ability
to
understand
and
work
with
Koreans
I
was
dispatched
by
Execu8ve
Management
to
Korea
and
assist
Contractor
in
finding
solu8ons
to
have
the
Sub
Contractor
Re
Open
their
Yard
and
re
commence
work.
This
was
achieved,
manufacture
re
commenced
and
deliveries
were
made,
which
did
not
impact
on
the
schedule.
The
reason
I
was
sent
was
because
of
my
capability
of
being
able
to
work
with
and
influence
the
Koreans
and
show
them
the
Clients
interest.
24. Colin
Lawton
Experience
Contractor
Experience
1977
–
1978
–
North
Sea,
Offshore
• Project
–
Claymore
and
Thistle
Pla`orms
• Scope
–
Hook
Up
two
Pla`orms
• Posi8on
–
Clients
Cer8fica8on
Engineer/Work
Pack
Coordinator
• Client
–
Occidental
and
Sa`e
• Contractors
–
Wagley
Offshore
and
Kilpatrick
Green
1978
–
1980
–
England,
Onshore
• Projects,
USSR
Methanol
Plant,
St
Fergus
Gas
Extract
Plant
&
Sullom
Voe
Gas
Plant
• Scope
–
Pipe
Spooling,
Structural
and
Equipment
• Posi8on
–
Contractors
Chief
Inspector
• Clients
–
Ralph
M
Parson,
William
Press
&
Foster
Wheeler
• Contractor
–
Mc
Tay
Engineering
–
Later
John
Mowlem
Group
1981
–
1982
–
Australia,
Onshore
• Project
–
North
Rankin
A
Gas
Pla`orm
• Scope
–
Fabrica8on
of
Plate
Girders
and
Decks
• Posi8on
–
Contractors
Quality
Assurance
Manager
• Client
–
Woodside
• Contractor
–
Johns
Perry
UIE/Forward
Down
25. Colin
Lawton
Experience
Contractor
Experience
1982
–
1983
–
Australia,
Offshore
• Project
–
North
Rankin
Installa8on
and
Sub
Sea
Pipeline
• Scope
–
Jacket
Installa8on
&
Sub
Sea
Pipeline
• Posi8on
–
Contractors
Opera8ons
Manager
• Client
-‐
Woodside
• Contractors
–
Herema
&
ETPM
Clough
• 1983
–
1986
–
Australia,
Onshore
• Project
–
Dampier
to
Perth
Pipeline
• Scope
–
1500klm
Cross
Country
Pipelines,
Compressor
and
Meter
Sta8ons
• Posi8on
–
Clients
Welding
Superintendent,
Site
Manager
&
Commissioning
Superintendent
• Client
–
State
Energy
Commission
Western
Australia
• Contractors,
Saipem
&
ICC
• 1986-‐
1988
–
Australia
On
and
Offshore
• Project
–
South
Pepper
North
Herald
Oil
Pla`orms
• Scope
–
Design,
Build,
Transport
and
Installa8on
of
Two
Pla`orms
• Posi8on
Contractors
Project
Manager
• Client
-‐
Western
Mining
• Contractor
–
J
Ray
Mc
DermoW
27. Colin
Lawton
Experience
Contractor
Experience
1993
–
1994
–
Australia,
Onshore
• Project
–
Goodwyn
A
U8li8es
Module
• Scope
–
Design,
Build,
Pre
Commission
and
Load
Out
• Posi8on
–
Company
Site
Representa8ve
• Client
–
Woodside
(seconded
to
Hardcastle
and
Richards)
• Contractors
–
United
Construc8on
1994
–
1995
Australia,
Onshore
• Project
–
Karratha
to
Port
Headland
Gas
Pipeline
• Scope
–
Design,
Build
and
Commission
Cross
country
Pipeline,
Meter
&
Receiver
Sta8ons
• Posi8on
–
Clients
Site
Construc8on
Manager
• Client
–
William
Brothers/Western
Mining
• Contractor
–
Clough
28. Colin
Lawton
Experience
Contractor
Experience
1995
–
1996
Australia,
Onshore
Project
–
Various
Scope
–
Achieve
Lloyds
ISO
9001
Accredita8on
Posi8on
–
Company
Representa8ve
Client
–
Fluor
Daniel
1996-‐
1997
Australia,
Onshore
Project
–
Goldfield
Gas
pipeline
Scope
–
Specifically
recruited
to
recover
lost
progress
and
finish
the
project
on
8me
Posi8on
–
Company
Comple8ons
Manager
Client
–
Western
Mining
Contractor
–
Saipem/Leighton's
1997
–
1997
Australia,
Onshore
Project
–
Olympic
Dam
Expansion
Scope
–
Expand
exis8ng
Plant
Posi8on
–
Companies
Construc8on
Manager
Client
–
Western
Mining
Sub
Contractors
–
Thiess,
Transfield,
ABB
&
united
Construc8on
29. Colin
Lawton
Experience
Contractor
Experience
1999
to
2002,
Australia,
Onshore
• Project
–
Eastern
Gas
Pipeline
• Scope
–
Compressor,
Metering
Sta8on
and
Gas
Pipeline
• Posi8on
–
Companies
Site
Construc8on
Manager
• Client
–
Duke
Energy
• Contractors
–
Simon
Carves
and
various
local
Civil
and
Mechanical,
plus
main
Vendors
2001
–
2004,
Australia/Korea
• Project
–
Train
IV
LNG
Plant
• Scope
-‐
Various
Offshore
Contracts
(Korea/Thailand)
&
Australia
• Posi8on
–
Companies
Principal
Project
Engineer/Comple8ons
Superintendent
• Client
–
Woodside
• Contractors
–
KJV,
CBI,
United
Construc8on,
Sino
Thai
&
Jord
2009
–
2010,
Korea
• Project
–
North
Rankin
A
24,000
Tone
Integrated
Deck
• Scope
–
Fabricate,
Build,
Pre
Commission,
Commission
and
Load
Out
• Posi8on
–
Mechanical
Comple8ons
Coordinator
• Client
–
Woodside
• Contractor
–
Hyundai
• Sub
Contractors
-‐
Various
30. Colin
Lawton
Experience
Contractor
Experience
2010
–
2013
• Project
–
Cur8s
Island
LNG
Plant
• Scope
–
Fabricate,
Pre
Commission
&
Load
Out
45,000
Tone,
80
Modules
• Posi8on
–
Fabrica8on
Manager/
In
Country
Representa8ve
• Client
–
QGC/BG
• Contractor
–
Bechtel