CDPHE
CONTRACT MONITORING
TRAINING

                               Deb Polk, Director
     CDPHE Contracts Performance Monitoring Unit
                                            2012
Terms
 Contract/Purchase Order = Agreement
  for goods or services or both
 Monitoring = Planned, ongoing or
  periodic activity that measures and
  ensures contractor compliance with the
  terms, conditions, and requirements of a
  contract or purchase order.
 Contractor Performance = How the
  contractor meets the terms, conditions
  and requirements of a contract or
  purchase order.
Contract Monitor/Team

 Fiscal and Program
 Clearly Defined Role and Responsibilities

 Familiar with Contract & Funding

  Requirements
 Multiple Monitors – Information Sharing

 Escalate Compliance Issues within the

  Program
Post Award Meeting
 Facilitates Compliance
 Review All Requirements/ Expectations/
  Standards/ Monitoring Activities
 Guidance/Reference Materials

 Fiscal and Program Staff Attend

 Group or Individual/ In Person or
  Telephone
 Formal Agenda (Refer to Handout)

 Document Meeting – Share with
Risk Assessments


 Risk-Based Monitoring
 Program and Fiscal

 Level of Resources/Activities for
  Monitoring
 Uniform Process

 Solicitation or After Award
Risk Assessments (continued)

   Program Assessment
     Compliance with
      Program/Administrative/ Contractual
      Requirements
     Uniform Process
      Criteria
      Procedureand tools
      Measurement/ Rate
      Documentation
Risk Assessments (continued)

   Fiscal Assessment
     LPHAs/Counties
     FRMS
     Other   Contractors
      DivisionFiscal Staff Assesses Financial
       Management System
      Technical Assistance for Assessment
       Development
      Uniform Process
Communication
   Lack of or Inadequate Communication often
    Leads to Poor Performance
   Subcontractors
   Method
     InPerson, Telephone (document), Email
     Frequency of Contact – Risk Based

   Staff Roles/Contact Information – Keep
    Updated (Post Award Meeting)
   Staff Information Sharing – Who, How and
    When
Monitoring Methods
   Fits Nature of Project, Risk Level and
    Resources
   Documentation Reviews (Fiscal or Program)
     Examination/Analysis    of Documentation that
     Reflects Performance
       Progress  Reports
       Survey Results
       Electronic Data
       Correspondence
       Invoices
       Fiscal Data/Reports
     Tracking Deliverables
     Follow Up & Archiving
Monitoring Methods (continued)
   FRMS Site Visits – LPHAs/Counties
   Site Visits (Fiscal or Program)
     Preparation

     Entrance  Conference (Meeting)
     Assessment for Compliance/Following up on
      Issue/ etc
     Exit Conference (Meeting)

     Report – CDPHE Template in Development

     Follow Up & Archiving
Monitoring Practices
   Standardized Practices – Not Inclusive of ALL
    Practices (Refer to Handout)
   High Risk Practices (Refer to Handout)
     Federally    Funded High Risk Requirements
       Special conditions and restrictions must correspond to
        the reason for the high risk rating AND be included in
        the award notification or contract
       Additional restrictions during contract period:
            Contractor must be notified of the nature of the restriction
            Reason for imposing the additional restriction
            Corrective Action/time line to have restriction removed
            Method for requesting reconsideration of the restriction
Performance Improvement Plan
   Formal Process to Resolve Compliance Issues
     Program and Fiscal
     CDPHE Template in Development
     When and How Initiated
     Who is Involved
     Negotiate Solution & Time line for completion
      (when possible)
     Time Extensions
     Progress Tracking
     What happens if not completed (Contracts
      Compliance Team)
Documentation of Performance

 Basis for All Performance Evaluations
 Provides History of the Contract and
  Performance
 Dispute Resolution based on Facts

   Facts = Documentation

 Must Archive Specific Documentation

  (Refer to Handout)
Performance Evaluation


 CDPHE & CMS Statutory
  Requirement
 Training coming up…
Technical Assistance
   Email, Telephone or in Person
     Document      & Archive
   Reference Document
     Standardizes information/promotes compliance
     Post Award Meeting

     Best Practices:
       Available  in hard copy and electronically
       Internet access
       Short in length and concise
       Updated timely & Contractor notified of updates
Unresolved Compliance Issues
Extensive effort to resolve issue with Contractor
     1. Comprehensive documentation of issue(s)
      Efforts made to resolve
      Staff/contractor representatives involved
     2. Program management awareness/involvement
     3. Notify Contracts Compliance Team
      Purchasing and Contracts Director, Lisa
      McGovern
     4. General Provisions, “Remedies” Provision
      Contract/ Intergovernmental/ Master Contract)
     5. Implemented all appropriate/applicable
        Remedies
 Stop Work Order/ Terminate
Monitoring Process Audit

 Voluntary
 Audit Monitoring & Evaluation
  Process
 Qualify for Reduction in Evaluation
  Frequency – Level 1 or Level 2
Contract Performance
      Evaluation
    (CMS Evaluations)
Purpose of Contractor
Performance Evaluations

   Compliance with CMS Statute (Senate Bill
    07-228, as Incorporated in the C.R.S. §§24-
    102-205,24-102-206,24-103.5-101 and 24-
    105-102
   Feedback to Contractors Concerning
    Performance
   Future Award Decisions
   Determine Contracting Requirements –
    Mitigate Risk
   Information Sharing – internally and
Evaluation Categories
   Quality – met requirements, expectations or
    desired outcomes as specified in the contract
   Timeliness- performed work within the time
    frames specified in the contract
   Budget – adhered to budget, effective
    financial management, value received
    supports costs
   Business Relations –
    professional, respectful, friendly, businesslike
    interactions and communications
   Deliverables – compliant in meeting
    standards of deliverables as specified in the
Evaluation Ratings
 3 Tiered System
 Established by Office of the State Controller
  (Refer to Handout-pg 11)
 Used for all performance evaluations
 Standard
   Optimum
   Meets specifications/ requirements/expectations
    defined in the contract.
   Contractor is cooperative in resolving issues of
    noncompliance.
Evaluation Ratings (continued)
 Below Standard
   Less than satisfactory performance.
   Does not meet specifications, requirements or
    expectations defined in the contract.
   Does not resolve issues of noncompliance or is
    uncooperative.
 Above Standard
   Exceptional performance
   Consistently superior achievement beyond what
    is defined in the contract.
   Significantly exceeds
    specifications, requirements, or expectations
    defined in the contract.
Frequency of Evaluations
 Interim Performance Evaluations
   Level 4 – 4 Times per 12 Month Period

   Level 3 - 3 Times per 12 Month Period

 Final Performance Evaluation
   End of the Life of the Contract & Complete
   Complete = Performance Obligations are Met and
    the Final Invoice is Received and Accepted OR 6
    Months has Passed since the Receipt of the Final
    Invoice
Evaluation Participants
   Evaluator
     Conducts/Coordinates      Evaluations
     Usually   Program Staff
   Evaluator Supervisor
     Approves    Evaluation/Rating
   Contract Writer
     Creates/Edits CMS Records
     Enters Final Evaluation Data in CMS

   Contractor is not involved in the process
Evaluation Procedure: Level 3 & 4

   Equal assessment of both program and fiscal
    performance
   30 Day Time Line – Some Flexibility
   Program & Fiscal Staff Review Documentation
   Complete CDPHE Evaluation Worksheet/Determine
    Rating
   Supervisor Approves
   Email Worksheet to Contractor for Review/Comment
    – use scripted message (DO NOT SEND TO
    SUBCONTRACTOR)
   Archive Evaluation Information (Program or Fiscal
Evaluation Procedure: Final

 Similar Procedure as Level 3 and Level
  4
    Final Contractor Performance

     Evaluation Form
    Contract Writer/CMS Data Entry

 Timeline is Not Flexible – 30 days

 Evaluation Information IS ENTERED in
  CMS
Ratings & Disputes – FINAL
Evaluation
   Notify Immediately for the Following:
     Below   Standard Rating – DO NOT email the
      evaluation to the contractor without approval.
     Contractor Request for a Meeting- DO NOT
      schedule a meeting or discuss the
      evaluation/rating with the contractor.
     Dispute – DO NOT discuss the dispute process
      with the contractor or provide assistance
      regarding the process.
Standardized Invoice
   Form Training
Why do we need a Standardized
         Invoice Form?
   Resolve contracting related issues
     Background/   History
 Good business practice
 Efficient, Effective

  and Elegant
When Do I Use The New Form?
   Contracts and Purchase Orders - Services
   All Entity Types
   Division staff will utilize the CDPHE
    standardized invoice form for all contracts and
    purchase orders.
   Requests to use a customized form or to
    accept a vendor issued form must be
    approved by the Contracts Performance
    Monitoring Unit Director.
   Customized Forms
Accessing the New Form

   Link on CDPHE web site
     http://www.cdphe.state.co.us/StandardizedInvoice
     /index.html
     URL   on Form
 Check current version
 Revision control log (track changes)
Communicating with
          Contractors
 Fact Sheet (under development)
 Contractor Memo (under

  development)
  All Entity Types
 Orientation for LPHAs

  April 2012
Transition and Provisions

 Transition period: April 1 – June 30
 Effective Date: July 1, 2012

 Program staff train the Contractor

 New provision - Invoicing

   Contracts, Exhibit A – Additional
     Provisions
   Purchase Orders
Filling out the Form
 Invoice Handout
 Excel Workbook – 2003-2010

 2 Tabs

  Expenditure Details &
    Reimbursement Invoice
 Expenditure Details data auto-

  populates Reimbursement Invoice
Filling out the Form (Continued)

 Locked cells vs. Unlocked
  Protect Formulas/ Data
 Instruction Bubbles

 Expenditure Categories

  Personal Services/ Columns
Filling out the Form (Continued)

   Line Items and Rows
     Personal Services – 25
     Operating Expenses - 30

 Expanded Version (100 personnel
  rows)
 Attestations and Signature Blocks

 Billing Summary

 Submission
HELP
 Training and Technical Assistance
 Deb Polk

   Director, Contracts Performance
    Monitoring Unit
   ext. 2136 - deb.polk@state.co.us


   Brian Stafford
     FRMS Coordinator
     ext. 2138 - brian.stafford@state.co.us

Weitere ähnliche Inhalte

Was ist angesagt?

Scalable integrated program audit (sipa)
Scalable integrated program audit (sipa)Scalable integrated program audit (sipa)
Scalable integrated program audit (sipa)Vishnuvarthanan Moorthy
 
Risk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship ManagementRisk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship ManagementCarolineKealey
 
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTS
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTSHOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTS
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTSAbraham Ncunge
 
Operational definition of of Monitoring and Evaluation Terms
Operational definition of of Monitoring and Evaluation TermsOperational definition of of Monitoring and Evaluation Terms
Operational definition of of Monitoring and Evaluation TermsAbraham Ncunge
 
Vikram - Resume
Vikram - ResumeVikram - Resume
Vikram - ResumeVikram Rao
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Managementneha2788
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 
PMBOK 4th Edtions Changes
PMBOK 4th Edtions ChangesPMBOK 4th Edtions Changes
PMBOK 4th Edtions Changesgryasam
 
Methods for evaluating project performance
Methods for evaluating project performanceMethods for evaluating project performance
Methods for evaluating project performanceliviu00
 
PMP Training - 12 project procurement management
PMP Training - 12 project procurement managementPMP Training - 12 project procurement management
PMP Training - 12 project procurement managementejlp12
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost managementImran Jamil
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012satish526
 

Was ist angesagt? (16)

Scalable integrated program audit (sipa)
Scalable integrated program audit (sipa)Scalable integrated program audit (sipa)
Scalable integrated program audit (sipa)
 
Risk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship ManagementRisk Mitigation Guide: Client-Agency/Consultant Relationship Management
Risk Mitigation Guide: Client-Agency/Consultant Relationship Management
 
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTS
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTSHOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTS
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECTS
 
Operational definition of of Monitoring and Evaluation Terms
Operational definition of of Monitoring and Evaluation TermsOperational definition of of Monitoring and Evaluation Terms
Operational definition of of Monitoring and Evaluation Terms
 
Vikram - Resume
Vikram - ResumeVikram - Resume
Vikram - Resume
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
PMBOK 4th Edtions Changes
PMBOK 4th Edtions ChangesPMBOK 4th Edtions Changes
PMBOK 4th Edtions Changes
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Methods for evaluating project performance
Methods for evaluating project performanceMethods for evaluating project performance
Methods for evaluating project performance
 
PMP Training - 12 project procurement management
PMP Training - 12 project procurement managementPMP Training - 12 project procurement management
PMP Training - 12 project procurement management
 
11070_AP_NA
11070_AP_NA11070_AP_NA
11070_AP_NA
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
 

Andere mochten auch

4. contractor performance_assessment_reporting_system
4. contractor performance_assessment_reporting_system4. contractor performance_assessment_reporting_system
4. contractor performance_assessment_reporting_systemColorado PTAC
 
Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12Brandon Williams
 
Cmwg contract breaches presentation
Cmwg contract breaches presentationCmwg contract breaches presentation
Cmwg contract breaches presentationBrandon Williams
 
Career consultant performance appraisal
Career consultant performance appraisalCareer consultant performance appraisal
Career consultant performance appraisalRonaldKoeman345
 
Using Social Software to Make Blended Learning a Success
Using Social Software to Make Blended Learning a Success Using Social Software to Make Blended Learning a Success
Using Social Software to Make Blended Learning a Success Brandon Williams
 
What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014Brandon Williams
 
What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2
What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2
What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2Brandon Williams
 
Performance of contract
Performance of contractPerformance of contract
Performance of contractgyan_prakash
 
Vendor Management - Compliance Checklist Manifesto Series
Vendor Management - Compliance Checklist Manifesto SeriesVendor Management - Compliance Checklist Manifesto Series
Vendor Management - Compliance Checklist Manifesto SeriesContinuity Control
 
20170302 tryswift tasting_tests
20170302 tryswift tasting_tests20170302 tryswift tasting_tests
20170302 tryswift tasting_testsKazuaki Matsuo
 
GNU Build System
GNU Build SystemGNU Build System
GNU Build Systemimacat .
 
Trabajo de ingles
Trabajo de inglesTrabajo de ingles
Trabajo de inglesGaznatiiTha
 

Andere mochten auch (20)

4. contractor performance_assessment_reporting_system
4. contractor performance_assessment_reporting_system4. contractor performance_assessment_reporting_system
4. contractor performance_assessment_reporting_system
 
Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12Tobacco wb webinar 6.22.12
Tobacco wb webinar 6.22.12
 
Cmwg contract breaches presentation
Cmwg contract breaches presentationCmwg contract breaches presentation
Cmwg contract breaches presentation
 
Career consultant performance appraisal
Career consultant performance appraisalCareer consultant performance appraisal
Career consultant performance appraisal
 
Using Social Software to Make Blended Learning a Success
Using Social Software to Make Blended Learning a Success Using Social Software to Make Blended Learning a Success
Using Social Software to Make Blended Learning a Success
 
What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014What's Your LMSs Status? Online Learning Conference 2014
What's Your LMSs Status? Online Learning Conference 2014
 
What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2
What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2
What's Your LMSs Status? Online Learning Conference 2013 (#olc13) session 504v2
 
CAPE-GPS
CAPE-GPSCAPE-GPS
CAPE-GPS
 
Performance of contract
Performance of contractPerformance of contract
Performance of contract
 
Discharge and Performance of Contracts
Discharge and Performance of ContractsDischarge and Performance of Contracts
Discharge and Performance of Contracts
 
Vendor Management - Compliance Checklist Manifesto Series
Vendor Management - Compliance Checklist Manifesto SeriesVendor Management - Compliance Checklist Manifesto Series
Vendor Management - Compliance Checklist Manifesto Series
 
20170302 tryswift tasting_tests
20170302 tryswift tasting_tests20170302 tryswift tasting_tests
20170302 tryswift tasting_tests
 
jens ulriksen
jens ulriksenjens ulriksen
jens ulriksen
 
116 anna schramvejlby_om at skue hunden p+ñ h+ñrene
116 anna schramvejlby_om at skue hunden p+ñ h+ñrene116 anna schramvejlby_om at skue hunden p+ñ h+ñrene
116 anna schramvejlby_om at skue hunden p+ñ h+ñrene
 
GNU Build System
GNU Build SystemGNU Build System
GNU Build System
 
29 jacob andersen&anninemoltsen_forhistoriske ovne
29 jacob andersen&anninemoltsen_forhistoriske ovne29 jacob andersen&anninemoltsen_forhistoriske ovne
29 jacob andersen&anninemoltsen_forhistoriske ovne
 
Sidsel Wåhlin
Sidsel WåhlinSidsel Wåhlin
Sidsel Wåhlin
 
Trabajo de ingles
Trabajo de inglesTrabajo de ingles
Trabajo de ingles
 
61 Janne Laursen, Kulturmøder
61 Janne Laursen, Kulturmøder61 Janne Laursen, Kulturmøder
61 Janne Laursen, Kulturmøder
 
Bullying
BullyingBullying
Bullying
 

Ähnlich wie Mar 2012 cdphe contractor performance monitoring trng

Inbound MIPR Process
Inbound MIPR ProcessInbound MIPR Process
Inbound MIPR ProcessJames Foster
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Peter Soetevent
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremDaliaCulbertson719
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.pptMUST
 
Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...
Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...
Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...nzde
 
Supplier Relationship Management
Supplier Relationship ManagementSupplier Relationship Management
Supplier Relationship ManagementMichelle Lombard
 
James Brodie - Outsourcing Partnership - Shared Perspectives
James Brodie - Outsourcing Partnership - Shared Perspectives James Brodie - Outsourcing Partnership - Shared Perspectives
James Brodie - Outsourcing Partnership - Shared Perspectives TEST Huddle
 
Testing Junior Management Course v2
Testing Junior Management Course v2Testing Junior Management Course v2
Testing Junior Management Course v2sharon elgarat
 
Project Management 101 Briefing
Project Management 101 BriefingProject Management 101 Briefing
Project Management 101 BriefingBen Blanquera
 
Grant and Financial Management Training for Implementing Partners
Grant and Financial Management Training for Implementing PartnersGrant and Financial Management Training for Implementing Partners
Grant and Financial Management Training for Implementing PartnersBenjamin Kofi Quansah
 
Projects Management
Projects ManagementProjects Management
Projects ManagementNirmal Shah
 
CONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxCONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxihsanmuhammad44
 
A/E Project Management Optimization-Part Two
A/E Project Management Optimization-Part TwoA/E Project Management Optimization-Part Two
A/E Project Management Optimization-Part TwoZweigWhite
 
5. source selection_101
5. source selection_1015. source selection_101
5. source selection_101Colorado PTAC
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementTrue Corporation
 

Ähnlich wie Mar 2012 cdphe contractor performance monitoring trng (20)

FMSuport Ltd
FMSuport LtdFMSuport Ltd
FMSuport Ltd
 
Inbound MIPR Process
Inbound MIPR ProcessInbound MIPR Process
Inbound MIPR Process
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project Procurem
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.ppt
 
Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...
Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...
Generating Increased Value through Turbulent Times (Peter Doolin, GCL Consult...
 
Money Saving
Money SavingMoney Saving
Money Saving
 
NCMA Performance-Based Acquisition Overview
NCMA Performance-Based Acquisition OverviewNCMA Performance-Based Acquisition Overview
NCMA Performance-Based Acquisition Overview
 
Supplier Relationship Management
Supplier Relationship ManagementSupplier Relationship Management
Supplier Relationship Management
 
James Brodie - Outsourcing Partnership - Shared Perspectives
James Brodie - Outsourcing Partnership - Shared Perspectives James Brodie - Outsourcing Partnership - Shared Perspectives
James Brodie - Outsourcing Partnership - Shared Perspectives
 
BIS10 Service Delivery
BIS10 Service DeliveryBIS10 Service Delivery
BIS10 Service Delivery
 
Testing Junior Management Course v2
Testing Junior Management Course v2Testing Junior Management Course v2
Testing Junior Management Course v2
 
Project Management 101 Briefing
Project Management 101 BriefingProject Management 101 Briefing
Project Management 101 Briefing
 
Grant and Financial Management Training for Implementing Partners
Grant and Financial Management Training for Implementing PartnersGrant and Financial Management Training for Implementing Partners
Grant and Financial Management Training for Implementing Partners
 
Projects Management
Projects ManagementProjects Management
Projects Management
 
CONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxCONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptx
 
A/E Project Management Optimization-Part Two
A/E Project Management Optimization-Part TwoA/E Project Management Optimization-Part Two
A/E Project Management Optimization-Part Two
 
5. source selection_101
5. source selection_1015. source selection_101
5. source selection_101
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 

Mehr von Brandon Williams

Applicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiativesApplicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiativesBrandon Williams
 
Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12Brandon Williams
 
Applicant webinar tobacco community initiatives
Applicant webinar tobacco community initiativesApplicant webinar tobacco community initiatives
Applicant webinar tobacco community initiativesBrandon Williams
 
Cdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11aCdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11aBrandon Williams
 
Jillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd finalJillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd finalBrandon Williams
 
Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12Brandon Williams
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbBrandon Williams
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbBrandon Williams
 
Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11Brandon Williams
 
PSD Obesity Presentation 2011
PSD Obesity Presentation 2011PSD Obesity Presentation 2011
PSD Obesity Presentation 2011Brandon Williams
 
Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)Brandon Williams
 
LGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan SlidesLGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan SlidesBrandon Williams
 
Tobacco budget update nov 2011a
Tobacco budget update nov 2011aTobacco budget update nov 2011a
Tobacco budget update nov 2011aBrandon Williams
 
Strategic plan presentation 11.16.11
Strategic plan presentation 11.16.11Strategic plan presentation 11.16.11
Strategic plan presentation 11.16.11Brandon Williams
 
Ccpd presentation 11 4 2011
Ccpd presentation 11 4 2011Ccpd presentation 11 4 2011
Ccpd presentation 11 4 2011Brandon Williams
 

Mehr von Brandon Williams (20)

Cmpu orientation webinar
Cmpu orientation webinarCmpu orientation webinar
Cmpu orientation webinar
 
Applicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiativesApplicant webinar tobacco cessation initiatives
Applicant webinar tobacco cessation initiatives
 
Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12Applicant webinar ccpd final 05-29-12
Applicant webinar ccpd final 05-29-12
 
Applicant webinar tobacco community initiatives
Applicant webinar tobacco community initiativesApplicant webinar tobacco community initiatives
Applicant webinar tobacco community initiatives
 
MCH Data to Action
MCH Data to ActionMCH Data to Action
MCH Data to Action
 
Tobacco wb webinar 5 1-12
Tobacco wb webinar 5 1-12Tobacco wb webinar 5 1-12
Tobacco wb webinar 5 1-12
 
Cdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11aCdphe cd presentation for ccpd 10 14 11a
Cdphe cd presentation for ccpd 10 14 11a
 
Jillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd finalJillians slides for 12 9 11 ccpd final
Jillians slides for 12 9 11 ccpd final
 
Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12Ccpd stakeholder input process 01 13-12
Ccpd stakeholder input process 01 13-12
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cb
 
Federal tobacco control
Federal tobacco controlFederal tobacco control
Federal tobacco control
 
Ttfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cbTtfcci mid program presentation to trc 121411.cb
Ttfcci mid program presentation to trc 121411.cb
 
Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11Colorado lgbt data scan final 10 14-11
Colorado lgbt data scan final 10 14-11
 
PSD Obesity Presentation 2011
PSD Obesity Presentation 2011PSD Obesity Presentation 2011
PSD Obesity Presentation 2011
 
Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)Epe literature review training november 28 2011 (1)
Epe literature review training november 28 2011 (1)
 
Colorado leadership v4
Colorado leadership v4Colorado leadership v4
Colorado leadership v4
 
LGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan SlidesLGBT HOPP Strategic Plan Slides
LGBT HOPP Strategic Plan Slides
 
Tobacco budget update nov 2011a
Tobacco budget update nov 2011aTobacco budget update nov 2011a
Tobacco budget update nov 2011a
 
Strategic plan presentation 11.16.11
Strategic plan presentation 11.16.11Strategic plan presentation 11.16.11
Strategic plan presentation 11.16.11
 
Ccpd presentation 11 4 2011
Ccpd presentation 11 4 2011Ccpd presentation 11 4 2011
Ccpd presentation 11 4 2011
 

Mar 2012 cdphe contractor performance monitoring trng

  • 1. CDPHE CONTRACT MONITORING TRAINING Deb Polk, Director CDPHE Contracts Performance Monitoring Unit 2012
  • 2. Terms  Contract/Purchase Order = Agreement for goods or services or both  Monitoring = Planned, ongoing or periodic activity that measures and ensures contractor compliance with the terms, conditions, and requirements of a contract or purchase order.  Contractor Performance = How the contractor meets the terms, conditions and requirements of a contract or purchase order.
  • 3. Contract Monitor/Team  Fiscal and Program  Clearly Defined Role and Responsibilities  Familiar with Contract & Funding Requirements  Multiple Monitors – Information Sharing  Escalate Compliance Issues within the Program
  • 4. Post Award Meeting  Facilitates Compliance  Review All Requirements/ Expectations/ Standards/ Monitoring Activities  Guidance/Reference Materials  Fiscal and Program Staff Attend  Group or Individual/ In Person or Telephone  Formal Agenda (Refer to Handout)  Document Meeting – Share with
  • 5. Risk Assessments  Risk-Based Monitoring  Program and Fiscal  Level of Resources/Activities for Monitoring  Uniform Process  Solicitation or After Award
  • 6. Risk Assessments (continued)  Program Assessment  Compliance with Program/Administrative/ Contractual Requirements  Uniform Process  Criteria  Procedureand tools  Measurement/ Rate  Documentation
  • 7. Risk Assessments (continued)  Fiscal Assessment  LPHAs/Counties FRMS  Other Contractors  DivisionFiscal Staff Assesses Financial Management System  Technical Assistance for Assessment Development  Uniform Process
  • 8. Communication  Lack of or Inadequate Communication often Leads to Poor Performance  Subcontractors  Method  InPerson, Telephone (document), Email  Frequency of Contact – Risk Based  Staff Roles/Contact Information – Keep Updated (Post Award Meeting)  Staff Information Sharing – Who, How and When
  • 9. Monitoring Methods  Fits Nature of Project, Risk Level and Resources  Documentation Reviews (Fiscal or Program)  Examination/Analysis of Documentation that Reflects Performance  Progress Reports  Survey Results  Electronic Data  Correspondence  Invoices  Fiscal Data/Reports  Tracking Deliverables  Follow Up & Archiving
  • 10. Monitoring Methods (continued)  FRMS Site Visits – LPHAs/Counties  Site Visits (Fiscal or Program)  Preparation  Entrance Conference (Meeting)  Assessment for Compliance/Following up on Issue/ etc  Exit Conference (Meeting)  Report – CDPHE Template in Development  Follow Up & Archiving
  • 11. Monitoring Practices  Standardized Practices – Not Inclusive of ALL Practices (Refer to Handout)  High Risk Practices (Refer to Handout)  Federally Funded High Risk Requirements  Special conditions and restrictions must correspond to the reason for the high risk rating AND be included in the award notification or contract  Additional restrictions during contract period:  Contractor must be notified of the nature of the restriction  Reason for imposing the additional restriction  Corrective Action/time line to have restriction removed  Method for requesting reconsideration of the restriction
  • 12. Performance Improvement Plan  Formal Process to Resolve Compliance Issues  Program and Fiscal  CDPHE Template in Development  When and How Initiated  Who is Involved  Negotiate Solution & Time line for completion (when possible)  Time Extensions  Progress Tracking  What happens if not completed (Contracts Compliance Team)
  • 13. Documentation of Performance  Basis for All Performance Evaluations  Provides History of the Contract and Performance  Dispute Resolution based on Facts  Facts = Documentation  Must Archive Specific Documentation (Refer to Handout)
  • 14. Performance Evaluation  CDPHE & CMS Statutory Requirement  Training coming up…
  • 15. Technical Assistance  Email, Telephone or in Person  Document & Archive  Reference Document  Standardizes information/promotes compliance  Post Award Meeting  Best Practices:  Available in hard copy and electronically  Internet access  Short in length and concise  Updated timely & Contractor notified of updates
  • 16. Unresolved Compliance Issues Extensive effort to resolve issue with Contractor 1. Comprehensive documentation of issue(s) Efforts made to resolve Staff/contractor representatives involved 2. Program management awareness/involvement 3. Notify Contracts Compliance Team Purchasing and Contracts Director, Lisa McGovern 4. General Provisions, “Remedies” Provision Contract/ Intergovernmental/ Master Contract) 5. Implemented all appropriate/applicable Remedies  Stop Work Order/ Terminate
  • 17. Monitoring Process Audit  Voluntary  Audit Monitoring & Evaluation Process  Qualify for Reduction in Evaluation Frequency – Level 1 or Level 2
  • 18. Contract Performance Evaluation (CMS Evaluations)
  • 19. Purpose of Contractor Performance Evaluations  Compliance with CMS Statute (Senate Bill 07-228, as Incorporated in the C.R.S. §§24- 102-205,24-102-206,24-103.5-101 and 24- 105-102  Feedback to Contractors Concerning Performance  Future Award Decisions  Determine Contracting Requirements – Mitigate Risk  Information Sharing – internally and
  • 20. Evaluation Categories  Quality – met requirements, expectations or desired outcomes as specified in the contract  Timeliness- performed work within the time frames specified in the contract  Budget – adhered to budget, effective financial management, value received supports costs  Business Relations – professional, respectful, friendly, businesslike interactions and communications  Deliverables – compliant in meeting standards of deliverables as specified in the
  • 21. Evaluation Ratings  3 Tiered System  Established by Office of the State Controller (Refer to Handout-pg 11)  Used for all performance evaluations  Standard  Optimum  Meets specifications/ requirements/expectations defined in the contract.  Contractor is cooperative in resolving issues of noncompliance.
  • 22. Evaluation Ratings (continued)  Below Standard  Less than satisfactory performance.  Does not meet specifications, requirements or expectations defined in the contract.  Does not resolve issues of noncompliance or is uncooperative.  Above Standard  Exceptional performance  Consistently superior achievement beyond what is defined in the contract.  Significantly exceeds specifications, requirements, or expectations defined in the contract.
  • 23. Frequency of Evaluations  Interim Performance Evaluations  Level 4 – 4 Times per 12 Month Period  Level 3 - 3 Times per 12 Month Period  Final Performance Evaluation  End of the Life of the Contract & Complete  Complete = Performance Obligations are Met and the Final Invoice is Received and Accepted OR 6 Months has Passed since the Receipt of the Final Invoice
  • 24. Evaluation Participants  Evaluator  Conducts/Coordinates Evaluations  Usually Program Staff  Evaluator Supervisor  Approves Evaluation/Rating  Contract Writer  Creates/Edits CMS Records  Enters Final Evaluation Data in CMS  Contractor is not involved in the process
  • 25. Evaluation Procedure: Level 3 & 4  Equal assessment of both program and fiscal performance  30 Day Time Line – Some Flexibility  Program & Fiscal Staff Review Documentation  Complete CDPHE Evaluation Worksheet/Determine Rating  Supervisor Approves  Email Worksheet to Contractor for Review/Comment – use scripted message (DO NOT SEND TO SUBCONTRACTOR)  Archive Evaluation Information (Program or Fiscal
  • 26. Evaluation Procedure: Final  Similar Procedure as Level 3 and Level 4  Final Contractor Performance Evaluation Form  Contract Writer/CMS Data Entry  Timeline is Not Flexible – 30 days  Evaluation Information IS ENTERED in CMS
  • 27. Ratings & Disputes – FINAL Evaluation  Notify Immediately for the Following:  Below Standard Rating – DO NOT email the evaluation to the contractor without approval.  Contractor Request for a Meeting- DO NOT schedule a meeting or discuss the evaluation/rating with the contractor.  Dispute – DO NOT discuss the dispute process with the contractor or provide assistance regarding the process.
  • 28. Standardized Invoice Form Training
  • 29. Why do we need a Standardized Invoice Form?  Resolve contracting related issues  Background/ History  Good business practice  Efficient, Effective and Elegant
  • 30. When Do I Use The New Form?  Contracts and Purchase Orders - Services  All Entity Types  Division staff will utilize the CDPHE standardized invoice form for all contracts and purchase orders.  Requests to use a customized form or to accept a vendor issued form must be approved by the Contracts Performance Monitoring Unit Director.  Customized Forms
  • 31. Accessing the New Form  Link on CDPHE web site  http://www.cdphe.state.co.us/StandardizedInvoice /index.html  URL on Form  Check current version  Revision control log (track changes)
  • 32. Communicating with Contractors  Fact Sheet (under development)  Contractor Memo (under development) All Entity Types  Orientation for LPHAs April 2012
  • 33. Transition and Provisions  Transition period: April 1 – June 30  Effective Date: July 1, 2012  Program staff train the Contractor  New provision - Invoicing  Contracts, Exhibit A – Additional Provisions  Purchase Orders
  • 34. Filling out the Form  Invoice Handout  Excel Workbook – 2003-2010  2 Tabs Expenditure Details & Reimbursement Invoice  Expenditure Details data auto- populates Reimbursement Invoice
  • 35. Filling out the Form (Continued)  Locked cells vs. Unlocked Protect Formulas/ Data  Instruction Bubbles  Expenditure Categories Personal Services/ Columns
  • 36. Filling out the Form (Continued)  Line Items and Rows  Personal Services – 25  Operating Expenses - 30  Expanded Version (100 personnel rows)  Attestations and Signature Blocks  Billing Summary  Submission
  • 37. HELP  Training and Technical Assistance  Deb Polk  Director, Contracts Performance Monitoring Unit  ext. 2136 - deb.polk@state.co.us  Brian Stafford  FRMS Coordinator  ext. 2138 - brian.stafford@state.co.us