SlideShare a Scribd company logo
1 of 4
Download to read offline
DHARMENDRA KUMAR CHOUDHARY
SENIOR SURVEYOR-RAIL & METRO
S/o Sri Bhagwan Singh
Nandan Regedency Flat no 103,
Plot no 76, Dakshinpuri Phase 1, Jagatpura,
Near Jeevan Rekha Hospital
Jaipur
Tel No: - +91 – 9079401619; +91-8440895122
E-mail Id: cdharmendra53@yahoo.com, dharmendrakr@rediffmail.com
Date of Birth: 05 July 1976
Marital Status: Married
Key qualifications:
Diploma in civil in 2012
Sridhar university pilani
Rajasthan
EDUCATION
Govt industrial training institute Agra (G ITI SURVEYING) IN 2000 U.P
12TH, 1997
Rajasthan Board of Ajmer
Land Development Software & Auto-Cad Civil 3D 2007 Software
EMPLOYMENT SUMMARY:
From Date To Date Employer Name Project Designation
Sep 2013 Till Date Continental engineers corporation ltd, Project: JMRC UG-1B, Chandpole
– Badi Choper Underground, Phase – 1B,
LAND SURVEYOR /
DEPUTY MANAGER
Feb 2011 Sep 2013 Lanco infratech ltd Project: CC 07, Badarpure-Ymca 8 elevated
Stations, DMRC PROJECT Faridabad
Assistant Manager
Survey
Aug’10 Feb’11 ERA GROUP Bareilly – Sitapur NH-24 Senior surveyor
Nov’09 Aug’10 M B L INFRACTURE Coman Wealth Game Project 2010
Beautification&Streets aping
Senior surveyor
Oct’ 05 Nov’09 LEIGHTON-OSE JV Agra-Bharatpur Bot NH-11 Senior surveyor
Aug’01 Oct’ 05 Villayaty RAM MITTAL LUCKNOW-KANPUR BOQ NH-25 surveyor
Aug2000’ Aug’01 Riding Consulting & Engineers Pvt. Ltd KANPUR MAPING PROJECT surveyor
From Sep’13 To Till date
Continental engineers corporation ltd,
LAND SURVEYOR / DEPUTY MANAGER
Project: JMRC UG-1B, Chandpole – Badi Choper Underground, Phase – 1B,
Design and Construction of Tunnel between Chandpole and Badi Chouper and reversal line by Shield TBM, Underground Metro Stations at
Choti Chouper and Badi Chouper by Cut & Cover Method on East–West Corridor of Jaipur Metro (Phase 1B) at Jaipur, Rajasthan, India
Survey Done: Leveling Survey, Traversing Survey, Topography survey, preparation of inventory list, tree list, utility drawing, All Kinds of Earth
Work, Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing, Lay out of
Pile, Layout of Guide wall, Diaphragm wall , Plunge Column & All slab for stations /Shaft, Watching Plant Lay Out, All Kinds of survey required
for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, EGL Survey, Preparation of Level Sheet for side work, Survey for
Laser Alignment & fixing, Survey to satisfy Consultant & Client, Area Calculation, Monitoring all kinds of survey job, Job of QS, Alignment of
Gantry as per drawing, Centerline marking for Rail Track.
Instruments Used:-Auto Level, TOTAL STATION (LIECA 801,803, TCRM 1202 & SHOKIA, Nikon, Trimble M3 TOPCON GPT)
Accountabilities
 Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and
measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.
 Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.
 Undertaking exploration work, such as taking samples and recording results.
 Determine methods and procedures for establishing or reestablishing survey control.
 Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.
 Shouldering the onus of preparing planning applications for clients;
 Creating strategies for the re-use of previous development sites.
 Using site data and other information sources to map levels of physical resources.
 Writing planning applications on behalf of site owners.
 Using specialist CAD (computer-aided design) software to map the structure of a site.
Feb’11-Sep13
Lanco infratech ltd
Assistant Manager Survey
Project: CC 07, Badarpure-Ymca 8 elevated Stations, DMRC PROJECT
Badarpur to YMCA 8 No's Stations - NHPC, Mewala maharajpur, Sector 27 A, Bhadkal, Old Faridabad, Ajronda, Faridabad New Town and
YMCA Stations
Survey Done: Leveling Survey, Traversing Survey, All Kinds of Earth Work, Preparation of setting-out drawing, information drawing, As Built
drawing, Drawing of Cross-section, Survey for as built drawing, Lay out of Pile, Layout of Pile cap, column, beam, concourse slab top slab,
Watching Plant Lay Out, All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, EGL Survey,
Preparation of Level Sheet for side work, Preparation of FRL Sheet, Survey for Laser Alignment & fixing, Survey to satisfy Consultant & Client,
Area Calculation, Monitoring all kinds of survey job, Job of QS, Alignment of Gantry as per drawing, Centerline marking for Rail Track.
Instruments Used:-Auto Level, TOTAL STATION (LIECA 801,803, TCRM 1202 & SHOKIA, Nikon, Trimble M3)
Accountabilities
 Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and
measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.
 Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.
 Undertaking exploration work, such as taking samples and recording results.
 Determine methods and procedures for establishing or reestablishing survey control.
 Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.
 Shouldering the onus of preparing planning applications for client.
 Creating strategies for the re-use of previous development sites
 Using site data and other information sources to map levels of physical resources.
 Writing planning applications on behalf of site owners.
 Using specialist CAD (computer-aided design) software to map the structure of a site.
ERA GROUP Aug’10-Feb’11
Senior surveyor
Bareilly – Sitapur NH-24 from KM 262.000 TO KM 413.200 In The State Of U P Under NHDP -!!! On Design, Build, Finance, Operate and
Transfer (THE DBFOT) BASIS Cost is 1950 crores
Survey done:
Leveling Survey, Traversing Survey, All Kinds of Earth Work, Preparation of setting-out drawing, information drawing, As Built drawing, Drawing
of Cross-section, Survey for as built drawing, Lay out of ,Watching Plant Lay Out of Wmm plant, Lay out Hot Mix Plant, All Kinds of survey
required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, Preparation of Level Sheet for side work, Preparation of
FRL Sheet, Survey for Laser Alignment & fixing, Survey to satisfy Consultant & Client, Area Calculation, Monitoring all kinds of survey job, as
per drawing, Centerline marking for Tree cutting / Retranslate .
Accountabilities
 All responsibilities for survey work, like marking of center line, establishing TBM benchmarks and station Pillars for horizontal
alignment of the road by Total Station Equipment.
 Setting out for Lay-out of Structures i.e. Bridges & Culverts.
 Identify variation work and contractual claim.
 ]Marking Of Proposed R O W By Revenue Map
 Reporting daily work progress to Senior General Manager
Instruments Used:-Auto Level, TOTAL STATION (Leica SHOKIA Nikon)
M B L INFRACTURE
Senior surveyor Nov’09-Aug’10
Project: Coman Wealth Game Project 2010 Beautification &Streets aping Of The M C D Roads Around R K Khanna Tanis Stadium & Thyagraj
Stadium New Delhi
 Leveling Survey, Traversing Survey, All Kinds of Earth Work
 Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing.
 All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, OGL Survey.
 Preparation of Level Sheet for side work, FRL Sheet.
 Setting out for Lay-out of Structures Drain &Footpath
 Monitoring all kinds of survey job,
Instruments Used:-Auto Level, TOTAL STATION (LIECA & SHOKIA)
LEIGHTON-OSE JV Oct’ 05-Nov’09
Survey HEAD
Project: Agra-Bharatpur Bot NH-11 from Km 17.756 to 62.295 in the state of U.P. & Rajasthan BOT basis. Cost is 195 crores
Survey Done:
All responsibilities for survey work, like marking of center line, establishing TBM benchmarks and station Pillars for
horizontal alignment of the road by Total Station Equipment.
Setting out for Lay-out of Structures i.e. Bridges & Culverts.
Identify variation work and contractual claim.
Marking of Proposed R O W by Revenue Map.
Valuation of Privet Property in R O W.
Reporting daily work progress to Chief Project Manager.
Instruments Used:-Auto Level, TOTAL STATION (LIECA, SHOKIA, Nikon, Trimble M3)
Accountabilities
 Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and
measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.
 Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.
 Undertaking exploration work, such as taking samples and recording results.
 Determine methods and procedures for establishing or reestablishing survey control.
 Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.
 Meeting with members of the public and providing information and advice to them as required.
 Shouldering the onus of preparing planning applications for clients;
 Agreeing contracts around the use of particular sites.
 Creating strategies for the re-use of previous development sites.
 Using site data and other information sources to map levels of physical resources.
 Writing planning applications on behalf of site owners.
 Using specialist CAD (computer-aided design) software to map the structure of a site.
Villayaty RAM MITTAL Dec’03- Oct’05
Surveyor
Four- Laning & Strengthening from Km 60+295 to 75+500, Luck now- Kanpur Section
Survey Done: Earthwork sub-grade, Granular Sub Base, DBM, BM, retaining wall, four nos. major bridges, seven nos. Minor bridge and eighteen
nos. of culvert.
Instruments Used:-Auto Level, TOTAL STATION (SHOKIA 500)
Accountabilities
 Survey work, like marking of horizontal alignment of the road by the Total Station Equipment, establishing TBM benchmarks.
 Setting out for Lay-out of Structures i.e. Bridges & Culverts.
 Attend consultant for work verification.
 Reporting daily work progress to Survey Manager.
Villayaty RAM MITTAL
Surveyor Aug’01-Dec’03
Project: Four Laning and Strengthing of NH-25, Four-Laning & Strengthening from Km 21+800 to 42+500, Lack now- Kanpur Section.
Survey Done: Earthwork sub-grade, Granular Sub Base, DBM, BM, retaining wall, four nos. major bridges, seven nos. Minor bridge
and eighteen nos. of culvert.
Instruments Used:-Auto Level, TOTAL STATION (SHOKIA Nikon)
Accountabilities
 Survey work, like marking of horizontal alignment of the road by the Total Station Equipment, establishing TBM benchmarks.
 Setting out for Lay-out of Structures i.e. Bridges & Culverts.
 Attend consultant for work verification.
Reporting daily work progress to Survey Manager.
Riding Consulting & Engineers Pvt. Ltd
Surveyor Aug2000’-Aug’01
Kanpur Mapping Project for Municipal Corporation Department.
 Survey work with Plain Table for marking by topography of Structures, Road, Streets, Electrical poles and all features concern to Municipal
Instruments Used:-Plane Table, TOTAL STATION (SOKIA)
1. Current CTC : 11.2 Lac/ Annum
2. Expected CTC : Negotiable
3. Notice Period : 1 Months
4. Current Location : Jaipur
5. Relocation (Yes/No) : Yes
6. Total years of experience : 16 +Yrs.
7. Skills / Expertise : Survey & Site Execution
8. Passport details : No
9. Current Team : 20Nos.
I hereby declare that all the above information is true to the best of my knowledge
Dharmendra kumar Choudhary
Date:

More Related Content

What's hot

Draughtsman_Sai
Draughtsman_SaiDraughtsman_Sai
Draughtsman_Sai
Sai Anand
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016
ASHRAF GOMAH MOHAMED
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014
Bavik Sing
 
Site_Surveying_Class (2)
Site_Surveying_Class (2)Site_Surveying_Class (2)
Site_Surveying_Class (2)
Sandy Noisette
 

What's hot (19)

Draughtsman_Sai
Draughtsman_SaiDraughtsman_Sai
Draughtsman_Sai
 
Drawing And Report
Drawing And Report Drawing And Report
Drawing And Report
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016
 
RESUME New
RESUME NewRESUME New
RESUME New
 
K-MINE. Complex solution for mining companies
K-MINE. Complex solution for mining companiesK-MINE. Complex solution for mining companies
K-MINE. Complex solution for mining companies
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)
 
Zulfiaqar213CV-Updated
Zulfiaqar213CV-UpdatedZulfiaqar213CV-Updated
Zulfiaqar213CV-Updated
 
Abijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdfAbijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdf
 
Shazia-Resume
Shazia-ResumeShazia-Resume
Shazia-Resume
 
CV Arushini Padayachee
CV Arushini PadayacheeCV Arushini Padayachee
CV Arushini Padayachee
 
Using Gis To Solve City Problems
Using Gis To Solve City ProblemsUsing Gis To Solve City Problems
Using Gis To Solve City Problems
 
Subsurface utility engineering by Advance Scanning Services
Subsurface utility engineering  by Advance Scanning ServicesSubsurface utility engineering  by Advance Scanning Services
Subsurface utility engineering by Advance Scanning Services
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014
 
Site_Surveying_Class (2)
Site_Surveying_Class (2)Site_Surveying_Class (2)
Site_Surveying_Class (2)
 
Terrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse PlanningTerrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse Planning
 
Frankovitch Resume-July 2015
Frankovitch Resume-July 2015Frankovitch Resume-July 2015
Frankovitch Resume-July 2015
 
CV mona-rev 2
CV mona-rev 2CV mona-rev 2
CV mona-rev 2
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
HOW TO CARRY OUT  ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATIONHOW TO CARRY OUT  ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
 

Similar to Resume dharmendra

Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
sukdeb samanta
 
PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH Pranesh Ghosh
 
SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16
Santanu Datta
 
omarPro updated latest 2015
omarPro updated latest 2015omarPro updated latest 2015
omarPro updated latest 2015
Ummar Alam
 
Stephen Wiafe - Resume
Stephen Wiafe - ResumeStephen Wiafe - Resume
Stephen Wiafe - Resume
Stephen Wiafe
 

Similar to Resume dharmendra (20)

Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
 
UPDATED RESUME
UPDATED RESUMEUPDATED RESUME
UPDATED RESUME
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
 
PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
Shafaqat Hussain
Shafaqat Hussain Shafaqat Hussain
Shafaqat Hussain
 
gandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Managergandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Manager
 
Shafaqat Hussain
Shafaqat Hussain Shafaqat Hussain
Shafaqat Hussain
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
Vishu resume new
Vishu resume newVishu resume new
Vishu resume new
 
Vishu resume new
Vishu resume newVishu resume new
Vishu resume new
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16
 
Vishu resume new (1)
Vishu resume new (1)Vishu resume new (1)
Vishu resume new (1)
 
Resume Dharmendra.pdf
Resume Dharmendra.pdfResume Dharmendra.pdf
Resume Dharmendra.pdf
 
omarPro updated latest 2015
omarPro updated latest 2015omarPro updated latest 2015
omarPro updated latest 2015
 
Stephen Wiafe - Resume
Stephen Wiafe - ResumeStephen Wiafe - Resume
Stephen Wiafe - Resume
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Subhash CV Dec 2016
Subhash CV Dec 2016Subhash CV Dec 2016
Subhash CV Dec 2016
 

Resume dharmendra

  • 1. DHARMENDRA KUMAR CHOUDHARY SENIOR SURVEYOR-RAIL & METRO S/o Sri Bhagwan Singh Nandan Regedency Flat no 103, Plot no 76, Dakshinpuri Phase 1, Jagatpura, Near Jeevan Rekha Hospital Jaipur Tel No: - +91 – 9079401619; +91-8440895122 E-mail Id: cdharmendra53@yahoo.com, dharmendrakr@rediffmail.com Date of Birth: 05 July 1976 Marital Status: Married Key qualifications: Diploma in civil in 2012 Sridhar university pilani Rajasthan EDUCATION Govt industrial training institute Agra (G ITI SURVEYING) IN 2000 U.P 12TH, 1997 Rajasthan Board of Ajmer Land Development Software & Auto-Cad Civil 3D 2007 Software EMPLOYMENT SUMMARY: From Date To Date Employer Name Project Designation Sep 2013 Till Date Continental engineers corporation ltd, Project: JMRC UG-1B, Chandpole – Badi Choper Underground, Phase – 1B, LAND SURVEYOR / DEPUTY MANAGER Feb 2011 Sep 2013 Lanco infratech ltd Project: CC 07, Badarpure-Ymca 8 elevated Stations, DMRC PROJECT Faridabad Assistant Manager Survey Aug’10 Feb’11 ERA GROUP Bareilly – Sitapur NH-24 Senior surveyor Nov’09 Aug’10 M B L INFRACTURE Coman Wealth Game Project 2010 Beautification&Streets aping Senior surveyor Oct’ 05 Nov’09 LEIGHTON-OSE JV Agra-Bharatpur Bot NH-11 Senior surveyor Aug’01 Oct’ 05 Villayaty RAM MITTAL LUCKNOW-KANPUR BOQ NH-25 surveyor Aug2000’ Aug’01 Riding Consulting & Engineers Pvt. Ltd KANPUR MAPING PROJECT surveyor From Sep’13 To Till date Continental engineers corporation ltd,
  • 2. LAND SURVEYOR / DEPUTY MANAGER Project: JMRC UG-1B, Chandpole – Badi Choper Underground, Phase – 1B, Design and Construction of Tunnel between Chandpole and Badi Chouper and reversal line by Shield TBM, Underground Metro Stations at Choti Chouper and Badi Chouper by Cut & Cover Method on East–West Corridor of Jaipur Metro (Phase 1B) at Jaipur, Rajasthan, India Survey Done: Leveling Survey, Traversing Survey, Topography survey, preparation of inventory list, tree list, utility drawing, All Kinds of Earth Work, Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing, Lay out of Pile, Layout of Guide wall, Diaphragm wall , Plunge Column & All slab for stations /Shaft, Watching Plant Lay Out, All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, EGL Survey, Preparation of Level Sheet for side work, Survey for Laser Alignment & fixing, Survey to satisfy Consultant & Client, Area Calculation, Monitoring all kinds of survey job, Job of QS, Alignment of Gantry as per drawing, Centerline marking for Rail Track. Instruments Used:-Auto Level, TOTAL STATION (LIECA 801,803, TCRM 1202 & SHOKIA, Nikon, Trimble M3 TOPCON GPT) Accountabilities  Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.  Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.  Undertaking exploration work, such as taking samples and recording results.  Determine methods and procedures for establishing or reestablishing survey control.  Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.  Shouldering the onus of preparing planning applications for clients;  Creating strategies for the re-use of previous development sites.  Using site data and other information sources to map levels of physical resources.  Writing planning applications on behalf of site owners.  Using specialist CAD (computer-aided design) software to map the structure of a site. Feb’11-Sep13 Lanco infratech ltd Assistant Manager Survey Project: CC 07, Badarpure-Ymca 8 elevated Stations, DMRC PROJECT Badarpur to YMCA 8 No's Stations - NHPC, Mewala maharajpur, Sector 27 A, Bhadkal, Old Faridabad, Ajronda, Faridabad New Town and YMCA Stations Survey Done: Leveling Survey, Traversing Survey, All Kinds of Earth Work, Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing, Lay out of Pile, Layout of Pile cap, column, beam, concourse slab top slab, Watching Plant Lay Out, All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, EGL Survey, Preparation of Level Sheet for side work, Preparation of FRL Sheet, Survey for Laser Alignment & fixing, Survey to satisfy Consultant & Client, Area Calculation, Monitoring all kinds of survey job, Job of QS, Alignment of Gantry as per drawing, Centerline marking for Rail Track. Instruments Used:-Auto Level, TOTAL STATION (LIECA 801,803, TCRM 1202 & SHOKIA, Nikon, Trimble M3) Accountabilities  Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.  Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.  Undertaking exploration work, such as taking samples and recording results.  Determine methods and procedures for establishing or reestablishing survey control.  Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.  Shouldering the onus of preparing planning applications for client.  Creating strategies for the re-use of previous development sites  Using site data and other information sources to map levels of physical resources.  Writing planning applications on behalf of site owners.  Using specialist CAD (computer-aided design) software to map the structure of a site. ERA GROUP Aug’10-Feb’11 Senior surveyor Bareilly – Sitapur NH-24 from KM 262.000 TO KM 413.200 In The State Of U P Under NHDP -!!! On Design, Build, Finance, Operate and Transfer (THE DBFOT) BASIS Cost is 1950 crores
  • 3. Survey done: Leveling Survey, Traversing Survey, All Kinds of Earth Work, Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing, Lay out of ,Watching Plant Lay Out of Wmm plant, Lay out Hot Mix Plant, All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, Preparation of Level Sheet for side work, Preparation of FRL Sheet, Survey for Laser Alignment & fixing, Survey to satisfy Consultant & Client, Area Calculation, Monitoring all kinds of survey job, as per drawing, Centerline marking for Tree cutting / Retranslate . Accountabilities  All responsibilities for survey work, like marking of center line, establishing TBM benchmarks and station Pillars for horizontal alignment of the road by Total Station Equipment.  Setting out for Lay-out of Structures i.e. Bridges & Culverts.  Identify variation work and contractual claim.  ]Marking Of Proposed R O W By Revenue Map  Reporting daily work progress to Senior General Manager Instruments Used:-Auto Level, TOTAL STATION (Leica SHOKIA Nikon) M B L INFRACTURE Senior surveyor Nov’09-Aug’10 Project: Coman Wealth Game Project 2010 Beautification &Streets aping Of The M C D Roads Around R K Khanna Tanis Stadium & Thyagraj Stadium New Delhi  Leveling Survey, Traversing Survey, All Kinds of Earth Work  Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing.  All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, OGL Survey.  Preparation of Level Sheet for side work, FRL Sheet.  Setting out for Lay-out of Structures Drain &Footpath  Monitoring all kinds of survey job, Instruments Used:-Auto Level, TOTAL STATION (LIECA & SHOKIA) LEIGHTON-OSE JV Oct’ 05-Nov’09 Survey HEAD Project: Agra-Bharatpur Bot NH-11 from Km 17.756 to 62.295 in the state of U.P. & Rajasthan BOT basis. Cost is 195 crores Survey Done: All responsibilities for survey work, like marking of center line, establishing TBM benchmarks and station Pillars for horizontal alignment of the road by Total Station Equipment. Setting out for Lay-out of Structures i.e. Bridges & Culverts. Identify variation work and contractual claim. Marking of Proposed R O W by Revenue Map. Valuation of Privet Property in R O W. Reporting daily work progress to Chief Project Manager. Instruments Used:-Auto Level, TOTAL STATION (LIECA, SHOKIA, Nikon, Trimble M3) Accountabilities  Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.  Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.  Undertaking exploration work, such as taking samples and recording results.  Determine methods and procedures for establishing or reestablishing survey control.  Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.  Meeting with members of the public and providing information and advice to them as required.  Shouldering the onus of preparing planning applications for clients;  Agreeing contracts around the use of particular sites.  Creating strategies for the re-use of previous development sites.  Using site data and other information sources to map levels of physical resources.  Writing planning applications on behalf of site owners.  Using specialist CAD (computer-aided design) software to map the structure of a site. Villayaty RAM MITTAL Dec’03- Oct’05
  • 4. Surveyor Four- Laning & Strengthening from Km 60+295 to 75+500, Luck now- Kanpur Section Survey Done: Earthwork sub-grade, Granular Sub Base, DBM, BM, retaining wall, four nos. major bridges, seven nos. Minor bridge and eighteen nos. of culvert. Instruments Used:-Auto Level, TOTAL STATION (SHOKIA 500) Accountabilities  Survey work, like marking of horizontal alignment of the road by the Total Station Equipment, establishing TBM benchmarks.  Setting out for Lay-out of Structures i.e. Bridges & Culverts.  Attend consultant for work verification.  Reporting daily work progress to Survey Manager. Villayaty RAM MITTAL Surveyor Aug’01-Dec’03 Project: Four Laning and Strengthing of NH-25, Four-Laning & Strengthening from Km 21+800 to 42+500, Lack now- Kanpur Section. Survey Done: Earthwork sub-grade, Granular Sub Base, DBM, BM, retaining wall, four nos. major bridges, seven nos. Minor bridge and eighteen nos. of culvert. Instruments Used:-Auto Level, TOTAL STATION (SHOKIA Nikon) Accountabilities  Survey work, like marking of horizontal alignment of the road by the Total Station Equipment, establishing TBM benchmarks.  Setting out for Lay-out of Structures i.e. Bridges & Culverts.  Attend consultant for work verification. Reporting daily work progress to Survey Manager. Riding Consulting & Engineers Pvt. Ltd Surveyor Aug2000’-Aug’01 Kanpur Mapping Project for Municipal Corporation Department.  Survey work with Plain Table for marking by topography of Structures, Road, Streets, Electrical poles and all features concern to Municipal Instruments Used:-Plane Table, TOTAL STATION (SOKIA) 1. Current CTC : 11.2 Lac/ Annum 2. Expected CTC : Negotiable 3. Notice Period : 1 Months 4. Current Location : Jaipur 5. Relocation (Yes/No) : Yes 6. Total years of experience : 16 +Yrs. 7. Skills / Expertise : Survey & Site Execution 8. Passport details : No 9. Current Team : 20Nos. I hereby declare that all the above information is true to the best of my knowledge Dharmendra kumar Choudhary Date: