1. DHARMENDRA KUMAR CHOUDHARY
SENIOR SURVEYOR-RAIL & METRO
S/o Sri Bhagwan Singh
Nandan Regedency Flat no 103,
Plot no 76, Dakshinpuri Phase 1, Jagatpura,
Near Jeevan Rekha Hospital
Jaipur
Tel No: - +91 – 9079401619; +91-8440895122
E-mail Id: cdharmendra53@yahoo.com, dharmendrakr@rediffmail.com
Date of Birth: 05 July 1976
Marital Status: Married
Key qualifications:
Diploma in civil in 2012
Sridhar university pilani
Rajasthan
EDUCATION
Govt industrial training institute Agra (G ITI SURVEYING) IN 2000 U.P
12TH, 1997
Rajasthan Board of Ajmer
Land Development Software & Auto-Cad Civil 3D 2007 Software
EMPLOYMENT SUMMARY:
From Date To Date Employer Name Project Designation
Sep 2013 Till Date Continental engineers corporation ltd, Project: JMRC UG-1B, Chandpole
– Badi Choper Underground, Phase – 1B,
LAND SURVEYOR /
DEPUTY MANAGER
Feb 2011 Sep 2013 Lanco infratech ltd Project: CC 07, Badarpure-Ymca 8 elevated
Stations, DMRC PROJECT Faridabad
Assistant Manager
Survey
Aug’10 Feb’11 ERA GROUP Bareilly – Sitapur NH-24 Senior surveyor
Nov’09 Aug’10 M B L INFRACTURE Coman Wealth Game Project 2010
Beautification&Streets aping
Senior surveyor
Oct’ 05 Nov’09 LEIGHTON-OSE JV Agra-Bharatpur Bot NH-11 Senior surveyor
Aug’01 Oct’ 05 Villayaty RAM MITTAL LUCKNOW-KANPUR BOQ NH-25 surveyor
Aug2000’ Aug’01 Riding Consulting & Engineers Pvt. Ltd KANPUR MAPING PROJECT surveyor
From Sep’13 To Till date
Continental engineers corporation ltd,
2. LAND SURVEYOR / DEPUTY MANAGER
Project: JMRC UG-1B, Chandpole – Badi Choper Underground, Phase – 1B,
Design and Construction of Tunnel between Chandpole and Badi Chouper and reversal line by Shield TBM, Underground Metro Stations at
Choti Chouper and Badi Chouper by Cut & Cover Method on East–West Corridor of Jaipur Metro (Phase 1B) at Jaipur, Rajasthan, India
Survey Done: Leveling Survey, Traversing Survey, Topography survey, preparation of inventory list, tree list, utility drawing, All Kinds of Earth
Work, Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing, Lay out of
Pile, Layout of Guide wall, Diaphragm wall , Plunge Column & All slab for stations /Shaft, Watching Plant Lay Out, All Kinds of survey required
for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, EGL Survey, Preparation of Level Sheet for side work, Survey for
Laser Alignment & fixing, Survey to satisfy Consultant & Client, Area Calculation, Monitoring all kinds of survey job, Job of QS, Alignment of
Gantry as per drawing, Centerline marking for Rail Track.
Instruments Used:-Auto Level, TOTAL STATION (LIECA 801,803, TCRM 1202 & SHOKIA, Nikon, Trimble M3 TOPCON GPT)
Accountabilities
Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and
measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.
Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.
Undertaking exploration work, such as taking samples and recording results.
Determine methods and procedures for establishing or reestablishing survey control.
Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.
Shouldering the onus of preparing planning applications for clients;
Creating strategies for the re-use of previous development sites.
Using site data and other information sources to map levels of physical resources.
Writing planning applications on behalf of site owners.
Using specialist CAD (computer-aided design) software to map the structure of a site.
Feb’11-Sep13
Lanco infratech ltd
Assistant Manager Survey
Project: CC 07, Badarpure-Ymca 8 elevated Stations, DMRC PROJECT
Badarpur to YMCA 8 No's Stations - NHPC, Mewala maharajpur, Sector 27 A, Bhadkal, Old Faridabad, Ajronda, Faridabad New Town and
YMCA Stations
Survey Done: Leveling Survey, Traversing Survey, All Kinds of Earth Work, Preparation of setting-out drawing, information drawing, As Built
drawing, Drawing of Cross-section, Survey for as built drawing, Lay out of Pile, Layout of Pile cap, column, beam, concourse slab top slab,
Watching Plant Lay Out, All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, EGL Survey,
Preparation of Level Sheet for side work, Preparation of FRL Sheet, Survey for Laser Alignment & fixing, Survey to satisfy Consultant & Client,
Area Calculation, Monitoring all kinds of survey job, Job of QS, Alignment of Gantry as per drawing, Centerline marking for Rail Track.
Instruments Used:-Auto Level, TOTAL STATION (LIECA 801,803, TCRM 1202 & SHOKIA, Nikon, Trimble M3)
Accountabilities
Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and
measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.
Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.
Undertaking exploration work, such as taking samples and recording results.
Determine methods and procedures for establishing or reestablishing survey control.
Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.
Shouldering the onus of preparing planning applications for client.
Creating strategies for the re-use of previous development sites
Using site data and other information sources to map levels of physical resources.
Writing planning applications on behalf of site owners.
Using specialist CAD (computer-aided design) software to map the structure of a site.
ERA GROUP Aug’10-Feb’11
Senior surveyor
Bareilly – Sitapur NH-24 from KM 262.000 TO KM 413.200 In The State Of U P Under NHDP -!!! On Design, Build, Finance, Operate and
Transfer (THE DBFOT) BASIS Cost is 1950 crores
3. Survey done:
Leveling Survey, Traversing Survey, All Kinds of Earth Work, Preparation of setting-out drawing, information drawing, As Built drawing, Drawing
of Cross-section, Survey for as built drawing, Lay out of ,Watching Plant Lay Out of Wmm plant, Lay out Hot Mix Plant, All Kinds of survey
required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, Preparation of Level Sheet for side work, Preparation of
FRL Sheet, Survey for Laser Alignment & fixing, Survey to satisfy Consultant & Client, Area Calculation, Monitoring all kinds of survey job, as
per drawing, Centerline marking for Tree cutting / Retranslate .
Accountabilities
All responsibilities for survey work, like marking of center line, establishing TBM benchmarks and station Pillars for horizontal
alignment of the road by Total Station Equipment.
Setting out for Lay-out of Structures i.e. Bridges & Culverts.
Identify variation work and contractual claim.
]Marking Of Proposed R O W By Revenue Map
Reporting daily work progress to Senior General Manager
Instruments Used:-Auto Level, TOTAL STATION (Leica SHOKIA Nikon)
M B L INFRACTURE
Senior surveyor Nov’09-Aug’10
Project: Coman Wealth Game Project 2010 Beautification &Streets aping Of The M C D Roads Around R K Khanna Tanis Stadium & Thyagraj
Stadium New Delhi
Leveling Survey, Traversing Survey, All Kinds of Earth Work
Preparation of setting-out drawing, information drawing, As Built drawing, Drawing of Cross-section, Survey for as built drawing.
All Kinds of survey required for Structure, Control Point Survey, Maintain Of Centre line, TBM Transfer, OGL Survey.
Preparation of Level Sheet for side work, FRL Sheet.
Setting out for Lay-out of Structures Drain &Footpath
Monitoring all kinds of survey job,
Instruments Used:-Auto Level, TOTAL STATION (LIECA & SHOKIA)
LEIGHTON-OSE JV Oct’ 05-Nov’09
Survey HEAD
Project: Agra-Bharatpur Bot NH-11 from Km 17.756 to 62.295 in the state of U.P. & Rajasthan BOT basis. Cost is 195 crores
Survey Done:
All responsibilities for survey work, like marking of center line, establishing TBM benchmarks and station Pillars for
horizontal alignment of the road by Total Station Equipment.
Setting out for Lay-out of Structures i.e. Bridges & Culverts.
Identify variation work and contractual claim.
Marking of Proposed R O W by Revenue Map.
Valuation of Privet Property in R O W.
Reporting daily work progress to Chief Project Manager.
Instruments Used:-Auto Level, TOTAL STATION (LIECA, SHOKIA, Nikon, Trimble M3)
Accountabilities
Plans, organizes, and directs work of one or more survey parties engaged in surveying earth's surface to determine precise location and
measurements of points, elevations, lines, areas, and contours for construction, mapmaking, land division, titles, mining or other purposes.
Researches previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys.
Undertaking exploration work, such as taking samples and recording results.
Determine methods and procedures for establishing or reestablishing survey control.
Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.
Meeting with members of the public and providing information and advice to them as required.
Shouldering the onus of preparing planning applications for clients;
Agreeing contracts around the use of particular sites.
Creating strategies for the re-use of previous development sites.
Using site data and other information sources to map levels of physical resources.
Writing planning applications on behalf of site owners.
Using specialist CAD (computer-aided design) software to map the structure of a site.
Villayaty RAM MITTAL Dec’03- Oct’05
4. Surveyor
Four- Laning & Strengthening from Km 60+295 to 75+500, Luck now- Kanpur Section
Survey Done: Earthwork sub-grade, Granular Sub Base, DBM, BM, retaining wall, four nos. major bridges, seven nos. Minor bridge and eighteen
nos. of culvert.
Instruments Used:-Auto Level, TOTAL STATION (SHOKIA 500)
Accountabilities
Survey work, like marking of horizontal alignment of the road by the Total Station Equipment, establishing TBM benchmarks.
Setting out for Lay-out of Structures i.e. Bridges & Culverts.
Attend consultant for work verification.
Reporting daily work progress to Survey Manager.
Villayaty RAM MITTAL
Surveyor Aug’01-Dec’03
Project: Four Laning and Strengthing of NH-25, Four-Laning & Strengthening from Km 21+800 to 42+500, Lack now- Kanpur Section.
Survey Done: Earthwork sub-grade, Granular Sub Base, DBM, BM, retaining wall, four nos. major bridges, seven nos. Minor bridge
and eighteen nos. of culvert.
Instruments Used:-Auto Level, TOTAL STATION (SHOKIA Nikon)
Accountabilities
Survey work, like marking of horizontal alignment of the road by the Total Station Equipment, establishing TBM benchmarks.
Setting out for Lay-out of Structures i.e. Bridges & Culverts.
Attend consultant for work verification.
Reporting daily work progress to Survey Manager.
Riding Consulting & Engineers Pvt. Ltd
Surveyor Aug2000’-Aug’01
Kanpur Mapping Project for Municipal Corporation Department.
Survey work with Plain Table for marking by topography of Structures, Road, Streets, Electrical poles and all features concern to Municipal
Instruments Used:-Plane Table, TOTAL STATION (SOKIA)
1. Current CTC : 11.2 Lac/ Annum
2. Expected CTC : Negotiable
3. Notice Period : 1 Months
4. Current Location : Jaipur
5. Relocation (Yes/No) : Yes
6. Total years of experience : 16 +Yrs.
7. Skills / Expertise : Survey & Site Execution
8. Passport details : No
9. Current Team : 20Nos.
I hereby declare that all the above information is true to the best of my knowledge
Dharmendra kumar Choudhary
Date: