1. LNG Engineering Solutions for
LNG Fuelled Ships and
Small-Mid Scale LNG Carriers
Brandon Shin
General Manager
Solutions for Gas Engineering
2. LNG TREND
35,000 MW for Indonesia
WHY LNG
Conversion to NG:
Reduction of Ship Emissions
Elimination of Particulate
Matter (PM)
Reduction of SOx, NOx, CO2
National Mid-Term
Development Plan 2015-
2019 35,000MW or
7,000MW/year
Green Energy Source LNG
and Small/ Mid Scale LNG
Solution
p2
[ Source: PLN ]
[ Source: TOTE ]
3. Establishment : Feb, 2013
No. of Employees : 45 Persons
Address : #2701-2707, KNN Tower, Centumseo-ro 30, Haeundae-gu, Busan, Korea
Main Business : SOLUTIONS FOR LNG ENGINEERING
COMPANY INTRODUCTION
Small LNG FSRU Small/Mid Scale
LNG Carrier
Fuel Gas Supply System
(FGSS) LNG Storage Solution
p3
Major Clients & Partners:
4. ENGINEERING SERVICE
p4
Scope of Work
Tender Document for Shipyard
Invitation & Evaluation
⁻ Outline Building Specification
⁻ General Arrangement
⁻ Light Weight Calculation
⁻ Shipbuilding Master Schedule
⁻ Quotation base formats
Technical Bid Evaluation (TBE)
⁻ Shipyard selection & Shipbuilding
cost negotiation
⁻ Major Equipment vendor
selection
Pre-Engineering
Basic & Detail Design for
Small/ Mid LNG Carrier
⁻ Hull & Structure
⁻ Cargo Containment System (CCS)
⁻ Cargo Handling System (CHS)
⁻ Hull & Machinery Outfitting
⁻ Electric & Automation
Procurement & Practice
⁻ Purchasing Order Specification
⁻ Equipment for Cargo Handling
System
Shipbuilding
Engineering & Design
Master & Sub. Build scheduling
Shipbuilding supervising for
CCS & CHS
Coordination for Owner,
Shipyard, Class Society, Vendor
and third party authorities.
Project Management
6. PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping
(Indonesia)
50mmscfd LNG FRU EPC Contract
2
JSK Shipping
(Indonesia)
26K LNG FSU
Engineering Service for
⁻ FEED & PMC
⁻ Shipbuilding Engineering & Design
⁻ Cargo Handling Equipment Supply
3
GTT
(Caribbean Sea)
30K LNG FSRU
Proposal for
- EPC Contract
4
JSK Shipping
(Indonesia) FSRU Conversion Feasibility Study for
- Existing LNGC to FSRU
5
CONRAD Shipyard
(USA)
2,200 CBM LNG Bunkering Barge
Engineering Service for
⁻ Basic & Detail Design (Cargo, Machinery, Electric)
⁻ CAMS (Control, Alarm and Monitoring System)
6
GTTNA
(USA)
32K CBM LNG Carrier
Engineering Development
- FEED & PMC
7
PLATOU
(Singapore)
8,000 CBM LNG Bunkering Ship
Engineering Consulting for
⁻ LNG Barge Construction
⁻ Re-liquefaction Process
8
CLEANSHIPS
(USA)
37.5K DWT Bulk Carrier
Engineering Service for
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
9
CIMC
(China)
800 TEU
LNG Fuelled Container Ship
Proposal
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
10
GTTNA
(USA)
63K Bulk Carrier Jumboization
to LNG Fuelled Propulsion
Engineering Study
- Feasibility Study of Retrofit
- LNG Fuel System and Storage Tank
11
Keppel
(Singapore)
65T BP LNG Fuelled Tug Boat
Engineering Consulting for
- LNG Fuel System Package
p6
7. PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping
(Indonesia)
50mmscfd LNG FRU EPC Contract
2
JSK Shipping
(Indonesia)
26K LNG FSU
Engineering Service for
⁻ FEED & PMC
⁻ Shipbuilding Engineering & Design
⁻ Cargo Handling Equipment Supply
3
GTT
(Caribbean Sea)
30K LNG FSRU
Proposal for
- EPC Contract
4
JSK Shipping
(Indonesia) FSRU Conversion Feasibility Study for
- Existing LNGC to FSRU
5
CONRAD Shipyard
(USA)
2,200 CBM LNG Bunkering Barge
Engineering Service for
⁻ Basic & Detail Design (Cargo, Machinery, Electric)
⁻ CAMS (Control, Alarm and Monitoring System)
6
GTTNA
(USA)
32K CBM LNG Carrier
Engineering Development
- FEED & PMC
7
PLATOU
(Singapore)
8,000 CBM LNG Bunkering Ship
Engineering Consulting for
⁻ LNG Barge Construction
⁻ Re-liquefaction Process
8
CLEANSHIPS
(USA)
37.5K DWT Bulk Carrier
Engineering Service for
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
9
CIMC
(China)
800 TEU
LNG Fuelled Container Ship
Proposal
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
10
GTTNA
(USA)
63K Bulk Carrier Jumboization
to LNG Fuelled Propulsion
Engineering Study
- Feasibility Study of Retrofit
- LNG Fuel System and Storage Tank
11
Keppel
(Singapore)
65T BP LNG Fuelled Tug Boat
Engineering Consulting for
- LNG Fuel System Package
p7
8. Floating Regasification Unit (FRU)
SMALL LNG FSRU
Bali 50mmscfd LNG FRU
Project Images 2
Project Images 1
“The World’s First Floating Regasification Unit
for Bali Benoa Port to supply LNG to Power Plant”
Year of Contract (Delivery): 2015 (2016)
Client: JSK Shipping (Indonesia)
Shipyard: KangNam Corporation
Classification: KR
Scope of Work: EPC Contractor
Dimension of Vessel/ Barge
• LOA : 46.0 m / Breadth: 12.0 m / Depth: 4.7/ 5.2 m
Characteristics of LNG Buffer Tank
• Q’ty x Capacity: 1 x 400 m3
• LNG feed pump: 2 x 100m3/h x 260 mlc, Electric
motor driven, Barrel Type
Regasification System
• LNG flow to skid: 50 mmscfd
• Inlet/ Outlet temp.: appr. -158 ℃/ min. 5 ℃
• NG outlet pressure: 900 kPa.g
KR: Korea Register
p8
10. Floating Regasification Unit (FRU)
SMALL LNG FSRU
p10
LNG Buffer Tank
Control Room
Re-gasification Unit,
Compressor & Feed Pump Room
Machinery Room
11. Floating Regasification Unit (FRU)
SMALL LNG FSRU
p11
FRU & LNGC 이미지로 교체 예정
Arrangement for FRU & LNGC (as temporary LNG Storage)
12. PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping
(Indonesia)
50mmscfd LNG FRU EPC Contract
2
JSK Shipping
(Indonesia)
26K LNG FSU
Engineering Service for
⁻ FEED & PMC
⁻ Shipbuilding Engineering & Design
⁻ Cargo Handling Equipment Supply
3
GTT
(Caribbean Sea)
30K LNG FSRU
Proposal for
- EPC Contract
4
JSK Shipping
(Indonesia) FSRU Conversion Feasibility Study for
- Existing LNGC to FSRU
5
CONRAD Shipyard
(USA)
2,200 CBM LNG Bunkering Barge
Engineering Service for
⁻ Basic & Detail Design (Cargo, Machinery, Electric)
⁻ CAMS (Control, Alarm and Monitoring System)
6
GTTNA
(USA)
32K CBM LNG Carrier
Engineering Development
- FEED & PMC
7
PLATOU
(Singapore)
8,000 CBM LNG Bunkering Ship
Engineering Consulting for
⁻ LNG Barge Construction
⁻ Re-liquefaction Process
8
CLEANSHIPS
(USA)
37.5K DWT Bulk Carrier
Engineering Service for
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
9
CIMC
(China)
800 TEU
LNG Fuelled Container Ship
Proposal
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
10
GTTNA
(USA)
63K Bulk Carrier Jumboization
to LNG Fuelled Propulsion
Engineering Study
- Feasibility Study of Retrofit
- LNG Fuel System and Storage Tank
11
Keppel
(Singapore)
65T BP LNG Fuelled Tug Boat
Engineering Consulting for
- LNG Fuel System Package
p12
13. Floating Storage Unit (FSU)
Bali 26K LNG FSU
Project Images 2
Project Images 1
“Floating Storage Unit for Bali Benoa Port
to supply LNG to FRU”
Year of Contract (Delivery): 2015 (2016)
Client: JSK Shipping (Indonesia)
Shipyard: (TBD)
Classification: KR
Scope of Work:
• FEED & PMC
• Shipbuilding Engineering & Design
• Cargo Handling Equipment Supply
Dimension of Vessel/ Barge
• LOA : 119.1 m/ Breadth: 27.1 m/ Depth: 16.4 m
Characteristics of LNG Storage Tank
• Q’ty x Capacity: 2 x 13,000m3
• CCS: MK-III Membrane type
Cargo Handling Equipment
• Main CP: 4sets (2sets/ tank), 200 m3/hr, 155 mlc
• Stripping/Spray pump: 2sets (1set/ tank),50 m3/hr, 155 mlc
• Return gas compressor: 2 x 2,000 m3/hr
Nitrogen Generator Plant
• Capacity PSA plant: 2 x 40 m3/hr at 97 vol %
CCS: Cargo Containment System
CP: Cargo Pump
PMC: Project Management Consultancy
PSA: Pressure Swing Adsorption p13
SMALL LNG FSRU
15. Floating Storage Unit (FSU)
p15
SMALL LNG FSRU
FRU, FSU and Small LNG Carrier Arrangement
To Bali LNG Power Plant
16. PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping
(Indonesia)
50mmscfd LNG FRU EPC Contract
2
JSK Shipping
(Indonesia)
26K LNG FSU
Engineering Service for
⁻ FEED & PMC
⁻ Shipbuilding Engineering & Design
⁻ Cargo Handling Equipment Supply
3
GTT
(Caribbean Sea)
30K LNG FSRU
Proposal for
- EPC Contract
4
JSK Shipping
(Indonesia) FSRU Conversion Feasibility Study for
- Existing LNGC to FSRU
5
CONRAD Shipyard
(USA)
2,200 CBM LNG Bunkering Barge
Engineering Service for
⁻ Basic & Detail Design (Cargo, Machinery, Electric)
⁻ CAMS (Control, Alarm and Monitoring System)
6
GTTNA
(USA)
32K CBM LNG Carrier
Engineering Development
- FEED & PMC
7
PLATOU
(Singapore)
8,000 CBM LNG Bunkering Ship
Engineering Consulting for
⁻ LNG Barge Construction
⁻ Re-liquefaction Process
8
CLEANSHIPS
(USA)
37.5K DWT Bulk Carrier
Engineering Service for
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
9
CIMC
(China)
800 TEU
LNG Fuelled Container Ship
Proposal
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
10
GTTNA
(USA)
63K Bulk Carrier Jumboization
to LNG Fuelled Propulsion
Engineering Study
- Feasibility Study of Retrofit
- LNG Fuel System and Storage Tank
11
Keppel
(Singapore)
65T BP LNG Fuelled Tug Boat
Engineering Consulting for
- LNG Fuel System Package
p16
17. Floating Storage Regasification Unit (FSRU)
SMALL LNG FSRU
Reference List
30K LNG FSRU
Project Images 2
Project Images 1
“Floating Storage Regasification Unit for Caribbean Island
to supply NG to Power Plant”
Dimension of Vessel/ Barge
• LOA : 102.77 m/ Breadth: 29.39 m/
Depth: 23.00 m/ Draft: 7.54 m
Characteristics of LNG Storage Tank
• Q’ty x Capacity: 2 x 15,000m3
• CCS: MK-III Membrane type
• LNG feed Pump: 4 x 100m3/h x 155mlc,
Electric motor driven & Submerged type
• Booster Pump: 2 x 50m3/h x 210mlc,
Electric motor driven & Barrel type
Regasification System
• Gas flow to power plant: 1,440m3/day (190MW)
• Inlet/ Outlet temp: appr. -158 ℃/ min. 5 ℃
• NG outlet pressure: 10 bar.g
. CCS: Cargo Containment System
p17
19. LNG Storage Tank
Floating Storage Regasification Unit (FSRU)
SMALL LNG FSRU
p19
Liquid in
to GCU
SeaWaterin
SeaWaterOut
Steam
Steam
BOG Compressor
Forcing Vaporizer
Regasification Unit
Glycol Water Tank
Glycol Water Pump
Heat Exchanger
toGenerator
to Boiler
Vapor In/Out
toPowerPlant
20. PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping
(Indonesia)
50mmscfd LNG FRU EPC Contract
2
JSK Shipping
(Indonesia)
26K LNG FSU
Engineering Service for
⁻ FEED & PMC
⁻ Shipbuilding Engineering & Design
⁻ Cargo Handling Equipment Supply
3
GTT
(Caribbean Sea)
30K LNG FSRU
Proposal for
- EPC Contract
4
JSK Shipping
(Indonesia) FSRU Conversion Feasibility Study for
- Existing LNGC to FSRU
5
CONRAD Shipyard
(USA)
2,200 CBM LNG Bunkering Barge
Engineering Service for
⁻ Basic & Detail Design (Cargo, Machinery, Electric)
⁻ CAMS (Control, Alarm and Monitoring System)
6
GTTNA
(USA)
32K CBM LNG Carrier
Engineering Development
- FEED & PMC
7
PLATOU
(Singapore)
8,000 CBM LNG Bunkering Ship
Engineering Consulting for
⁻ LNG Barge Construction
⁻ Re-liquefaction Process
8
CLEANSHIPS
(USA)
37.5K DWT Bulk Carrier
Engineering Service for
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
9
CIMC
(China)
800 TEU
LNG Fuelled Container Ship
Proposal
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
10
GTTNA
(USA)
63K Bulk Carrier Jumboization
to LNG Fuelled Propulsion
Engineering Study
- Feasibility Study of Retrofit
- LNG Fuel System and Storage Tank
11
Keppel
(Singapore)
65T BP LNG Fuelled Tug Boat
Engineering Consulting for
- LNG Fuel System Package
p20
21. FSRU Conversion Using Existing LNG Carrier
SMALL LNG FSRU
p21
Reference List
125K LNGC to FSRU
Project Images 2
Project Images 1
“Feasibility Study for Conversion of
Existing Old LNG Carrier to FSRU”
Dimension of Vessel/ Barge
• LOA : 268.0 m / Breadth: 44.0 m /
Depth: 25.0 m / Draft: 11.5 m
Required work for FSRU Conversion
[ Install ]
• Re-gasification unit (abt. 100mmscfd) x 2 sets
• Dual Fuel Genset x 2 sets
• Daily LNG Buffer Tank 500m3 x 2 units
• Sea Water Lift Pump 2,000m3/Hr x 4 sets
• Re-Gas Handling System
• Custody transfer & Measuring System
• Boil-off Gas Compressor
[ Retrofit & Repair ]
• Cryogenic Pipe and Outfitting
• Main Switchboard and Elec. Power Routing
• Insulation Part, etc.
22. FSRU Conversion Using Existing LNG Carrier
SMALL LNG FSRU
p22
+
Activity
Conversion Schedule (Month)
M0 M1 M2 M3 M4 M5 M6 M7 M8 M9
Regas. Unit
Old Ship Repair
Dry Dock
Contract Delivery
Liquid in
toPowerPlant
Steam
SteamBOG Compressor
Vent
Master
LNG Storage Tank
High Pressure Pump
BOG Heater
Forcing Vaporizer
HCR
Fuel Gas Heater
( Depends on Ship Condition )
23. PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping
(Indonesia)
50mmscfd LNG FRU EPC Contract
2
JSK Shipping
(Indonesia)
26K LNG FSU
Engineering Service for
⁻ FEED & PMC
⁻ Shipbuilding Engineering & Design
⁻ Cargo Handling Equipment Supply
3
GTT
(Caribbean Sea)
30K LNG FSRU
Proposal for
- EPC Contract
4
JSK Shipping
(Indonesia) FSRU Conversion Feasibility Study for
- Existing LNGC to FSRU
5
CONRAD Shipyard
(USA)
2,200 CBM LNG Bunkering Barge
Engineering Service for
⁻ Basic & Detail Design (Cargo, Machinery, Electric)
⁻ CAMS (Control, Alarm and Monitoring System)
6
GTTNA
(USA)
32K CBM LNG Carrier
Engineering Development
- FEED & PMC
7
PLATOU
(Singapore)
8,000 CBM LNG Bunkering Ship
Engineering Consulting for
⁻ LNG Barge Construction
⁻ Re-liquefaction Process
8
CLEANSHIPS
(USA)
37.5K DWT Bulk Carrier
Engineering Service for
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
9
CIMC
(China)
800 TEU
LNG Fuelled Container Ship
Proposal
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
10
GTTNA
(USA)
63K Bulk Carrier Jumboization
to LNG Fuelled Propulsion
Engineering Study
- Feasibility Study of Retrofit
- LNG Fuel System and Storage Tank
11
Keppel
(Singapore)
65T BP LNG Fuelled Tug Boat
Engineering Consulting for
- LNG Fuel System Package
p23
24. LNG Bunkering Barge
“The first LNG bunker barge for the marine market
in North America”
Year of Contract (Delivery): 2015 (2015)
Client: Conrad Orange Shipyard (USA)
Shipyard: Conrad Orange Shipyard
Classification: ABS
Scope of Work:
• Total Engineering
• IAS, CTMS, ESD Package
Dimension of Barge
• LOA : 70.7m/ Breadth: 14.8 m/ Depth: 4.78 m
Characteristics of LNG Cargo Tank
• Q’ty x Capacity: 1 x 2,197m3 at 100%
• CCS: GTT MARK III membrane type
Cargo Handling Equipment
• Main CP: 500 m3/h@155 mlc x 2sets
• Stripping/Spray pump : 8m3/h@121 mlc x 1set
• Return gas compressor: 2 x 6,700 m3/hr
LNG vaporizer heating capacity: 120.5 kW x 1set (DongHwa Entec)
Re-liquefaction plant: Stir SPC-4RL, 43.6 kg/h(unit), 6sets
Nitrogen generator : 38 m3/h@2sets
2,200 CBM LNG Bunkering Barge
Project Images 2
Project Images 1
CCS: Cargo Containment System
CTMS: Custody Transfer Measuring System
ESD: Emergency Shut-down System
IAS: Integrated Automation System
p24
SMALL/ MID SCALED LNGC
42. PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping
(Indonesia)
50mmscfd LNG FRU EPC Contract
2
JSK Shipping
(Indonesia)
26K LNG FSU
Engineering Service for
⁻ FEED & PMC
⁻ Shipbuilding Engineering & Design
⁻ Cargo Handling Equipment Supply
3
GTT
(Caribbean Sea)
30K LNG FSRU
Proposal for
- EPC Contract
4
JSK Shipping
(Indonesia) FSRU Conversion Feasibility Study for
- Existing LNGC to FSRU
5
CONRAD Shipyard
(USA)
2,200 CBM LNG Bunkering Barge
Engineering Service for
⁻ Basic & Detail Design (Cargo, Machinery, Electric)
⁻ CAMS (Control, Alarm and Monitoring System)
6
GTTNA
(USA)
32K CBM LNG Carrier
Engineering Development
- FEED & PMC
7
PLATOU
(Singapore)
8,000 CBM LNG Bunkering Ship
Engineering Consulting for
⁻ LNG Barge Construction
⁻ Re-liquefaction Process
8
CLEANSHIPS
(USA)
37.5K DWT Bulk Carrier
Engineering Service for
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
9
CIMC
(China)
800 TEU
LNG Fuelled Container Ship
Proposal
₋ FGSS (Fuel Gas Supply System)
₋ LNG Fuel Tank, Membrane System
10
GTTNA
(USA)
63K Bulk Carrier Jumboization
to LNG Fuelled Propulsion
Engineering Study
- Feasibility Study of Retrofit
- LNG Fuel System and Storage Tank
11
Keppel
(Singapore)
65T BP LNG Fuelled Tug Boat
Engineering Consulting for
- LNG Fuel System Package
p42
43. LNG Fuelled Vessel (FGSS + Storage Solution)
Project Images 2
Project Images 1
“A study to estimate the cost and schedule of LNG fuel
System & tank to be fitted in a typical 63k BC for
LNG fuelled propulsion”
Year of Contract (Delivery): 2014 (2014)
Client: GTTNA (USA)
Scope of Work:
Feasibility Study of Retrofit
LNG Fuel System and Storage Tank
Dimension of Vessel/ Barge
• Length OA: 198.5 m
• Breadth: 32.3 m
• Depth: 18.3 m
Engineering Study including;
• Layout and P&ID
• Master Schedule
• Cost Estimation
• 3D Modeling
63K Bulk Carrier Jumboization
p43
LNG FUELLED SHIP (LFS)
49. GAS Entec Co., Ltd.
#2701-2707, KNN Tower, Centumseo-ro 30, Haeundae-gu, Busan,
South Korea 48058