The document discusses Navantia's experience and facilities for offshore wind projects. It details Navantia's work on floating wind projects like Hywind and Windfloat, where it constructed and assembled floating wind turbine foundations. It also discusses the TLP Wind project and Navantia's collaboration with ports for final assembly and storage of floating structures. The conclusions state that floating wind requires large areas for fabrication, assembly and storage and that yards and ports need to collaborate for efficient construction. Navantia is well-positioned to cooperate in designing floating wind solutions given its experience.
4. 4
FWP ATLANTIC FORUM 2017, SAINT-NAZAIRE & LORIENT
"First FPSO
designed to
withstand harsh
environment
condition west of
Shetland Islands "
FPSO Texaco Captain
" First FPSO designed to be built as
a single unit in only one yard "
PETROJARL IV FPSO
FOINAVEN PHASE 1 for GOLAR NOR (PGS)
3 x ‘Discoverer ‘class Drilling Unit s
for Transocean Offshore
" First Monohull Drilling Units
sdesigned to operate in ultra
deep waters (up to 10,000
feet) and first to be provided
wit dual drilling systems"
EXAMPLES ON NAVANTIA'S BACKGROUND IN OIL & GAS
26. 26
TLPWIND® - Manufacturing (Navantia)
FWP ATLANTIC FORUM 2017, SAINT-NAZAIRE & LORIENT
8. General Arrangement at Navantia Shipyard
Two Storage Options (completed units) & (almost
completed units) will help to maximize the use of
Navantia´s shipyard from a logistic point of view. Also, a
loading out (performed with SPTMs) area for 3 “ready to
ship” units is designated , as well an area for “storing
pontoons”
Completed
units
Almost completed
units
Ready to
ship