B C das
Work Permit System: Why?
• Basic purpose of permit system is to prevent injuries to personnel.
• Ensure that all work is carried out in safest possible manner.
• permit specifies the conditions and procedure for safe execution.
Work Permit System: What is it?
A work permit system consists primarily of a standard procedure designed to ensure that
potentially hazardous routine and non routine work on industrial installations can be carried out
safely. The procedure should define the need for the following essential steps:
 Details of the necessary preparatory work
 Clear definition of responsibilities
 Appropriate training of the work force
 Provision of adequate safety equipment
 A formal work permit with or without attached specific checklists.
The Work Permit System : When?
 For all non-routine works,
 For hazardous routine works not covered by procedures,
 When work is performed:
– by your employees
– and/or third parties
The Work Permit System (For what kind of work?)
 A work permit is required in case of:
– Potential oxygen deficiency or enrichment
– Potential flammable/explosive atmosphere
– Potential high temperature/pressure
– Potential hazardous chemicals, e.g.: toxic substances
– Confined space (tanks, cold box, pit, normally closed vessels)
– Electrical repair on live circuits
– Temporary or permanent changes, alterations, modification of equipment or
processes,
– Exposure to traffic,
– Exposure to moving/rotating machinery
– In proximity of vents, liquid of gas
– On process lines with gas release
The Work Permit System : Why?
 Because: As In-charge of the work, you don‟t know everything
 about the site and the process around
 about the work
 Safety measures have to be prepared
 You cannot start the work without the OK of the production personnel or the
customer or the supplier
Page 2 of 4
B C das
 The production needs your OK in order to re-start the plant after your work is
achieved
 To obtain a safe as well as a quick and cost effective work
The Work Permit System : With who?? The Work Permit must be prepared with:
 The person responsible for the work
 The person(s) in charge of the production, the customer or supplier, who will release the
process before the work starts
 The other work bodies
 The person in charge of HSE measures
 The Work Permit System : How? Before issuing the Work Permit, you must:
– Describe the work to be done
– List all the specifications and drawings which are required
– Issue detailed planning with all involved entities
– Determine the logging and tagging procedures
 Fill-in together the work permit and sign,
 The start of the work must be authorized by production and/or user,
 The re-start of the process must take place after the work is finished.
Review of Flow sheets, drawings and specifications
Purpose of the review is to ensure all key persons involved in job planning have a thorough
understanding of the job. It should include:
 Process fluids and materials involved,
 Degree of isolation,
 Effect of other processes,
 Power supply isolation, tagging,
 Specialist advice,
 Location of underground services and pipes,
Review of Flow sheets, drawings and specifications
 Location of elevated pipelines and walkways,
 Purging and lock-out requirements,
 Pressure, Temperature,
 Valve identification,
 Equipment specification,
 Operating and maintenance instructions,
 Materials of construction and compatibilities
Work site inspection
 To inspect the work area
– Neighbouring activities, overhead, underground, access, natural hazards etc,..
 To identify potential hazards
– Flammable, oxygen, toxic substances, confined spaces, electricity, pressure,
temperature, moving objects, traffic, falls/trips/slips, etc,..
Page 3 of 4
B C das
Development of work procedures
 The procedure should include:
– Logging and tagging procedures: Electricity, process fluids Instrumentation,
utilities (water, air, oil,…)
– Depressurising, Draining, Venting, Purging, Flushing, Isolating, Atmosphere
checking, Disassembly of equipment, Method of repair, Reassembly and
installation, Quality control, Pressure and leak testing, Reinstatement of
equipment, Hand-back procedure, etc..
The Work Permit System : Work Planning
 Work Scope
 Review Drawings / Flowsheets
 Inspect Worksite
 Identify Safety Precautions
 Compliance With Regulations
 Develop Work Procedure
 Assign Responsibilities
 Communication Procedures
 Work Execution
The Work Permit System : Work Execution
 Preparatory Work
 Issue Work Permits
 Supervision Monitoring
 Work Completed
 Testing
 Re-instate Equipment
 Return Work Permit
 Handback Plant / Equipment
 Confined Space Entry
 Excavations
 Blasting
 Line Breaking
The Work Permit System : In brief
Many accidents have occurred due to lack of Work Permit or non observance of its consigned
safety measures.
• The Safe Work Permit is useful for:
– The safety of persons in charge of the work
– The safety of persons in charge of the process
– The risk management of the process and equipment
– Fill in and follow correctly the work permit, because…. It could save your life!
Page 4 of 4
B C das
Safe Work Permits : Features Of Work Permit Form
Work Permit form generally consists of the following features:
THE ORIGINIAL AND COPIES
Original is unmarked and belongs to “Executing Authority”-pink copy
Printed serial number
FORM NO. …..…...
Procedure For Work Permit System(wps)
• Permit In Printed Form
• Separate Permit For Cold & Hot Work
• Separate Permit For Elect / Mech Work
• Permit Colour Coded with Serial Number
• Permit Initiation By (name , Desgn, signature)
• All Permits To Be In Writing
• Work Order No. To Be Mentioned On Permit
• Location Drawing/Sketch To Be Given Along With Permit.
• Risk Evaluation Checklist To Be Ticked By Issuer
Who Can Sign A Work Permit
Personnel who are authorized to sign on the Work Permit shall have thorough knowledge of the
work to be performed and the conditions under which the work will be performed.
Issuing Authority Of Work Permit
Issuing authority is responsible for preparation and handing over of the equipment in safe
condition to perform the work.
Authority to issue all types of work permits is generally granted to shift supervisor or Officers
and above.
Executing Authority of Work Permit
Request for a work permit by executing authority. He shall indicate types of tools and
equipment necessary for performing the work.
He shall also ensure his tools, equipment and accessories are in good condition and all his
workers are provided with proper PPE.
Electrical Isolation
Before issuing a Work Permit, it is essential to ensure that the equipment / facility to be worked
on is electrically safe and electrical power is isolated to the extent necessary for the safe conduct
of the authorized work.
Issuing, Executing authorities and Electrical Maintenance shall jointly decide the extent of
isolation required.
– „DO NOT OPERATE‟ tag shall be used when isolation by local switch is decided as
adequate protection.
– Multi-lock systems to be used when different crafts are involved.(this is towards best safety
practices)

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Fire Risk Assessment.doc
Fire Risk Assessment.docFire Risk Assessment.doc
Fire Risk Assessment.doc
 
Permit to work
Permit to workPermit to work
Permit to work
 
Hazard Communication- LinkedIn
Hazard Communication- LinkedInHazard Communication- LinkedIn
Hazard Communication- LinkedIn
 
Step 6 hot work permit
Step 6 hot work permitStep 6 hot work permit
Step 6 hot work permit
 
Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Emergency Preparedness and Workplace Safety
Emergency Preparedness and Workplace SafetyEmergency Preparedness and Workplace Safety
Emergency Preparedness and Workplace Safety
 
Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment
 
Chemcial handling
 Chemcial handling Chemcial handling
Chemcial handling
 
Hot Work
Hot WorkHot Work
Hot Work
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
 
26 Storage of Substances under CoSHH Risk Assessment Templates.docx
26 Storage of Substances under CoSHH Risk Assessment Templates.docx26 Storage of Substances under CoSHH Risk Assessment Templates.docx
26 Storage of Substances under CoSHH Risk Assessment Templates.docx
 
Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
GTC546 HSE PPT
GTC546 HSE PPTGTC546 HSE PPT
GTC546 HSE PPT
 
HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
LOTO
LOTO LOTO
LOTO
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Safe Material Handling
Safe Material Handling Safe Material Handling
Safe Material Handling
 

Ähnlich wie Work Permit System Guide

AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAhmadNadzir4
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1Jahanzeb Khan
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasKUNALKHANDELWAL44
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsHarry George
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsHarry George
 
An Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfAn Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfOlivia Wilson
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfRazFazwan
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure HIMADRI BANERJI
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptxssuserb8f3fd2
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptxnaeem41394
 
4_Fire Prevention Elements.ppt
4_Fire Prevention Elements.ppt4_Fire Prevention Elements.ppt
4_Fire Prevention Elements.pptOktomiWijaya1
 
General guidelines for building commissioning ppt
General guidelines  for building  commissioning pptGeneral guidelines  for building  commissioning ppt
General guidelines for building commissioning pptDayasagar Govidaraju
 
General guidelines for building commissioning ppt.pptx
General guidelines  for building  commissioning ppt.pptxGeneral guidelines  for building  commissioning ppt.pptx
General guidelines for building commissioning ppt.pptxDayasagar Govidaraju
 

Ähnlich wie Work Permit System Guide (20)

AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of Gas
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
 
An Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfAn Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdf
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdf
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
MODULE 4.pptx
MODULE 4.pptxMODULE 4.pptx
MODULE 4.pptx
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptx
 
Waleed CV
Waleed CVWaleed CV
Waleed CV
 
Kafeero Isaac (4)
Kafeero Isaac (4)Kafeero Isaac (4)
Kafeero Isaac (4)
 
4_Fire Prevention Elements.ppt
4_Fire Prevention Elements.ppt4_Fire Prevention Elements.ppt
4_Fire Prevention Elements.ppt
 
General guidelines for building commissioning ppt
General guidelines  for building  commissioning pptGeneral guidelines  for building  commissioning ppt
General guidelines for building commissioning ppt
 
General guidelines for building commissioning ppt.pptx
General guidelines  for building  commissioning ppt.pptxGeneral guidelines  for building  commissioning ppt.pptx
General guidelines for building commissioning ppt.pptx
 
Permit to work
Permit to workPermit to work
Permit to work
 
CV BINHNB1
CV BINHNB1CV BINHNB1
CV BINHNB1
 
Plant start up
Plant start upPlant start up
Plant start up
 

Mehr von Bimal Chandra Das

Mehr von Bimal Chandra Das (20)

EMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfEMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdf
 
construction macheinery Safety.pdf
construction macheinery Safety.pdfconstruction macheinery Safety.pdf
construction macheinery Safety.pdf
 
INTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdfINTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdf
 
IS 14489 Q.doc
IS 14489 Q.docIS 14489 Q.doc
IS 14489 Q.doc
 
Safety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptSafety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.ppt
 
Indian Electricity Act 1910.pdf
Indian  Electricity  Act 1910.pdfIndian  Electricity  Act 1910.pdf
Indian Electricity Act 1910.pdf
 
Indian electricity IE RULES 1956.pdf
Indian electricity  IE RULES 1956.pdfIndian electricity  IE RULES 1956.pdf
Indian electricity IE RULES 1956.pdf
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Factories -ACT & RULE.ppt
Factories -ACT &  RULE.pptFactories -ACT &  RULE.ppt
Factories -ACT & RULE.ppt
 
Contractor's _obligation.ppt
Contractor's _obligation.pptContractor's _obligation.ppt
Contractor's _obligation.ppt
 
SAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdfSAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdf
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Check List for Crane Inspection.pdf
Check List for Crane Inspection.pdfCheck List for Crane Inspection.pdf
Check List for Crane Inspection.pdf
 
COST OF ACCIDENT.ppt
COST OF ACCIDENT.pptCOST OF ACCIDENT.ppt
COST OF ACCIDENT.ppt
 
Plant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffold
 
Safety in use of ladder
Safety in use of ladderSafety in use of ladder
Safety in use of ladder
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
 
Selection of safety appliances
Selection of safety appliancesSelection of safety appliances
Selection of safety appliances
 
Risk
RiskRisk
Risk
 
Safety education and training
Safety education and trainingSafety education and training
Safety education and training
 

Kürzlich hochgeladen

THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 

Kürzlich hochgeladen (20)

THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 

Work Permit System Guide

  • 1. Page 1 of 4 B C das Work Permit System: Why? • Basic purpose of permit system is to prevent injuries to personnel. • Ensure that all work is carried out in safest possible manner. • permit specifies the conditions and procedure for safe execution. Work Permit System: What is it? A work permit system consists primarily of a standard procedure designed to ensure that potentially hazardous routine and non routine work on industrial installations can be carried out safely. The procedure should define the need for the following essential steps:  Details of the necessary preparatory work  Clear definition of responsibilities  Appropriate training of the work force  Provision of adequate safety equipment  A formal work permit with or without attached specific checklists. The Work Permit System : When?  For all non-routine works,  For hazardous routine works not covered by procedures,  When work is performed: – by your employees – and/or third parties The Work Permit System (For what kind of work?)  A work permit is required in case of: – Potential oxygen deficiency or enrichment – Potential flammable/explosive atmosphere – Potential high temperature/pressure – Potential hazardous chemicals, e.g.: toxic substances – Confined space (tanks, cold box, pit, normally closed vessels) – Electrical repair on live circuits – Temporary or permanent changes, alterations, modification of equipment or processes, – Exposure to traffic, – Exposure to moving/rotating machinery – In proximity of vents, liquid of gas – On process lines with gas release The Work Permit System : Why?  Because: As In-charge of the work, you don‟t know everything  about the site and the process around  about the work  Safety measures have to be prepared  You cannot start the work without the OK of the production personnel or the customer or the supplier
  • 2. Page 2 of 4 B C das  The production needs your OK in order to re-start the plant after your work is achieved  To obtain a safe as well as a quick and cost effective work The Work Permit System : With who?? The Work Permit must be prepared with:  The person responsible for the work  The person(s) in charge of the production, the customer or supplier, who will release the process before the work starts  The other work bodies  The person in charge of HSE measures  The Work Permit System : How? Before issuing the Work Permit, you must: – Describe the work to be done – List all the specifications and drawings which are required – Issue detailed planning with all involved entities – Determine the logging and tagging procedures  Fill-in together the work permit and sign,  The start of the work must be authorized by production and/or user,  The re-start of the process must take place after the work is finished. Review of Flow sheets, drawings and specifications Purpose of the review is to ensure all key persons involved in job planning have a thorough understanding of the job. It should include:  Process fluids and materials involved,  Degree of isolation,  Effect of other processes,  Power supply isolation, tagging,  Specialist advice,  Location of underground services and pipes, Review of Flow sheets, drawings and specifications  Location of elevated pipelines and walkways,  Purging and lock-out requirements,  Pressure, Temperature,  Valve identification,  Equipment specification,  Operating and maintenance instructions,  Materials of construction and compatibilities Work site inspection  To inspect the work area – Neighbouring activities, overhead, underground, access, natural hazards etc,..  To identify potential hazards – Flammable, oxygen, toxic substances, confined spaces, electricity, pressure, temperature, moving objects, traffic, falls/trips/slips, etc,..
  • 3. Page 3 of 4 B C das Development of work procedures  The procedure should include: – Logging and tagging procedures: Electricity, process fluids Instrumentation, utilities (water, air, oil,…) – Depressurising, Draining, Venting, Purging, Flushing, Isolating, Atmosphere checking, Disassembly of equipment, Method of repair, Reassembly and installation, Quality control, Pressure and leak testing, Reinstatement of equipment, Hand-back procedure, etc.. The Work Permit System : Work Planning  Work Scope  Review Drawings / Flowsheets  Inspect Worksite  Identify Safety Precautions  Compliance With Regulations  Develop Work Procedure  Assign Responsibilities  Communication Procedures  Work Execution The Work Permit System : Work Execution  Preparatory Work  Issue Work Permits  Supervision Monitoring  Work Completed  Testing  Re-instate Equipment  Return Work Permit  Handback Plant / Equipment  Confined Space Entry  Excavations  Blasting  Line Breaking The Work Permit System : In brief Many accidents have occurred due to lack of Work Permit or non observance of its consigned safety measures. • The Safe Work Permit is useful for: – The safety of persons in charge of the work – The safety of persons in charge of the process – The risk management of the process and equipment – Fill in and follow correctly the work permit, because…. It could save your life!
  • 4. Page 4 of 4 B C das Safe Work Permits : Features Of Work Permit Form Work Permit form generally consists of the following features: THE ORIGINIAL AND COPIES Original is unmarked and belongs to “Executing Authority”-pink copy Printed serial number FORM NO. …..…... Procedure For Work Permit System(wps) • Permit In Printed Form • Separate Permit For Cold & Hot Work • Separate Permit For Elect / Mech Work • Permit Colour Coded with Serial Number • Permit Initiation By (name , Desgn, signature) • All Permits To Be In Writing • Work Order No. To Be Mentioned On Permit • Location Drawing/Sketch To Be Given Along With Permit. • Risk Evaluation Checklist To Be Ticked By Issuer Who Can Sign A Work Permit Personnel who are authorized to sign on the Work Permit shall have thorough knowledge of the work to be performed and the conditions under which the work will be performed. Issuing Authority Of Work Permit Issuing authority is responsible for preparation and handing over of the equipment in safe condition to perform the work. Authority to issue all types of work permits is generally granted to shift supervisor or Officers and above. Executing Authority of Work Permit Request for a work permit by executing authority. He shall indicate types of tools and equipment necessary for performing the work. He shall also ensure his tools, equipment and accessories are in good condition and all his workers are provided with proper PPE. Electrical Isolation Before issuing a Work Permit, it is essential to ensure that the equipment / facility to be worked on is electrically safe and electrical power is isolated to the extent necessary for the safe conduct of the authorized work. Issuing, Executing authorities and Electrical Maintenance shall jointly decide the extent of isolation required. – „DO NOT OPERATE‟ tag shall be used when isolation by local switch is decided as adequate protection. – Multi-lock systems to be used when different crafts are involved.(this is towards best safety practices)